Installation Procedure
1. Assembling the installation frame.
1) Fix the floor anchor, side support (R), side support (L), and reinforce plate at the 6 locations using the
A
parts shown below.
J K L M
( Bolt (M6 × 16L), Washer (M6), Spring washer (M6) , Nut (M6))
B C D
A
Floor anchor
B
Side support (R)
C
Side support (L)
Accessories
D
Reinforce plate
21112
E
Support plate
1216
F
Support cover
1166
G
Cover
H
Thermal insulation
J
Bolt (M6 × 16L)
K
Washer (M6)
L
Spring washer (M6)
M
Nut (M6)
N
Screw (M4 × 8L)
25
Limitations on Place of Installation
Right back pipingLeft back piping
244537.5
* M10 foundation bolt
43
*Be careful of the installation direction.
C
Side support (L)
M
L
K
K
L
M
D
Reinforce plate
Face the cut surface inside.
B
Side support (R)
J
K
A
Floor anchor
K
J
Cross-section diagram
D
Reinforce plate
A
Floor anchor
M
Nut (M6)
L
Spring washer (M6)
K
Washer (M6)
K
Washer (M6)
J
Bolt (M6 × 16L)
150
403
105
* Fixing holes
on the wall
537.5
950
* Maximum width
(for air conditioner installation)
Right bottom pipingLeft bottom piping
105
Right pipingLeft piping
720
(for air conditioner installation)
* Maximum height
406 (liquid pipe)
369 (gas pipe)
unit: mm
* Maximum depth
(for air conditioner installation)
223
233
142 (gas pipe)
157 (liquid pipe)
60
45
2. Fix the installation frame.
2-1) Fix the installation frame at 2 locations on the
floor surface using the M10 foundation bolts.
(field supply: M10 foundation bolt)
2-2) Fix the installation frame at 4 locations on the
wall using screws. (field supply: M4 × 25L)
CAUTION
• Be sure to fix the installation frame
on the floor surface firmly using
M10 foundation bolts.
• Fix the installation frame to a
sufficiently strong wall that can
bear the heavy load of the unit.
M10 foundation bolts (field supply)
(2 locations)
Screws (field supply: M4 × 25L)
(4 locations)
M10 nuts (field supply)
(2 locations)
3. Preparing for the air conditioner installation.
3-1) Remove the pipe port cover on the bottom right of the air conditioner.
3-2) Set the thermal insulation, and cover the field piping, drain hose, and inter-unit wiring with it.
(Note: The thermal insulation is used only when it is routed under the support cover.)
3-3) Fix the support cover at 8 locations on the installation frame using screws. ( Screw (M4 × 8L))
H
Thermal insulation
H
H F
NF
Cross-section diagram
Pipe port cover
Drain hose
Inter-unit wiring
H
Thermal insulation
Field piping
4. Installing the air conditioner and performing finishing.
4-1) Hook the air conditioner on the mounting plate (supplied with the air conditioner), and fix it at 2 locations on the
installation frame using screws. ( Screw (M4 × 8L))
N
Screw (M4 × 8L)
(2 locations)
N
H
Set the thermal insulation
according to the locations of the
M10 foundation bolts.
N
Screw (M4 × 8L)
(8 locations)
F
Support cover
3-4) Fix the support plate (2 pcs.) at 6 locations on the installation frame using screws. ( Screw (M4 × 8L))
E
N
3-5) Fix the mounting plate (supplied with the air conditioner) at 6 locations on the installation frame using screws.
N
( Screw (M4 × 8L))
N
Screw (M4 × 8L)
(6 locations)
E
Support plate
(After the support
cover is installed.)
F
Mounting plate
(supplied with the air conditioner)
E
Support plate
(After the support
cover is installed.)
F
4-2) After connecting the field piping, drain hose, and
G
G
N
Cover
inter-unit wiring, fix the cover at 3 locations on the
installation frame using screws. ( Screw (M4 × 8L))
N
Screw (M4 × 8L)
(3 locations)
Diagram of finished unit
N
Screw (M4 × 8L)
(6 locations)
*In accordance with the direction of
the piping, remove the pipe port
cover of the cover on either the
G
left or right.