Order No. 120 110 2202
Order No. 120 220 2202
Order No. 130 120 2202
Order No. 130 230 2202
Order No. 120 310 2202
Order No. 120 420 2202
Order No. 130 330 2202
Order No. 130 430 2202
Signature / Stamp: (structural engineer / construction authority)
59860002 Edition 11 25.25.2011 / Bak Page 3/19
Wall attachment Mach 120/130
Mach LED 120/130
Dr. Mach
Lamps and Engineering
These installation instructions must be kept at hand together with the
relevant operating instructions of the lamp for consultation at any time.
1. Safety instructions
It is not allowed to connect the lamp to the mains, until it has been fully assembled and
installed. This device is not suitable for use in hazardous locations.
The devices are not suitable for use in combustible blends of anaesthesia agents with oxygen
or nitrous oxide.
Repairs to the wall attachment and special installation work on the sliding contacts should
only be carried out by ourselves or a company expressly authorised by ourselves.
The manufacturer is only responsible for operational safety of the wall attachment when
repairs and modifications are carried out by his own staff or by persons who guarantee
compliance with the safety regulations.
The manufacturer is not responsible for damage to persons or property caused by incorrect or
improper use, or when used for incorrect purposes.
In view of the slight weight of the Dr. Mach lamps, it is not fundamentally necessary to drill through the
wall and use a counter-plate.
Depending on the stability of the location, it may be necessary to use a counter-plate for the wall
attachment.
The forces arising when the widely extending articulated arms tilt, do make it necessary to drill very
carefully with a certified hammer drill, paying close attention to the drilling tolerances.
59860002 Edition 11 25.25.2011 / Bak Page 4/19
Wall attachment Mach 120/130
Mach LED 120/130
2. Mounting layout wall lamps
Type 1: Mach 120; Mach 120F
Wall
Bracket Spring arm
Dr. Mach
Lamps and Engineering
Wall bearing
Lamp
Type 2: Mach 130; Mach 130F
Wall
Wall bearing
Lamp
Bracket Spring arm
59860002 Edition 11 25.25.2011 / Bak Page 5/19
Wall attachment Mach 120/130
Mach LED 120/130
Wall bearing
Dr. Mach
Lamps and Engineering
Wall
Bracket
Light
Spring arm
59860002 Edition 11 25.25.2011 / Bak Page 6/19
Wall attachment Mach 120/130
Mach LED 120/130
3. Wall attachment
3.1 Preparatory work on the wall
70
190
lower fixation hole for wall bearing
Dr. Mach
Lamps and Engineering
Fastening with dowels
If dowels are included in the scope of supply,
please do not use them!
Dr. Mach cannot guarantee that the supplied
dowels are suitable with the existent wall.
Please ask a structural engineer for the proper
dowels according to the configuration of the
wall (see also the static inspection on page 5).
•In the case of a fixed connection, lay the
electrical cable.
Fastening with counter-plate
Depending on the stability of the location, it may be
necessary to use a counter-plate for the wall
attachment.
• Ascertain the exact position of the OT-lamp-
• In the case of a fixed connection, lay the
electrical cable.
• Stick the supplied drilling template to the wall.
• Drill the two holes ∅ 12mm and 190mm apart.
When drilling, keep as closely as possible to the
spacing between the holes. The counter-plate
can be mounted with variations of up to 20mm.
Electrical connection is carried out later using a 2m
long cable provided by Dr. Mach with shock-proof
plug on the wall arm.
It is important to check whether there is an
appropriate plug socket in the vicinity.
If the lamp is to be connected directly, the mains
connection must be located between the two fixing
screws (see section showing electrical connection).
Follow any directions given by the technical
staff!
59860002 Edition 11 25.25.2011 / Bak Page 7/19
Wall attachment Mach 120/130
Mach LED 120/130
4.2 Mounting the wall bearing
Dr. Mach
Lamps and Engineering
For mounting the wall bearing proceed as follows:
3
2
1
Fastening with dowels
• Fix the wall bearing with the dowels
recommended by the structural engineer.
• Place cover 1, cover 2 and cap 3 in position in
such a way that they engage in the locks.
Fastening with counter-plate
• Fix the wall bearing, push through the M10
threaded rods and screw on the wall bracket
and counter-plate using bolts and hexagonal
nuts (if necessary, weld the hexagonal nuts to
the counter-plate).
• Place cover 1, cover 2 and cap 3 in position in
such a way that they engage in the locks.
59860002 Edition 11 25.25.2011 / Bak Page 8/19
Wall attachment Mach 120/130
g
g
Mach LED 120/130
4.2.1 Wall attachment, room heights
90 800
Dr. Mach
Lamps and Engineering
Wall attachment
R700
985
ht=2000
hei
Passin
Lower fixation hole for wall bearing
Room heights H wall attachments
Lower borehole for
Lamps
Mach 120 2274
Mach 120F 2274
Mach 130 2274
Mach 130F 2274
Mach LED 120 2274
Mach LED 120F 2274
Mach LED 130 2274
Mach LED 130F 2274
wall bearing
(min)
59860002 Edition 11 25.25.2011 / Bak Page 9/19
Wall attachment Mach 120/130
Mach LED 120/130
Dr. Mach
Lamps and Engineering
4. Electrical connection
4.1 Preparing the electrical connection
Wall attachment
The lights Mach 130 and Mach 130F are normally supplied with integrated transformer and connection
cable with shock-proof plug. The socket used must be installed according to IEC or VDE 0100-710
requirements. In case of the lights Mach LED 120, Mach LED 120F, Mach 120 and Mach 120F the
transformer is positioned in the wall bearing.
Once the electrical connections have been completed, check that the system functions correctly in a noload operation trial run.
When connecting to an external transformer, the emerging voltage U will be approx. 10-20% above rated
voltage because of no load and anticipated lead losses. There is no point in making any adjustments until
the lamps have been completely mounted.
4.2 Position of transformer – Dr. Mach lamps
Lamps External transformer
Transformer
in the lamp housing
Remark
Mach 120 / 120F X*
Mach 130 / 130F X X*
Mach LED 120 / 120F X*
Mach LED 130 / 130F X*
* Transformer included in the extent of supply
5.3 Wall lights with external transformer / power supply
a. Lights Mach LED 120 / 120F and Mach 120 / 120F
Transformer or
power supply
Wall bearing
Bracket
In case of the lights Mach LED 120, Mach LED
120F, Mach 120 and Mach 120F the transformer is
positioned in the wall bearing.
It is possible to connect these lamps direct to a
power supply cable through the wall.
Optionally the lights can be connected by the
supplied connection cables with shock-proof plug to
the wall socket.
For models with
electronic transformer –
potentiometer instead of
change-over switch
59860002 Edition 11 25.25.2011 / Bak Page 10/19
Wall attachment Mach 120/130
Mach LED 120/130
5. Mounting the articulated arms and the l head
5.1 Mounting the articulated arms to the wall bearing
1
2
5
4
Wall bearing
Articulated arm
Dr. Mach
Lamps and Engineering
To mount the articulated arms proceed as follows:
• Loosen the screw 1.
• Remove cover 2 including the sliding contact-
plug.
• Remove circlip 3, gib washer 4 and levelling
washer 5 from the suspension tube (tool:
mounting plier).
• Slide the articulated arm onto the suspension
tube.
• Slide the levelling washer, gib washer and
circlip onto the suspension tube in the correct
order.
Take care to ensure that the nose of the gib
washer lies on the lateral bore (not shown) of
the suspension tube, and that the safety ring
slots properly into the groove of the suspension
pipe (tool: mounting plier).
• Place the cover 2 back on the articulated arm
and screw on with screw 1.
3
59860002 Edition 11 25.25.2011 / Bak Page 11/19
Wall attachment Mach 120/130
Mach LED 120/130
Dr. Mach
Lamps and Engineering
5.2 Mounting the lamp to the spring arm
ATTENTION! Notice the rated voltage information!
Coupling journal
Lamp bow
Sticker with
voltage information
Each lamp has a red sticker applied near the coupling journal at the lamp bow. The sticker shows
the rated voltage of the lamp.
Connect the lamp only to the prescribed voltage, to avoid irreparable damage (e.g. the electrical
components).
Following rated voltage is usual:
230V 24-28V DC 22,8V
After mounting the lamp take off the sticker and dispose it, otherwise it could fall down in the OTfield after some time!
120V
110V
59860002 Edition 11 25.25.2011 / Bak Page 12/19
Wall attachment Mach 120/130
Mach LED 120/130
Do not remove screw 13, it is designed
to fix the sliding contact and provides
earthling!
13
3 3
2
180°
5
13
8
10 12 11 9
3 6 4
8 8 7
180°
Dr. Mach
Lamps and Engineering
Attention: If the spring arm is pushed
downwards (the arm is under spring tension) it
may bounce up and cause harm. While
mounting the lamp head no other persons are
allowed to be within the swivel range of the
spring arm.
Mounting the lamp Mach 120/120F to the
spring arm
• Loosen brake screw 1, so the plastic bushing 2
can be slipped easy onto the spring arm.
• Slip plastic bushing 2 onto the spring arm to
1
12
overlap slots 3.
• Check if the journal 4 of the lamp is greased.
• Insert the greased journal 4 of the lamp and
insert security segment 5 completely into slot 3,
so that the security segment leads in groove 6.
• Rotate plastic bushing 2 by 180° up to the
provided drilling for the brake screw and
screw in brake screw 1 until you reach the
desired brake effect for lamp head 4.
•Check if lamp head 4 is firmly fixed.
Mounting the lights Mach LED 120/120F,
Mach LED 130/130F and Mach 130/130F to
the spring arm
• Loosen brake screw 12, so the plastic bushing
7 can be slipped easy onto the spring arm.
• Slip plastic bushing 7 onto the spring arm to
overlap slots 8.
• Check if the journal 9 of the lamp is greased.
• Insert the greased journal 9 of the lamp and
insert security segment 10 completely into slot
8, that the security segment leads in groove 11.
• Rotate plastic bushing 7 by 180° up to the
provided drilling for the brake screw and
screw in brake screw 12 until you reach the
desired brake effect for lamp head 9.
•Check if lamp head 9 is firmly fixed.
59860002 Edition 11 25.25.2011 / Bak Page 13/19
Wall attachment Mach 120/130
Mach LED 120/130
Dr. Mach
Lamps and Engineering
6. Cleaning
Note: Before doing any cleaning work turn off the lamp, disconnect from mains and make sure
that the lamp cannot be switched on again.
Please ensure that no disinfection liquid flows into the joints or lamp head.
The surface of the ceiling attachment can be easily kept clean by simply wiping with a wet cloth. You can
use conventional cleaning agents.
Caution:
In order to prevent any damage at plastic parts, do not use scouring agents or alkaline, acidic and
alcoholic cleaning agents.
For cleaning proceed as follows:
• Draw plug from mains.
• Wipe the surface of the ceiling attachment with a wet cloth. As a cleaning agent you can use water or
a soap solution (washing-up liquid).
7. Maintenance
Note: Before doing any maintenance work, turn off the lamp, disconnect from mains and make
sure, that the lamp cannot be switched on again.
7.1 Periodical maintenance work
The following maintenance work/tests has/have to be done every six months:
• check on defects in paint work;
• check on fissures at plastic parts;
• check on deformation of the suspension.
The following maintenance work/tests has/have to be done once a year:
• check the function;
• electrical safety test;
• check the suspension.
Remark:
Check and grease the security segment once a year.
59860002 Edition 11 25.25.2011 / Bak Page 14/19
Wall attachment Mach 120/130
Mach LED 120/130
Dr. Mach
Lamps and Engineering
7.2 Adjusting the spring force
Springs are wearing parts, thus the spring force can decrease in time and must be readjusted.
Note: Set the spring force in such a way, that the spring arm with the lamp head holds its position
at every set height.
B
A
B
In case the spring arm with the lamp moves
down on its own, proceed as follows:
•Remove lateral cover A. The adjusting screw (B)
for the spring force is visible now.
•Push the lamp and spring arm upwards as much
as possible, so the spring is without charge.
• Insert a slotted screwdriver into the screw B.
• Turn the adjusting screw to the left
(anticlockwise), until the lamp holds its position
at every set height.
In case the spring arm with the lamp moves
up on its own, proceed as follows:
•Remove lateral cover A. The adjusting screw (B)
for the spring force is visible now.
•Push the lamp and spring arm upwards as much
as possible, so the spring is without charge.
• Insert a slotted screwdriver into the screw B.
• Turn the adjusting screw to the right
(clockwise), until the lamp holds its position at
every set height.
7.3 Maintenance of the segment
• Dismount the lamp head in reverse order of mounting (see chapter 5.2).
• Check the thickness of the segment. It must be at least 1,5mm. In case the thickness of the segment
is less than 1,5mm, it has to be changed.
• Grease the segment and the coupling journal of the lamp.
• Mount the lamp to the spring arm (see chapter 5.2).
59860002 Edition 11 25.25.2011 / Bak Page 15/19
Wall attachment Mach 120/130
Mach LED 120/130
Dr. Mach
Lamps and Engineering
8. Data
8.1 Technical data
Rated voltage 120V / 230V
Rated frequency 50 / 60Hz
Power consumption 60W
Rated current at 24V 2,5A
Protection class I.
The device is not suitable for use in combustible blends of anaesthesia agents with air or for use in
combustible blends of anaesthesia agents with oxygen or nitrous oxide.
The device is designed for continuous operation.
8.2 Environmental conditions
Operation
Min. Max.
Wall attachment
Temperature +10°C +40°C
Relative atmospheric humidity 30% 75%
Air pressure 700hPa 1060hPa
Transport / storage
Temperature +10°C +40°C
Relative atmospheric humidity 30% 75%
Air pressure 700hPa 1060hPa
Min. Max.
9. Disposal
The wall attachments do not contain any danger goods.
The components of the wall attachment should be properly disposed at the end of its shelf life. In order to
respect all regulations for disposal, please contact us before disposing the product.
10. CE- mark
The products wall attachment comply to the EMC standards 93/42/EEC for medical
products of the European Community’s Council.
59860002 Edition 11 25.25.2011 / Bak Page 16/19
Wall attachment Mach 120/130
Mach LED 120/130
10. Dimensions and range of movement
90 800
Dr. Mach
Lamps and Engineering
Rmax=1900
R700
985
59860002 Edition 11 25.25.2011 / Bak Page 17/19
Wall attachment Mach 120/130
Mach LED 120/130
Dr. Mach
Lamps and Engineering
12. Spare parts
06
17,26
01,02,03
05
23,24 11,26 11,26
13
14
Mach 120
23,24
13
14
09
08 04
07
10
Mach 130
15
16,27(25)
09
08
07
59860002 Edition 11 25.25.2011 / Bak Page 18/19
18,19,20
16,27(25)
21,22
Wall attachment Mach 120/130
Mach LED 120/130
Dr. Mach
Lamps and Engineering
13. Spare parts list
Item Qty. Name Part no. Remark
01 1 Wall bearing 230V / 24V with power supply 60W
Halogen
02 1 Wall bearing 230V / 24V with power supply 60W