Dell PowerEdge Rack Enclosure 4210 Cabling T710 White Paper

Cable Routing Procedures for Dell™ PowerEdge™ T710 Systems
Dell Datacenter Infrastructure Engineering
By Chris Kitten and Jose L. Flores
March 2011
Cable Routing Procedures for Dell™ PowerEdge™ T710 Systems
THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES ONLY, AND MAY CONTAIN TYPOGRAPHICAL ERRORS AND TECHNICAL INACCURACIES. THE CONTENT IS PROVIDED AS IS, WITHOUT EXPRESS OR IMPLIED WARRANTIES OF ANY KIND.
© 2011 Dell Inc. All rights reserved. Reproduction of this material in any manner whatsoever without the express written permission of Dell Inc. is strictly forbidden. For more information, contact Dell.
Dell
, the
DELL
logo, the
Page ii
DELL
badge, and
PowerEdge
are trademarks of Dell Inc.
Cable Routing Procedures for Dell™ PowerEdge™ T710 Systems
Contents
Introduction ............................................................................................................................................................... 2
Section 1: Cabling a Dell™ PowerEdge™ T710 With a Cable Management Arm (CMA) ............................................ 2
1.1 Connecting the CMA Cables to the System .................................................................................................. 2
1.2 Routing the Power Cables Through the Strain Reliefs ................................................................................. 3
1.3 Installation of the CMA ................................................................................................................................ 3
Section 2: Cabling a Dell™ PowerEdge™ T710 System Without a CMA ..................................................................... 5
2.1 Routing the Cables ....................................................................................................................................... 5
Section 3: Replacing a Power Supply on a PowerEdge™ T710 System With a CMA.................................................. 6
Table of Figures
Figure 1: System with Cables Installed .................................................................................................................. 2
Figure 2: Routing Power Cables Through the Strain Reliefs ............................................................................. 3
Figure 3: Routing the Cables Through the CMA ................................................................................................. 4
Figure 4: Right-Side Mounted CMA Installation .................................................................................................. 4
Figure 5: Left-Side Mounted CMA Installation ..................................................................................................... 5
Figure 6: Cable Routing Without a CMA ............................................................................................................... 5
Figure 7: Replacing the Power Supply ................................................................................................................... 6
Page 1
Loading...
+ 5 hidden pages