JCC JC71276UGR Installation Instructions

company
Installation Sheet
595
595
10.5
Supply
Ceiling Grid
a
Please read these instructions before
installation and retain for future reference
Prole & Dimensions
Important Information
SKYTILE® RANGE
JC71276UGR
600 X 600 LED PANEL
Light source:
Total circuit Wattage:
Luminous ux:
Colour temp:
Available in white only
Driver
220-240V 50/60Hz / Class II
Fig. 1 Mains Input Cable
Luminaire
Integral LED 28W 2700 lumens
96 LpcW
4000K/4700K
Ra:
80
Neutral: Blue
Live: Brown
Please read these instructions before installation and retain for future reference. It is recommended
that luminaires are installed by a qualied electrician to ensure the installation complies with the current IEE wiring regulations BS7671: 2008. Any broken or damaged parts should be replaced as soon as possible. JCC will not accept responsibility for claims arising from sub-standard installations. This product is for indoor use only, and should not be covered by any insulated material. The light
source of this luminaire is not replaceable : when the light source reaches its end of life, the whole of the luminaire shall be replaced.
Installation Note
It may be necessary to uprate your MCBs to allow for increased inrush current.
Installation Procedure
Read instructions and check you have all the tools and accessories required to complete the installation correctly. Isolate power supply before starting the installation.
1. Remove the ceiling tile from the location where you wish to install the LED Panel.
2. Wire the LED Driver to the mains supply. Refer to Fig.1 for details.
3. Move LED Panel into the ceiling aperture and when positioned halfway connect the Driver to the LED Panel and select the required colour temperature of 4000K or 4700K (Fig. 2).
4. View on inside of ceiling void showing LED Panel in position with the Driver positioned on top of it.
5. Reconnect mains power supply.
Mains
Driver
Positioning
LED Panel
All dimensions in millimetres
Suspension Mounting
JCC can also supply
a Wire Suspension Kit for applications where a ceiling grid is not available
Ordering Code: JC71311
Ceiling Fix
Suspension
Wire
700mA/43-54V DC / Class III
Fig. 2: Plug & Play Connectors
4000K
4700KDriver
RoHS
Compliant IP44
Registered Firm Certicate No. GB 1552
Drg No. JC71276UGR-IS Issue: A - 24.07.17 - KB
JCC Lighting Products Ltd. Innovation Centre Beeding Close Southern Cross Trading Estate Bognor Regis West Sussex PO22 9TS Technical Support: 01243 838986 Customer Services: 01243 838999
BS EN ISO9001 - 2008
Note: DO NOT carry out insulation tests with the driver connected to the circuit. The external exible cable cord of this luminaire cannot be replaced: if the cord is damaged the luminaire should be decommissioned and destroyed.
Important Warranty Information
Skytile is supported by a 2 year on site warranty, plus our 5 year extended commercial warranty, to provide a total of 7 years of assured quality and performance. (2 year on site warranty applies from date of purchase for UK installations only)
Please register at the address below; The installer will be asked to provide the following information, which is detailed on a label attached to the luminaire’s chassis:
· Product Code Batch Code.
jcc.co.uk
Surface Mounting JCC can also supply a Surface Mounting Tray.
Ordering Code: JC71262.
Please ensure there
is adequate clearance around the tting to
allow access to the panel.
Panel Fixing
Bracket
Panel
LED
Loading...