S53-053, S53-058, S53-295 and S53-082 Installation
2 5/21/08 Bradley Corporation • 215-1532 Rev. C; EN 08-206
Mounting Metering Faucet and Connecting Water Supply
Supplies required for installation:
• Mounting holes in countertop (see dimensions below)
• Cold or tempered water supply to 1/4" nom. copper tubing
• Piping needed to make water supply connection
• Inlet supply water strainer (available from Bradley)
Installation:
1. Insert the faucet’s mounting shank(s) and copper tubing down through the hole(s) in the deck.
2. Mount the faucet to the deck by tightening the washers and nuts as shown in Figure 1 on page 3.
3. Connect the tempered or cold water supply to the copper tube using 1/4" nominal (3/8" O.D.)
compression fittings as required (supplied by installer).
WARNING: The inlet supply water must be filtered. An in-line strainer housing (118-136),
filter (269-003) and O-ring (125-001BY) is available from Bradley. The strainer will
adapt to any standard 1/4" nominal compression stop. When making connection to
the faucet, the supply line should be flexible enough so that the strainer can be
removed for cleaning. If installation of Bradley’s strainer is not practical, any
suitable strainer of the same wire mesh must be used.
4. Turn on the water supply and test the faucet to ensure proper valve cycling. Adjust the timing, if
necessary (refer to “Timing Adjustments” on page 4 for instructions).
IMPORTANT!
Read this entire installation manual to ensure proper installation, then file this manual with
the owner or maintenance department. Compliance and conformity to local codes and
ordinances is the responsibility of the installer.
Pressurized plumbing fixtures must be installed in accordance with manufacturer’s
recommendations. The supply piping to these devices must be securely anchored to the
building structure to prevent unnecessary movement of the installed device when operated
by the user. Use extreme caution when installing the device to prevent damage to the
exposed significant surface.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain the
missing parts.
Flush water supply lines before making connections. DO NOT use pipe dope on any faucet or
supply connections. Possible solenoid contamination could occur which will void any
warranty. Teflon tape is the recommended sealant.
The incoming water supply can be tempered or cold. An optional Bradley Vernatherm™
thermostatic mixing valve delivers tempered water at a temperature no greater than 105°F.
The 1100 series faucet operates at a flowing water pressure of 20–100 PSI. A vandal-resistant
.5 GPM flow restrictor ensures a constant flow rate at all pressures.
Product warranties may be found under "Product Information" on our web site at