![](/html/85/85c6/85c6b93a116ff1e634f697b9a39266e565b661710edf76fbdd97b2c546542faf/bg1.png)
John Deere
750/1560/1590-15 ft
Grain Drill
Scale System
Instructions
And
Repair Parts
Ft. Atkinson, Wisconsin USA
Panningen, The Netherlands
www.digi-star.com
D3859-US-Rev A February 9, 2010
![](/html/85/85c6/85c6b93a116ff1e634f697b9a39266e565b661710edf76fbdd97b2c546542faf/bg2.png)
Table Of Contents
TABLE OF CONTENTS
INTRODUCTION ............................................................................................................................................................................................... 1
Charging Battery and Welding ....................................................................................................................................................................... 1
SCALE BRACKET AND LOAD CELL MOUNTING INSTALLATION ................................................................................................................. 2
John Deere Grain Drill Scale Kit .................................................................................................................................................................... 4
JUNCTION BOX MOUNTING ............................................................................................................................................................................ 5
Connect Load Cell and J-Box Cable .............................................................................................................................................................. 5
Installing wires into Terminal Block ................................................................................................................................................................ 5
INDICATOR MOUNTING ................................................................................................................................................................................... 6
Power Connection: ........................................................................................................................................................................................ 6
Load Cell Connection:.................................................................................................................................................................................... 6
TROUBLE SHOOTING ...................................................................................................................................................................................... 7
How to Check the Drill Scale after Installation ............................................................................................................................................... 7
REPAIR PARTS ................................................................................................................................................................................................ 8
Kit – Scale System ......................................................................................................................................................................................... 8
Indicator Swivel Mount ................................................................................................................................................................................. 10
LICENSE AGREEMENT .................................................................................................................................................................................. 11
All rights reserved. Reproduction of any part of this manual in any form whatsoever without Digi-Star’s express written permission is forbidden. The contents of this manual are subject
to change without notice. All efforts have been made to assure the accuracy of the contents of this manual. However, should any errors be detected, Digi-Star would greatly appreciate
being informed of them. The above notwithstanding, Digi-Star can assume no responsibility for errors in this manual or their consequence.
© Copyright! 2008 Digi-Star, Fort Atkinson (U.S.A.).
John Deere 750/1560/1590-15 ft Grain Drill D3859-US-Rev A
![](/html/85/85c6/85c6b93a116ff1e634f697b9a39266e565b661710edf76fbdd97b2c546542faf/bg3.png)
Introduction
INTRODUCTION
Congratulations on the purchase of your new Digi-Star Grain Drill Scale System. This scale system is
specifically designed to weigh the seed hopper on a John Deere 750/1560/1590-15 ft Grain Drill. The scale kit
can be used to record and monitor seed weight going into or out of the seed hopper.
The scale system is specially designed to weigh the central commodity seed hopper. The scale will record and
monitor seed weigh going into or out of the CCS hopper.
This scale system is covered by the following US patents: 6732667, 7059258 and 7273017. The single-use
license is included with this document (see page 11).
This
SAFETY ALERT SYMBOL
symbol, be alert to the possibility of
NEVER OPERATE WITHOUT ALL COVERS, SHIELDS AND GUARDS IN PLACE. KEEP
HANDS, FEET AND CLOTHING AWAY FROM MOVING PARTS. FAILURE TO HEED MAY RESULT IN
SERIOUS PERSONAL INJURY OR DEATH.
Some covers and guards have been removed for illustrative/photographic purposes only in this manual.
For information on ordering repair parts, refer to Parts Section in this book.
This supersedes all previous published instructions.
indicates important safety messages in the manual. When you see this
PERSONAL INJURY
and carefully read the message that follows.
Important!
Charging Battery and Welding
Disconnect all cables from the weighing indicator before charging the battery or welding on the machine. If
cables are left connected, the weighing indicator and connected load cells could be damaged.
Important:
Do not weld near indicator, load cells or cables; remove from area to be welded. Place ground
close to area to be welded to prevent current from passing through electronic parts.
Scale Indicator
Remote Indicator
O
tional
Disconnect
all cords
J-Box
D3859-US-Rev A John Deere 750/1560/1590-15 ft Grain Drill 1
![](/html/85/85c6/85c6b93a116ff1e634f697b9a39266e565b661710edf76fbdd97b2c546542faf/bg4.png)
Scale Bracket and Load Cell Mounting Installation
SCALE BRACKET AND LOAD CELL MOUNTING INSTALLATION
1. On the right side, as you are facing forward looking at the tractor, loosen the four 7/16 bolts that hold
the seed bin to the frame.
2. On the left side, remove the 7/16 bolts that hold the seed bin to the frame.
3. On the inner frame on the left side (that runs under the seed bin) place a jack between the frame and
seed bin. Lift the seed bin up about 2-1/2” on the left side.
It is recommended the hopper be supported by two methods when attaching the load cells and
brackets. In addition to lifting the hopper with a chain or nylon strap, the hopper should be supported in
the middle with a hydraulic jack or stands.
Important:
The lifting chains, bucket attachments, loader/skid steer or winch must be capable of lifting
and controlling 1000 lbs.
The hopper can be lifted
by wrapping a nylon strap
or chain around the
hopper end. (Left side of
hopper shown.)
Location of secondary hopper support
using the middle frame and a hydraulic
jack. The jack must support the hopper
bod
not the fluted wheel drive shaft.
2 John Deere 750/1560/1590-15 ft Grain Drill D3859-US-Rev A