OPERATOR’S MANUAL TP1044S5XXXXXXXX
INCLUDING: OPERATION, INSTALLATION AND MAINTENANCE.
INCLUDE MANUALS: AF1044SXXXXXX-XX-X Extrusion Pump (pn 97999-1522), 66516-X Follower Assembly
(pn 97999-854), 67195-X Follower Assembly (pn 97999-841), RM552S-XX Heavy Duty Two Post Lift / Ram (pn
97999-1445), & S-636 General Information (pn 97999-636).
RELEASED: 5-12-10
(REV. 01)
10” AIR MOTOR
44:1 RATIO
6” STROKE
EXTRUSION PUMPING SYSTEM
For use with 55 gallon drums
READ THIS MANUAL CAREFULLY BEFORE INSTALLING,
OPERATING OR SERVICING THIS EQUIPMENT.
It is the responsibility of the employer to place this information in the hands of the operator. Keep for future reference.
SERVICE KITS
104468 for repair of lter section of P39124 -100 lter / regulator.
104302
104326 for repair of lter section of P39344 -100 lter/regulator..
637489 for repair of air motor section.
637466 for repair of lift / ram seals.
637348-XXD for repair of lower pump end section.
for repair of regulator section of P39124-100 lter / regulator.
The original language of this manual is English.
TP10445SXXXXXXXX EXTRUSION SYSTEM
MODEL DESCRIPTION CHART
TP 10 44 S 5 XXXXX XX X
Packing Type
TP - Two Post
Air Motor Size
10 - 10”
Pump Ratio
44 - 44 : 1
Check Type / Wetted Materials
S - Primer Piston, Carbon Steel Nickel-Plated
Container Suitability
55 Gallon (400 lbs)
Pump Options
Refer to pump Operator’s Manual
Follower Assembly
AC - 66517 TB - 66517-7 TN - 67196-6
AA - 66517-1 AM - 67196-1 TV - 67196-7
AB - 66517-2 AN - 67196-2 AS - 67196-8
TC - 66517-5 AV - 67196-3 TS - 67196-9
TA - 66157-6 TM - 67196-5
Package Options
0 – None - Basic control for Ram only
2 - Advanced Pump and Ram controls
Figure 1
GENERAL DESCRIPTION
By delivering a smooth, continuous bead of the proper size, an
ARO® system helps the operator maintain both production rate
and produce high quality standards. Maintained quality standards
assures that the material bene ts are realized. To further maximize
operator production time, the ARO system has a built-in lift / ram
feature for quick and easy drum changeover and easy lifting of the
pump assembly from the container.
ARO systems are totally enclosed, sealing the material in the system from air and moisture, preventing premature cure-out of the
material. This allows for either continuous or intermittent use of the
system and allows the need for daily system clean-up.
INGERSOLL RAND COMPANY LTD
209 NORTH MAIN STREET – BRYAN, OHIO 43506
(800) 495-0276 y FAX (800) 892-6276
www.ingersollrandproducts.com
© 2010 CCN 15339062
INSTALLATION
The TP1044S5XXXXXXXX Extrusion System comes completely
assembled. Remove the unit from the crate and place on a level
surface. Install the material hose and dispensing device as required.
When the following instructions are observed, heavy paste
OPERATING INSTRUCTIONS
OPERATING INSTRUCTIONS / INITIAL SET-UP PROCEDURE
WARNING
Read the warnings on page 3 of RM552S-XX Two Post Lift / Ram
Operator’s Manual.
Stand clear when raising or lowering the lift.
AIR CONTROLS
Pump air supply valve
Ram air iter /
regulator
Gauge
(1/4 - 18 N.P.T.)
Air Inlet
materials can be pumped directly from their original drum
without air inclusion or excessive waste. The follower plate creates
an air tight seal as well as clean-wiping action in its progressive
downward movement into the drum.
place and center an opened drum of material on the lift / ram
base and securely against the barrel guides, adjusting if necessary.
Lubricate the lower follower wiper plate seal with grease. NOTE:
6.
Make certain the grease is compatible with the material being
dispensed. This ensures a smooth t into the drum, as well as
prevents curing type compounds from bonding to the seal.
Check the vent plug on the follower plate to be sure it easily
7.
threads in and out. It is recommended to lubricate the threads
of the plug to help prevent possible set-up of the compound at
this point.
TO LOWER LIFT:
WARNING
PINCH HAZARD. Follower can descend quickly,
causing injury. Keep hands clear when aligning with container. Read the warnings on page 3 of RM552S-XX Two Post
Lift / Ram Operator’s Manual.
NOTE: Be certain the follower plate vent plug has been removed
so that the air trapped between the follower and the material is allowed to escape from this vent.
Control Lever
Follower Plate
Air Supply Valve
Figure 2
TO RAISE THE LIFT, (the rst time):
Take note of the pump / drum clearance above. Be certain the
1.
lift / ram is clear of any objects above. Also, refer to “Operating
and Safety Precautions” found on page 3 of RM552S-XX Two
Post Lift / Ram Operator’s Manual.
Connect the air supply (100 p.s.i. max.) to the air inlet. Adjust
2.
the air pressure on the lift / ram pressure regulator (turn the
knob clockwise) to 30 - 40 p.s.i. (2.1 - 2.8 bar).
Shift the control valve lever to the “up” position.
3.
Raise the lift / ram high enough to clear the height of the drum.
4.
Stop the lift upward travel by moving the control valve lever to
the “neutral” (center) position.
Once the lift / ram assembly and pump are in the “up” position,
5
.
NOTE: The lift / ram may hesitate momentarily before starting
downward. The air pressure inside the post air chamber must decrease before it will begin to descend.
1.
Shift the control valve lever to the “down” position and proceed
to lower the pump.
2.
Replace the vent plug once the material begins to ooze from
the vent opening.
3.
The unit is now ready for operation. Adjust the air pressure
on the pump lter / regulator (turn the pump regulator knob
clockwise) until the pump begins to cycle.
4.
Trigger the gun to prime the pump with material.
TO RAISE LIFT, (normal operation):
1.
Adjust the follower plate air valve pressure up to approximately
8 p.s.i.g. (0.55 bar). DO NOT OVER PRESSURIZE THE DRUM to
avoid damage. NOTE: Air from this valve will only pass when
the control lever is in the “up” position.
2.
Shift the control valve lever to the “up” position.
3.
Raise the lift / ram high enough to clear the height of the drum.
Stop the lift upward travel by moving the control valve lever to
the “neutral” (center) position.
TO CHANGE THE DRUM:
NOTE: The control valve lever must be in the “neutral” position.
1.
Remove the old drum.
2.
Place and center a new drum into position.
Page 2 of 8 TP1044S5XXXXXXXX (en)
Y45-9-C Reducing
Bushing
Y43-5-C Pipe
PARTS LIST / TP1044S5XXXXXXXX
94810 Muer
AF1044S1XXXX Pump
Assembly
Y44-65-C Nipple
96927 Elbow
RM552S-XX Two Post
Lift / Ram
Y6-66-C
Screw (4)
Y12-106-C Nut (4)
Y14-616 Lock
Washer (4)
Y6-65-C Screw (4)
Y12-6-C Nut (4)
Y14-616 Lock
Washer (4)
92362 Bracket (2)
(see page 4 for Bracket
Assembly)
96614 (1 1/4-11 1/2 NPT)
Nipple
Y43-317-C
Elbow
Y99-84-C Screw (3)
Follower Assembly
(see model description
chart on page 1)
(1 1/4-11 1/2 NPT)
94980-XXX-X
Tubing
(5/16” o.d. x 44”)
94980-100 Bulk Tubing
(5/16” o.d. x 100”)
59474-158 Connector
Figure 3
TP1044S5XXXXXXXX (en) Page 3 of 8