DeDietrich GT 123 A, GT 125 A, GT 124 A, GT 126 A Installation And Maintenance Manual

GT 120 A - GT 1200 A
Please Read & Save This Manual for Future Reference
Oil-Gas Fired Hot Water Boiler
English
09/02/08
GT 120 A
GT 1200 A
Assembly, installation and maintenance manual
Warning:
Before putting the boiler into operation read this manual carefully.
Warning:
The operating manual is part of the documentation that is delivered to the installation’s operator. Go through the information in this manual with the owner/operator and make sure that he or she is familiar with all the necessary operating instructions.
Notice:
This manual must be retained for future reference. Improper installation, adjustment, alteration, service or maintenance can cause injury, loss of life or property damage. Refer to this manual. For assistance or additional information consult a qualified installer, service agency or the gas supplier.
94863361
Guideline of Notices
Do not use gasoline, crankcase draining, or any other oil containing gasoline.
Never Burn garbage or paper in the unit, and never leave combustible material around it.
Safety Considerations
Warning:
indicates presence of hazards that can cause, if not avoided, severe personal injury, death or substantial property damage.
! Caution:
indicates presence of hazards that will or can cause, if not avoided, minor personal injury or property damage.
Notice:
Application comment for optimum use of equipment and adjustment as well as useful information.
Reference to an other instruction book.
Z
Observe the following symbols
DANGER
due to explosion of gas.
- Work only on gas components when you have a license to do so.
- Note that the assembly of gas and vent connections, the initial start-up, the electrical connections, the maintenance and service can only be performed by a licensed service contractor or technician.
DANGER
due to electricity.
- Prior to doing any work on the heating system, disconnect all electrical power to the boiler at the emergency switch.
- It is NOT sufficient to shut off only the boiler control!
! CAUTION!
SYSTEM DAMAGE due to improper installation.
- Observe local and state codes as well as common industry practices during the installation and operation of the heating appliance.
! CAUTION!
SYSTEM DAMAGE due to inadequate cleaning and maintenance.
- A boiler cleaning and maintenance should be performed annually. Verify complete system operation at the same time.
- Correct the problem immediately to prevent damage to the system!
! Caution:
Refer to User’s Manual regarding the carcinogenic hazard of crystalline silica that may be found during installation, servicing and removal of this boiler.
Please observe the following safety instructions. Read this manual carefully. Correct installation and adjustment of the burner and the control
panel is a precondition for safe, efficient operation of the boiler. Read this manual and the specifications on the safety label carefully
before attempting to put the burner into operation.
Do not store or use gasoline or other flammable liquids in
the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
- Do not try to light any appliance.
- Do not touch any electric switch, do not use any phone in your building.
- Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
- If you cannot reach your gas supplier, call the Fire Department.
Installation and service must be performed by a qualified installer, service agency or the gas supplier.
Warning:
Improper installation, adjustment, and/or operation could cause carbon monoxide poisoning resulting in injury or death. This product must be installed and serviced by a professional service technician who is experienced and qualified in hot water boiler installation and gas combustion.
! Caution: Strict compliance with these instructions is a
precondition for the correct operation of the boiler.
! IMPORTANT
Service on this boiler should be undertaken only by trained and skilled personnel. Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors and liquids. Do not place any obstruction in the boiler room that will hinder the flow of combustion and ventilating air. Read these instructions carefully before proceeding with the installation of boiler. Post instructions near boiler for reference by owner and serviceman. Maintain instructions in legible condition.
“Installation of this equipment must be in accordance to all local codes and authorities having jurisdication, in conjunction with national codes”
- Canadian Installations: CSA B149.1 & .2 for gas fired boilers & CSA B139 for oil fired boilers
- USA Installations: NFPA 31 for oil fired boilers & NFPA 54/ANSI Z223.1 for gas fired boilers
2
“Please consult all applicable codes having jurisdication in which the boiler is being installed”
The boiler must be connected to a venting system that will safely discharge all flue gases outside effectively and safely.
GT 120 A - GT 1200 A 09/02/08 - 94863361 - 85784009D

Contents

Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Regulations and guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
1 Uncrating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
2 Technical specifications of boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
3 Main Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
1 Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
2 Combustion air requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Piping connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
1 Dimensional Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
2 Example of installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Chimney connection - Venting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
1 Flue size. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
2 Dimensional information required for the connection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
3 Venting layout. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
4 Termination location. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26
Connecting the burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28
Electrical connections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28
Start up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28
Periodic maintenance and checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
1 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
2 Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
1 Precautions required in the case of long boiler stops (one or more years) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
2 Precautions required if the heating is stopped when there is a risk of freezing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Spare parts - GT 120 A - GT 1200 A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32
09/02/08 - 94863361 - 85784009D GT 120 A - GT 1200 A
3

Regulations and guidelines

The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z 223.1 / NFPA 54. In Canada, installation must be in accordance with the requirements of CAN/ CGA B149.1 or 2 Installation Code for Gas Burning Appliances and Equipment. Where required by the authority having jurisdiction, the installation must conform to the Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1.
Install CO detectors per local regulations. Boiler requires yearly maintenance, see "Connecting the burner", page 28.
The boilers of the GT 120 A range are automatic independent hot­water boilers designed for connecting to a flue which require a sepa-

1 Uncrating

Upon arrival, check shipment to ensure all parts have been shipped. Inspect all items for delivery damage. Report all damage and short­ages to the delivery carrier. Report any damage and shortages to the Distributor.
Only a qualified installing contractor may carry out the installation, the initial start-up, the connection for fixed gas and vent gas, and conversion to another type of gas. The hot water distribution system must comply with the applicable codes and regulations. When replacing an existing boiler, it is important to check the entire hot water distribution system to insure safe operation. Maintenance and cleaning must be carried out at least once a year by a trained service technician. The entire installation must be tested for proper operation. Any defects detected must be fixed immediately.
General
rate fuel oil or gas burner.
Parts list:
Boiler Box nr. GT 123 A GT 124 A GT 125 A GT 126 A
Assembled boiler body
Control S2NA panel or
E (Easymatic)
MA3 1 MA4 1 MA5 1 MA6 1
ME50
or
FM199
ME50
or
FM199
ME50
or
FM199
ME50 FM199
or
4
GT 120 A - GT 1200 A 09/02/08 - 94863361 - 85784009D

2 Technical specifications of boilers

Item Unit GT 123 A GT 124 A GT 125 A GT 126 A
Firing Sequence Gas-Oil - On-Off - Single Stage Only
[CSA] - Gas Input
[CSA] - # 2 Fuel Oil Input US GPH 0.65 0.80 1.00 1.15
[CSA] - Output [Gas-Oil] [NET] - Output [Gas-Oil] MBH 68 83 104 120
[CSA] - AFUE Effy. % Gas 85% & Oil 87%
Cast Iron Sections # 3 4 5 6
+HDWLQJVXUIDFHDUHD6TIW
Water capacity
Water resistance
[
t = °F]
Combustion chamber
Dimensions
MAWP [Water] PSI
Min. Safety Relief Capacity MBH
Electrical Connection V/P/H 120/1/60
Maximum Temperature [Water]
S2NA Panel
Operating Water Temperature Range
Chamber Resistance
Gas-Vent Category # I, II - III or IV
Boiler Vent Connection Inch 5 5 5 6
Weight [Dry]
18° F 27° F 36° F
Diameter
[Equivalent]
Depth
Volume
MBH 94 115 144 166
kW 27.5 33.7 42.2 48.65
MBH 78 96 120 138
kW 22.9 28.1 35.2 40.4
US Gal 5 6.5 7.9 9.4
Liter 19 24.5 30 35.5
O
Ft. H
2
Ft. H2O Ft. H2O
Inch 9.45
mm 240
Inch 12.13 17.13 22.13 27.13
mm 308 435 562 689
3
ft
3
m
°F 230 °C 110 °F 104 - 212 °C 40 - 100
Inch w.c. 0.06 0.09 0.09 0.09
mbar
lb 302 357 412 470
kg 137 162 187 213
0.13 0.20 0.30 0.42
0.06 0.09 0.14 0.19
0.03 0.05 0.08 0.11
0.57 0.74 0.92 1.09
16.0 21.0 26.0 31.0
ASME IV Rating Class 30 - (60 PSI) [See Canadian Provincial CRN
78
0.15 0.22 0.22 0.22
approvals]
96 120 138
M
- CSA - MBH Output based on Thermal Efficiency Test According to ANSI Z21.13a/CSA 4.9a-2005
- [NET] MBH Output Factor 1.15, Allowance for Piping and Pickup Losses
- All Models Comply and Certified in Accordance to the latest Canadian & US standards
- To Obtain Current IBR Ratings, consult their publications and website.
- Chamber Resistance Based on Neutral Chimney-Vent Pressure
- Gas Vent Category Based on Several Factors [CO2 content, Vent Pressure & Net-Flue Gas Temp]
- Approved for Direct-Vent, Use Only Approved Venting as Listed
- Natural Draft Applications, Approved for Type L vent [Gas-Oil] or Type B Vent [Gas Only]
- Conversion Btu to kW = 3,412 Btu per kW
- All Models are Design Certified & Eligible to Bear Approval Marking as Shown.
- All Models Certified to Fire; # 2 oil, Natural & Propane Gases. Consult factory for Available Burners.
02/10/06 - 94863361 - 85784009D GT 120 A - GT 1200 A
5

3 Main Dimensions

Note:
Dimension 'A' will be increased with applied burner, consult burner documentation for dimensions and required service clearance required.
GT 120 A
3
11/16
3/8
9
B
14
7
11/16
2
7/8
32
(1)
GT
123 A
GT
124 A
GT
125 A
GT
126 A
10
11
7/16
1
3/8
11
7/16
22
10
A B øD E F
26
22
32
37
1/4
15/16
1/4
1/4
27
32
37
42 6
4
4
4
15/16
15/16
15/16
11
16
21
26
1
13/16
13/16
13/16
13/16
3/4
2
F
3/8
2
1/8
1
E
A
7/16
6
3/16
22
1/2
15
7/16
5
1/8
6
1/4
11
7/16
22
(1) Adjustable feet : basic height 1”, adjustment range 1” to 1
3
3/4
2
4
5
6
7/16
4
8578N014B
9/16
1 1 1/4 threated heating outlet
2
2 Tapping 1/4”
2
2
3 Tapping 3/4” 4 Flue gas nozzle ø D 5 1 1/4 threated heating return
7/8
3
6 1/2” tapped draining outlet 10 4 x M8 on ø 5
4 markings on ø 6
5/16
11 ø 4
1/8
cut-out
ø 5
7/8
15/16
hole
6
GT 120 A - GT 1200 A 09/02/08 - 94863361 - 85784009D
GT 1200 A
9/16
(3)
58
3/4
22
7/16
3/8
11/16
3
10
11
1/8
36
5/8
23
1
F
3/8
2
1/8
1
B
A
1/2
46
13/16
39
14
1/4
11
1/8
6
3/4
29
7
8
9
9
11/16
7
3/423/4
2
2
3
1/8
5/16
20
1/16
29
11
GT 1203/160 GT 1204/160 GT 1205/160
1/2
6
GT 1206/160
4
5
6
1/4
3/8
11
2
GT 1203
A/160
GT 1204
A/160
GT 1205
A/160
GT 1206
A/160
GT 1205
A/250
GT 1206
A/250
1/4
19 23
5/8
(2)
3/8
1
A B øD F
26
22
32
37
32
37
1/4
15/16
1/4
1/4
1/4
1/4
27
32
37
42 7
37
42 7
4
4
4
4
15/16
15/16
15/16
15/16
1/16
2
2
2
2
7/8
3
2
7/8
3
5/8
5/8
36 (160 L.)
36
7/16
51 (250 L.)
1/4
3
3/8
(2) Adjustable feet : basic height 1 (3) Adjustable feet : feet screwed to lock at
9/16
possible
1
, adjustment range 1
3/4
adjustment from
1 1 1/4 threated heating outlet 2 Tapping 1/4” 3 Tapping 3/4” 4 Flue gas nozzle ø D 5 1 1/4 threated heating return 6 1/2” tapped draining outlet 7 Domestic hot water outlet - R 1 8 Domestic hot water circulation loop return R 3/4 9 Domestic cold water inlet - R 1 10 4 x M8 on ø 5
4 markings on ø 6
5/16
11 ø 4
1/8
cut-out
ø 5
14/16
15/16
hole
R = thread
1/8
11
1306
GT 1205/250 GT 1206/250
3/8
to 1
3/4
9/16
to
G = cylindrical external thread, leak tightness by flat washer
09/02/08 - 94863361 - 85784009D GT 120 A - GT 1200 A
7

1 Location

Installation

Sufficient space shall be left clear around the boiler. The figures stated in
inches in the drawings below are the minimum
GT 120 A
recommended dimensions for providing easy access around the boiler. Dimension 'X' must provide 24 inches in front of the burner for service.
Boiler A (in)
GT 123 A
GT 124 A
GT 125 A
GT 126 A
1/4
22
15/16
26
1/4
32
1/4
37
GT 1200 A
Boiler L (in)
GT 1203 A
GT 1204 A
GT 1205 A 37 GT 1206 A 42
GT 1205 A
GT 1206 A
Floor : non combustible - do not install on carpet
10/16
36
10/16
36
7/16
51
7/16
51
33
19
A
22
19
8578N016A
19
X
19
L
23
19
8578N017A
19
X

2 Combustion air requirements

8
Warning:
Inadequate combustion air supply will result in carbon monoxide [CO] development.
Ensure boiler room is provided with an obstruction free combustion air source,
Sources must be sized to provide ample supply, more than one o pening maybe required.
Ensure boiler room must be been with adequate se rvicing clearances.
Ensure boiler installed with proper clearance to combustible mate rials
Do not store combustible materials, flammable fluids or vapors near the boiler.
Do not operate the boiler under a negative building pressure.
The combustion air supply depends on the volume and construction of the building, more than one combustion air supply source or openings maybe required. Combustion air sources that are provided by mechanical device or electrically operated must be interlocked with the boiler/burner to ensure they are in the correct position.
The combustion air supply must be from a source that is free from airborne contaminates such as dust, fumes, corrosive elements, hydrocarbons and any other known air containments. If the combustion air quality is unknown or is a concern, please consult the factory for assistance. Failure in complying with any of these requirements will result in void of product warranty.
Particular installation areas and other equipment occupying the same room, precautions regarding the combustion air supply and quality.
Rural areas
Chemical plants
Automotive shops
Beauty shops
Paint shops
The combustion air supply/source must be sized in accordance to local and national codes.
Canada – CSA B149 for gas installations Canada – CSA B139 for oil installations
Consult local building codes, for any other additional combustion air supply or source requirements.
Agricultural
Green houses
Mechanical rooms
Other fuel burning equipment.
US – ANSI Z223.1/NFPA 54 for gas installations US – NFPA 31 for oil installations
GT 120 A - GT 1200 A 09/02/08 - 94863361 - 85784009D
The assembly of any options delivered with the boiler is described in the instructions accompanying the options. The list of available options is indicated in the price list in force.
Step one
Removing the front panel
Lift the window.
Unscrew the two front panel side attachment screws.
Unclip the front panel from the clips and notches near the top,
and pull it towards you.
Remove the front panel from the notches in the bottom of the side
panels.
Assembly
1
2
3
2
3
Step two
Reverse the direction of opening of the burner door if necessary (opening at left)
When the burner leaves the factory, the burner door opens towards the right. To open the burner door towards the left (if necessary):
- remove the front cap, then
- perform following operations: 2.1, 2.2 and 2.3.
Loosen the 2 top and bottom nuts.
Remove the lower and upper hinges.
2.1
4
8578N031
9
Remove the cast iron hinge pin for the burner door fixed by the 2
screws
- Reinstall the cast iron hinge pin
side using the 2 screws
. Put the two screws  back on the right-hand side.
for the burner door on the left
.
2.2
- Reinstall the hinge pins
nuts located on the burner door hinge pins, on the left side, as shown on the adjacent figure.
- Tighten the 2 nuts.
Step three
on the left side, fixing them using the
2.3
GT120A boilers can be installed on an L160 or L250 domestic hot water tank
- perform following operations:
Fixing the feet
- Screw the 4 adjustable feet (delivered in the hot water tank
instruction packet) to the base of the tank.
10
, 
and .
GT 120 A - GT 1200 A 09/02/08 - 94863361 - 85784009D
8575N046B
Levelling the tank
- Level the tank using the adjustable feet.
3/8
3/8
to 1
,
9/16
possible.
Base measurement 1 Adjustment from 1
Fixing the boiler on the DHW tank
Using gloves, lift the boiler using 2 ø3/4” tubes placed as shown in the drawing, or with the two handles on the lower part of each side of the boiler.
8575N047D
19
Boiler
P (in)
GT 1203/160
GT 1204/160
GT 1205/160
GT 1205/250
GT 1206/250
1/8
11
GT 1206/160
1/2
6
P
C
09/02/08 - 94863361 - 85784009D GT 120 A - GT 1200 A
11
Step four
The burner as supplied shall be installed according to the manufacturers supplied documents and installation requirements.
The fuel tank, fuel lines and filters and connection to the burner must comply to all National and local codes as required.
CSA B139 Oil CSA B149 Gas ANSI Z223 Gas NFPA 31 Oil
The maintenance required for the burner and associated fittings, are described with each burner as supplied, consult their documentation.
Installing the burner
- Installing the burner fixing flange
See burner manufacturer instructions for burner installation. Diagram 4.1 is for reference only. Burner mounting tools are not supplied.
4.1
1
8575N239C
Fixing the burner to the boiler
Note:
When the connections have been made and the installation has been filled with water, start the burner with reference to the instructions provided with it.
Burner shown is for demonstration purposes, only. Consult burner manufactures installation instructions.
4.2
8575N459
12
GT 120 A - GT 1200 A 09/02/08 - 94863361 - 85784009D
Loading...
+ 28 hidden pages