DAVIS Vantage Vue Quick Setup Guide

0 (0)
DAVIS Vantage Vue Quick Setup Guide

Quick Setup Guide

Please refer to your manuals for detailed instructions.

1. Prepare the Integrated Sensor Suite (ISS): attach wind cups and wind vane; install debris screen, rain collector tipping spoon assembly, and battery. (Pages 3-4, ISS Installation Manual)

2. Install, power and set up console. (Pages 2 -15, Console Installation Manual)

3. Verify data from ISS to the console. (Page 6, ISS Installation Manual)

Up to

10 minutes

3+ meters

10+ feet

Note: For best reception during this step, console and ISS should be at least 10 feet (3 meters) apart . (Initial reception typically takes 1 -3 minutes but can take up to 10 minutes depending on speci c environmental conditions.)

4. Install the ISS. (Pages 7-10, ISS Installation Manual)

Need help? Check the FAQs at www.davisnet.com/support.

The latest version of the Vantage Vue manuals can be downloaded from our web site at www.davisnet.com/support

 

Copyright ©2009 Davis Instruments Corp. All rights reserved.

US

Document Part Number: 07395.257 Rev. A Aug. 17, 2009

For Vantage Vue Weather Stations #6250, 6351, 6357

Loading...