Huawei NE20E-S2 User Manual

Introduction to the NE20E-S2
NE20E-S2 Hardware Quick Installation Guide
综合运营商面
Ground terminal
Cable tray
DC power module
Rack-mounting ear
Fan module
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
5cm
5cm
Environmental requirements
Installation Tools
Rack-Mounting Ear and Cable Tray Installation Guide
Installing the NE20E-S2
Installing the NE20E-S2 in the Cabinet
How to Install the NE20E-S2 Rack-Mounting Ear
How to Install the Cable Tray
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
1
2
Installing Cables
Heat dissipation requirements
Marker Screwdriver Cable cutter Wire stripper
ESD gloves Cable tester Multimeter Ladder
Diagonal pliers Crimping tool
Network cable crimping pliers
ESD wrist strap
85%RH
45°C
0°C - 45°C Damp Accumulated
water
Dust5% - 85%RH
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
2
1
1 Install the removed mounting ears in the middle of side panels of the NE20E-S2 .
2 Installi mounting ears for the 21-inch cabinet.
3 Connect the ground cable to the NE20E-S2 before installing the NE20E-S2 into a cabinet.
4 Install the NE20E-S2 into the cabinet.
5 Install the cable tray.
1 Install ground cables.
2 Install power cables.
3 Install network cables.
4 Install optical fibers.
5 Install E1 cables.
Part 3
Part 1
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
1
2
1
2
Part 3
Part 1
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
PSU-DC
NEG(-)
IN
-48V -60V
OUT
Air exhaust
vent
Air intake
vent
Part 3
Part 1
F1
PHONE
ALMO
ALM1
FE1
FE2
FE3
FE4
STAT
SRV
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
FE1
FE2
FE3
FE4
Part 3
Part 1
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
100mm (3.94 in.)
1
2
Corrugated
pipe
Electrical tape
Part 3
Part 1
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
2
1
Part 3
Part 1
E1(0-15)
STAT
SRV
ML1
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
E1(0-15)
2
1
This document takes installing the NE20E-S2 into a 21-inch N63B cabinet as an example.
Wear an ESD wrist strap or ESD gloves before installing the NE20E-S2 .
ESD
● The normal DC power distribution voltage ranges from -40 V DC to -72 V DC.
● Do not install power cables when the power is on.
Use a network cable tester to test cable connectivity.
!
All cables must be routed through the cable tray. Ensure that cables block no fan modules.
!
● The bending radius of an optical fiber must be greater than 40 mm.
● To mark and reinforce the edges of the pipe, wrap electrical tape around both ends.
● Lead the corrugated pipe about 100 mm in to the cabinet through the top opening.
!
X4
Floating nuts
For 23-inch cabinetFor 21-inch cabinetFor 19-inch cabinet
For the middle-column cabinet, install the rack-mounting ear in location 1. For the front-column cabinet, install the rack-mounting ear in location 2.
Part 3
PSU-DC
NEG(-)
IN
-48V -60V
OUT
AUX
CON
BITS0 BITS1
SATAT
RESET
PSU-DC
NEG(-)
IN
-48V -60V
OUT
STAT
L/A0
L/A1
L/A2
L/A3
STAT
L/A0
L/A1
L/A2
L/A3
ESD
FAN
Part 1
Part 3
Part 1
21-inch middle-column cabinet19-inch front-column cabinet
23-inch middle-column cabinet
Part 3
Part 1
Part 1
21-inch front-column cabinet 23-inch front-column cabinet
Part 1
Part 1
Issue: 02 Date: 2014.09.30
For more information, please visit http://support.huawei.com
Loading...