Daikin air handling units guarantee high quality indoor air at low energy costs. Fully
customisable systems or pre-configured standard modular units are available.
Armed with an extremely flexible development, Daikin air handling units are able to
satisfy all types of technical requirements.
Daikin systems guarantee respect for the environment since they are based on high
levels of energy efficiency. Reduced ecological impact and low energy consumption
make Daikin air handling units ideal for any type of market.
Page 3
Contents
Important warnings 4
Purpose of the manual 4
Intended use of the machine 4
Safety regulations 5
What to do in case of accident? 7
Residual risks 8
Safety devices 9
Machine characteristics 10
Environmental conditions 10
Environmental contamination 10
Electrical panel limit operating conditions 10
Range specifications 11
Summary of machine operation 13
Attachments 13
Adhesives on the machine 14
Machine description 16
Receipt of the cartons 19
Reading the packaging symbols 19
Transport 20
Lifting using hooks 20
Lifting using a pallet truck 21
Lifting non-palletised equipment 21
Unpacking and verification of integrity 22
After unpacking 22
Reading the serial number plate 23
Storage waiting for installation 24
The pictogram shows a situation of immediate danger or a dangerous situation that might cause injuries or death.
The pictogram shows that it is necessary to adopt suitable behaviour in order to avoid jeopardising staff safety and
cause damages to the equipment.
The pictogram shows particularly important technical information that should be taken into consideration by the
people installing or using the equipment.
Purpose of the manual
The purpose of this manual is to guide the installer and qualified operator in the installation, maintenance and proper and safe use of the equipment. For this reason, it is mandatory for all personnel
involved in installation, maintenance and supervision of the machine to read this manual.
Contact the manufacturer if any points are unclear or difficult to understand.
This manual contains information regarding:
- Technical specifications of the machine.
- Instructions for transport, handling, installation and assembly.
- Use.
- Information for instructing personnel authorised for its use.
- Maintenance activities.
All information refers in general to any unit of the Modular R and Modular P ranges. All units are shipped
accompanied by:
- electrical diagram;
- manual for all accessories;
- section coupling manual;
- operating manual;
- installation manual;
- declaration of conformity;
- electrical panel CE certification;
- electrical panel test report.
Intended use of the machine
This appliance has the function of treating the air intended to condition civil and industrial environments. Any other use is not in accordance with the intended use and therefore dangerous.
These ranges of units are designed for use in NON-explosive environments. For installation in potentially explosive environments, the manufacturer can design and manufacture suitable machines (an-
ti-explosion) that will be identified by the mark.
If the machine is used in critical situations, by type of system or environmental context, the customer
must identify and adopt the technical and operational measures to avoid damage of any kind.
4
Page 5
Safety regulations
Skills required for the installation of the machine
Installers must perform operations according to their professional qualifications: all activities not within one's expertise
(i.e. electrical connections) must be carried out by specialised and qualified staff so as not to endanger one's safety and
the safety of the other operators interacting with the machine.
Transport and equipment handling operator: authorised person with recognised expertise in using transport
and lifting equipment.
Technical installer: expert technician, sent or authorized by the manufacturer or its representative, with adequate
skills and training to install the machine.
Assistant: technician subject to care obligations while lifting and assembling the equipment. He must be suitably
trained and informed about the operations to perform and the safety plans of the site/installation location.
In this manual, the technician competent to carry out each operation is specified.
Skills required for the use and maintenance of the machine
Generic operator: AUTHORISED to run the machine using commands placed on the keypad of the electrical control
panel. Performs only machine control operations, power on/off.
Maintenance mechanic (qualified): AUTHORISED to carry out maintenance, adjustments, replacement and repair
of mechanical parts. It must be a person competent in mechanical systems, therefore able to perform mechanical
maintenance in a satisfactory and safe manner, must possess theoretical preparation and manual experience. NOT
AUTHORISED to work on electrical systems.
Manufacturer's technician (qualified): AUTHORISED to perform complicated operations in every situation. Oper-
ates in accordance with the user.
Maintenance electrician (qualified): AUTHORISED to perform service of an electric nature, adjustments, mainte-
nance and electrical repairs. AUTHORISED to operate in the presence of an active electrical connection inside the
control panels and junction boxes. It must be a person competent in electronics and electrical engineering, therefore
able to work on electrical systems satisfactorily and safely, must possess theoretical knowledge and proven experience. NOT AUTHORISED to work on mechanical systems.
Installers, users and maintenance staff for the machine must also:
- Be responsible and experienced adults without physical impairments, in perfect psychological and physical condition.
- Master the machine's operating cycle, therefore participate in theoretical/practical training alongside an expert machine operator,
or alongside a technician of the manufacturer.
In this manual, the technician competent to carry out each operation is specified.
5
Page 6
Read this manual carefully before machine installation and maintenance and keep it for any
further future consultation by the various operators. Do not remove, tear out or rewrite any part
of this manual.
All installation, assembly, electrical connections to the mains and ordinary/extraordinary maintenance must be performed only by qualied personnel authorised by the Retailer or Manu-facturer after turning off the unit electrically and using personal protective equipment (i.e., gloves,
protective goggles, etc.), in compliance with the regulations in force in the country the equipment
is to be used in and the laws regarding the systems and safety in the workplace.
Installation, use or maintenance other than those specified in the manual may cause damage,
injury or death, invalidate the warranty and relieve the Manufacturer of any liability.
Use protective clothing and suitable equipment while handling or installing the equipment, in
order to prevent accidents and safeguard your own and other people's safety. Individuals not
assigned to installation or maintenance are NOT allowed to stand or pass through the work area
while the machine is assembled.
Disconnect the equipment from the mains before installing or maintaining it.
Before installing the equipment, check that the systems comply with the legal provisions in
force in the country of use and meet the specifications on the serial number plate.
It is the responsibility of the user/installer to check the static and dynamic stability relative to the
installation and to arrange environments so that people who are not competent or author-ised DO NOT have access to the machine or to its commands.
It is the responsibility of the user/installer to make sure that weather conditions do not affect the
safety of persons and property during installation, use and maintenance.
Make sure the air intake is not located near any exhausts, flue-gases or other contaminating el-
ements.
Do NOT install the equipment in places exposed to strong winds, salt air, open flames or tem-
peratures exceeding 46°C (115°F).
After installation is complete, instruct the user on the correct use of the machine.
If the equipment does not work or functional or structural alterations are noted, disconnect it
from the mains and contact a service centre authorised by the Manufacturer or Retailer, without attempting to repair it on your own. For any replacements request the use of original spare
parts.
Unauthorised actions, tampering or modifications that do not follow the information provided
in this manual can cause damage, injuries or fatal accidents and void the warranty.
The serial number plate on the unit provides important technical information, essential in case
of machine maintenance or repairs. We recommend that you do not remove, damage or modify
it.
In order to ensure correct and safe conditions of use, it is recommended to have the unit main-
tained and checked at least annually by a service centre authorised by the manufacturer or
dealer.
Failure to follow these instructions may cause damage and injuries, even fatal, voids the
warranty and relieves the Manufacturer of any liability.
6
Page 7
Information ownership
This Manual contains proprietary information. All rights reserved.
This manual may not be reproduced or photocopied, in whole or in part, without the Manufacturer's
prior written consent. The use of this documentary material is allowed only to the customer to whom
the manual has been supplied as a kit for the machine and only for the purposes of installation, use and
maintenance of the machine to which the manual refers. The Manufacturer declares that the information
contained in this manual is congruent with the technical and safety specifications of the machine to
which the manual refers. The drawings, diagrams and technical data shown are updated to the date of
publication of this document and are valid exclusively for the machine they accompanied. The Manufacturer reserves the right to make changes or improvements to this documentary material without notice.
The Manufacturer accepts no responsibility for direct or indirect damage to persons, things or pets resulting from the use of this documentary material or the machine in conditions other than those provided for.
What to do in case of accident?
Installation, use and maintenance should always be performed along with other people who are able to provide assistance in
case of accident.
WHAT TO DO IN CASE OF AN ACCIDENT (general rules)
- remain calm and lucid, quickly examine the situation and act accordingly;
- if necessar y, disconnect the machine's power supply;
- promptly call emergency services (118 in Italy) without abandoning the victim, explaining what happened and listening care-
fully to the instructions of the emergency services;
- carry out first aid (see section below), remain close to the accident victim, watching and comforting him/her with your presence until
the first responders arrive;
While waiting for rst responders:
- move the victim only if absolutely necessary, for example to move him/her away from more serious hazards (e.g., fire, gas leak, etc.);
- avoid coming into contact with any blood or secretions, protecting your hands with gloves and if possible the mucous membranes of
your eyes with protective glasses;
- if conscious, have the injured person lie down, loosen tight clothing, open the windows if in a closed place and keep back the bystand-
ers who tend to crowd the place. If unconscious, place the victim in the lateral safety position (see drawing) and cover him/her with
a blanket.
lateral safety position
- if the injured person is haemorrhaging (bleeding) significantly, promptly arrest the blood loss with manual compression, using a tour-
niquet only as a last resort (as it can lead to tissue damage);
- if the injured person is not breathing or is in cardiac arrest, perform CPR;
WHAT NOT TO DO:
- Never give alcohol to the injured person, and, if unconscious, any type of drink.
- Never take any action that is the physician's responsibility (e.g., administering medicines).
7
Page 8
Residual risks
Despite having implemented and adopted all the safety measures indicated by applicable regulations,
some residual risks remain. In particular, in some operations of replacement, adjustment and tooling maximum attention is always required in order to work in the best possible conditions.
List of operations with residual risks
Risks for qualified personnel (electrician and mechanic)
- Handling - during unloading and handling it is necessary to pay attention to all the steps listed in this manual regarding the points
of reference
- Installation - during installation it is necessary to pay attention to all the steps listed in this manual regarding the points of reference
The installer must ensure the static and dynamic stability of the machine's site of installation.
- Maintenance - during maintenance it is necessary to pay attention to all the steps listed in this manual, and in particular to high
temperatures that may be present in the heat transfer fluid lines to/from the unit.
- Cleaning - the machine must be cleaned only when it is switched off, by turning off the switch installed by the electrician and the
switch located on the unit itself. The key for interrupting the power supply must be kept by the operator until the end of the cleaning operations. Internal cleaning of the machine must be carried out using the protections required by current regulations. While
the inside of the machine does not contain particular hazards, it is necessary to pay the utmost attention so that accidents do not
occur during cleaning. The heat exchange coils that have a potentially sharp finned pack must be cleaned using protective glasses
and gloves suitable for handling metals.
During adjustment, maintenance and cleaning there are residual risks of variable entity. Being operations
that must be performed with guards disabled, it is necessary to pay particular attention in order to avoid
damage to persons and things.
Always pay close attention when performing the operations specified above.
Remember that these operations must always be performed by authorised personnel.
All work must be completed in accordance with the legal provisions relating to work safety.
Remember that the unit in question is an integral part of a larger system that includes other components,
depending on the final characteristics of realisation and the mode of use. Therefore in the end it is the responsibility of the user and assembler to assess the residual risks and their respective preventive measures.
For more information about the possible risks, please refer to the RAD (Risk Assessment Document) available from the manufacturer.
8
Page 9
Safety devices
The machine is equipped with safety devices to prevent risks of damage to persons and for
proper operation. Always pay attention to the symbols and safety devices on the machine. It
should only operate with the safety devices engaged and with fixed or movable guards installed correctly and in the proper position.
If during installation, use or maintenance the safety devices have been temporarily removed
or disabled, the machine can be operated exclusively by the qualified technician who made
this change. It is mandatory to prevent other people's access to the machine. When finished,
restore the devices to their proper status as soon as possible.
Key lock (standard): the doors to access the machine's fan area have a key lock on the handle, to avoid their opening by unauthorised persons.
Micro Switch (optional): the doors to access the machine's fan areas can be equipped with a Micro Switch to interrupt the
power supply. They are of the "magnetic proximity sensor" type with polarised magnet, which cannot be excluded by means of
magnetised instruments, guaranteeing correct operation even in conditions of permanent humidity.
Protective guard (optional): in the transmission area the motor-cooling unit is equipped with a suitably shaped protective
guard, mechanically and jointly attached.
Safety handles (standard): double-click handle system for the access doors to the ventilating area of the machine to prevent
accidental opening during operation.
9
Page 10
2
Machine characteristics
Environmental conditions
The machine was designed to operate in technical spaces or outdoors. It CANNOT operate
in environments with explosive material, high concentration of dust and in environments
with high temperatures (range from -25 to 46°C - maximum altitude: 2500 m above
46°C
90% max
sea level), unless specific production requests were made.
These machines are used to resolve thermohygrometric and air purity problems in both civil
and industrial environments.
Thanks to its modularity, each machine is able to adapt to different needs in terms of air
handling:
- civil
- airports
- banking
- commercial
- hotel
- museums, theatres, cinemas and auditoriums
- television and recording studios
- libraries
- data processing centres
The optimised choice of every detail, the search for maximum efficiency in each component, the adoption of specific materials and constructive solutions transform environment friendliness and energy savings into valid and advanced technological solutions.
Environmental contamination
Depending on the installation operating environment, specific regulations must be followed and all the
necessary precautions must be taken to avoid environmental issues (a system that operates in a hospital
or chemical environment can have problems different from those in other sectors, even from the point of
view of disposal of consumable parts, filters, etc.).
It is mandatory for the buyer to inform and train workers regarding proper procedures.
- Min. air pressure 260 hPa, corresponding to a maximum of 10,000 m above sea level
10
Page 11
Range specifications
The MACHINE is designed and built for air treatment and can have different configurations depending on
the type of treatment requested by the customer. In this sense, the MACHINE consists of several sections,
each of them with a specific function, which may or may not be present according to the type of treatment requested.
The supporting structure consists of profiles made by aluminium alloy extrusion. The fixing screws are
concealed in the profile itself so as to have smooth surfaces on the inside. The panels of the structure
consist of two zinc-plated box press-folded sheets injected with polyurethane. Alternatively, as an insulator, mineral wool can be used. Where necessary, along the panels, doors with locked handles and/or
portholes are installed to inspect the inside of the machine.
Construction specifications:
- Profile type: anodised aluminium with thermal break
- Insulation panels: polyurethane or mineral wool
Base module
- Condensing or absorbing rotary recuperator, or with counterflow plates;
- Single suction EC-type centrifugal fans with integrated electronics (2 in parallel for each fan section for size 09-10);
- Pocket filters;
- Compact prefilters;
- Aluminium dampers;
- Condensate drain tank downstream of the recuperator (only for Modular-P model).
Additional modules
- In addition to the Basic Module, depending on the customer's needs, it is also possible to add optional
components:
- Mixing Module, used to vary the mixture of the supplied air;
- Attenuator in Exhaust Air;
- Attenuator in Fresh Air;
- Electric heating battery (preheating or post-heating);
- Additional rigid pocket filter;
- Hot water battery;
- Cold water battery
- As an alternative to water batteries, direct expansion batteries can be used for both heating and cooling.
11
Page 12
Available modules:
- Battery module;
- Filter module
- Pre- and post-heating module;
- Flow separating module with side dampers;
- Mixing module;
- Single or combined silencing module;
- Combined silencing module with damper;
- Electric pre- or post-heating module;
- Humidification module
Attachments
To complete this manual, together with the delivery of the machine,
the following documents are issued:
- Electrical diagrams
- Operating manual
- Declaration of conformity
- Electrical panel certification
12
Page 13
Summary of machine operation
RECOVERY AIR
SUPPLY AIR
Filter
INTERIOR
Supply
fan motor
assembly
Machine control
system
Heat
recuperator
by-pass
Filter
Recovery
fan motor
assembly
DamperRecuperator
EXTERNAL AIR
EXTERNAL
EXPULSION AIR
Damper
operational diagram of a left-hand machine (MODULAR PLATE)
1
Damper
EXHAUST AIR
Machine control
system
EXTERNAL
EXTERNAL AIR
Filter
RECOVERY AIR
INTERIOR
SUPPLY AIR
Damper
operational diagram of a right-hand machine (MODULAR ROTARY)
2
Filter
Heat
recuperator
Supply
fan motor
assembly
13
Page 14
Adhesives on the machine
The following table describes the meaning of the various adhesives on the unit.
External air
right
Exhaust
air
right
Air supply
right
Extracted air
right
External air
left
Exhaust
air
left
Air supply
left
Extracted air
left
Damper
Drop
separator
Fans
Electric
coil
Cold water
inlet
Hot water
inlet
Cold water
outlet
Hot water
outlet
Heat
recuperator
Humidification
Heat
exchange
coil
Control
Liquid
coolant
inlet
Vapour
coolant
outlet
Condensate
drain
14
Filter
Silencer
Page 15
Notes
15
Page 16
Machine description (Modular Plate)
Filters
Particular care is taken in the selection and arrangement of
the filters within the section, supplied by certified and internationally recognised producers.
Pocket filters are supplied with the machine. The customer can choose an efficiency class between ePM10 50% and
ePM1 80%. Compact prefilters are 48mm thick. The customer
can select an efficiency class between ISO Coarse 55% and
ePM10 75%, according to ISO 16890. The stability of the filters
is guaranteed by an exclusive POLYSEAL fixing system that
allows comfortable replacement and excellent seal.
All the filters are equipped with a differential pressure switch
that makes it possible to monitor the level of filter blockage.
The filters are always mounted to be extracted from the dirty
side, in order to maintain the seal and avoid the release of
dust and contaminants into the circuit during replacement.
Frame with supporting structure
The frame is made of extruded profiles in anodised aluminium with a thermal break, having a 40x40 mm cross-section.
Coupling is done with nylon joints reinforced with glass fibre.
The profiles are always of the type with concealed screws,
double fins and chamber, making it possible to attach the
panels without the screw being visible from inside the machine. This is an advantage, for both aesthetic and safety
reasons. If people must work inside the machine for maintenance or cleaning, they can work in total safety without running the risk of injury. The interior of the machine is therefore
without protrusions or discontinuities in the profiles.
The units are equipped with a continuous base along the entire base and this is made entirely of aluminium (up to size 07
and in galvanized steel from Size 08 to 10).
The profiles have a thermal break, i.e., they are constructed
with an insulating element able to considerably limit the
thermal bridges towards the outside. This technology allows
reducing condensation on external surfaces and improves
the thermal insulation of the machines.
Seals
Sealing gasket in polyurethane, placed on door and panel
ledges.
16
Page 17
Heat recuperators
The recovery sections are made using counterflow recuperators (Modular P). The exchange of energy between the outdoor air and the recovered air makes it possible to pre-treat
the supply air, lowering the heat output necessary for the
complete treatment.
Doors and handles
Each door of the ventilating sections is equipped with a security key, thus allowing access only to authorised personnel.
All locking handles on the same machine are identical.
Hinges
The hinges are made of black painted zamak alloy
Panels
The panels are made of double sheet metal folded into a box
enclosing the hot-injected polyurethane (density of 45 Kg/
m3 and fire reaction Class 1) or mineral wool (density of 120
Kg/m3 and fire reaction Class 0).
The material of the external sheet can be customised according to the need for resistance to corrosion, ranging from
Aluzinc to pre-painted sheet metal.
The panels are attached with stainless self-drilling screws
housed in nylon bushes: the latter are embedded in the panel and include a closing cap.
The use of stepped panels allows coupling with the profiles
that guarantees the continuity of the internal surface and a
better thermal insulation of the machine.
Fan motor assemblies
The fans used on the units are of
the EC type, procured from the
best manufacturers. This technology guarantees high efficiency and
reduced noise in extremely compact dimensions. The maintenance of these machines is very limited,
as the motor is directly keyed on the impeller.
17
Page 18
Machine description (Modular Rotary)
Filters
Particular care is taken in the selection and arrangement of
the filters within the section, supplied by certified and internationally recognised producers.
Pocket filters are supplied with the machine.
The customer can choose an efficiency class between ePM10
50% and ePM1 80%. Compact prefilters are 48mm thick. The
customer can select an efficiency class between ISO Coarse
55% and ePM1 80%, according to ISO 16890. The stability of
the filters is guaranteed by an POLYSEAL fixing system that
allows comfortable replacement and excellent seal.
All the filters are equipped with a differential pressure switch
that makes it possible to monitor the level of filter blockage.
The filters are always mounted to be extracted from the dirty
side, in order to maintain the seal and avoid the release of
dust and contaminants into the circuit during replacement.
Frame with supporting structure
The frame is made of extruded profiles in anodised aluminium with a thermal break, having a 40x40 mm cross-section.
Coupling is done with nylon joints reinforced with glass fibre.
The profiles are always of the type with concealed screws,
double fins and chamber, making it possible to attach the
panels without the screw being visible from inside the machine. This is an advantage both for aesthetic reasons and for
safety: if people must work inside the machine for maintenance or cleaning, they can work in total safety without running the risk of injury. The interior of the machine is therefore
without protrusions or discontinuities in the profiles.
The units are equipped with a continuous base along the entire length and is made entirely of aluminium.
The profiles have a thermal break, i.e., they are constructed
with an insulating element able to considerably limit the
thermal bridges towards the outside. This technology avoids
condensation problems on external surfaces and improves
the thermal insulation of the machines.
Seals
Sealing gasket in polyurethane, placed on door and panel
ledges.
18
Page 19
Rotary recuperators
All the rotary recuperators supplied comply with the latest
directives and regulations applicable to safety, performance
and labelling in force within the European Community.
There are “sorption” and condensing models, chosen by the
customer during the selection phase.
Each recuperator is equipped with a motor and transmission
with belt and pulley.
The inverter has a 230V/1ph/50-60Hz input power supply,
230V/3ph output power supply to the motor, IP54 protection degree, 0-10V control analogue input, alarm relay output. Each rotary recuperator is equipped with an air-tight
brush-type seal with an internal plastic blade which ensures
greater seal along the entire perimeter of the wheel.
Doors and handles
Fan motor assemblies
Each door of the ventilating sections is equipped with a security key, thus allowing access only to authorised personnel.
All locking handles on the same machine are identical.
Hinges
The hinges are made of black painted zamak alloy
Panels
The panels are made of double sheet metal folded into a box
enclosing the hot-injected polyurethane (density of 45 Kg/
m3 and fire reaction Class 1) or mineral wool (density of 120
Kg/m3 and fire reaction Class 0).
The material of the external sheet can be customised according to the need for resistance to corrosion, ranging from
Aluzinc to pre-painted sheet metal.
The panels are attached with stainless self-drilling screws
housed in nylon bushes: the latter are embedded in the panel and include a closing cap.
The use of stepped panels allows coupling with the profiles
that guarantees the continuity of the internal surface and a
better thermal insulation of the machine.
The fans used on the units are of
the EC type, procured from the
best manufacturers. This technology guarantees high efficiency and reduced noise in extremely compact dimensions. The maintenance
of these machines is simple and fast, as the motor is directly keyed on the impeller.
19
Page 20
Parts and accessories
Dampers
The dampers of the Modular range are all made of aluminium with gasket,
with class II seal according to EN 1751. The external and exhaust air dampers can be equipped with a rainproof system or an anti-pest net.
Internal structure
The internal sheets used for attaching components like fans, filters and recuperators are entirely made of Aluzinc, guaranteeing high resistance to
corrosion. All points of contact with the internal section are equipped with
gaskets to ensure a superior seal against air leakage. The condensate collection tanks in the counter flow recuperators (Modular P) are made entirely of stainless steel, thus ensuring maximum durability. The welds of the exhaust pipe and of the edges are made of continuous wire in
an inert gas atmosphere.
Heat exchange coils (Only in the coil module)
The heat exchange coils are of the finned pack type. This component is made of copper tubes, aluminium
frame and BLUE FIN aluminium fins. Depending on the choices, the coils can use water or direct expansion. In both cases, the battery is controlled. In the case of DX units are supplied with “ERQ Daikin" control
board and "Daikin" electronic expansion valve mounted and connected. In the case of water batteries,
the control is entrusted to a three/two-way valve complete with modulating actuator supplied separately.
Condensate collection basins
The condensate collection tanks in the counter flow recuperators (Modular P) are made entirely of stainless steel, thus ensuring maximum durability. The welds of the exhaust pipe and of the edges are made of
continuous wire in an atmosphere of inert gas: all the welds are protected with zinc-based paints.
Anti-vibration joints
On request, the units can be equipped with anti-vibration joints for the connection of the external air
ducts to the machine. These components are flanged and made of fire-retardant PVC-coated polyester
fabric.
Covering roof
The machines for outdoor use can be equipped with Aluzinc roofs, resistant to corrosion and therefore
ensuring the extreme durability of the component.
Silencers
With drawstring with 100 mm thick silencing partitions. The silencers are built according to the VDI6022
hygiene standard and the silencing material is rock wool protected by a flake-proof film compliant with
the VDI6022 standard. .
20
Page 21
3
The means and method of transport must be chosen by the transport operator according to the type, weight and size of the
machine. If necessary, draw up a "safety plan" to guarantee the safety of the people directly involved.
Receipt of the cartons
Handle the equipment following the Manufacturer's instructions on the packaging and in this manual.
Always use personal protective equipment.
Upon receipt of the machine check the integrity of the packaging
and the amount of parcels sent:
A) There is visible damage/one or more cartons is missing: do not
install, but promptly notify the Manufacturer and the carrier that
made the delivery.
B) There is NO visible damage: move the machine to the site of
installation.
Read the packaging symbols
Externally, the packaging bears all the information necessary to transport the equipment safely: compliance with these instructions ensures operators are safe and prevents any damages to the equipment.
The figure shows the symbols applied to the packaging:
Indicates top and bottom
Indicates that the package must be stored in a dry place because its contents are sensitive
to humidity
Shows that the package must be handled with care because its contents are fragile
Shows the package's centre of gravity
Shows the position of the cables so that the package can be lifted correctly
Shows the maximum weight that can be placed on top of the package
21
Page 22
4
Transport
Packages can be handled with a lifting hook or pallet truck of suitable capacity. The choice of the
most suitable means and method lies with the operator.
The operating area must be perfectly free from objects or people not involved in the transport.
If the unit is moved using hooks, use some spreader bars between the lifting cables to prevent
damage to the unit and ensure no excessive stress is placed on the side panels.
Lifting using hooks
Use hooks with a capacity adequate to the weight of the package to be lifted. Make sure that the safety
latch is in the correct position while lifting.
DO NOT move the equipment if the field of vision is poor or there are obstacles along the way (e.g.,
electric cables, beams, etc.). When the loads are lifted, the range of action of the lifting equipment
must remain free of persons.
Use perfectly serviceable hooks, chains or steel cables of adequate capacity and material, with-
out any joints or extensions. To guarantee efficiency, carry out periodic checks.
Make sure the ground the lifting equipment rests on is stable and not subject to subsidence. Check
the flatness of the ground. Do not move the lifting device with the machine suspended in the air.
Before lifting it, check the position of the centre of gravity and that the equipment is correctly
anchored to the lifting points provided, then slowly lift the package to the minimum height
necessary and move it carefully to prevent any dangerous vibrations.
Avoid sudden stops while lifting or lowering the package, to prevent any dangerous oscillations.
22
OK!
OK!
Page 23
Lifting with ropesLifting with eyebolts
15°
OK!
15°
15°
15°
Lifting with bracket + hook
(up to Size 07 with aluminium base)
OK!
23
Page 24
Lifting using a pallet truck
OK!
If
transport is done using a pallet truck make sure it is suitable for the weight and size of the machine. Insert the forks into the points provided for handling (usually in a central position) so as to
keep the centre of gravity of the load in balance. Move the equipment carefully, avoiding sudden
movements.
OK!
Lifting non-palletised equipment
The equipment must be lifted using tubes (not
supplied) inserted into the holes provided on the
apparatus (ø holes = 60 mm).
The type and diameter of the lifting tubes depend on the weight of the machine to handle. It
is the transport operator's responsibility to make
the right choice.
Use steel tubes that are in good condition and
undamaged.
The ends of the lifting tubes must be closed mechanically to prevent them from coming out of
OK!
the holes provided.
Position the lifting ropes as shown in the figure,
in the part of the tube nearest the equipment.
24
ø 55 mm
20 cm
OK!
Page 25
5
Unpacking and verification of integrity
We recommend the equipment be unpacked after moving it to its installation location and only when
it is to be installed. This operation must be performed using personal protection equipment (i.e., gloves,
safety shoes, etc.).
Do not leave the packing unattended: it is potentially harmful to children and animals (suffocation hazard).
Some packing materials must be kept for future use (wooden crates, pallets, etc.), while those that
cannot be reused (i.e., polystyrene, strapping, etc.) must be disposed of in compliance with the
regulations in force in the country of installation: this will protect the environment!
After unpacking
After unpacking, check the integrity of the
machine and any additional modules.
In case of damaged or missing parts.
- Do not move, install or repair damaged components and
the machine in general.
- Take quality photos to document the damage.
- Find the serial number plate on the machine and note the
machine's serial number;
- Immediately notify the carrier that delivered the machine;
- Promptly contact the Manufacturer (keep on hand the serial
number of your machine).
Please note that complaints or claims of
damage reported after 10 days of receipt
of the machine cannot be accepted.
MANUFACTURER INFORMATION:
DAIKIN APPLIED EUROPE S.P.A.
Via Piani di Santa Maria, 72 - 00040 Ariccia (Roma) - Italy
Tel: (+39) 06 93 73 11 - Fax: (+39) 06 93 74 014
http://www.daikinapplied.eu
C
I
F
A: Manufacturer's name and data
B: CE markings
C: Machine size
D: Unit reference in the order
E: Date of manufacture
A ModularP left
E Modular P right
F Modular R right
B Modular R left
C Polyurethane, pre-painted panel
D Mineral wool, pre-painted panel
R Polyurethane, aluzinc panel
S Mineral wool, aluzinc panel
W Water
D Direct expansion
N
No heat exchange coil or only electric coils for
thermal and gas exchange
V direct expansion coil + water coil
1 Made in Italy
14 Year of production (e.g., 14 = 2014)
0001 Project number
001 Machine number
26
Page 27
Storage waiting for installation
Waiting for the installation, the components of the machine and the relative documents must be stored
in an area that:
- Is dedicated exclusively to the storage of the components.
- Is covered and protected from the weather (preferably prepare a closed area), with adequate temperature and humidity.
- Is accessible only to operators tasked with the assembly.
- Can support the weight of the equipment (check the load rating) and has a stable floor.
- Is free from other components, especially if they are potentially explosive/incendiary/toxic.
If you cannot proceed with the installation straight away, check periodically that the above-mentioned conditions of the storage area are maintained and cover the machine with a canvas.
While waiting for the finale installation, always provide an insulating base (e.g., wood blocks) be-
tween the floor and the machine itself.
Correct storage awaiting installation
3
Any movement carried out after unpacking must be done with the doors closed. Do not move
the units by pulling on the doors, if present, the uprights or other protruding parts that are not
an integral part of the structure.
5÷35°C
90% max
Do not step on the units!
27
Page 28
Notes
28
Page 29
2A
6
There are two different types of hook, refer to the assembly instructions for the one in your possession.
Any movement carried out after unpacking must be done with the doors closed.
Do not move the units by pulling on the doors, if present, the uprights or other protruding parts that are
not an integral part of the structure.
Do not step on the units!
Before proceeding with the installation of the machine, it is necessary to prepare the power supplies and
utilities necessary for the correct operation of the system and, if required, consulting in advance with the
Manufacturer's Technical Office.
The machine does not require special environmental conditions for its operation. For a correct installation it is sufficient to prepare a level support surface, indispensable for the correct operation of the
machine and to guarantee the regular opening of the inspection doors.
The altitude of the installation room must be less than 1,000 meters above sea level (at higher altitudes
the electric motors deliver powers lower than the nominal ones).
The installation in the workplace must be done in such a way that the machine and its equipment are
accessible to allow it to start, stop and carry out maintenance work on the machine.
For the choice of location, in general, care must be taken that an operator can move around the machine without hindrance. The minimum distance to the nearest wall must in any case be at least equal
to the width of the machine.
Where there are no means of transport to move the machine, its positioning must take into account the
free space required for any repairs. It is of course necessary to plan enough space for regular operation,
as well as for machine maintenance, including all the space for any peripheral equipment.
Installation
All installation, assembly, electrical connections to the mains and extraordinary maintenance
must be performed only by qualied personnel authorised by the Retailer or Manufac-turer, in compliance with the regulations in force in the country the equipment is to be used
and the standards on the systems and safety in the workplace.
During installation, the area must be free from people
and objects not used for the assembly.
Before starting, make sure you have all the necessary
equipment.
Use only equipment that is in good condition and un-
damaged.
To operate the machine requires:
- Electrical connections;
- Water connection;
- Air duct connection.
29
Page 30
Installation procedure
Before installation, read the safety instructions on the first pages of this manual. Contact the Manufacturer if any points are unclear or not perfectly understandable. A check mark next to each step will help
to confirm complete and proper installation.
Step 1: Position the unit ....................................................................................................................................................page 31
Step 2: Assemble the unit (if necessary) ................................................................................................................. page 32
Step 3: Fasten the units to the ground (optional) ............................................................................................page 35
Step 4: Make the connections ...................................................................................................................................... page 36
Step 5: Perform a trial run ................................................................................................................................................page 48
Step 6: Install the required filters .................................................................................................................................page 49
After installation store this manual and the assembly sheet that accompanied the machine in a place
that is dry and clean. This way it will be accessible to operators in the future who need to consult it.
Do not remove, tear out or write on any part of this manual besides the space set aside for notes:
Installer/maintenance notes
30
Page 31
Step 1: Position the unit
Check that a suitable base has been prepared (fig. 4) for the support and installation of the machine. It
must be stable, perfectly flat, made of reinforced concrete and have the capacity to support the weight
of the machine.
For the size of the base and the weight to be supported, refer to the schematic delivered when
the machine was ordered.
The installation site must also include (fig. 4):
• Suitabledrainage to convey and drain the water in case of accidental breakage of pipes that carry
the fluids to the machine.
• Anelectrical system compliant with current regulations and with specifications that meet the needs
of the machine;
• Awater/gas connection (in the case of connection to coils supplied by water or gas).
• Adrainpipewithdrain siphon connected to the sewerage system.
• anaeraulic system (ducts for the air to be conveyed to the environments).
Position the unit above the base. Make sure that the area chosen for the placement has sucient space
to allow for subsequent installation and maintenance all around the unit (including replacement of any
internal components, for example the removal of heat exchange coils, filters, etc.) (fig. 5 indicates the
minimum distances to be maintained). It is advisable to check the extraction side of the components
before installing the machine.
Warning! The machines were designed to operate in technological spaces or outdoors. They
CANNOT operate in environments with explosives, where there is a high presence of dust, high
humidity or high temperatures unless specific modifications are requested during production.
Drainage
80 cm
L
80 cm
Single unit
4
5
L + 30 cm
Minimum distancesPreparations
31
Page 32
Step 2: Assemble the unit (if necessary)
If additional modules are required, the units must be assembled directly at the installation site. The necessary components for the assembly of the sections are placed inside a section of the machine, adequately
protected.
Gently join the sections after attaching the adhesive seal supplied with the machine on the whole
perimeter of contact, just on one side.
Fasten all the coupling screws provided with the machine, and then level the modules. Tighten all the
coupling screws entering into the units through the inspection doors. Tighten all the other screws, bolts,
knobs and anything else that may have been previously dismantled. It is not recommended to remove
fixed panels during installation.
The drawings on the following pages represent a generic and stylised unit, however the
connection procedure is the same for all types of units.
32
Page 33
2
3 x
TE8x30
3 x
ø 8,5
3 x
ø 8,5
1 x
M8
6
VDI 6022
33
Page 34
7
2 x
TE8x35
2 x
ø 8,5
2 x
M8
34
1 x
TE8x35
1 x
ø 8,5
1 x
M8
Page 35
Step 3: Fasten the units to the ground (optional)
After positioning the units, make sure they are perfectly level, if necessary inserting suitable solid and stable shims under the supports.
Finish by fastening them to the ground (tools and fastening components not included). The installer is responsible for choosing the most suitable means of fastening based on experience (the drawing includes
an example).
There is no need to insert vibration damping material between the machine and the ground as
the moving internal parts transmit no residual vibrations to the outside.
Example of floor mounting using steel brackets (not supplied)
8
35
Page 36
Step 4: Make the connections
To operate the machine requires:
- An electrical connection.
- A water connection and drainage.
- A connection to the aeraulic circuit (air ducts).
Electrical connections
As to the power supply, an electrical cable must be connected to the machine:
single phase + neutral + earth (size 01 and 02).
three phase + neutral+ earth (size from 03 to 10);
(N.B.: The power supply of any electric batteries is separate from that of the unit and is always three-phase).
The cable must have a section adequate to the electrical absorption of the machine and the current
regulations. The total electric draw is shown on the machine's tag.
Always refer to the wiring diagram that is specic to the machine that you bought (it was
shipped with the unit). If it is not on the machine or has been lost, contact the salesperson of reference who will send a copy (specify the machine's serial number).
• Includesafunctioninggrounded plug; for multiple units it is necessary to combine them all with metal
ties.
• Preferablysituatedinadedicatedroom,locked and protected from atmospheric agents. If there is also
a key switch, the key must be removed when cutting the power supply and returned to its position
only after finishing service operations.
• Controlled by a multipolar switch with switching capacity equal to 60A suitable for the machine ab-
sorption.
During installation and maintenance, make sure that no other person besides the one who is
working has access to the electrical cabinets or switches.
The actual supply voltage of the user devices must not deviate more than 10% from the expected
nominal voltage. Higher voltage differences cause damage to users and to the electrical system, malfunctioning of fans, noise. It is therefore essential to check the alignment of the actual voltage values
with the nominal values.
36
The Manufacturer is not responsible for connections made in a manner that does not comply
with regulations, with the specifications of this manual, and in the event of tampering with any
electrical component of the machine.
Page 37
QS1
L1 L2 L3 N
Size 01 ÷ 02
supply 230/1/50 (V-F-Hz)
Size 03 ÷ 10
supply 400/3/50 (V-F-Hz)
NB: Electric battery module power
supply always 400/3/50 (V-F-Hz)
separate from that of the unit.
9
Grounding
Example of electrical connection
10
Additional warnings regarding the connection to the power supply:
It is necessary to install a suitable differential-type protection upstream of the machine's power supply
connection points, in order to be able to isolate each of its elements in the event of malfunctions; the
choice of the differential protection device must not be in conflict with the provisions of the law, the local
regulations, the characteristics of the plant’s electrical system and of the machine itself.
They are recommended, where not in contrast with local laws or system characteristics, differential switches with adjustable current and trip time that cannot be affected by high frequency. The cables connecting
the various elements of the machine to the power supply must be shielded or must pass through metal
ducting, so as to reduce electromagnetic interference.
The shield or metal ducting must be earthed.
Once the system has been set up, the machine can be connected to the electricity supply network. The
actual supply voltage of the user devices must not deviate more than 10% from the expected normal voltage. Higher voltage differences cause damage to users and to the electrical system, malfunctioning of fans,
noise. It is therefore essential to check the compliance of the actual voltage values with the nominal values.
Before connecting the electrical panel, make sure that, during installation and maintenance, no other person besides the one who is working has access to the electrical cabinets or switches.
After connecting, make sure that:
- The ground c
circuit, is contrary to safety regulations and is a source of danger that can damage the components of the machine.
- The connections are correct and the current consumption of the motor is lower than indicated on the nameplate.
onnection is sufficient (using the appropriate tool). An incorrect connection, ineffective and lacking the grounding
37
Page 38
Water or coolant gas connections
Connections to water or to a coolant gas are required for the installation of a water or direct expansion coil
(optional).
For the water/gas supply it is necessary to connect the manifolds to piping having a size that is suf-cient for the ow rates envisaged: in order to avoid damage to the heat exchange battery in correspondence with the junction between the steel fluid supply manifold and the copper circuits, it is necessary, when fixing the system pipe, to use a double wrench so as not to overload the battery connections.
In order to ensure optimum heat exchange of the coils it is necessary to:
• Completely eliminate the air present in the water circuit using suitable valves.
Apart from the heat transfer fluid used, the thermal exchange with the air occurs in flow, with counter
flow injection with respect to the flow of the treated air. Connect the pipes following the indications of
the plates placed on the machine's panel.
Take care that no moisture or dirt enters the heat exchange coil.
11
38
Example of connection to water coils
Page 39
WATER-BASED THERMAL EXCHANGE COILS
The heat exchange coils are installed with horizontal pipes.
The circuit pipes must have a size based on the nominal flow rate calculated from the thermal output of
the project and indicated in the data sheet of the unit.
Do not use the heat exchange coil connections to support the weight of the piping. It is necessary to prepare appropriate fasteners and brackets (not supplied).
Shut-o valves must be included to exclude the heat exchange coil from the water circuit.
In the heating coils, a stopped fan could lead to the overheating of the stagnant air in the machine, with possible consequential damage to the motor, bearings, insulation and parts made of synthetic
material. To avoid such eventualities it is advisable to design the system so that a stopped fan will also stop
the passage of the heat transfer fluid.
Cold water
inlet
Hot water
inlet
Support
brackets
Cold water
outlet
Hot water
outlet
Shut-off
valve
12
Example of connection to water coils
39
Page 40
DIRECT EXPANSION THERMAL EXCHANGE COILS
The filling by the installer must be performed according to current regulations and by authorised
personnel, authorised for the use and handling of coolants.
The heat exchange coils are installed with horizontal pipes.
Do not use the heat exchange coil connections to support the weight of the piping. It is neces-
sary to prepare appropriate fasteners and brackets (not supplied).
Shut-o valves must be included to exclude the heat exchange coil from the coolant circuit.
The system piping must be connected to the heat exchange battery with braze welding, circulating an-hydrous nitrogen inside the pipes to prevent oxides from forming. The liquid suction pipes must be the
appropriate size for the expected potential and to ensure the circulation of the oil present in the coolant
even when the heat exchange coil operates at minimum load.
Use of wet patches to protect the plastic against the heat of the flame.
Shut-off
valve
Coolant
inlet
Vapour outlet
Condensate
drain
13
40
Example of connection to gas coils
Page 41
Drain and siphon
In correspondence with the humidification sections and the thermal exchange cooling coils, the air handling units are equipped with a threaded drain that protrudes laterally for about 80 mm.
In order to allow a regular flow of water, each drain must be fitted with a properly sized SIPHON
(see fig. 14).
IMPORTANT
CONDENSATE COLLECTION TANK
Siphon
Condensate
collection tank
14
Drain siphon
Maximum siphon level
Siphon minimum height 100 mm
mm and a total static pressure exceeding 1000Pa, increase the height
of the siphon by 10 mm every 10
mm of head and every 100Pa of total static.
To avoid overflows from the collection tank
and consequent flooding of the machine as
well as the room in which it is installed, the siphon must have a purge valve that allows the
removal of impurities deposited on the bottom.
In order not to affect the operation of the
drainage system, siphons operating under
With an upper fan head of about 100
x
pressure must NOT be connected to others
operating under vacuum.
15
drain
valve
Drain siphon
x+20 mm
AIR GAP
min 25 mm
2%
The drainage pipe to the sewerage network:
•Must not be connected directly to the siphon. This in order to absorb returns of air
or slurry and to make the correct outflow of
waste water visible.
•Musthavealargerdiameteratthemachine
drain and a minimum inclination of 2% in order to ensure proper operation.
41
Page 42
Aeraulic connections
If present, the air ducts must be connected to the joints or the circular attachments that may be provided
on the unit. If these components were not provided with the machine, the coupling can be made by connecting directly to the machine's panels, making sure to insert a suitable anti-vibration system between
the unit and the duct.
If not using anti-vibration joints it is necessary to:
If the connection is made with anti-vibration joints, when assembly is completed they should not be taut,
so as to avoid damage and the transmission of vibrations.
To ensure the seal of the connections and the integrity of the machine, it is essential that the air ducts be
supported by special brackets that do not weigh directly on the machine.
1
2
x4
x 1
42
Page 43
3
100mm
250mm
250mm
250mm
x 1
100mm
10
100mm
45
ø5mm
43
Page 44
6
OK!
NO!
7
44
Page 45
8
H2O
SOAP
45
Page 46
9
46
Page 47
Notes
47
Page 48
Step 5: Perform a trial run
To commission the machine it is necessary (tick "√" the operations completed):
Check the proper connection of the fluid inlet and outlet piping to the thermal (if present) exchange coils (if present).
Vent the air from the heat exchange coils.
Check that there is a suitable siphon for all the water being drained.
Inspect the correct installation and adequate electrical connection of the energy recovery equipment, together with a mechanical and electrical check.
Insert an anti-vibration coupling between the machine and the ducts.
Check the tightening of screws and bolts (especially those used to attach motors and fans).
Check the integrity of the anti-vibration supports and the various accessories.
Remove extraneous materials (e.g., assembly sheets, tools, clips, etc.) and dirt (footprints, dust, etc.)
from inside the sections.
48
Page 49
Step 6: Install the required filters
Verify proper installation of the prefilters located on special counter-frames with safety springs or guides.
After removing the filters from the packing (that they are placed in to prevent deterioration during transport and at the installation site), insert them into the containment section, paying attention to ensure a
rigid assembly and a perfect seal of the gaskets.
Remove the filters from their packaging only when ready to install them to avoid getting them
dirty and contaminating them.
Make sure that the inside of the filter is not contaminated by external agents.
This operation should be carried out after the first start-up of the machine, when the ducts are
cleaned of dust and various debris. Proceeding in this way preserves the filtering sections that
cannot be regenerated.
16
Installation of "pocket" filters and a pre-filter
To protect the components installed inside the unit, make sure that coarse filters (Prefilters) are
installed.
49
Page 50
Step 7: Safety signs
The machine is supplied with the electricity-specific signs on the access doors to the fan sections.
The buyer must position other appropriate signs in the work area:
DO NOT REMOVE THE PROTECTIONS AND SAFETY DEVICES
DO NOT REPAIR OIL ADJUST CLEAN MOVING PARTS
In addition, the space where the machine is positioned must be integrated into the general signage, specific to the characteristics of the area and workplaces:
noise - movement - dangerous areas - escape route, etc.
PERSONAL PROTECTIVE EQUIPMENT
Personal protective equipment should be used when operating
the machine, suitable for use in accordance with company criteria and rules.
During machine maintenance, other preventive measures are
suggested in addition to the above: safety shoes, gloves, suitable clothing, always compatible with the use and according to
company guidelines.
TRAINING
It is the responsibility of the machine buyer/user to provide adequate instruction and training to machine
operators.
OPTIONAL
In agreed cases, additional training may be provided through the one-on-one instruction of operators by
the Manufacturer's technical staff.
50
Page 51
7
After carrying out the above mentioned connections, it is necessary to set up the machine, according to
the following:
• Check that the batteries are correctly supplied (input / output).
• Ensure that all batteries are vented.
• Check that the drains are made and connected correctly, checking the correct flow of the condensate.
• Make the siphons and trigger them.
• Provide an anti-vibration joint between the ducts and the machine.
• Check the filters are installed correctly.
• Check the tightening of screws and bolts.
• Confirm that the structure is earthed.
• Confirm that the belt is correctly tensioned (only Modular rotary recuperator).
• Check that the recuperator belt is correctly tensioned (only Modular Rotary).
• Check the dampers are working correctly.
• Check that all the electrical components, such as microswitches, disconnectors, lights, pressure switch-
es, probes, inverters, etc. are correctly connected and powered.
• Remove any foreign materials from inside the machine.
• Check and keep the inside of the machine adequately clean.
• Remove the blocks of the rotary recuperators (Modular).
Commissioning
To perform the task in question, Personal Protective Equipment is required (for example, safety shoes,
safety glasses, helmet, gloves, etc.)
Once the operations to set up the machine after installation have been carried out, it is possible to proceed with the commissioning of the machine.
To avoid damaging the machine, make sure that the machine's dampers are in the correct position.
Do not start the motor-fan units without first checking the completion of the machine connections with
all the necessary ducts.
Check the correct installation of the prefilters.
After removing the filters from the packaging (they are placed in to prevent deterioration during transport), insert the absolute and active charcoal pocket filters into the containment section, paying attention
to ensure a rigid assembly and a perfect seal of the gaskets.
51
Page 52
To avoid damage to the battery, caused by ice, it is advisable to fill the water circuit with antifreeze liquid
or completely empty the battery if the air temperature can drop below 3°C.
Checking the machine safety devices
Checking the efficiency of the safety devices fitted on the machine MUST be carried out prior to commissioning.
Microswitch (optional)
Use the following procedure:
- Open one of the inspection doors fitted with a microswitch on the machine.
- Check it is impossible to start the machine itself.
- Close the door and open another door fitted with a microswitch. Repeat the operation for all interlocked
inspection doors, checking each time that the machine cannot be started.
- Similarly, press the emergency button on the outside of the control panel and check that the machine
cannot be started.
Use of the machine
It is essential that any dampers on the system side are open for the correct operation of the machine and
to avoid sure breaking phenomena, open the dampers before starting ventilation.
I ON
0 OFF
The sequence that leads to the automatic start-up of the machine is as follows:
- Power the machine by acting on the general disconnector;
- Carry out the programming necessary for the correct operation of the machine;
The machine does not require further intervention by the operator as it has automated start-up and shutdown and is managed by the controller. If you want to permanently turn off the controller, you must turn
off the automatic management and intervene at the disconnector.
52
Page 53
2A
8
Maintenance
Safety precautions for maintenance
Ordinary and extraordinary maintenance must be carried out solely by the operator assigned
to perform maintenance (mechanical and electrical maintenance staff ) according to the regulations in force in the country of use and respecting the laws regarding systems and work
safety. Remember that, by operator assigned to perform maintenance is meant the person who
can work on the machine to perform ordinary and extraordinary maintenance, repairs and fine
tuning. This person must be an expert operator, properly instructed and trained, given the risks
involved in such operations.
Before performing any ordinary and extraordinary maintenance, the machine must always be
stopped (by disconnecting it from the mains) turning the master switch OFF,. The switch
must have a key that must be removed and held by the operator who will perform the operations until the end of the maintenance itself.
It is absolutely prohibited to remove any protections from moving parts and unit protection
devices with the machine connected to the mains or operational. Adjustments made with safety devices disengaged must be performed by a single person, expert and authorised, and
during this activity it is necessary to prevent access to the area of the machine by other people.
Upon completing the adjustments with safety devices disengaged, the protections must be
re-engaged as soon as possible.
During maintenance the operational space surrounding the machine for a distance of 1.5 me-
tres must be free of obstacles, clean and well lit. It is prohibited for unqualified people to pass
through or remain in this space.
Use personal protective clothing (safety shoes, safety glasses, gloves, etc.) compliant with regu-
lations.
Before carrying out repairs or other work on the machine, always declare out loud your inten-
tions to other operators who are located in the machine area and make sure that they have
heard and understood the warning.
When carrying out maintenance operations with the doors open, never enter the machine
and close the access doors behind you.
53
Page 54
Ordinary maintenance
Proper maintenance of the systems maintains efficiency (reducing costs) and consistent performance
over time, and increase the usable life of the equipment.
ACTIVITY
General cleaning of the machine.
Check and possible disassembly and washing of the filters to be inspected accord-
ing to the conditions of use)
Replacing the filters (when they have deteriorated).
Cleaning the finned surfaces of the heat exchange batteries (if provided) with a jet
of compressed air or water and a soft brush (direction parallel to the fins).
Cleaning the heat recuperator exchange surfaces with compressed air / water jet
and a soft brush (direct. / to exchange packs).
Empty and clean the condensate collection basins.
Visual inspection for corrosion, limescale, release of fibrous substances, any damage,
abnormal vibrations, etc. (if possible, it is advisable to extract the components for a
more thorough inspection).
Check condensate drain and cleaning of siphons.
Check the status of anti-vibration connections.
Check tightness of screws and bolts in the fan section.
Check the impeller and various devices, with removal of any buildup.
FREQUENCY
ABCDE
Check the integrity of piping connected to pressure gauges and pressure switches.
Check and fine tune servo controls and lifting assemblies for actuating the gripping
dampers, and their lubrication.
Check the ground connection.
Visual check on the wheel face for dirt or deposits of dust and debris (Modular R)
check of the condition of the transmission belt for wear and wheel tension
(Modular R)
Check the clearance between seals and rotor by visual inspection and,
if necessary, correct it
Check and cleaning (if necessary) of the recuperator exchanger pack (Modular P)
affect their good operation and create problems with durability.
• Forthecleaningofnnedcomponentsordampersuseanindustrialvacuumcleanerand/oracompressor. Attention, the compressed air flow must run opposite to the direction of the airflow through
the unit and parallel to the fins.
Cleaning lters
The machine must NOT be running when the filters are removed to avoid drawing in outside air
that might be contaminated.
The filters must be cleaned often and carefully to prevent dust and microbial build-up. Usually, compact
filters can be cleaned twoor three times (replacement is anyway recommended in preference to washing) before they are replaced. As a general rule, replacement is required after 500-2000 hours of operation
(it varies depending on the type of filter, refer to the directions of the Manufacturer), but may need to be
replaced much sooner if required.
Compact lters can be cleaned using a vacuum cleaner or by blowing with compressed air or hot water
(not under pressure).
Pocket lters cannot be cleaned and must be changed after their life cycle.
Cleaning lamellar components
Remove the dust and fibres with a soft bristle brush or a vacuum cleaner.
Be careful when cleaning with compressed air because the exchanger package can be damaged.
CLEANING with pressure jets is allowed if the maximum water pressure is 3 bar and a flat nozzle
is used (40° - WEG 40/04 type).
Oils, solvents, etc. can be removed with water or hot grease solvents, by washing or immersion.
Periodically clean the condensate drain tray and fill the drain siphon with water.
55
Page 56
Dampers
Dampers and their mechanism can be cleaned first with compressed air, then with a slightly alkaline detergent. Particular attention should be paid to the levers of the actuation system.
Seals should be checked at regular intervals.
Also check if there is good rotation of the fins and the lubrication of the mechanisms. If necessary use
molybdenum disulphide oil in a spray as it is possible to direct the flow where it is needed.
Exchange coils
The coils must be cleaned at the slightest sign of contamination.
The coil should be cleaned and washed gently to avoid damaging the fins.
For cleaning using a mild detergent suitable for the purpose. Do not use alkaline, acidic or chlorine-based
solutions.
THE coils can be washed with a slightly pressurised water jet (max. 1.5 bar). The jet must NOT contain
chemicals or microorganisms. Moreover the water must be sprayed in the opposite direction to the air
flow and parallel to the fins.
For the direct expansion system, all the coolant in the batteries must be collected in the receiver before
washing the coil with water. This makes it possible to avoid the increase of the pressure and damage to
various parts of the pipe, keeping the airflow clean.
Alternatively, it is possible to remove the batteries from the unit during cleaning. Avoid exposing them to
the light and keep them in the dark.
For the cleaning of the injection tubes, you can access the distributor by removing the protective metal
foil. Clean it with a soft brush and water, or if it is very dirty use a disinfectant diluted in water.
Fans
The fans can be cleaned with compressed air or by brushing them with soap and water or with a mild
detergent. Finish cleaning by rotating the impeller by hand to check there are no abnormal noises.
Vents
Periodically check that there are no new sources of contamination near the air intake. Each component
must be checked periodically for the presence of contamination, damage and corrosion. The seal can be
protected with glycerine-based lubricants or replaced with a new one, if worn.
56
Page 57
Lights
The lights are made of polycarbonate in a coated steel frame. Clean them with a mild detergent or with a
disinfectant suitable for the purpose.
Pay particular attention to the polycarbonate glass, which should be inspected at regular intervals, as
shown in the maintenance schedule (“General cleaning of the machine” line).
Exchangers
If there are dirt and dust deposits on the exchangers, these can be easily removed, using one of the following methods:
- vacuum cleaner, if there is not too much dirt;
- compressed air, if it is very dirty, but it is not firmly fixed, being careful not to damage the wheel;
- hot water (70°C max.) or detergent spray (e.g. Decade, ND-150, Chem Zyme, Primasept, Poly-Det, Oakite
86M or similar) to remove fatty deposits, if the dirt is firmly fixed to many elements.
57
Page 58
Extraordinary maintenance
One can not predict extraordinary maintenance as it is normally due to effects of wear or fatigue caused
by the incorrect operation of the machine.
Replacement of parts
The replacement of parts should be performed by expert personnel:
• Qualiedmaintenancemechanic
• Qualiedmaintenanceelectrician
• Manufacturertechnician
The machine is designed to be able to perform all the servicing necessary to maintain good efficiency of
the components. However, it sometimes happens that a component fails due to malfunction or wear, so
for replacement refer to the executive schematic.
These are the components that may need replacement:
• Filters
• rotaryrecuperatorbelts(ModularR)
• Fan
• Recovery/heating/coolingheatexchangecoil
For some of these operations of a general nature we will not enter into detail as these are operations that
fall within the abilities and professional expertise of the staff assigned to perform them.
Consumable components - Spare parts
During the operation of the machine there are particular mechanical and electrical components that are
most subject to wear. These parts must be monitored in order to carry out their replacement or repair
before they cause problems to the correct operation of the machine with consequent downtime.
The annexes will include a sheet listing the parts subject to wear specific to the machine ordered. For
special components like bearings, crankshaft, etc., see the specific annexes detailing the technical specifications.
To purchase the spare parts needed for normal and/or extraordinary maintenance, contact Daikin specifying the serial number of the machine noted in the documentation and on the machine's plate.
58
Page 59
Disposal of used materials - waste
DEFINITION OF WASTE
Waste is any substance and object deriving from human activities or natural cycles that is abandoned or
destined to be abandoned.
Harmful toxic waste is all waste containing or contaminated by substances listed in the annex to the Italian
Presidential Decree 915/52 implementing directives 75/442/EEC, 76/442/EEC, 76/403/EEC, 768/319/EEC.
Following are described the types of waste that may be generated during the lifetime of an air handling unit:
• Drivebelts.
• UV germicidal lamps, which must be disposed of according to current legislation.
Waste from the cell filters are to be handled as special waste or harmful toxic depending on their
use, the sector and the environment in which they are used.
Waste and scraps may cause irreparable damage if dispersed in the environment.
ELECTRICAL/ELECTRONIC WASTE
Under art. 13 of Italian Legislative Decree no. 49 of 2014 "Implementation of the WEEE Directive 2012/19/EU on electrical and electronic equipment waste.
The logo with the crossed-out bin specifies that the product has been placed on the market after 13 August 2005 and that
at the end of its useful life it should not be disposed of with other waste but rather must be collected separately. All equipment is made from recyclable metallic materials (stainless steel, iron, aluminium, galvanised steel, copper, etc.) in a percent-
age higher than 90% by weight. Before disposal make the equipment unusable by removing the power cord and closing any
devices for closing compartments or cavities (where present). It is necessary to pay attention to the management of this product at
the end of its life by reducing its negative impact on the environment and improving the effective use of resources, applying the
principles of "he who pollutes pays", prevention, preparation for reuse, recycling and recovery. Remember that the illegal or improper
disposal of the product may result in the application of sanctions provided for by current provisions of law.
Disposal in Italy
In Italy WEEE equipment must be delivered:
- To Collection Centres (also called ecological islands or ecological platforms).
- To the dealer from whom the new equipment was purchased, which is required to collect it free of charge ("one to one" withdrawal).
Disposal in countries of the European Union
The EU Directive on WEEE equipment has been implemented differently by each country, so to dispose of this equipment we suggest
contacting local authorities or the dealer to ask for the correct method of disposal.
59
Page 60
Diagnostics
General diagnostics
The machine's electrical system includes quality electromechanical components and is therefore extremely durable and reliable over time.
Should there be any malfunctions due to malfunctions of electrical components it will be necessary to
act as follows:
The machine does not require routine maintenance repairs.
Do not modify the machine for any reason and do not add other devices.
The manufacturer is not liable for resulting malfunctions and problems.
Further clarification is available by contacting the manufacturer's Customer Service.
60
Page 61
Troubleshooting table
MALFUNCTION TYPECOMPONENTPOSSIBLE CAUSE/SOLUTION
Impeller deformed, unbalanced or loose
NOISE
INSUFFICIENT AIR FLOW
EXCESSIVE AIR FLOW
INSUFFICIENT THERMAL
EFFICIENCY
WATER LEAK
Fan impeller
Ducts
Ducts
Filterstoo dirty
Heat exchange coilstoo dirty
Ducts
Machine
Heat exchange coil
Electric pump
Fluid
Heat exchange coil
Fan section
Nozzle damaged
Foreign bodies in the fan
Excessive speed in the ducts
Anti-vibration joint too taut
Load losses superior to the demand
Dampers closed
Obstructions in the ducts
Load losses inferior to the demand
Ducts too big
Terminals not installed
Transducer failure
(with pressure control set point too high)
Filters not inserted
Access doors open
Dampers not calibrated
Incorrect connection of inlet/outlet piping
Heat exchange coil dirty
Air bubbles in the pipes
Excessive air flow
Insufficient water flow
insufficient pressure
Wrong direction of rotation
Temperature different from the project
Incorrect or faulty regulation bodies
Leak from the heat exchange coil due to
Dragging of drops due to high air velocity
Siphon faulty or not working
Clogged "overflow" drain
corrosion
61
Page 62
Repair log
DAT ESERVICE TYPETIME REQUIREDSIGNATURE
62
Page 63
2A
9
ON-OFF switchemergency button
lock
main menu
Green LED: the unit is working
properly
Orange LED: an alarm has been
triggered
Use
I ON
0 OFF
increases the values
opens the alarms screen
brings up the previous
page
Refer to the Operating Manual for more detailed information on the use of the machine.
decreases the values
when pressed confirms
the entered value
Page 64
Via Piani S. Maria, 72 - 00072 Ariccia (Rome) Italy - www.daikinapplied.eu
This publication is drawn up only as a technical support and does not constitute a binding commitment
for Daikin Applied Europe S.p.A. Daikin Applied Europe S.p.A. has drawn up the content to the best of
its ability.
No explicit or implicit guarantee is given as to the completeness, precision or reliability of its
content. All the data and specifications contained herein are subject to change without notice. The
data stated at the time of the order prevail. Daikin Applied Europe S.p.A. accepts no liability whatsoever for any direct or indirect damage, in the broadest sense of the word, deriving from or associated
with the use and/or interpretation of this publication.
All content is protected by the copyright of Daikin Applied Europe S.p.A.
D-EIMAH00211-19_00EN
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.