Duke FBB-30-230 Installation Manual

Installation & Operation Manual
BURGER KING FLEXIBLE BATCH BROILER
CE Version
Please read this manual completely before attempting
to install, operate or service this equipment
This manual is Copyright © 2011 Duke Manufacturing Co. All rights reserved.
trademark of the Duke Manufacturing Co.
Duke Manufacturing Co.
2305 N. Broadway
St. Louis, MO 63102
Phone: 314-231-1130
Toll Free: 1-800-735-3853
Fax: 314-231-2460
www.dukemfg.com
P/N 175820N
Installation & Operation Manual for Flexible Batch Broiler - CE Units
TABLE OF CONTENTS
I. General Information .....................................................................................................4
A. Batch Broiler Specications ...................................................................................4
A-1. Model Number Key ......................................................................................4
A-2. Broiler Dimensions ......................................................................................5
II. Installation Instructions ..............................................................................................6
A. Qualied Personnel ................................................................................................6
B. Delivery and Inspection ..........................................................................................6
C. Broiler Assembly ....................................................................................................8
D. Adjustments at Installation .....................................................................................9
Raise or Lower Broiler ........................................................................................ 9
E. Location of the Broiler ..........................................................................................10
F. Gas Piping ............................................................................................................10
G. Electrical Connections .........................................................................................10
H. Ventilation ............................................................................................................10
Venting to a Canopy Exhaust Hood ..................................................................10
Maintenance of Ventilation System ...................................................................10
III. Operation Instructions ............................................................................................. 11
A. Broiler Controls .................................................................................................... 11
B. Cooking Product .................................................................................................. 11
B-1.0 Lighting the Broiler ................................................................................... 11
B-2.0 Cook Product ...........................................................................................12
B-3.0 Cook Cycle Complete ..............................................................................13
B-4.0 Fine Cooking Adjustment .........................................................................13
B-5.0 Cancel a Cook Cycle ...............................................................................13
B-6.0 Checking the Broiler Temperature ...........................................................13
B-7.0 Checking the Set Point Temperature .......................................................13
B-8.0 Shutdown the Broiler ...............................................................................13
C. Cleaning ...............................................................................................................13
C-1. Four (4) Hour Cleaning .............................................................................. 15
C-2. Daily Cleaning ...........................................................................................16
C-3. Weekly Cleaning ........................................................................................18
C-4. Monthly Cleaning ...................................................................................... 21
D. Troubleshooting ...................................................................................................22
IV. Service and Repair ...................................................................................................25
V. Replacement Parts List .............................................................................................26
VI. Wiring Schematic .....................................................................................................28
VII. Customer Assistance .............................................................................................31
2
Installation & Operation Manual for Flexible Batch Broiler - CE Units
IMPORTANT WARNING AND SAFETY INFORMATION
POST IN A PROMINENT LOCATION instructions to be followed in the event the user smells gas. This information shall be obtained by consulting the local gas supplier.
FOR YOUR SAFETY:
Do not store or use gasoline or other ammable vapors or liquids in the vicinity of this or any other appliance.
: Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.
THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE.
3
Installation & Operation Manual for Flexible Batch Broiler - CE Units
I. GENERAL INFORMATION
A. Batch Broiler Specications
I3B/
P(G30)
12,7mm
BSPT
I3B/
P(G30)
30/50
mbar
19,93
mbar
19,93
mbar
I3B/
P(G30)
GROSS HEAT INPUT
GAS PIPE CONNECTION
Supply Pressure
IR Burner Pressure
Lower Burner Pressure
ORIFICE – Front IR Burner
ORIFICE – Rear IR Burner
ORIFICE – Lower Burner
I2H/I2E(G20) I2L(G25)
26,3 KW 29,1 KW 31,3 KW 26,3 KW 26,5 KW 28,2 KW 25,2 KW 25,2 KW 26,4 KW 26,5 KW 26,6 KW
12,7mm
BSPT
20 mbar 20 mbar 20 mbar 25 mbar 25 mbar 25 mbar
9,34
mbar
9,34
mbar
2,35 2,35 2,35 2,35 2,35 2,35 1,40 1,55 1,55 1,55 1,55
2,50 2,50 2,50 2,50 2,50 2,50 1,51 1,61 1,61 1,61 1,61
3,05 3,25 3,45 3,05 3,25 3,45 1,70 1,85 1,90 1,95 2,00
12,7mm
BSPT
I2H/I2E(G20) I2L(G25)
9,34
mbar
9,34
mbar
I2H/I2E(G20) I2L(G25)
12,7mm
BSPT
9,34
mbar
9,34
mbar
12,7mm
BSPT
12,95
mbar
12,95
mbar
12,7mm
BSPT
12,95
mbar
9,34
mbar
12,7mm
BSPT
12,95
mbar
9,34
mbar
12,7mm
BSPT
37/50
mbar
19,93
mbar
19,93
mbar
I3P(G31)
12,7mm
BSPT
I3P(G31)
37/50
mbar
19,93
mbar
19,93
mbar
I3P(G31)
12,7mm
BSPT
37/50
mbar
19,93
mbar
19,93
mbar
12,7mm
BSPT
37/50
mbar
19,93
mbar
19,93
mbar
SHIPPING WEIGHT
SHIPPING DIMENSIONS
ELECTRICAL RATING
204 Kg (450 lbs)
121,9 cm x 99,1 cm x 172,7 cm (48” x 39” x 68”)
230V~ 50Hz 1,1A 250W
A-1. Model Number Key
X identies Gas Conguration Y = O without Catalyst Y = C with Catalyst
DESCRIPTION MODEL DESCRIPTION MODEL
X = 1 I3P(G31) gas w/o Catalyst FBB-10-230 I3P(G31) gas with Catalyst FBB-1C-230
X = 2 I2H/I2E(G20) gas w/o Catalyst FBB-20-230 I2H/I2E(G20) gas with Catalyst FBB-2C-230
X = 3 I3B/P(G30) gas w/o Catalyst FBB-30-230 I3B/P(G30) gas with Catalyst FBB-3C-230
X = 5 I2L(G25) gas w/o Catalyst FBB-50-230 I2L(G25) gas with Catalyst FBB-5C-230
4
Installation & Operation Manual for Flexible Batch Broiler - CE Units
A-2. Broiler Dimensions
Note: Dimension shown in centimeters, bracketed [ ]are in inches
44"
111,9
20 3/4"
52,9
8 1/2"
21,6
50 3/8"
128
39 1/2"
100,3
34 3/4"
88,4
GAS CONNECTION 3/4" BSPT FEMALE
53 5/8"
136,1
HIGH POSITION
63 5/8"
161,7
45 5/8"
115,8
55 5/8"
141,4
LOW POSITION
5
Installation & Operation Manual for Flexible Batch Broiler - CE Units
II. INSTALLATION INSTRUCTIONS
A. QUALIFIED PERSONNEL
These installation instructions are for the use of qualied installation and service personnel only. Installation or service by other than qualied personnel may result in damage to the broiler and/or injury to the operator.
Qualied installation personnel are those individuals, rms, companies or corporations which either in person or through an agent is engaged in and responsible for:
Co mpliance w ith the in sta lla tion in fo rce in the country in which the appliance is to be installed.
This appliance shall be installed with sufcient ventilation to prevent the occurrence of unacceptable concentrations of substances harmful to health in the room in which the appliance is installed.
Caution - the appliance is mounted on 4 wheels. Care must be taken not to hit kitchen walls or similar hard objects while moving or installing the appliance.
Parts protected by the manufacturer, agent, or assignee shall not be adjusted by the installer.
B. DELIVERY AND INSPECTION
Duke Manufacturing Co. does everything within its power to insure you received your broiler in good condition. They are strapped down on heavy wooden skids and packed to prevent shipping damage. They have all been carefully inspected before they were packaged and consigned to the carrier.
Upon delivery of your Duke broiler:
Look over the shipping container, carefully noting any exterior damage on the delivery receipt, which must also be signed by the driver/ delivery person.
Unpack and check for any damage, which was not evident on the outside of the shipping container.
Caution: The Broiler is very heavy!
Use adequate help for lifting.
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for
their safety.
6
Installation & Operation Manual for Flexible Batch Broiler - CE Units
1. Using a utility knife, cut away plastic wrap (not shown).
2. Remove Training Material box.
3. Remove the top cardboard and inner cap.
4. Remove cardboard from the corners (4 places).
5. Remove cardboard on the ends (2 places).
6. Remove banding straps (cut with utility knife or scissors: 5 places).
7. Remove box of attachable parts and accessories from the front.
8. Safely lift one end of broiler and tap block towards center and then sideways to remove.
Repeat for remaining blocks. This allows casters
to touch the pallet.
9. Remove the broiler from the shipping pallet using 3 people to guide and distribute its weight (approx 335 lbs) accordingly. While carefully supporting the broiler, roll it forward until the front casters are clear of the pallet. Lift the broiler 6-8 inches above and away from the pallet, and gently place on oor to avoid damage to casters.
10. Remove protective blue tape from broiler panels, double checking that no tape remains.
Check for concealed damage. The carrier must be notied within fteen (15) days of the delivery of the broiler and the carton, skid and all packaging materials must be retained for inspection.
2
4
3
5
4
5
4
7
8
6
4
Duke Manufacturing Co. cannot assume liability for loss or damage suffered in transit. The carrier assumes full responsibility for delivery in good order when the shipment was accepted. However, we are prepared to assist you with ling your claim.
7
Installation & Operation Manual for Flexible Batch Broiler - CE Units
12
13 15
11
10
9
8
7
6
5
4
3
2
1
16
C. BROILER ASSEMBLY
Be fo re asse mbling and insta lling t he broi le r, pleas e check to m ake sur e that al l neces sary pa rt s are p resent.
ITEM # PART NAME PART #
1 PRODUCT PAN SHELF 175353
2 DISCHARGE CHUTE 175340
3 DISCHARGE HOOD 175362
4 DISCHARGE PAN HOLDER 175358
5 DISCHARGE GREASE PAN 175357
6 “V” GREASE PAN 175325
7 MAIN GREASE PAN 175329
8 LOADER 175444
9 LOADER TRAY 175430
10 LOADER BRACKET 175438
11 DOOR 175429
12 LOADER RAMP 175741
13 IMPEDANCE PAN 175226
14 CATALYST (OPTIONAL) 175480
15 CATALYST GUARD (OPTIONAL) 175482
16 SANITATION PAIL 175842
(Included with Broiler Tools Kit)
Loader Install Tool
OPTIONAL SERVICE PARTS & ACCESSORIES
PARTS KIT – I2H/I2E(G20) & I2L(G25) (w/ Controller & Cook Chain)
PARTS KIT – I3B/P(G30) & I3P(G31) (w/ Controller & Cook Chain)
PARTS KIT - (Burner & Flame Arrestor) 176354 KIT – CE GAS HOSE CONNECTOR - UK 175827
176351
176352 KIT – CE GAS HOSE CONNECTOR
PARTS KIT ­Shield)
(Burner, Arrestor, Loader, & Burner
176353
175831
Setup: Install all items as shown below.
Note: Install loader bracket with (4) ¼-20 nuts. Use supplied extension tool to remove and reinstall nuts. (Nuts are shipped installed on loader mounting studs.)
8
Installation & Operation Manual for Flexible Batch Broiler - CE Units
D. ADJUSTMENTS AT INSTALLATION
Each broiler section and all its component parts have been tested thoroughly and inspected before your broiler was shipped from the factory. However, it is sometimes necessary to further test or adjust the broiler once it has been installed. Such adjustments are the responsibility of the Dealer or Installer. These types of adjustments are not considered defects, rather a normal and routine part of the proper installation of the equipment.
These adjustments include but are not limited to:
• Adjustments to the gas pressure regulator
• Broiler height adjustment (if required)
No installation should be considered complete without proper inspection and, if necessary, any adjustments by qualified service or installation personnel.
It is also important not to obstruct the natural ow of combustion and ventilation air if the broiler is to operate properly. This broiler should not be installed on a curb base or sealed to the wall. Either condition can restrict the ow of air to the combustion compartment or prevent proper ventilation of the unit. Before making any connections to the broiler, check the ratings plate to be sure the broiler specications concur with the type of gas and voltage to be supplied to the broiler.
Raise or Lower Broiler
The broiler height can be adjusted via two screws on each leg.
Caution: The Broiler is very heavy!
Use adequate help for lifting.
1. Lift one end of the broiler onto a wide, sturdy stand (not supplied).
2. Remove (2) screws per leg and raise/lower to threaded holes. Reinstall screws.
3. Remove stand and safely raise/lower broiler.
4. Place plastic hole plugs (supplied attach to stand) in any unused holes.
The rating plate is located on the back of the control compartment cover panel on the right end of the unit.
The plate bearing the broiler’s model number and serial number is attached to the back side of the unit.
Support broiler here
Screw
Screw
Slide Leg. Reinstall screws.
Plastic Hole Plug
9
Installation & Operation Manual for Flexible Batch Broiler - CE Units
E. LOCATION OF THE BROILER
Proper placement of the broiler will give you the best results long-term user convenience. We urge you to give adequate thought in the placement of your broiler prior to its arrival.
The broiler should be placed in an area that is free from drafts and accessible for proper operation and servicing.
The area around the broiler must be kept clear of combustible materials as specic below:
COMBUSTIBLE SURFACE SPACING
Discharge End (left side) 305 mm
Access Panel End (right side) 76 mm
Rear 102 mm
Floor/Table 0 mm
F. GAS PIPING
The standard broiler consumes gas at a total of 100,000 BTU/hr, 29.4 KW. The overall piping plan of the kitchen must support the supply rating to support appliance to achieve the performance rating.
Generally, piping should be sized to provide a gas supply sufcient to meet the maximum demand of all gas appliances on a line without undue loss of pressure to the equipment. The total BTU requirements of all equipment being served and the piping length from the meter are major considerations in the proper design of the gas supply system.
G. ELECTRICAL CONNECTIONS
Your broiler must be supplied from a 230 Volt 50 Hertz, grounded circuit with a detachable line cord for each country’s requirements. A wiring diagram is attached to the broiler control compartment and with this manual.
: Th is ap plianc e empl o ys an
earthed, safety ground electrical supply system. DO NOT cut or modify the earthing provisions of this appliance.
H. VENTILATION
This appliance shall be installed with sufficient ventilation to prevent the occurrence of unacceptable concentrations of substances harmful to health in the room in which the appliance is installed.
Venting to a Canopy Exhaust Hood
A mechanically driven exhaust hood must have a minimum capacity of 1700 m3/hr (1000 cfm) with a minimum 100cm by 130cm (39.4 in by 51.2 in) opening to adequately vent this appliance. The specied capacity and opening is required in a dedicated hood for this appliance or in addition to other appliance vented through a common canopy exhaust hood.
Maintenance of Ventilation System
The vent ilati on sy s tem m ust b e mai ntai n ed and annually inspected by Qualied Personnel concurrent as part of or in addition to governmental requirements.
NOTE: A xed restraint of the proper length must be incorporated to secure the broiler to a non-movable surface to eliminate strain on the gas connector.
10
This inspection/maintenance should consist of, but not be limited to:
Inspection for blockages or build up which might
interfere with the venting of the broiler.
Repair of such blockages.
Inspection of the venting canopy, its drive motors
and bells, etc.
: Do not place any objects such
as sheet pans, food containers or aluminum foil on the top of the broiler. This will obstruct the venting of cooking vapors and airow through the unit—resulting in poor cooking performance.
Loading...
+ 22 hidden pages