Honeywell Excel 5000 Open System, Excel 5000 Open System 10 FTT/LPT 209541 B Installation Instructions Manual

Excel 10 FTT/LPT 209541 B
BEFORE INSTALLATION
E-Bus Free Topology Transceiver (FTT)/Linked Power Transceiver (LPT) networks require termination. Depending on the network topology, one or more FTT/LPT Termination Modules may be required, see Fig. 1. If an FTT Repeater or a LPT device is required in the network, their on-board terminators can be used in place of the 209541 B Termination Module. Refer to the
E-Bus Wiring Guidelines
form 74-2865, for complete rules on network topology and termination module locations. Refer to the
Repeater Installation Instructions
, form 95-7555, for
Q7740A,B FTT
information on enabling the on-board network terminators. FTT networks are very flexible and convenient for installation and maintenance. However it is imperative to carefully plan the network layout, and create and maintain accurate layout documentation.
TERMINATION MODULE
,
Fig. 1. 209541 B FTT/LPT Termination Module
INSTALLATION
The FTT/LPT Termination Module can be attached to the network at a controller node (the easiest place); In a wall
.
module that is attached to standard utility junction box (the
module will not fit in a 60 mm junction box); At a wiring junction (using wire nuts). See Fig. 6 when connecting two wires at a controller or wall module terminal. If the termination module must be located at a surface mounted wall module, and does not fit inside the wall module
housing, extend a pair of E-Bus wires from the wall module
back to the nearest junction box or controller, and wire in the termination module. The module has three lead wires,
but only two are attached to the E-Bus network .To install the termination module, connect the brown and yellow wires to the E-Bus when the network requires
termination
; connect the brown and orange to the E-Bus
when the network requires double termination
single
. In either case, always cover the unused wire with a wire nut to prevent potential grounding problems. As with other E-Bus connections, polarity is not important. Fig. 2 shows the module attached to typical FTT/LPT network topologies for
single termination
a
.
Fig. 2. FTT/LPT termination module wiring for
termination
network topologies
.
single
®
U.S. Registered Trademark
Copyright
1997 Honeywell Inc. • All Rights Reserved
©
EXCEL 10 FTT/LPT 209541 B TERMINATION MODULE
Fig. 3 shows the physical connection of the module for a single termination network. Fig. 4 shows the modules attached to a typical FTT/LPT network for a
termination
. Fig. 5 shows the physical connection of the
double
modules for a double termination network. Double termination is only applicable when a network is wired in a daisy-chain topology and the total wire length is greater than 1640 ft (500m). Refer to the
E-Bus Wiring Guidelines
form 74-2865, for complete rules on network topology and termination module locations.
Fig. 3. Physical connection of module for a
termination
BROWN
network
YELLOW
ORANGE
.
E-BUS
M12200
single
,
Fig. 4. FTT/LPT termination module wiring for
termination
BROWN
ORANGE
YELLOW
network topology
E-BUS E-BUS
BROWN
ORANGE
YELLOW
Fig. 5. Physical connection of modules for a
termination
network
.
double
.
M12201
double
1/2
(13)
1. STRIP 1/2 IN. (13 MM) FROM WIRES TO BE ATTACHED AT ONE TERMINAL. WITH PLIERS (A MINIMUM
Fig. 6. Attaching two wires at controller or wall module terminals.
2. TWIST WIRES TOGETHER
OF THREE TURNS).
3. CUT TWISTED END OF WIRES TO 3/16 IN. (5 MM) BEFORE INSERTING INTO TERMINAL AND TIGHTENING SCREW. THEN PULL ON EACH WIRE IN ALL TERMINALS TO CHECK FOR GOOD MECHANICAL CONNECTION.
M8945
NOTE: The termination module is outside of the scope of the EMC directive and therefore does not require CE marking. This is
because the termination module is an RC filter (with only passive components.
Home and Building Control Home and Building Control
Honeywell Inc. Honeywell Plaza
Honeywell Limited-Honeywell Limitee
155 Gordon Baker Road P.O. Box 524 North York, Ontario D-71101 Schomaich Minneapolis, MN 55408-0524
M2H 3N7
Home and Building Control Products
Honeywell AG
Boblinger Straβe 17
Phone (49-7031) 637-01 Fax (49-07031) 637-493
95-7554 J.D. 3-97
Printed in Mexico
Loading...