30/40G(CE) International
ECLIPSE™ ERGONOMIC
TILTING BRAISING PAN
· Stainless Steel
· Manual Tilt
· Gas Heated
THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE.
READ, UNDERSTAND AND FOLLOW THE INSTRUCTIONS AND
WARNINGS CONTAINED IN THIS MANUAL.
FOR YOUR SAFETY
Do not store or use gasoline or other ammable vapors
and liquids in the vicinity of this or any other appliance.
POST IN A PROMINENT LOCATION
Instructions to be followed in the event user smells gas.
This information shall be obtained by consulting your
local gas supplier. As a minimum, turn o the gas and
call your gas company and your authorized service
agent. Evacuate all personnel from the area.
WARNING
Improper installation, adjustment, alteration, service
or maintenance can cause property damage, injury or
death. Read the installation, operating and maintenance
instructions thoroughly before installing or servicing this
equipment.
NOTIFY CARRIER OF DAMAGE AT ONCE
It is the responsibility of the consignee to inspect the container upon receipt of
same and to determine the possibility of any damage, including concealed dam-
age. Unied Brands suggests that if you are suspicious of damage to make a
notation on the delivery receipt. It will be the responsibility of the consignee to le
a claim with the carrier. We recommend that you do so at once.
Manufacture Service/Questions 888-994-7636.
Information contained in this document is known to be current and accurate at the time
of printing/creation. Unified Brands recommends referencing our product line websites,
unifiedbrands.net, for the most updated product information and specifications.
PART NUMBER 160812, REV. H (02/15)
1055 Mendell Davis Drive
Jackson, MS 39272
888-994-7636, fax 888-864-7636
unifiedbrands.net
IMPORTANT - READ FIRST - IMPORTANT
THESE APPLIANCES MUST BE INSTALLED BY A COMPETENT PERSON IN CONFORMITY WITH THE INSTALLATION AND
SERVICING INSTRUCTIONS AND NATIONAL REGULATIONS IN FORCE AT THE TIME. PARTICULAR ATTENTION MUST BE
PAID TO THE FOLLOWING:
I. E. E. REGULATIONS FOR ELECTRICAL INSTALLATIONS
ELECTRICITY AT WORK REGULATIONS
GAS SAFETY (INSTALLATION & USE REGULATIONS
HEALTH AND SAFETY AT WORK ACT
FIRE PRECAUTIONS ACT
LOCAL AND NATIONAL BUILDING REGULATIONS
DETAILED RECOMMENDATIONS ARE CONTAINED IN INSTITUTE OF GAS ENGINEERS PUBLISHED DOCUMENTS: IGE/UP/1,
IGE/UP/2, BS6173 AND BS5440.
THESE APPLIANCES HAVE BEEN CE-MARKED ON THE BASIS OF COMPLIANCE WITH THE GAS APPLIANCE DIRECTIVE,
EMC AND LOW VOLTAGE DIRECTIVE FOR THE COUNTRIES, GAS TYPES AND PRESSURES AS STATED ON THE DATA
PLATE.
WARNING: TO PREVENT SHOCKS, ALL APPLIANCES WHETHER GAS OR ELECTRIC, MUST BE EARTHED.
ON COMPLETION OF THE INSTALLATION, THESE INSTRUCTIONS SHOULD BE LEFT WITH THE ENGINEER-IN-CHARGE
FOR REFERENCE DURING SERVICING. FURTHER TO THIS, THE USERS INSTRUCTIONS SHOULD BE HANDED TO THE
USERS AND THE INSTALLER SHOULD INSTRUCT THE RESPONSIBLE PERSON(S) IN THE CORRECT OPERATION AND
MAINTENANCE OF THE APPLIANCE. EMPHASIS SHOULD BE MADE WITH REGARD TO SAFE OPERATION OF DRAIN VALVE.
IT IS MOST IMPORTANT THAT THESE INSTRUCTIONS BE CONSULTED BEFORE INSTALLING AND COMMISSIONING THE
APPLIANCE. FAILURE TO COMPLY WITH THE SPECIFIED PROCEDURES MAY RESULT IN DAMAGE OR THE NEED FOR A
SERVICE CALL.
CAUTION: SHIPPING STRAPS ARE UNDER TENSION AND CAN SNAP BACK WHEN CUT.
CAUTION: UNIT WEIGHS 420 TO 560 LB. (165 TO 255 KG). FOR SAFE HANDLING, INSTALLER SHOULD OBTAIN HELP AS
NEEDED, OR EMPLOY APPROPRIATE MATERIALS HANDLING EQUIPMENT (SUCH AS A FORKLIFT, DOLLY,
OR PALLET JACK) TO REMOVE THE UNIT FROM THE SKID AND MOVE IT TO THE PLACE OF INSTALLATION.
WARNING: INSTALLATION OF THE BRAISING PAN MUST BE DONE BY PERSONNEL QUALIFIED TO WORK WITH GAS
AND ELECTRICITY. IMPROPER INSTALLATION CAN RESULT IN INJURY TO PERSONNEL AND/OR DAMAGE
TO EQUIPMENT.
WARNING: THIS UNIT IS DESIGNED FOR COMMERCIAL USE. NEVER USE HOME OR RESIDENTIAL GRADE GAS
CONNECTIONS. THEY DO NOT MEET GAS CODES AND COULD BE HAZARDOUS.
DANGER: ELECTRICALLY GROUND THE UNIT AT THE TERMINAL PROVIDED. FAILURE TO GROUND UNIT COULD
RESULT IN ELECTROCUTION AND DEATH.
WARNING: KEEP THE APPLIANCE AREA FREE AND CLEAR OF COMBUSTIBLE MATERIALS.
CAUTION: BE SURE ALL OPERATORS READ, UNDERSTAND AND FOLLOW THE OPERATING INSTRUCTIONS,
CAUTIONS AND SAFETY INSTRUCTIONS CONTAINED IN THIS MANUAL.
CAUTION: THE BRAISING PAN IS NOT INTENDED FOR USE AS A DEEP-FAT FRYER. SHALLOW-FRYING IS PERMISSIBLE
AS LONG AS THE OIL LEVEL DOES NOT EXCEED THE HEIGHT MARK ON THE LOWER REAR WALL (50 MM
MAXIMUM). SEE THE USER INSTRUCTIONS SECTION FOR SPECIFIC DETAILS.
CAUTION: KEEP FLOORS IN BRAISING PAN WORK AREA CLEAN AND DRY. IF SPILLS OCCUR, CLEAN IMMEDIATELY TO
AVOID THE DANGER OF SLIPS OR FALLS.
2 OM-BPM-G
IMPORTANT - READ FIRST - IMPORTANT
WARNING: WHEN TILTING BRAISING PAN FOR PRODUCT TRANSFER:
1) USE CONTAINER DEEP ENOUGH TO CONTAIN AND MINIMIZE PRODUCT SPLASHING.
2) PLACE CONTAINER ON STABLE, FLAT SURFACE, AS CLOSE TO PAN AS POSSIBLE.
3) STAND TO SIDE OF PAN WHILE POURING — NOT DIRECTLY IN POUR PATH OF HOT CONTENTS.
4) RETURN PAN BODY TO LEVEL POSITION AFTER CONTAINER IS FILLED OR TRANSFER IS COMPLETE.
5) DO NOT OVER FILL CONTAINER. AVOID DIRECT SKIN CONTACT WITH HOT CONTAINER AND ITS
CONTENTS.
WARNING: DO NOT HEAT AN EMPTY PAN FOR MORE THAN 5 MINUTES AT A SETTING HIGHER THAN 300ºF (150ºC).
WARNING: IF THE PAN CONTAINS ITEMS IN SAUCE OR MELTED FAT, THEY CAN SLIDE FORWARD SUDDENLY DURING
TILTING AND CAUSE THE HOT LIQUID TO SPLASH OUT.
WARNING: AVOID ALL DIRECT CONTACT WITH HOT FOOD OR WATER IN THE PAN. DIRECT CONTACT COULD RESULT
IN SEVERE BURNS.
WARNING: IT IS RECOMMENDED THAT WATER AND SOLUTIONS BE KEPT OUT OF CONTROLS AND BURNERS. DO
NOT USE HIGH PRESSURE SPRAY DIRECTLY ON THE CONTROL CONSOLE, ELECTRICAL CONNECTIONS
AND BURNERS. USE A GARDEN HOSE SPRAY CONNECTED TO CITY WATER SUPPLY.
CAUTION: MOST CLEANERS ARE HARMFUL TO THE SKIN, EYES, MUCOUS MEMBRANES AND CLOTHING.
PRECAUTIONS SHOULD BE TAKEN TO WEAR RUBBER GLOVES, GOGGLES OR FACE SHIELD AND
PROTECTIVE CLOTHING. CAREFULLY READ THE WARNINGS AND FOLLOW THE DIRECTIONS ON THE
LABEL OF THE CLEANER TO BE USED.
WARNING: BEFORE REPLACING ANY PARTS, DISCONNECT THE UNIT FROM THE ELECTRIC POWER SUPPLY AND
CLOSE THE MAIN GAS COCK. ALLOW FIVE MINUTES FOR UNBURNED GAS TO VENT. FAILURE TO
DISCONNECT COULD RESULT IN ELECTROCUTION AND DEATH.
CAUTION: USE OF ANY REPLACEMENT PARTS OTHER THAN THOSE SUPPLIED BY GROEN OR AUTHORIZED
DISTRIBUTORS CAN CAUSE INJURY TO THE OPERATOR AND DAMAGE TO THE EQUIPMENT AND WILL
VOID ALL WARRANTIES.
IMPORTANT: SERVICE PERFORMED BY OTHER THAN FACTORY AUTHORIZED PERSONNEL WILL VOID ALL
WARRANTIES.
OM-BPM-G 3
Table of Contents
Important Operator Warnings ....................................................page 2-3
Service Log .................................................................................. page 35
References
CANADIAN STANDARDS ASSOCIATION
8501 East Pleasant Valley Road
Cleveland, Ohio 44131
Z83-11 - Gas Foodservice Equipment
Z223.1 - National Fuel Gas Code
AMERICAN NATIONAL STANDARDS INSTITUTE
1403 Broadway
New York, New York 10018
CANADIAN GAS ASSOCIATION
55 Scarsdale Road
Don Mills, Ontario M3B 2 R3
NATIONAL FIRE PROTECTION ASSOCIATION
60 Battery March Park
Quincy, Massachusetts 02269
NFPA/54 - Installation of Gas Appliances & Gas Piping
NFPA/70 - The National Electrical Code
NFPA/96 - Ventilating Hoods
NSF INTERNATIONAL
789 N. Dixboro Road
P.O. Box 130140
Ann Arbor, Michigan 48113-0140
4 OM-BPM-G
UNDERWRITERS LABORATORIES, INC.
333 Pngsten Road
Northbrook, Illinois 60062
Equipment Description
Groen gas-heated Eclipse Ergonomic Tilting Braising Pans provide a stainless steel
pan equipped with patented heat transfer fins, burner/combustion chamber, handoperated or electric powered tilting mechanism, thermostatic controls, and hinged
cover. The appliance serves as braising pan, griddle, fry pan, oven, kettle, bainmarie
and food warmer/server, can be adapted for use as a non-pressure steamer and can
be used to stir-fry, reheat and saute foods.
The pan body is made from heavy-duty stainless steel welded into one solid piece,
with a polished interior and exterior. A pouring lip is welded to the front wall. The
cooking surface is a stainless steel clad plate fitted with welded heat transfer
fins which assure uniform heat transfer over the entire surface. The gas burner/
combustion chamber supplies the heat.
An easily operated worm and gear mechanism tilts the pan and provides precise
control for pouring or dumping the contents of the pan. This hand-wheel controlled
mechanism is located in a stainless steel console to the right of the pan body. For
models with electric power tilt, a switch operates an electric motor that starts and
stops the pan tilt smoothly. To assist cleaning, the pan body can be tilted past the
vertical position. When the pan is tilted, the burners shut off automatically.
The thermostat provides automatic control of cooking temperature. Operating the
thermostat dial on the front of the control console turns the heat on or off and sets the
pan temperature.
Model
BPM-15G
BPM-30G
BPM-40G
A vented, heavy gauge, one-piece, stainless steel cover with a condensate drip shield
on the rear edge is standard on the Braising Pan. A fully enclosed, torsion bar type
counterbalance provides easy operation to open the cover and to maintain it open at
any position. The cover opens to the back and is hinged to the frame, so it moves
independently of the pan body.
The braising pan is mounted on an open-leg frame fabricated from tubular stainless steel
Models have an ignition system that uses electronic spark ignition.
Optional equipment available with these models are:
1. Fill faucet with swing spout (left or right mounted) - specify single or double
pantry
2. Fill faucet with 48” or 60” spray hose assembly (left or right mounted) - specify
single or double pantry
3. Caster mounting kit
4. Flanged feet
5. 2” Tangent draw-off (factory-installed must be indicated on initial order)
6. Steamer insert set
7. Steamer pan carrier (30- and 40-gallon models only)
8. Quick gas disconnect with restraining cable
9. Pouring lip strainer
10. Strainer for 2” TDO valve
6 OM-BPM-G
Inspection & Unpacking
CAUTION
SHIPPING STRAPS ARE UNDER TENSION
AND CAN SNAP BACK WHEN CUT.
CAUTION
UNIT WEIGHS 420 TO 560 LB (190 TO 255
KG). FOR SAFE HANDLING, INSTALLER
SHOULD OBTAIN HELP AS NEEDED, OR
EMPLOY APPROPRIATE MATERIALS
HANDLING EQUIPMENT (SUCH AS A
FORKLIFT, DOLLY, OR PALLET JACK) TO
REMOVE THE UNIT FROM THE SKID AND
MOVE IT TO THE PLACE OF INSTALLATION.
The unit is strapped to a skid, and shipped in
a heavy cardboard carton. (Shown is a model
BPM-40G with optional right side mounted,
double pantry faucet assembly.)
The unit will arrive completely assembled, wrapped in protective plastic on a heavy skid,
in a heavy cardboard carton. Immediately upon receipt, inspect the carton for damage.
Report any apparent shipping damage or an incorrect shipment to the delivery agent.
When installation is to begin, get someone to assist in removing the carton. Lift it straight
up and away from the unit. Do not simply raise it and push backwards - it will break
the cover assembly vent handle. Write down the model number, serial number, and
installation date of your unit, and keep this information for future reference. Space for
these entries is provided at the top of the Service Log in this manual.
Cut the straps holding the unit on the skid, and lift the unit straight up off the skid.
Flame Observation Port
OM-BPM-G 7
Installation
CAUTION
INSTALLER MUST VERIFY THAT THE
INSTALLATION COMPLIES WITH THE
APPLICABLE LOCAL CODES AND
REGULATIONS.
WARNING
INSTALLATION OF THE BRAISING PAN
MUST BE DONE BY PERSONNEL QUALIFIED
TO WORK WITH GAS AND ELECTRICITY.
IMPROPER INSTALLATION CAN RESULT IN
INJURY TO PERSONNEL AND/OR DAMAGE
TO EQUIPMENT.
WARNING
THIS UNIT IS FOR COMMERCIAL USE.
NEVER USE HOME OR RESIDENTIAL GRADE
GAS CONNECTIONS. THEY DO NOT MEET
GAS CODES AND COULD BE HAZARDOUS.
WARNING
ELECTRICALLY GROUND THE UNIT AT
THE TERMINAL PROVIDED. FAILURE
TO GROUND UNIT COULD RESULT IN
ELECTROCUTION AND DEATH.
The following information pertains to the CE model BPM-G, and replaces or augments
the information provided in OM-BPM. These appliances must be installed by a
competent person in conformity with the installation and servicing instructions and
national regulations in force at the time. Particular attention must be paid to the
following:
I. E. E. Regulations for Electrical Installations
Electricity at Work Regulations
Gas Safety (Installation & Use Regulations
Health and Safety at Work Act
Fire Precautions Act
Local and National Building Regulations
Detailed recommendations are contained in institute of gas engineers published
documents: IGE/UP/1, IGE/UP/2, BS6173 AND BS5440.
1.Installing Clearances
Left Side
Right Side
Rear
Minimum
Clearance
0mm
0mm
77mm305mm (12”) for service
51mm (2”) for service, 153mm (6”) when faucet is
installed on left side
305-405mm (12-16”), 153mm (6”) when faucet is
installed on right side
Recommended Clearance
Electronic spark ignition
A. Vertical clearance of at least 1000 mm should be allowed between the top
edge of the flue outlet and any overlying surface.
B. Adequate ventilation, whether natural or mechanically induced, must be
provided to ensure a supply of fresh air for gas combustion, and to facilitate
effective removal of the products of combustion.
C. Ventilation recommendations for catering appliances are provided in BS
5440:2. Furthermore, guidance on the column of ventilation air required for
different types of catering equipment to ensure sufficient room ventilation
is provided at right.
D. For multiple installations, the requirements for individual appliances should
be added together. Installation should be made in accordance with local
and national regulations applying at the time. A competent installer must
be employed.
E. The appliance flue discharges horizontally from the rear of the unit. It
must not be directly connected to any flue, mechanical extraction system,
ducting, etc., which leads to the outside of the building. The appliance
is best discharged under an open canopy connected with a ventilating
system.
8 OM-BPM-G
EQUIPMENT
Range, Unit Type
Pastry Oven
Fryer
Grill
Steak Grill
Boiling Pan
Ventilation Rate
Required
m³/minft³/min
17600
17600
26900
17600
26900
17600
Installation
F. For a unit on casters, the installation shall be made with a connector that
complies with the standard for Connectors for Moveable Gas Appliances,
ANSI Z21.69 - CSA 6.16. Restrain movement of the unit by attaching a
cable or chain to the eyelet provided at the back of the frame and anchor
the cable or chain to the wall or floor. Make the length and location of the
cable such that the unit cannot pull on the gas connection while the cable
is connected or quick-disconnect.
G. The gas connection for a unit on casters must be made with a quick-
disconnect device that complies with ANSI Z21.41 - CSA 6.9.
Steamer
Sterilizing Sink
Bain-Marie
Tea/Coee
Machine
WARNING
THIS APPLIANCE MUST BE EARTHED.
17600
14500
11400
8.5-14
Fig. 1
300-
500
Fig. 2
2.Gas SupplyIncoming service must be of sufficient size to supply full rate without excessive
pressure drop. A gas meter is connected to the service pipe by the gas supplier.
Any existing meter should be checked by the supplier to ensure that the meter
has the capacity for passing the required rate of gas for the braising pan in
addition to any other gas equipment installed.
The appliance governor is incorporated in the gas control valve which is situated
in the left control cabinet. The control valve governor is suitable for both natural
and propane gases without conversion.
Installation pipework should be fitted in compliance with IEGE/UP/2. The
pipework should not be smaller than the gas inlet connection (Rp½ [½” B.S.P.]).
An isolating cock must be located close to the appliance to allow shut-down
during emergencies or service. Installation must be tested for gas soundness
and purged as specified in IGE/UP/1.
3.Electrical SupplyThis unit is designed for connection to fixed wiring. A suitably rated isolating
switch with contact separation of at least three millimeters on both poles, must
be fitted to the installation. The wiring must be executed in accordance with
Power supply to this unit must be 230V, 1 Phase, 50/60hz with wiring suitable
for an electronic load of 50 watts.
The wiring must be executed in accordance with the regulations listed inside the
cover page of this manual supplement.
Cable entry is at the control box on the rear right side of the appliance. Access to
the terminals is gained by removing terminal block cover.
4.Water SupplyNot applicable to these appliances except for optional faucets.
OM-BPM-G 9
Installation
5.Gas System PerformanceThe tables shown here provide the total Gas Rates, Injector Diameters and
Pressure Adjustments for model BPM-G (CE) using natural (G20) and propane
(G31) gas sources.
Total Gas Rate
Model
Natural
(G20) KW
Natural BTU/hrPropane
(G31) KW
Propane
BTU/hr
BPM-15G
BPM-30G
BPM-40G
16.355,70016.355,700
26.189,10026.189,100
36.1123,30036.1123,300
Injector Diameters - Natural & Propane Gas
Model
BPM-15G
BPM-30G
BPM-40G
Natural Gas
(G20) mm
1.50.977
1.50.9711
1.50.9715
Propane Gas
(G31) mm
No. of Orifices
(injectors)
Gas Pressure Adjustment A pressure test point is fitted on the burner manifold
and on the gas control valve.
ModelModelBPM-15GBPM-30GBPM-40G
Natural Gas (G20)
Propane Gas (G31)
mbar8.08.08.0
in. WC3.23.23.2
mbar19.419.419.4
in. WC7.87.87.8
10 OM-BPM-G
NOTE: With reference to the gas rate, pressure adjustments and conversions, this
appliance is CE-approved for use with the following gases:
A. Gas Category I2H, G20 natural gas may be supplied to the appliance in
Austria, Denmark, Finland, Greece, Iceland, Italy, Luxembourg, Norway,
Portugal, Spain, Sweden, Switzerland and the United Kingdom.
B. Gas Category I3P, G31 propane gas may be supplied to the appliance in
Germany, Ireland, the Netherlands, Portugal, Spain, Switzerland and the
United Kingdom.
Use of the appliance with non-approved gases in a listed country, or use in other
countries will void CE certification.
Fig. 3
Installation
6.Burner AdjustmentThe burner primary airflow may be adjusted by loosening the screw and sliding
the aerator forward or backward. (See photograph)
Gas is connected at the rear of the control console.
WARNING
THIS APPLIANCE MUST BE EARTHED.
Fig. 4
Assembly & Commissioning
1.Electrical SupplyBefore commissioning the appliance, ensure that the electrical installation has
been performed in compliance with relevant regulations. See Paragraph 3 in
Installation section.
2.Pre-Commissioning Check
A. Remove literature and packing materials from the interior and exterior of
the unit.
B. Put enough water into the pan to cover the bottom to a depth of 6-12mm.
With the pan body in the horizontal position, note how the water lies in the
pan, to confirm that the pan was leveled properly during installation.
C. Verify that the rear heat shield panel is in place.
OM-BPM-G 11
Loading...
+ 25 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.