Emerson Process Management ETC01035 User Manual

Instruction Manual
ETC01035 08/2005
Instruction Manual
BINOS 100 F & MLT 2 Addendum for Pressurized Analyzers intended to be used in Hazardous Areas Zone 1: All Versions Zone 2: Non-Flammable Gases Only
4
Edition 08/2005
www.EmersonProcess.com
BINOS 100 F & MLT 2 Addendum Zone 1 & 2 Instruction Manual
ETC01035
08/2005

ESSENTIAL INSTRUCTIONS

READ THIS P AGE BEFORE PROCEEDING!
Emerson Process Management (Rosemount Analytical) designs, manufactures and test s its products to meet many national and international standards. Because these instruments are sophisticated technical products, you MUST properly install, use, and maintain them to ensure they continue to operate within their normal specifications. The following instructions MUST be adhered to and integrated into your safety program when installing, using and maintaining Emerson Process Management (Rosemount Analytical) products. Failure to follow the proper instructions may cause any one of the following situations to occur: Loss of life; personal injury; property damage; damage to this instrument; and warranty invalidation.
Read all instructions prior to installing, operating, and servicing the product.
If you do not understand any of the instructions, contact your Emerson Process
Management (Rosemount Analytical) representative for clarification.
Follow all warnings, cautions, and instructions marked on and supplied with the product.
Inform and educate your personnel in the proper installation, operation, and
maintenance of the product.
Install your equipment as specified in the Installation Instructions of the appropriate
Instruction Manual and per applicable local and national codes. Connect all products
to the proper electrical and pressure sources.
T o ensure proper performance, use qualified personnel to install, operate, update, program, and maintain the product.
When replacement parts are required, ensure that qualified people use replacement parts specified by Emerson Process Management (Rosemount Analytical). Unauthorized parts and procedures can affect the product’s performance, place the safe operation of your process at risk, and VOID YOUR W ARRANTY. Look-alike substitutions may result in fire, electrical hazards, or improper operation.
Ensure that all equipment doors are closed and protective covers are in place, except when maintenance is being performed by qualified persons, to prevent electrical shock and personal injury.
The information contained in this document is subject to change without notice. Misprints reserved.
1st Edition 03/2003 2nd Edition 01/2004 3rd Edition 08/2004
4th Edition 08/2005 © 2003-2005 by Emerson Process Management
Emerson Process Management GmbH & Co. OHG
Industriestrasse 1 D-63594 Hasselroth Germany T +49 (0) 6055 884-0 F +49 (0) 6055 884-209 Internet: www.EmersonProcess.com
ATEX Instruction Manual
ETC01035 August 2005
The purpose of this manual is to provide additional information concerning the components, functions, installation and maintenance of EEx p pressurized MLT 2 and BINOS installed and operated at hazardous locations. The analyzers are EC type certified, documented by the EC Type Examination Certificates
LCIE 03 ATEX 6010 X and LCIE 03 ATEX 6011 X
The user should become thoroughly familiar with the operation of this equipment before operating it.
Some sections may describe equipment not used in your configuration. This ATEX instruction manual is a supplement to the analyzers standard
instruction manual! In addition to this manual, the manuals of all devices necessary for operating the system must be observed. Read all manuals completely to be familiar with the operation of this equipment at hazardous locations.

PREFACE

®®
®
®®
100 F analyzers intended to be
MLT 2 / BINOS® 100 F
Some technical specifications in this manual may be different to those in the associated manuals for the analyzers and additional equipment. In this case the technical specifications listed in this manual are valid only.
Emerson Process Management Manufacturing GmbH & Co. OHG
P - 1
MLT 2 / BINOS® 100 F
The following definitions apply to WARNINGS, CAUTIONS and NOTES found throughout this publication.
ATEX Instruction Manual
ETC01035
August 2005
DEFINITIONS
Highlights an operation or maintenance procedure, practice, condition, state­ment, etc. If not strictly observed, could result in injury, death, or long-term health hazards of personnel.
Highlights an essential operating procedure, condition or statement.
Highlights an operation or maintenance procedure, practice, condition, state­ment, etc. If not strictly observed, could result in damage to or destruction of equipment, or loss of effectiveness.
NOTE
Emerson Process Management Manufacturing GmbH & Co. OHGP - 2
ATEX Instruction Manual
ETC01035 August 2005
MLT 2 / BINOS® 100 F
IMPORT ANT

SAFETY INSTRUCTIONS

SAFETY SUMMARY
If this equipment is used in a manner not specified in these instructions, protective systems may be impaired.
DANGER TO LIFE !
Before installing, operating or working at Products described in this manual read this and all other related manuals!
EXPLOSION HAZARD !
Instruments described in this manual are intended to be installed and operated at hazardous locations. Doing so may be permitted only taking into account special legal conditions not described in this manual!
Ensure all safety devices and the pressurization unit are safe and operating properly to operate the analyzers in a safe manner!
Failure to follow the proper instructions may cause an explosion!
DANGER TO LIFE !
Products described in this manual are not designed for use in any life support and/or safety equipment where failure to perform can reasonably be expected to result in personal injury or death.
Emerson Process Management Manufacturing GmbH & Co. OHG
P - 3
MLT 2 / BINOS® 100 F
Products described in this manual shall not be supplied with explosive gases!
ATEX Instruction Manual
ETC01035
August 2005
Safety Instructions
EXPLOSION HAZARD !
EXPLOSION HAZARD !
Instruments inclusive EEx p unit may weigh up to 40 kg (depending on installed options)!
Do not use the attached EEx p unit or the external valve as a handle for transportation or lifting the instrument! Failure to follow may loosen or damage the devices and impair the safety of the whole instrument!
EXPLOSION HAZARD !
When the analyzer is out of order or if the pressurization unit shuts off all non-intrinsically safe inputs and outputs connected to external equipment MUST be shut off too!
This ensures that no hazardous voltages are present within the analyzer enclosure when not pressurized.
AUTHORIZED PERSONNEL
T o avoid loss of life, personal injury and damage to this equipment and on-site property , do not operate or service this instrument before reading and understanding this instruction manual and receiving appropriate training. SAVE THESE INSTRUCTIONS FOR FUTURE USE.
Emerson Process Management Manufacturing GmbH & Co. OHGP - 4
ATEX Instruction Manual
ETC01035 August 2005

TERMS USED IN THIS MANUAL

ATEX
Directive 94/9/EC, commonly called the ATEX („Atmosphères Explosibles“) products directive.
Area Classification
MLT 2 / BINOS® 100 F
Zone 1
Where ignitable concentrations of flammable gases can exist some of the time under normal operating conditions. (A guideline value [not part of a standard ] is 10 to 1.000 hours per year.) Equipment to be used in Zone 1 has to be classified Category 2.
Explosion Protection External Explosion Protection
The „External explosion protection“ serves to prevent penetration of explosive gas mixtures into the analyzer enclosure. In addition it avoids ignition on the surface. For this reason the analyzer is purged with protective gas and held at an internal overpressure compared to the surrounding atmosphere.
Containment System
The part of the analyzer containing the gas that may constitute an internal source of release.
Zone 2
Where ignitable concentrations of flammable gases are not likely to exist under normal operating conditions. (A guideline value [not part of a standard ] is less than 10 hours per year.) Equipment to be used in Zone 2 has to be classified Category 3.
Internal Explosion Protection
The „Internal explosion protection“ serves to prevent ignition of gas being present in the analyzer’s Containment System (CS; = sample gas path). Dependent on the gas composition several options are available:
None required (if gas is noncom­bustible),
dilution by purge gas
and/or
internal overpressure of the analyzer’s enclosure compared to the CS.
Lower Explosion Limit (LEL)
V olume ratio of flammable gas in air below which an explosive gas atmosphere will not be formed: the mixture of gas and air lacks sufficient fuel (gas) to burn.
Emerson Process Management Manufacturing GmbH & Co. OHG
Upper Explosion Limit (UEL) V olume ratio of flammable gas in air above which an explosive gas atmosphere will not be formed: the mixture of gas and air is too rich in fuel (deficient in oxygen) to burn.
P - 5
MLT 2 / BINOS® 100 F
Terms used in this manual
ATEX Instruction Manual
ETC01035
August 2005
Protective Gas
Air or inert gas used for purging and maintaining an overpressure and, if required, dilution.
Pre-Purging
The pre-purging phase serves to remove any combustible gas out of the analyzer’s enclosure prior to switching on the analyzer.
Pressurization modes
„Continuous Flow“
In EEx p „continuous flow mode“ the protective gas flows with higher rates through the enclosure. Flow rates are calculated to hold an overpressure of > 1 mbar compared to atmospheric.
Dilution
The continuous supply of a protective gas, after purging, at such a rate that the concentration of a flammable mixture inside the pressurized enclosure is maintained at a value outside the explosive limits except in a dilution area.
„Leakage Compensation“
In EEx p „leakage compensation mode“ just as much protective gas is used to hold the required overpressure compared to atmospheric.
Flammable Gas(es)
Gases and gas mixtures are assigned to be flammable if they might become ignitable when in a mixture with air.
Emerson Process Management Manufacturing GmbH & Co. OHGP - 6
ATEX Instruction Manual
ETC01035 August 2005
MLT 2 / BINOS® 100 F
Emerson Process Management Manufacturing GmbH & Co. OHG
P - 7
ATEX Instruction Manual
ETC01035 August 2005
MLT 2 / BINOS® 100 F

TABLE OF CONTENTS

PREFACE P-1
Definitions....................................................................................................................... P-3
Safety Instructions........................................................................................................P-3
Terms used in this manual ............................................................................................ P-5
SECTION 1 Technical Description 1-1
1-1 Application and Principle of Operation........................................................... 1-1
1-2 Unused............................................................................................................... 1-2
1-3 Specification...................................................................................................... 1-3
1-3-1 Installation Site .................................................................................................. 1-3
1-3-2 Explosion Protection ........................................................................................ 1-3
1-3-3 Description of Pressurization Systems .......................................................... 1-4
1-3-4 Purge Gas Conditions ...................................................................................... 1-6
1-3-6 Differential Pressure Monitoring...................................................................... 1-6
1-3-5 Sample Gas Conditions.................................................................................... 1-7
1-3-7 Equivalent Safety Devices ............................................................................... 1-9
1-4 Additional Safety Measures ............................................................................. 1-9
SECTION 2 Installation 2-1
2-1 General ............................................................................................................... 2-1
2-2 Installation of the Unit....................................................................................... 2-1
2-3 Dimensional Drawings ..................................................................................... 2-2
2-3-1 Single Enclosure Analyzer............................................................................... 2-2
2-3-2 Dual Enclosure Analyzer.................................................................................. 2-4
2-4 Connection of Sample Gas and Protective Gas (Purge Gas) ....................... 2-6
2-4-1 Hints on Flammable Gases .............................................................................. 2-6
2-4-2 MLT 2 Gas Flow Diagrams................................................................................ 2-8
2-4-3 BINOS® 100 F Gas Flow Diagrams ................................................................ 2-11
2-5 Safety Device Settings ................................................................................... 2-15
2-6 Special Remarks and Instructions ................................................................ 2-15
2-7 Electrical Connections ................................................................................... 2-16
2-7-1 Cable Gland Assembly Instruction................................................................ 2-17
2-7-2 Signal Inputs and Outputs ............................................................................. 2-17
2-7-2 Category 2 Equipment Mains Connection ................................................... 2-18
2-7-3 Category 3 Equipment Mains Connection ................................................... 2-19
2-7-4 Category 3 Equipment Alarm Contacts ........................................................ 2-20
Emerson Process Management Manufacturing GmbH & Co. OHG
i - 1
ATEX Instruction Manual
ETC01035
MLT 2 / BINOS® 100 F
August 2005
SECTION 3 Startup 3-1
3-1 Final Check........................................................................................................ 3-1
3-2 Switching On ..................................................................................................... 3-1
SECTION 4 Maintenance 4-1
4-1 Maintenance Interval......................................................................................... 4-1
4-2 Gasanalyzer....................................................................................................... 4-1
4-3 Pressurization Systems and Other Additional Equipment ........................... 4-1
4-4 Verifications and Tests on Modified or Repaired Electrical Apparatus ....... 4-2
4-4-1 System with 14 mbar Operating Pressure...................................................... 4-2
4-4-1-1 Preparations ...................................................................................................... 4-2
4-4-1-2 Overpressure Test ............................................................................................ 4-3
4-4-1-3 Leakage Test ..................................................................................................... 4-3
4-4-2 System with 90 mbar Operating Pressure...................................................... 4-4
4-4-2-1 Preparations ...................................................................................................... 4-4
4-4-2-2 Overpressure Test ............................................................................................ 4-5
4-4-2-3 Leakage Test ..................................................................................................... 4-5
4-4-3 Removal of Modifications................................................................................. 4-6
APPENDIX A-1
A-1 EC Declarations of Conformity........................................................................ A-1
A-2 EC Type Examination Certificates ...................................................................A-5
A-2-1 Category 2 Certificate ....................................................................................... A-5
A-2-2 Category 3 Certificate ..................................................................................... A-10
A-3 Circuit Diagrams .............................................................................................A-15
A-3-1 MLT 2, single enclosure..................................................................................A-15
A-3-2 MLT 2, dual enclosure.....................................................................................A-19
A-3-3 BINOS® 100 F ...................................................................................................A-23
Emerson Process Management Manufacturing GmbH & Co. OHGi - 2
ATEX Instruction Manual
ETC01035 January 2004
SECTION 1
Technical Description

1-1 Application and Principle of Operation

MLT 2 / BINOS® 100 F
The gas analyzers of type BINOS® 100 F and MLT 2 are intended to measure gas components within gas mixtures. In combination with an appropriate certified pressurization system (protection method „Pressurized Enclosure“ EEx p) they can be installed and operated in hazardous areas of Category 2 or Category 3. Pressurization acts as external explosion protection and prevents external explosive atmosphere to penetrate into the analyzer by holding the enclosure at an overpressure compared to the surrounding The type of purge system used varies dependent on the area where the analyzer is intended to be installed. Both systems offer two modes of operation:
EEx p with continuous flow and
EEx p with leakage compensation. Dependent on the sample gas composition
it may be necessary to take care of internal explosion protection which refers to the sample gas path (containment system) in the analyzer.
One of the following protection methods is used:
Nonflammable gases and gas
mixtures below the LEL: It must be
ensured that the sample gas in the containment system always remains below the lower explosive limit!
Flammable gases and gas mixtures may be analyzed using an analyzer with pressurization method „leakage compensation“ when the sample gas is diluted below ¼ LEL outside the analyzer, so the resulting sample gas is to be categorized „nonflammable“. The diluting system must ensure that the gas in the containment system always remains below ¼ LEL.
Flammable gases and gas mixtures may be analyzed using an analyzer with pressurization method „leakage compensation“ or „continuous flow“ when the analyzer enclosure has an internal overpressure of > 50 Pa over the pressure in the containment system. To ensure this condition a differential pressure switch is used and connected between containment system and analyzer enclosure. In case the pressure decreases below the level of 50 Pa the switch is activated and forces the purging unit to disconnect the analyzer from it’s power supply . If more than one switch is needed because more than one flammable gas is supplied to the analyzer, the cont acts of these switches have to be connected in series. Purge medium may be inert gas or air. Flame arrestors are required for all gas inlets and outlets carrying flammable gases.
Explosive gases must not be connected to the analyzer!
Emerson Process Management Manufacturing GmbH & Co. OHG
1 - 1
MLT 2 / BINOS® 100 F

1-2 Unused

ATEX Instruction Manual
ETC01035
January 2004
1-2 Instrument Layout
Emerson Process Management Manufacturing GmbH & Co. OHG1 - 2
ATEX Instruction Manual
ETC01035 January 2004

1-3 Specification

1-3 Specification 1-3-1 Installation Site

Hazardous area: Zone 1 (Category 2)
or Zone 2 (Category 3),
dependent on purge system

1-3-2 Explosion Protection

MLT 2 / BINOS® 100 F
Concepts:
Category 2 : Pressurized enclosure
(EEx p) with either leakage compensation mode or continuous flow
Category 3: Pressurized enclosure
(EEx p) using simplified purge with either leakage compensation mode or continuous flow
Temperature class: T4
Options: Intrinsically safe (EEx i) digital,
analog, network or Foundation Fieldbus outputs.
Intrinsically safe (EEx i) para­magnetic Oxygen sensor or ther­mal conductivity sensor.
Applicable Standards:
EN 50014:1997 + amendments 1 & 2, EN 50016:1995, EN 50020:1994
Emerson Process Management Manufacturing GmbH & Co. OHG
1 - 3
MLT 2 / BINOS® 100 F
1-3-43 Description of Pressurization Systems

1-3-3 Description of Pressurization Systems

ATEX Instruction Manual
ETC01035
January 2004
An internal overpressure inside the pro­tected housing prevents outer (possibly ex­plosive) atmosphere to enter. Instruments intended to be installed in Zone 1 are automatically prepurged before power is supplied. This ensures that all possibly explosive atmosphere present inside the instrument is removed. The prepurge process is controlled by the pressurization control unit which also acitivates switching on the analyzer when the prepurge phase has elapsed.
While the Zone 2 unit mainly consists of a pressure monitor with alarm contacts the Zone 1 unit contains a purge gas inlet valve (proportional valve), a controller unit with microprocessor and an outlet valve (high pressure version only). The controller unit permanently monitors the parameters (e.g. prepurge phase, purge gas flow, internal overpressure, and more) and therefore ensures safe operation. A separate instruc­tion manual provides more detailled infor­mation.
The Zone 1 system is available in two differing variations due to different requirements for measuring flammable and non-flammable gases:
Measuring non-flammable gases:
The system provides an internal over­pressure of 14 mbar during operation.
Measuring flammable gases:
The standard configuration is designed to hold an internal overpressure of 90 mbar. Optionally 14 mbar may be adjusted if it is ensured that the gas pressure within the Containment System is allways below 12 mbar. In addition one differential pressure switch is installed within any gas path to ensure the instrument‘s overpressure is always at least 50 Pa (0.5 mbar) above the pressure in the containment system.
Emerson Process Management Manufacturing GmbH & Co. OHG1 - 4
ATEX Instruction Manual
Single Enclosure
Dual Enclosure (volume
Dual Enclosure (volume
ETC01035 January 2004
Depending on which system is used, diffe­rent parameters apply:
MLT 2 / BINOS® 100 F
Application Mode of Ope ration
Zon e 1 Pre p urge Ph ase for measuring Duration: 10 min 14 min flamm able gases Purge gas cons um ption: 1,75 Nm³/h 1,92 Nm³/h
max i m um overpressure: 95 mbar 95 mbar
Measuri ng Mode
Internal overpress ure: 90mbar 90 mbar
Flow rat e (leakage rate): <= 3 l/min <= 4, 5 l /min
Zon e 1 Pre p urge Ph ase for measuring Duration: 4 min 6 min non-flamm able gases P urge gas consumption: 6,8 Nm³/ h 9,2 Nm³/h
max i m um overpressure: 25 mbar 25 mbar
Measuri ng Mode
Internal overpressure: 14 mbar 14 mbar
Flow rat e (leakage rate): <= 3 l/min <= 4, 5 l /min
Application Mode of Ope ra tion
(volume approx . 56 l)
Single Enclosure
(volume approx . 56 l)
approx . 112 l)
approx . 112 l)
Zone 2 Pre p urge Ph ase for mea suri n g Duration: 5 min 17 min non-flamm able gases P urge gas consumption: 8 Nm³/h 7 Nm³/h
Minimum overpressure in all enclosures:
1 mbar against external atmosphere and
50 Pa against containment system when measuring flammable gases
Emerson Process Management Manufacturing GmbH & Co. OHG
max i m um overpressure: 25 mbar 25 mbar
Measuri ng Mode
Internal overpres sure: 1 m bar 1 mbar
Flow rat e (leakage rate): <= 22Nm ³/ h <= 22 Nm ³/ h
1 - 5
MLT 2 / BINOS® 100 F

1-3-4 Purge Gas Conditions

1-3-4 Purge Gas Conditions
Purge gas: Inert gas (e.g. Nitrogen)
Air (from an ex-free zone)
Temperature: As ambient, but min. 20 °C to 35 °C.
Medium has to be dry and free from dust, oil, corrosive or aggressive components!
Input pressure at inlet of EEx p device: 2.000 to 4.000 hPa (2 to 4 bar)
ATEX Instruction Manual
ETC01035
January 2004
Emerson Process Management Manufacturing GmbH & Co. OHG1 - 6
ATEX Instruction Manual
ETC01035 January 2004
MLT 2 / BINOS® 100 F

1-3-5 Sample Gas Conditions

1-3-5 Sample Gas Conditions
Applicable gases: Nonflammable gases or
gas mixtures which always Flammable gases remain below LEL
Maximum sample
gas pressure: atmospheric or atmospheric or
<1500 hPa at normal <1500 hPa at normal atmospheric pressure, atmospheric pressure, dependend on gas dependend on gas measuring principle measuring principle
and
overpressure < 85 mbar (optional < 12 mbar) against surrounding atmosphere
Sample gas flow: for all sample gases refer to the corresponding analyzer data sheet
1-3-6 Differential Pressure Monitoring
For analyzers connected to flammable gases (either sample gas or span gas) the operator needs to ensure that the pressure within the containment system always remains at minimum 50 Pa below the pressure within the analyzer enclosure. This ensures that in case of a leak the flammable gas does not enter the enclosure. An additional differential pressure switch must be provided to monitor the pressure difference. The switch’s electric contact has to be connected to the purge system. In case the pressure difference decreases below 50 Pa the contact opens and the purge system shuts down the analyzer. The limit of 50 Pa is the least permissible value given by the standards, higher values are acceptable, too. Flame arrestors are required for gas inlets and outlets. Electrical and mechanical connections are shown in section 2 „Installation“.
Emerson Process Management Manufacturing GmbH & Co. OHG
1 - 7
ATEX Instruction Manual
ETC01035
MLT 2 / BINOS® 100 F
January 2004
1-3-7 Equivalent Safety Devices
1-3-7 Equivalent Safety Devices
It is recommended to order and use the pressurization systems provided and specified by Emerson Process Management.
It is the responsibility of the operator/owner to choose and install a pressurization system other than recommended by Emerson Process Management!
In no case Emerson Process Management is held responsible for any damage, personal injury etc. resulting from choosing different pressurization systems!
In principle it is possible to use other equivalent pressurization systems as described in this manual, as long as they meet the following requirements:
Device is ATEX approved
Adjustable pre-purge phase
Minimum purge flow rate :
7 Nm3/h resp. 8 Nm3/h
Limited purge gas pressure during the pre-purging phase: < 25 mbar
Input pressure for purge gas supply:
2 ... 4 bar
Relay contacts for all-pole disconnection of the analyzer from power supply
Relay contacts for disconnecting additi­onal external equipment
Connection facility for bypass key switch, providing intrinsically safe signal for scanning the key switch
For units connected to flammable gases, only:
Connection facility for differential pressure switch, providing intrinsically safe signal for scanning the switch
Emerson Process Management Manufacturing GmbH & Co. OHG1 - 8
ATEX Instruction Manual
ETC01035 January 2004

1-4 Additional Safety Measures

1-4 Additional Safety Measures
Exhaust gas lines must end outside the hazardous area at a safe point. Sample gas lines may be returned to the sampling point.
If gas exhaust lines end within the hazardous area gas inlet and outlet have to be equipped with flame arrestors.
The maximum permissible gas pressure depends on the type of connected gas. See section 1-3-5 for detailed information.
MLT 2 / BINOS® 100 F
Emerson Process Management Manufacturing GmbH & Co. OHG
1 - 9
MLT 2 / BINOS® 100 F
ATEX Instruction Manual
ETC01035
January 2004
Emerson Process Management Manufacturing GmbH & Co. OHG1 - 10
ATEX Instruction Manual
ETC01035 August 2005
MLT 2 / BINOS® 100 F
SECTION 2
Installation
Before starting to install this equipment, read the corresponding sections of the analyzer’s instruction manual and the manuals of the additional equipment! Failure to follow the safety instructions could result in serious injury or death.

2-1 General

Proper functioning of the Emerson Process Management gas analyzers depends on proper installation. All procedures in this section, in the corresponding sections of the analyzer instruction manual and the manuals of the attached safety devices must be followed carefully .
Instruments inclusive EEx p unit may weigh up to 40 kg (depending on installed options)! Use two person and/or suitable tools for transpor­tation and lifting these instruments!

2-2 Installation of the Unit

Install the assembled unit as described in the analyzer’s instruction manual: Refer to the dimensional drawings in this manual (fig. 2-1a/b and 2-2a/b) to ensure the designated location is dimensioned sufficiently.
Take care to use anchors and bolts specified to be used for the weight of the units!
Take care the wall or stand the unit is intended to be installed at is solid and stable to hold the units!
EXPLOSION HAZARD !
Do not use the attached EEx p unit or the external valve as a handle for transportation or lifting the instrument! Failure to follow may loosen or damage the devices and impair safety of the whole instrument!
Emerson Process Management Manufacturing GmbH & Co. OHG
2 - 1
MLT 2 / BINOS® 100 F

2-3 Dimensional Drawings

2-3 Dimensional Drawings 2-3-1 Single Enclosure Analyzer

ATEX Instruction Manual
ETC01035
August 2005
Standard version w/o purging system
Fig. 2-1a
Single enclosure analyzer (approx. dimensions in mm)
Emerson Process Management Manufacturing GmbH & Co. OHG2 - 2
Loading...
+ 51 hidden pages