Freightliner Fld120 User Manual

4.6 (9)

FREIGHTLINER FLD 120

CPL SYSTEMS // GROENEVELD

AUTOMATICIC GREASINGI SYSTEM

INSTALLATIONI I MANUAL FOR

CUSTOMER SERVICEI TECHNICIANSI I

May 6, 1999

1

PUMP MOUNTING - FLD 120

Mount bracket with 5/16” - 18 x 1” bolt, 5/16” flat washer and lockwasher through existing hole

Use drill template DT003 to

 

drill two 11/32” holes in stack

 

support to mount pump

large tyraps two spots

Pump mounted on the exhaust stack support using ‘FREIGHT’ bracket, 5/16” - 18 x 1 1/2” bolts, nuts & washers

May 6, 1999 2

AIR & ELECTRICAL - FLD 120

secondary air tank

 

electrical, timer

 

 

 

to solenoid

 

 

 

 

 

 

 

 

 

air supply

 

 

 

 

 

 

 

main line

top view

bottom view L/S

Air Supply: take it from the highest outlet available in a ‘secondary’ air tank (i.e.. Top, end or side). Never connect to the bottom, never connect to a ‘wet’ tank, never connect to a ‘primary’ tank

Electrical - Timer to Solenoid: route with existing hoses etc. where possible - do not crush any air lines or wiring with tyraps

General: avoid sharp bends and corners, protect with spirap where necessary

bottom view R/S

electrical, timer

to solenoid

electrical, timer to solenoid

May 6, 1999

3

LEFT FRONT WHEEL - FLD 120

Most Freightliners have shocks - this routing will help avoid an interference

draglink, top view

kingpin & cam tube, top view

See note on right front wheel page about the direction of the slack fitting

 

cam tube, front

 

 

 

 

 

Important: fill cam tube with

 

grease before removing the zerk

 

fitting. Fill until grease can be seen

 

squeezing out between the cam

 

tube bushing and the slack

 

adjuster. Do Not assume it has been

 

done already even if someone says

 

it has. Make sure! Always cycle the

 

steering from ‘lock to lock’ to make

 

sure sufficient clearance is

 

available between fittings and lines

left knuckle

to all components

 

May 6, 1999

4

LEFT FRONT FRAME RAIL - FLD120

12 port block

follow brake hose to brake chamber

Electrical - timer to pressure switch: coil some extra wire at the manifold so the pressure switch and waterproof connector can be serviced easily.

General: grease lines are to be routed along the brake hose from end to end. Install a large tyrap on the brake hose fitting at the frame end, small tyraps every 3 or 4” along the brake hose and a large tyrap, double wrapped, on the brake hose fitting at the brake chamber end. Tyrap to the brake hose only,do not include any ABS wiring in CPL tyraps.

electrical, timer to pressure switch

triple grease line, blue and black to the spring shackle, red to the transmission cross shaft

large tyrap to huck bolt

spring shackle points

May 6, 1999

5

Freightliner Fld120 User Manual

FIFTH WHEEL

(3500 series on a Freightliner FLD 120, manifold mounted at the front of the slide plate)

secondary lining

 

These studs need to be ground off flush with the nuts

 

 

 

large tyraps on main line

This mainline to manifolds on fifth wheel deck could be routed a little different to improve the installation

Lines to be spiraped back to where movement begins, tyrap there too

This blue line represents ideal routing to minimize movement and vibration

keep manifold mounted close to the frame rail, out of harm’s way. Never drill holes in the frame rail flange.

large tyraps

do not put anything between the torque rod / bracket and the fifth wheel deck - it may get crushed !

May 6, 1999

6

Loading...
+ 13 hidden pages