THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE. READ, UNDERSTAND
AND FOLLOW THE INSTRUCTIONS AND WARNINGS CONTAINED IN THIS MANUAL.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN
THE VICINITY OF THIS OR ANY OTHER APPLIANCE.
WARNING
IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN
CAUSE PROPERTY DAMAGE, INJURY OR DEATH. READ THE INSTALLATION, OPERATING
AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING
THIS EQUIPMENT.
NOTIFY CARRIER OF DAMAGE AT ONCE
IT IS THE RESPONSIBILITY OF THE CONSIGNEE TO INSPECT THE CONTAINER UPON
RECEIPT OF SAME AND TO DETERMINE THE POSSIBILITY OF ANY DAMAGE, INCLUDING
CONCEALED DAMAGE. WE SUGGEST THAT IF YOU ARE SUSPICIOUS OF DAMAGE TO
MAKE A NOTATION ON THE DELIVERY RECEIPT. IT WILL BE THE RESPONSIBILITY OF THE
CONSIGNEE TO FILE A CLAIM WITH THE CARRIER. WE RECOMMEND THAT YOU DO SO
AT ONCE.
Page 3
IMPORTANT - READ FIRST - IMPORTANT
WARNING: THE UNIT MUST BE INSTALLED BY PERSONNEL QUALIFIED TO WORK WITH ELECTRICITY AND
PLUMBING. IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL AND/OR DAMAGE TO
THE EQUIPMENT. INSTALLATION MUST COMPLY WITH APPLICABLE CODES.
NOTICE: DO NOT INSTALL THE UNIT IN ANY WAY WHICH WILL BLOCK THE RIGHT SIDE VENTS , OR WITHIN
12 INCHES OF A HEAT SOURCE SUCH AS A BRAISING PAN , DEEP FRYER , CHAR BROILER OR
CONVECTION OVEN .
NOTICE: LEVEL THE UNIT FRONT TO BACK , OR PITCH IT SLIGHTLY TO THE REAR , TO AVOID DRAINAGE
PROBLEMS .
WARNING: TO AVOID DAMAGE OR INJURY, FOLLOW THE WIRING DIAGRAM EXACTLY WHEN CONNECTING A
UNIT. AN ELECTRICAL GROUND IS REQUIRED.
CAUTION: DRAIN MUST BE RATED FOR BOILING WATER. DO NOT USE PLASTIC PIPE.
WARNING: DO NOT CONNECT THE DRAIN DIRECTLY TO A BUILDING DRAIN. DAMAGE TO THE EQUIPMENT MAY
RESULT.
WARNING: BLOCKING THE DRAIN MAY BE HAZARDOUS.
IMPORTANT: IMPROPER DRAIN CONNECTION WILL VOID WARRANTY .
WARNING: WHEN YOU OPEN A COMPARTMENT DOOR, STAY AWAY FROM STEAM COMING OUT OF THE UNIT.
CONTACT WITH STEAM CAN CAUSE BURNS.
WARNING: BEFORE CLEANING THE OUTSIDE OF THE STEAMER, DISCONNECT ELECTRIC POWER . KEEP
WATER AND CLEANING SOLUTIONS OUT OF CONTROLS AND ELECTRICAL COMPONENTS. NEVER
HOSE OR STEAM CLEAN ANY PART OF THE UNIT. SERIOUS INJURY COULD RESULT.
WARNING: LET COOKING CHAMBERS COOL BEFORE CLEANING. HOT SURFACES CAN CAUSE BURNS.
WARNING: CAREFULLY READ THE WARNINGS AND FOLLOW THE DIRECTIONS ON THE LABEL OF EACH
CLEANING AGENT USED. DIRECT CONTACT WITH SOME AGENTS CAN CAUSE INJURY.
WARNING: DO NOT MIX DE-LIMING AGENTS (ACID) AND DE-GREASERS (ALKALI) IN THE STEAM GENERATOR
OR ON THE COOKING CHAMBER WALLS. HARMFUL GASSES MAY RESULT.
WARNING: DO NOT PUT HANDS OR TOOLS INTO THE COOKING CHAMBER, UNTIL THE FAN HAS STOPPED
TURNING. THE ROTATING FAN CAN CAUSE INJURIES.
WARNING: DO NOT OPERATE THE UNIT UNLESS THE REMOVABLE RIGHT SIDE PANELS HAVE BEEN RETURNED
TO THEIR PROPER LOCATIONS. DAMAGE TO THE UNIT COULD OCCUR.
CAUTION: DO NOT LOCATE THE BOILER CABINET DIRECTLY OVER A FLOOR DRAIN OR FLOOR SINK. HUMIDITY
OR WATER FROM A DRAIN WILL DAMAGE ELECTRICAL PARTS OF A UNIT.
NOTICE: DO NOT USE CLEANING OR DE -LIMING AGENTS THAT CONTAIN SULFAMIC ACID OR ANY
CHLORIDE, INCLUDING HYDROCHLORIC ACID . IF THE CHLORIDE CONTENT OF ANY PRODUCT IS
UNCLEAR, CONSULT THE MANUFACTURER . DO NOT USE CLEANING OR DE -LIMING AGENTS THAT
CONTAIN MORE THAN 30% PHOSPHORIC ACID.
WARNING: HIGH VOLTAGE EXISTS INSIDE CONTROL COMPARTMENTS. DISCONNECT POWER SOURCE
BEFORE SERVICING. FAILURE TO DO SO CAN RESULT IN SERIOUS INJURY OR DEATH.
OM-G-SB 1
Page 4
IMPORTANT - READ FIRST - IMPORTANT
WARNING: DO NOT EXPOSE SKIN TO ESCAPING STEAM. SEVERE BURNS CAN RESULT.
CAUTION: MAKING ANY ELECTRICAL OR MECHANICAL CHANGE IN THE UNIT WITHOUT PRIOR WRITTEN
APPROVAL FROM ENGINEERING WILL VOID ALL WARRANTIES.
WARNING: ALL POTENTIAL USERS OF THE EQUIPMENT SHOULD BE TRAINED IN SAFE AND CORRECT
OPERATING PROCEDURES.
WARNING: DO NOT OPERATE THE UNIT UNLESS ALL REMOVABLE PANELS (RIGHT, LEFT, FRONT AND REAR)
HAVE BEEN PROPERLY INSTALLED.
NOTICE: USE NO DE -GREASER THAT CONTAINS POTASSIUM HYDROXIDE OR SODIUM HYDROXIDE OR IS
ALKALINE .
WARNING: USE OF ANY REPLACEMENT PARTS OTHER THAN THOSE SUPPLIED BY THE MANUFACTURER OR
THEIR AUTHORIZED SERVICE AGENTS VOIDS ALL WARRANTIES AND CAN CAUSE BODILY INJURY
TO THE OPERATOR AND DAMAGE THE EQUIPMENT. SERVICE PERFORMED BY OTHER THAN
FACTORY AUTHORIZED PERSONNEL WILL VOID ALL WARRANTIES.
DANGER: HIGH VOLTAGE EXISTS IN CONTROL COMPARTMENTS. DISCONNECT FROM BRANCH CIRCUIT
BEFORE SERVICING. FAILURE TO DO SO CAN RESULT IN SERIOUS INJURY OR DEATH.
2 OM-G-SB
Page 5
Table of Contents
Important Operator Warnings ..................................................... page 1-2
Service Log ................................................................................. page 33
References
UNDERWRITERS LABORATORIES, INC.
333 Pngsten Road
Northbrook, Illinois 60062
KLENZADE SALES CENTER
ECOLAB, Inc.
370 Wabasha
St. Paul, Minnesota 55102
800 328-3663 or 612 293-2233
NATIONAL FIRE PROTECTION ASSOCIATION
60 Battery March Park
Quincy, Massachusetts 02269
NFPA/70 The National Electrical Code
NFPA/54 Installation of Gas Appliances & Piping
NFPA/96 Ventilating Hoods
NSF INTERNATIONAL
789 North Dixboro Road
P.O. Box 130140
Ann Arbor, Michigan 48113-0140
AMERICAN NATIONAL STANDARDS INSTITUTE
1403 Broadway, New York, New York 10018
Z21.30 Installation of Gas Appliances & Piping
Z223.1 (latest edition) National Fuel Gas Code
OM-G-SB 3
Page 6
Equipment Description
WARNING
THE UNIT MUST BE INSTALLED BY
PERSONNEL WHO ARE QUALIFIED TO WORK
WITH ELECTRICITY AND/OR GAS, AND
PLUMBING. IMPROPER INSTALLATION CAN
CAUSE INJURY TO PERSONNEL AND/OR
DAMAGE TO THE EQUIPMENT. THE UNIT
MUST BE INSTALLED IN ACCORDANCE WITH
ALL APPLICABLE CODES.
The G-SB Steamer is designed to bring you years of service. It has two stainless steel
cavities (cooking chambers) and a control compartment, which houses the electrical
components and steam valves. In each cavity, a powerful blower circulates the steam
for increased heating efficiency. Each cavity, depending on model, will hold either
three or five steam table pans (12” x 20” x 2-1/2”).
A 16 gauge stainless steel case encloses the cavities and the control compartment
that house electrical components. The door hinges are reversible (the doors may be
hung to open from the left or right).
Operator Controls are located on the front panel.
The steamer cavities are mounted on a cabinet base containing a gas-fired steam
boiler that generates low pressure steam. This model uses a spark ignition system.
The boiler is small enough to fit in a 24-1/8” wide by 34-3/16” deep by 29-3/16” tall
(maximum) cabinet. The boiler is constructed of 1/4” thick steel, which is certified by
the American Society of Mechanical Engineers (ASME) for pressure vessels. All welds
are hydrostatically tested. The boiler is also equipped with required instruments,
fittings, and controls per CSD-1 (Controls and Safety Devices for automatically fired
boilers). Heat transfer fins inside the combustion chamber add to the unit’s high
efficiency. The unit is rated as 60% efficient or better, with a firing rate of 200,000 BTU
per hour using natural or propane gas. Energy output is 120,000 BTU per hour, with an
effective boiler horsepower of 3.7.
G-SB steamers have two steam
compartments with individual controls
mounted on a gas-fired boiler base..
The drain system includes a spray condenser, which suppresses any steam escaping
from the chamber and cools condensate water going into the drain.
4 OM-G-SB
Page 7
Water Quality & Treatment
REDUCE SCALE PROBLEMS BY USING
AND MAINTAINING A WATER SOFTENER
FOR YOUR STEAMER!
It is essential that the boiler be supplied with water that will not form scale at an
unacceptable rate. The boiler was engineered to minimize scale, but its formation
depends on water hardness and how much the unit is used.
In some areas of the United States the water is low enough in mineral content to avoid
scale build-up. However, most water supplies carry heavy loads of minerals. This
will form scale on the boiler, reduce its steam output, and possibly cause premature
component failure.
Your water utility or local water quality dealer can tell you about the minerals in your
water. The water going to the steam generator should have:
1. Between 1 and 30 ppm total dissolved solids (TDS)
2. A pH (acidity rating) of 7.0 - 8.0
3. Total alkalinity less than 120 ppm
4. Silica less than 13 ppm
5. Chlorides less than 30 ppm
6. Sulfates less than 40 ppm
7. Chlorine less than 10 ppm.
Please follow these simple precautions:
1. Do not rely on unproven water treatment equipment which is sold for scale
prevention or scale removal. They frequently don’t work. The best way to prevent
scale is to supply the purest possible water.
2. If your water contains scale-forming minerals, as most water does, use a wellmaintained water treatment system. Whether an exchangeable softener cartridge
or a regenerating system is chosen, a regular exchange system is essential.
3. Installing a water meter on supply line to the steamer will provide an accurate
gauge of water use, and will help determine when to exchange cartridges or
regenerate the softener. Using treated water will provide longer generator life,
higher steam capacity, and reduce maintenance requirements.
4. If you notice a slowdown in steam production, check the boiler for scale build-up.
Heavy scale reduces the unit’s ability to boil water, and can even cause heating
elements in the steam generator to overheat and burn out.
5. Pressure boilers are available with two separate water intakes:
one for the boiler (treated water)
one for the spray condenser (untreated water).
The steam generator only uses 14 to 31% of a steamer’s water. Since water
treatment systems are typically sized by total GPH (gallons per hour), the second
intake could reduce treatment requirements by up to 80%, resulting in significant
savings.
OM-G-SB 5
Page 8
Installation
WARNING
MAKING ANY ELECTRICAL OR MECHANICAL
CHANGE IN THE UNIT WITHOUT PRIOR
APPROVAL WILL VOID ALL WARRANTIES.
WARNING
THE UNIT MUST BE INSTALLED BY
PERSONNEL WHO ARE QUALIFIED TO WORK
WITH GAS, ELECTRICITY AND PLUMBING.
IMPROPER INSTALLATION CAN CAUSE
INJURY TO PERSONNEL AND/OR DAMAGE
TO THE EQUIPMENT. THE UNIT MUST
BE INSTALLED IN ACCORDANCE WITH
APPLICABLE CODES. THE UNIT MUST BE
INSTALLED BY A LICENSED PLUMBER OR
GAS FITTER WHEN INSTALLED WITHIN THE
COMMONWEALTH OF MASSACHUSETTS.
WHEN THE UNIT IS RECEIVED, IMMEDIATELY INSPECT IT FOR EXTERNAL OR INTERNAL
DAMAGE. REPORT ANY DAMAGE TO THE FREIGHT CARRIER. After inspection, keep the
unit in its shipping container until it is installed. It can be installed on combustible and
non-combustible floors. Minimum clearances are:
Right Side 2 inches
Left Side 4 inches
Rear 6 inches
In order to service the unit properly, access with at least 24 inches clearance is
needed on the right side.
Install the unit in a well-vented room so that there is an adequate air supply. Since
products of combustion come out of its flue, the appliance must be located under a
ventilation hood. Do not directly vent the flue.
Level the unit front to rear and left to right by adjusting its legs. Levelness may be
checked by using a spirit level on top of the cabinet.
A free flow of air around the boiler promotes efficient operation. Items which might
restrict air flow must be removed. After installation, do not obstruct the flue, or any
front, side, rear or top vents. Similarly, keep the area directly around the appliance
clear of combustible material.
Installation must conform with local codes, or in the absence of local codes, with the
National Fuel Gas Code, ANSI Z223.1 (latest edition, including the following paragraph:
“The unit and its individual shut-off valve must be disconnected from the gas supply
piping system during any pressure testing of that system at test pressures in excess
of 1⁄2 PSI (3.45 kPA). The unit must be isolated from the gas piping system by closing
its individual manual shut-off valve during any pressure testing of the gas supply
piping system at test pressures equal to or less than 1⁄2 PSI (3.45 kPA).”
1. Gas Supply Connection
a. Connection to the gas supply can be completed with 1/2” NPT pipe
or approved equivalent. Although this is the diameter for immediate
connection to the unit, gas supply piping must be large enough to provide volumes and pressure sufficient for 200,000 BTU per hour.
Supply pressure must be at least 5.0” W.C. (14.0” W.C. maximum) for
natural gas or 11.0 W.C. (14.0” W.C. maximum) for propane.
b. In Canada, the installation must conform to the Canada Gas Code, CAN
1-B149 (Installation Codes for Gas Burning Appliances and Equipment),
and/or local codes.
c. After the unit has been connected to the gas supply, check piping joints for
leaks. Do NOT use flame to check for leaks. A thick soap solution or other
suitable leak detector should be used.
6 OM-G-SB
Page 9
Installation
WARNING
THE UNIT MUST BE INSTALLED BY
PERSONNEL WHO ARE QUALIFIED TO
WORK WITH ELECTRICITY AND PLUMBING.
IMPROPER INSTALLATION CAN CAUSE
INJURY TO PERSONNEL AND/OR DAMAGE TO
THE EQUIPMENT. THE UNIT MUST BE
INSTALLED IN ACCORDANCE WITH ALL
APPLICABLE CODES.
CAUTION
SHIPPING STRAPS ARE UNDER TENSION.
THEY CAN SNAP BACK VIOLENTLY AND
CAUSE INJURY WHEN CUT.
CAUTION
MAKING ELECTRICAL OR MECHANICAL
CHANGES TO THE UNIT WITHOUT APPROVAL
FROM THE FOOD SERVICE ENGINEERING
DEPARTMENT WILL VOID WARRANTIES.
IMPORTANT
IMPROPER DRAIN CONNECTION
WILL VOID WARRANTY.
CAUTION
DO NOT LOCATE THE BOILER CABINET
DIRECTLY OVER A FLOOR DRAIN OR
FLOOR SINK. HUMIDITY OR WATER
WILL DAMAGE ELECTRICAL.
2. Electrical Supply Connection
a. Power is supplied to cavity controls and blower from the boiler base, and
no other electrical connections are required.
b. The maximum electrical load is 4 AMP. You must provide 115 Volt
Alternating Current, 60 Hz, 1PH, 15 AMP service. Local codes and/or the
National Electrical Code should be followed (ANSI/NFPA-70-1987 - or latest
edition). AN ELECTRICAL GROUND IS REQUIRED.
c. The electrical schematic is located in the electrical enclosure and in
this manual. In Canada provide electrical service in accordance with the
Canadian Electrical Code, CSA C22.1, Part 1 and/or local codes.
3. Water Supply Connection
a. This Model features two separate water inlets – one for the steam boiler
(treated water), the other for the spray condenser (untreated water). The
second intake will reduce treatment requirements resulting in significant
savings.
b. Cold water should be supplied to a 3/8” NPT pipe connection for untreated
water at the rear of the unit. A back siphonage device (check valve) must
be installed, complying with local plumbing codes. The water pressure
should be between 30 and 60 PSI (210 to 410 kPa). A pressure regulator is
required above 60 PSI (410 kPa). A strainer screen at the connection is also
recommended, to trap debris before it can enter the system.
c. The condenser spray uses 0.70 to 0.95 gallons of water per minute (2.6 to
3.6 liters per minute) at 30 to 60 PSI (210 and 410 kPa). The spray will only
operate when a steamer cavity (cooking chamber) is in operation.
Leave an air gap between the hose and the build-
ing drain, and don’t allow water traps in the line.
d. Water supply lines should be sized to provide for maximum water use (the
total of the boiler and condenser spray) as shown in the following table:
Maximum Water Consumption-gal/hr (L/hr)Gas boiler only 12.9 (48.8)
a. The drain connection is made at the rear of the unit, using a 1-1/4” NPT
pipe. Do NOT use plastic pipe — the piping must be able to withstand
steam and hot water. Extend the drain piping to a nearby floor drain. Piping
of 1 - 1/4” NPT (or 1 - 1/2” NPT) is acceptable for distances of six feet or
less. If the distance to the drain is further than six feet, use 2” NPT piping.
b. Install the drain line with a constant downward pitch. Do not allow any
water traps in the line. A trap can cause pressure to build up inside the
cavity during steaming, which will make the door gasket leak. A vertical
air gap must be maintained between the drain line and the building drain,
unless otherwise specified by local plumbing codes.
OM-G-SB 7
Page 10
Installation
5. Utility Connections
a. Hot water (for faucet on 36” and wider units with kettles).
b. Steam outlet (for power take-off).
c. Cold water (treated).
d. Cold water (untreated).
e. Gas, natural or propane.
f. Drain (for boiler, steamers and condenser spray). Also for kettle
condensate and sink where used.
g. Electrical (conduit through underside, terminals at the right on the
inside).
8 OM-G-SB
Page 11
Operating Controls are located on the
front of the cabinet base unit.
Initial Start-Up
After the unit has been installed, test it to ensure that it is operating properly.
1. Remove literature and packing material from the interior and exterior of the unit.
2. Make certain the water supply is turned on.
3. Turn on electrical power to the unit.
4. Make sure the gas supply line is open, and turn on the gas valve.
Turn the knob on the gas valve to the “ON” position.
NOTE: The “trial for ignition” period is approximately 90 seconds after the on/off
switch is turned to the “ON” position. (Refer to the Control Panel illustration in
the Operation Section).
During initial start-up several trials may be necessary to remove air from the gas
piping. Subsequent start-ups should only need about five seconds for the pilot to
light. If the pilot burner does not light within the trial period, the ignition system
will automatically stop gas flow to the pilot burner, and terminate the ignition
trial. If this happens, turn the switch to “OFF” and then “ON” again, to repeat the
trial for ignition.
5. Turn the on/off switch on the cabinet front panel to the “ON” position:
• The amber light in the switch will come on
• The boiler drain valve will close
• The unit will ll with water
When the water level reaches the “mid” probe, the red RESET light will come on.
Push the start switch.
• The green light in the switch will come on
• The RESET light will go out
• The main burner will light
When the water level reaches the “hi” probe, the water supply to the boiler will
shut off.
6. After about 15 minutes, the pressure on the gauge will rise. When the pressure
reaches 9- 1/2 PSI, the main burner will turn off. Thereafter, as pressure
decreases, the burner will automatically re-light to maintain the 9-1/2 PSI level.
The pilot burner should stay lit, even though the main burner cycles on and off.
7. To shut the unit down, turn the on/off switch to OFF. When it has cooled to
approximately 170ºF, the boiler will automatically drain.
The pilot is off when the on/off switch is OFF.
If the boiler functions as described above, it is ready for use. If it does not, contact
your authorized Service Agent.
OM-G-SB 9
Page 12
Initial Start-Up
WARNING
STAY AWAY FROM STEAM COMING OUT
FROM THE UNIT. STEAM CAN CAUSE
SEVERE BURNS.
8. When steam is available for the cavity, choose one of the following:
a. Set the timer to the desired time for timed steaming.
b. Turn the timer to the manual ON position for continuous steam.
NOTE: The door must be shut before steam will enter the cavity. If the door is
opened when the timer is on, the flow of steam will stop.
c. Let the steamer sit idle until needed.
9. If the unit will not be used for an extended period, turn off power to the individual
steamer compartments. Turn off power to the gas or electric pressure boiler.
Refer to the steam boiler operator manual, if necessary.
If the unit functions as described above, it is ready for use. If it does not, contact your
Authorized Service Agent.
10 OM-G-SB
Page 13
Operation
WARNING
ALL POTENTIAL USERS OF THE EQUIPMENT
SHOULD BE TRAINED IN SAFE AND CORRECT
OPERATING PROCEDURES.
A. Controls
Operating controls are located on the front panel of the unit.
1. The on/off switch starts the unit or shuts it off.
2. The RESET indicator lights to show that the boiler has filled with water and
that the main burners can ignite.
3. The start switch (momentary) lights the main burners. It also restarts the
unit if electrical power is interrupted, or if a low water condition in the
boiler disables the unit.
4. In addition to operating these controls, there are gas supply controls
located on the gas valve.
When the control knob is “ON,” gas flows to the pilot, as well as to the
main burners.
Timers are located on the front right side of the unit. There are two timers — one
each for the upper and lower cavities.
The timer is used in two ways:
5. Turning the timer to any setting delivers steam to the cavity until the timer
runs down to OFF. At that time a red LED switches on and a beeper sounds
and the steam flow to the compartment stops.
6. When turned all the way to the ON position, the timer allows continuous
steaming. A green LED is turned on, and the timer does not time down.
Steam continues until the timer knob is turned to the OFF position.
OM-G-SB 11
Page 14
Operation
WARNING
ANY POTENTIAL USER OF THE EQUIPMENT
SHOULD BE TRAINED IN SAFE AND CORRECT
OPERATING PROCEDURES.
WARNING
WHEN YOU OPEN THE DOOR, STAY AWAY
FROM THE STEAM COMING OUT OF THE
UNIT. THE STEAM CAN CAUSE BURNS.
OFF
DONE
ON
TIMER
Timer Controls for each of the two
cavities are identical.
B. Operating Procedure
1. Turn on the unit’s water supply.
2. Turn on electrical power to the unit.
3. Turn on the gas supply to the unit, and turn on the gas valve. Turn the
control knob on the gas valve to the “ON” position.
NOTE: The “ignition trial” period runs for approximately 90 seconds after
the on/off switch is turned ON. This means that if the pilot light does not
light within the “trial” period, the ignition system will automatically stop the
gas flow and terminate the ignition trial. If ignition is terminated, turn the
switch off and then “ON” again to repeat the trial. Normally, the pilot should
light within five seconds of turning on the unit.
a. Turn the on/off switch on the front of the cabinet to “ON.”
1) The amber light will come on.
2) The boiler drain valve will close and the unit will fill with water.
3) When the water reaches the “mid” probe, the red RESET light
will come on.
4) Press the start switch.
5) The green light in the switch will come on, the RESET light will
go off, and the main burner will light.
6) When the water level reaches the “hi” probe, the water supply
to the boiler will shut off.
After about 15 minutes, the pressure gauge will indicate that the
b.
pressure is rising. When it reaches 9-1/2 PSI, the main burner will shut
off. Thereafter, the burner will periodically relight to maintain the pressure
at 9-1/2 PSI. The pilot light should stay lit when the burner is off.
c. To shut down the unit, turn the on/off switch to OFF. The unit will drain
automatically after it has cooled to about 170ºF. The unit turns off the
pilot light when the on/off switch is turned to OFF.
4. Load food into pans so that it is in uniform layers. For best results, pans
should be filled to about the same levels, and should be even on top.
5. Open the door and slide the pans onto the supports. If you will only be
steaming one pan, put it in the middle rack position.
6. Close the door.
NOTE: The door must be closed before steam will enter the cavity. If the
door is opened when the timer is on, the steam will stop.
12 OM-G-SB
Page 15
Operation
7. Turn the timer to one of the following settings:
a. If you want to steam for a definite period of time, set the timer to
that time. Steam will be delivered to the cavity for that time, and
then stop. A buzzer and red LED will indicate that the timed cycle is
complete. Steam flow stops.
b. If you want to steam continuously, turn the timer to the ON position.
A green light will come on. Steam will be delivered to the cavity until
the timer is returned to OFF.
8. Open the door.
9. Using a pad or oven mitt to protect your hands, remove the pans from the
steamer.
10. To shut down the steamer, turn the Timer to the OFF position.
OM-G-SB 13
Page 16
Sequence of Operation
CAUTION
WAIT AT LEAST 60 SECONDS BEFORE
ATTEMPTING TO RE-LIGHT THE MAIN
BURNER AFTER IT SHUTS OFF.
CAUTION
ESCAPING STEAM MAY CAUSE SEVER
BURNS. STAY AWAY FROM THERMOSTATIC
AIR VENT AND PRESSURE RELIEF VALVES.
When electrical power is turned on to the unit, the following happens:
• The drain valve closes
• The water valve opens
• The unit lls with water
As the boiler fills, the water is detected by two probes. The first of these is the “mid”
probe, which activates the RESET light. The second (“hi” probe) is reached when the
boiler is full, and shuts off the water supply. As the water supply drops below this
probe, the water supply opens until it is again reached.
The gas valve has a step-opening feature. When the control calls for the main burner
to light, the outlet pressure of the valve is maintained at a preset (non-adjustable) rate
for several seconds, before full rated pressure is allowed to develop.
Once the main burner shuts down, step-opening gas valves need at least 60 seconds
to reset. If an attempt to re-light the burner is made before these valves reset, it may
bypass or shorten the length of the low pressure step, and could re-light the main
burner under full flow rate.
A thermostatically-controlled air vent remains open while the boiler fills. As steam
begins to develop, this vent will close. Some steam may escape from this vent before
it is fully closed (at approximately 200ºF).
Once the pressure has reached 9-1/2 PSI, the main burner will be shut off by an
operating pressure switch. Residual heat stored in the boiler’s heat exchanger can,
however, cause the pressure to continue to build, even after the burner has shut down.
This is especially true when the unit is heated for the first time.
If/when the pressure reaches 12 PSI, a relief valve will open to prevent pressure from
increasing past 12 PSI. As pressure decreases, the main burner will automatically relight to maintain 9-1/2 PSI.
Even if something causes the pressure to pass 12PSI, a high-limit safety switch will
shut down the boiler electrically when it reaches 14-1/2 PSI. If this happens, the unit
should not be re-started until the problem which caused the shut-down has been
corrected.
As an additional safety measure, the unit is equipped with an A.S.M.E.-certified safety
valve which will open to relieve excess pressure at 15 PSI. The ability of this valve to
discharge steam pressure is greater than the boiler’s ability to generate steam.
When electrical power is turned off, the gas valve automatically shuts off flow to the
main gas burner.
A thermostatic switch (mounted on the boiler shell) keeps the drain valve closed until
the temperature drops to approximately 170ºF.
At that point, the thermostatic switch opens and water drains from the boiler. A
vacuum breaker allows air to enter the boiler for this purpose.
14 OM-G-SB
Page 17
Steamer Compartment Cleaning
WARNING
DISCONNECT THE POWER SUPPLY BEFORE
CLEANING THE OUTSIDE OF THE STEAMER.
KEEP WATER AND CLEANING SOLUTIONS OUT
OF CONTROLS AND ELECTRICAL COMPONENTS.
NEVER HOSE OR STEAM CLEAN ANY PART OF
THE UNIT.
DON’T MIX DE-LIMING AGENTS (ACID) WITH DE-
GREASERS (ALKALI ) ANYWHERE IN THE UNIT.
AVOID CONTACT WITH ANY CLEANERS,
DE-LIMING AGENT OR DE-GREASER AS
RECOMMENDED BY THE SUPPLIER. MANY ARE
HARMFUL. READ THE WARNINGS AND FOLLOW
THE DIRECTIONS!
EVEN WHEN THE UNIT HAS BEEN SHUT OFF,
DON’T PUT HANDS OR TOOLS INTO THE
COOKING CHAMBER UNTIL THE FAN HAS
STOPPED TURNING.
DON’T OPERATE THE UNIT UNLESS REMOVABLE
INTERIOR PARTITIONS HAVE BEEN PUT BACK IN
THEIR PROPER LOCATIONS.
DON’T USE ANY CLEANING OR DE-LIMING
AGENT THAT CONTAINS ANY SULFAMIC AGENT
OR ANY CHLORIDE, INCLUDING HYDROCHLORIC
ACID (HCl). TO CHECK FOR CHLORIDE
CONTENT SEE ANY MATERIAL SAFETY DATA
SHEETS PROVIDED BY THE CLEANING AGENT
MANUFACTURER. DON’T USE ANY CLEANING OR
DE-LIMING AGENT THAT CONTAINS MORE THAN
30% PHOSPHORIC ACID.
IMPORTANT
DO NOT USE ANY METAL MATERIAL (SUCH AS
METAL SPONGES) OR METAL IMPLEMENT (SUCH
AS A SPOON, SCRAPER OR WIRE BRUSH) THAT
MIGHT SCRATCH STAINLESS STEEL SURFACES.
SCRATCHES MAKE THE SURFACE HARD TO
CLEAN AND PROVIDE PLACES FOR BACTERIA TO
GROW. DO NOT USE STEEL WOOL, WHICH MAY
LEAVE PARTICLES IMBEDDED IN THE SURFACE,
WHICH COULD EVENTUALLY CAUSE CORROSION
AND PITTING.
To keep your Steamer in proper working condition, clean the unit each day. This
regular cleaning will reduce the effort required to clean the cavities.
A. Suggested Tools
1. Mild detergent
2. Stainless steel exterior cleaner such as Spray Degreaser, Zepper®
3. De-greaser, such as EncompasS®, Malone 34®, Puritan Puribrute®, or
Con-Lie®
4. Cloth or sponge
5. Plastic wool or a brush with soft bristles
6. Spray bottle
7. Measuring cup
8. Nylon pad
9. Towels
10. Plastic disposable gloves
B. Procedure
1. Outside
a. Prepare a warm solution of mild detergent as instructed by the
supplier. Wet a cloth with this solution and wring it out. Use the moist
cloth to clean the outside of the unit. Do not allow freely running liquid
to touch the controls, the control panel, any electrical part, or any
panel louver.
b. To remove material which may be stuck to the unit, use plastic wool,
a fiber brush, or a plastic or rubber scraper with a detergent solution.
c. Stainless steel surfaces may be polished with a recognized stainless
steel cleaner such as Zepper®.
2. Inside
Remove the fan/baffle partition from inside the unit and place it into a utility
sink. Wash the cooking chamber(s) and fan/baffle partition with a warm
solution of mild detergent and water. If needed, use a de-greaser with a
plastic scouring pad. Rinse parts thoroughly with clean water and replace
fan/baffle partition. Make sure the drain holes at the back of each cavity
are free of food particles or other debris.
OM-G-SB 15
Page 18
Boiler Cleaning
WARNING
WATER AND VALVES MAY BE VERY HOT,
AND MAY CAUSE BURNS. PROTECT HANDS
FROM HOT SURFACES AND WATER.
WARNING
USE SAFETY GLASSES AND RUBBER
GLOVES AS RECOMMENDED BY DE-LIMING
AGENT MANUFACTURER.
CAUTION
DO NOT USE A CLEANING OR DE-LIMING
AGENT THAT CONTAINS SULFAMIC ACID
OR ANY CHLORIDES, INCLUDING
HYDROCHLORIC ACID (HCL). IF THE
CHLORIDE CONTENT OF ANY PRODUCT IS
UNCLEAR, CONSULT THE MANUFACTURER.
Whenever the boiler is turned off and allowed to cool to about 170ºF, it drains
automatically. This should be done every day to minimize scale buildup inside the
boiler.
In addition to this draining, however, the following cleaning procedure should be
followed using a regular schedule. This will prevent the accumulation of lime on the
water level probes and interior surfaces of the boiler. The actual time between these
scheduled cleanings depends on the water quality and hours of operation. Minimally,
We recommend cleaning the boiler at least once each month.
A. Suggested Tools
1. 1/2” hardened square wrench extension
2. Pipe Joint compound (approved for 300ºF steam)
3. Delimer Descaler
4. Spray Degreaser
5. Nylon pad(s)
B. Procedure
1. Turn the boiler on/off switch to the OFF position.
2. Slowly open the manual drain valve to empty the boiler. The valve is located
under the boiler.
3. Close the manual drain valve.
The manual drain valve is
located under the boiler.
4. Turn off water supply to the boiler.
5. Allow the boiler to cool. This takes several hours, so it is recommended that
you cool the boiler overnight.
6. Turn on/off switch to “ON” to close the automatic drain valve.
7. Using a 1/2” hardened square wrench extension, remove one of the 1” NPT
pipe plugs from the front of the boiler.
8. Pour 32 ounces of de-limer into the boiler.
9. Replace the pipe plug. Use pipe joint compound, and tighten the plug
securely.
10. Turn on water supply to allow water to fill the boiler.
11. When the reset light appears, press the START switch.
12. Allow boiler pressure to develop. Let it stand for approximately 15 minutes
after pressure has built up. A badly limed unit may require more than 15
minutes.
16 OM-G-SB
Page 19
Cleaning
WARNING
SOLUTION AND VALVES WILL BE VERY HOT,
AND MAY CAUSE BURNS. PROTECT HANDS
FROM HOT SURFACES AND CONTINUE TO
USE PROTECTIVE GLOVES.
13. Set steamer timers for 10 minutes.
14. When steamer timers sound, turn them to OFF and open the doors.
15. When the fans have stopped, remove fan baffle partitions using protective
gloves, and rinse with clean water.
16. Completely wipe out steamer chambers using a degreaser and nylon pad, if
necessary. Rinse thoroughly with clean water.
17. Replace fan baffle partitions.
18. Wait 10 minutes for the compartments to air dry, then close the steamer
doors.
19. Turn the on/off switch OFF, and slowly open the manual drain valve.
20. When the boiler has drained completely, close the manual drain valve and
turn the on/off switch to “ON” to fill the boiler with water.
21. After the RESET light comes on, press the start switch.
22. Allow boiler pressure to develop If steamers are not present, proceed to
step 25.
23. Set steamer timers for 10 minutes.
24. When steamer signal sounds, turn timers off.
25. If the boiler is not to be used, it may be turned off. It is ready for normal
operation.
OM-G-SB 17
Page 20
Steamer Maintenance
WARNING
BEFORE REPLACING ANY PART TURN OFF
THE ELECTRICAL POWER TO THE UNIT.
DEATH OR INJURY COULD RESULT FROM
CONTACT WITH HIGH VOLTAGE.
The Steamer is designed for minimum maintenance, and no user adjustments should
be necessary. Certain parts may need replacement after prolonged use. If there is a
need for service, only Authorized Service Representatives should do the work.
Periodic Inspection: The manufacturer recommends that service personnel check
the unit thoroughly at least once a year. The inspection should include electrical wires
and connections. The inside of the control compartment should also be thoroughly
cleaned.
Door Latch Adjustment: If steam or condensate is observed leaking from around
the door, take the following steps:
1. Check the condition of the door gasket. Replace it if it is cracked or split.
2. Inspect the cooking chamber drain for blockage.
3. Adjust the latch pin to allow for changes that might occur as the gasket ages.
a. Loosen the lock nut at the base of the latch pin, then turn the latch
pin ¼ turn clockwise, and tighten the lock nut.
b. After adjustment, run the unit to test for further steam leakage.
c. If there is still leakage, repeat.
d. Continue adjusting the pin clockwise until the door fits tightly
enough to prevent leakage.
e. If leakage is still present, repeat steps a. through c. until leakage
stops.
A Maintenance and Service Log is provided at the back of this manual. Each time
maintenance is performed on the unit, enter the date the work was done, what was
done, and who did it.
18 OM-G-SB
Page 21
Maintenance
WARNING
USE ONLY MANUFACTURER-SUPPLIED PARTS.
USING SUBSTITUTE, UNAUTHORIZED OR
“GENERIC” PARTS CAN CAUSE BODILY
INJURY TO THE OPERATOR AND DAMAGE
THE EQUIPMENT.
WARNING
DO NOT EXPOSE SKIN TO ESCAPING STEAM.
SEVERE BURNS MAY RESULT.
Your boiler is designed to minimize maintenance, but certain parts may need to
be replaced after prolonged use. For the most part, no user adjustments should be
necessary. If a need for service arises, only Authorized Representatives should perform
the work.
Among the most common problems is the rapid build-up of scale in the boiler. To avoid
this, always supply water that has a low mineral content, which meets the standards
described in the Water Quality section of this manual.
A. Periodic Inspection
The unit should be inspected by a qualified service technician at least once each
year. The inspection should include electrical wires and connections, cleaning the
inside of the control enclosure and pilot burner adjustment, if required.
At the back of this manual (with the information about our warranty) is a
Maintenance and Service Log. Each time maintenance is performed on the unit,
enter the date on which it was done, what was done, and who did it. Keep this log
with the warranty.
In addition to yearly inspections by a qualified service technician, a weekly check
of the following will help prevent down time and ensure continued efficient
operation.
1. Pressure gauge operation
2. Proper water level (gauge)
3. Strainer in water feed line (clear?)
4. Air inlets for gas burner jets (clean?)
5. Pilot burner flame (blue? Envelops sensor?)
6. Drain piping (free running? No blockage?)
One of the pressure relief safety valves is
located on the top left rear of the boiler.
At least twice each month, check the safety valve to be sure it is working properly.
When pressure reaches five PSI on the gauge, lift the lever to vent steam, then
release it, allowing it to snap back into place.
B. Component Replacement
Boilers are easy to service. The design is simple, and controls are readily
accessible.
Before replacing any part, COMPLETELY SHUT OFF THE GAS AND ELECTRICAL
POWER TO THE UNIT. When breaking (opening) a gas pipe connection, allow five
minutes for gas to dissipate before proceeding.
When the pipes have been reconnected, check for leaks with a thick soap solution
or other suitable leak detector. Do not use flame to check for gas leaks.
OM-G-SB 19
Page 22
Troubleshooting
Do not operate the unit if it malfunctions or has damaged or broken parts. Steam boilers are designed to operate smoothly and efficiently when maintained properly. However, the following is a list of checks to make if there is a problem. Electrical schematics are
provided in this manual, and inside the unit electrical enclosure. IF THE ITEM ON THE LIST IS MARKED WITH (X), THE
WORK SHOULD ONLY BE DONE BY A FACTORY-AUTHORIZED SERVICE REPRESENTATIVE.
SYMPTOMWHOWHAT TO CHECK
Boiler does not ll with water.Usera. Is water supply connected and is water present?
b. Is water pressure low (less than 30 PSI)?
c. Is strainer screen (if used) clogged?
d. Is on/off switch in base cabinet turned on? Is the amber light in
the on/off switch “ON”?
e. Is the manual drain valve open?
Authorized
Service Rep Only
Boiler overlls with water.Usera. Is the boiler level? Check levelness of unit with a spirit level.
Authorized
Service Rep Only
Boiler under lls with water.Usera. Is the boiler level? Check levelness of unit with a spirit level.
Water enters boiler slowly.Usera. Is strainer screen (if used) clogged?
Authorized
Service Rep Only
RESET light does not come
on.
Authorized
Service Rep Only
f. Is the Water Level Control Board defective? Check for loose
electrical connections on water ll solenoid. (X)
g. Is the water ll solenoid valve defective? (X)
h. Is the solenoid drain valve open or leaking? Check for loose
electrical connections on solenoid drain valve. (X)
b. Is the water pressure too high? (Greater than 60 PSI?)
c. Is the Water Level Control Board defective? Check for loose
electrical connections on “hi” water ll solenoid. (X)
d. Is the water ll solenoid valve defective? (X) Check for debris on
valve seat.
e. Is the “hi” water probe sensing level? Clean water level probe
and probe well (located in boiler). (X)
b. Is the water pressure too low? (Less than 30 PSI)?
c. Is the water supply line too small?
d. Is the water ll solenoid defective? (X)
a. Is the Is the Water Level Control Board defective? Check for
loose electrical connections on “mid” water ll solenoid. (X)
b. Is the “mid” water probe sensing level? Clean water level probe
and probe well (located in boiler). (X)
c. Is the indicator light defective? (X)
Pilot burner will not light
(spark ignition).
Pilot burner will not stay lit.Authorized
20 OM-G-SB
Usera. Is supply gas valve open?
Authorized
Service Rep Only
Service Rep Only
b. Is gas valve knob in the “ON” position?
c. Is the boiler lled with water? Is the green light in the start switch
“ON”?
d. Does the pilot ame require adjustment? Screw attachment on
gas valve. (X)
e. Is the gas valve defective? (X)
a. Does the pilot ame require adjustment? Screw attachment on
gas valve. (X)
Page 23
Troubleshooting
SYMPTOMWHAT TO CHECK
Timer control will not operatea. Is the electrical supply turned on?
b. Is the ON/OFF switch in the base cabinet turned on?
c. Is boiler started? Is the green light in the ON/OFF switch lit?
d. Are any fuses blown?
No steam to cavitiesa. Has steam pressure developed?
b. Is steam supply turned on?
c. Is the door closed? (Doors must be closed before steam will
enter the cavity).
Door leaking steam or watera. Are the drain holes at the rear of the cavity blocked?
b. Does the door gasket need replacement?
c. Is the door latch in need of adjustment?
(See the Maintenance section).
d. Is the unit level?
Excessive steam coming from the vent pipea. Is the water supply turned on?
b. Is the condenser hose kinked or obstructed?
c. Is the condenser spray solenoid working?
OM-G-SB 21
Page 24
Steamer Cavity
Parts List
22 OM-G-SB
Page 25
Steamer Cavity
Parts List
KeyDescriptionPart #
1UPPER CAVITY DRAIN HOSE088847
2MOTOR ASSEMBLY096740
3TIMER096826
4KNOB, TIMER123100
5PC BOARD, HY-PLUS LIGHT AND TIMER130457
6BRACKET, BOARD MTG096888
7STEAMER CONTROL BOARD102222
8CAPACITOR, 6 MFD - SM & SG096812
8CAPACITOR, 3 MFD - SE096813
9SHIELD, MOTOR DRIP119844
10NUT, ROTARY SHAFT SEAL101145
11NUT, KEPS 6-32071289
12HARNESS, UPPER CONTROL130450
13POST, PC BOARD MTG099901
14SCREW, 6-32069777
15JUMPER, VOLTAGE SELECT - SM & SG100959
15JUMPER, VOLTAGE SELECT - SE100960
16HARNESS, SPRAY VAVLE - SM137834
16HARNESS, SPRAY VALVE - SE & SG130449
17CABLE CLAMP087958
18NUT, 10-32071256
19NUT, 8-32002632
20TRANSFORMER, 75VA 480V - SE - 480V121717
20TRANSFORMER, 75VA 208/240V - SE121716
KeyDescriptionPart #
20TRANSFORMER, 75VA 110V - SG121715
21BRACKET, TRANSFORMER MTG - SE - 480V102287
22RUBBER PAD - SE - 480V102292
23TRANSFORMER, 230V - SE - 480V101111
24SCREW, 1/4-20 X 2-1/4 - SE - 480V119836
25CIRCUIT BREAKER, 2 AMP - SE - 480V119836
26WIRE, 4” - SE - 480V130467
27BUSHING - SG & SE012864
28LOCK WASHER #8 - SG & SE12971
29RELAY, DPDT 24VAC - SG & SE121733
30SCREW, 8-32 X 3/8 - SG & SE069789
31VALVE, SAFETY143470
32MANIFOLD FITTING099249
33GASKET099250
34NUT, 1/4-20012940
35TEE013201
36SOLENOID VALVE113014
37NIPPLE, 3/8013202
38CONNECTOR054493
39TUBE, UPPER100551
40ELBOW042364
41TEE100553
42TUBE, SUPPLY100552
43LOWER CAVITY DRAIN HOSE088848
OM-G-SB 23
Page 26
Motor/Fan
Assembly
KeyDescriptionPart #
1MOTOR096739
2SLINGER WASHER096831
3MOTOR MOUNTING PLATE094134
4SHAFT SEAL096868
5PLATE SEAL HOLDER096752
Parts List
24 OM-G-SB
Page 27
Sheet Metal
& Doors
KeyDescriptionPart #
1COVER, RIGHT SIDE (6-PAN)143778
1COVER, RIGHT SIDE (10-PAN)-
2COVER, LEFT SIDE (6-PAN)123184
2COVER, LEFT SIDE (10-PAN)-
3COVER ASSEMBLY, TOP123182
4SCREW, 10-32 X 3/8 TRUSS
HEAD
5RETAINER, TOP123156
6SCREW, 8-32 X 3/8 SLOTTED
HEX HEAD
7DOOR HANDLE070123
8DOOR HINGE (6-PAN)094143
8DOOR HINGE (10-PAN)-
9OUTER DOOR (6-PAN)094140
9OUTER DOOR (10-PAN)-
004173
004173
Parts List
OM-G-SB 25
Page 28
Door & Cavity
Hardware
KeyDescriptionPart #
1DOOR GASKET (6-PAN)094147
1DOOR GASKET (10-PAN)-
2DOOR HANDLE070123
3DOOR CAM074252
4MAGNET ASSEMBLY069762
5U-CHANNEL ASSY. (6-PAN)
(INCL. DOOR SPRING 078911)
5U-CHANNEL ASSY. (10-PAN)
(INCL. DOOR SPRING 078911)
6LATCH SPRING078911
7LATCH PIN078914
XLEFT PAN RACK (6-PAN)094148
XLEFT PAN RACK (10-PAN)-
8LOCK NUT003823
9INNER PANEL (6-PAN)094141
9INNER PANEL (10-PAN)-
10DOOR SPACER071206
11DOOR SCREWS005764
12DOOR HINGE (6-PAN)094143
12DOOR HINGE (10-PAN)-
13OUTER DOOR (6-PAN)094140
13OUTER DOOR (10-PAN)-
XINSULATE BOARD (6-PAN) 094142
XINSULATE BOARD (10-PAN) -
XBLOWER COVER/RIGHT PAN
RACK (6-PAN)
XBLOWER COVER/RIGHT PAN
RACK (10-PAN)
X-Not Shown
094144
096788
Parts List
-
-
26 OM-G-SB
Page 29
Drain Box with
Spray Condenser
KeyDescriptionPart #
1SOLENOID VALVE
(SPRAY CONDENSER)
2HOSE D “ ID X 8” LONG099282B
3RUBBER FLAP099213
4SPACER099212
5HOSE, OUTLET 1 “ID X 3”
LONG
6ANCHOR COUPLING, D” NPTN89267
099221
099280B
Parts List
OM-G-SB 27
Page 30
Gas Boiler
KeyDescriptionPart #
1BOILER WELDMENTMS98221
2SIGHT GLASS ASSEMBLY121754
3KIT, REPAIR - SIGHT GLASS097099
4FLUE ASSEMBLY099217
5SAFETY VALVE (15PSI)102297
6PRESSURE RELIEF VALVE
(12PSI)
7WATER LEVEL PROBES (LO,
MED, HI)
8SOLENOID VALVE (WATER-IN)099220
9CHECK VALVE004187
10AIR VENT145167
11VACUUM BREAKER090787
12GLOBE VALVE 1/2”NPT099255
13OPERATING PRESSURE
SWITCH-9½ PSI
14HI-LIMIT PRESSURE
SWITCH-14½ PSI
15PRESSURE GAUGE078000
16SOLENOID VALVE (DRAIN)074594
17BALL VALVE (3/4” NPT)003436
18THERMOSTATIC SWITCH077985
099228
076526
099222
118255
Parts List
28 OM-G-SB
Page 31
Burner & Gas Valve
Parts List
KeyDescriptionPart #
1BAFFLE PLATE083076
2PILOT BURNER MOUNTING
BRACKET
3PILOT BURNER W/ SPARK
IGNITER-SENSOR
4SHIELD FOR PILOT BURNER102260
5FLAME DEFLECTOR (SINGLE
LOOP) HOLDER FOR #640
7AMAIN BURNER ASSY 0-2000
FT. ELEV.(INCL. (29) GAS
JETS W/ #54 DRILL DIA
HOLE) FOR NATURAL GAS
7AMAIN BURNER ASSY 0-2000
FT. ELEV.(INCL. (29) GAS
JETS W/ #68 DRILL DIA
HOLE) FOR PROPANE GAS
8GAS VALVE (SPARK IGNITION)
FOR NATURAL GAS
8GAS VALVE (SPARK IGNITION)
FOR PROPANE GAS
9SPARK IGNITION MODULE085153
10IGNITION CABLE106495
11BURNER MOUNTING
BRACKET
12KIT, SPARK IGNITION MOD-
ULE (INCLUDED BRACKET,
MODULE AND CABLE)
102257
102258
056965
047267
050491
101497
104391
050490
137312
12
11
OM-G-SB 29
Page 32
Boiler Electrical Controls
KeyDescriptionPart #
1SWITCH “ON/OFF”088876
2SWITCH “START”
(MOMENTARY)
3INDICATOR LIGHT “RESET”099289
4LIGHT, INDICATOR AMBER116384
5LIGHT, INDICATOR RED (2)116383
6TERMINAL BLOCK, 2-POLE003887
-BUSHING SNAP 11/16” ID012864
7CIRCUIT BOARD SUPPORT099292
8WATER LEVEL CONTROL
BOARD ASSEMBLY
9LUG, GROUND 14-6 AWG119829
10CIRCUIT BREAKER119860
11TRANSFORMER, 75VAC121715
12RELAY, DPDT 24VAC 30A121733
13WATER LEVEL CONTROL
BOARD ASSEMBLY
-HARNESS, ELECTRICAL BOX130446
14BRACKET, CIRCUIT BREAKER137254
15ELECTRONIC CABINET,
WELDMENT
099290
116016
122192
137257
Parts List
124
53
1112691015
14
137
8
30 OM-G-SB
Page 33
Steamer Cavities
Electrical Schematic
OM-G-SB 31
Page 34
Boiler
Electrical Schematic
S1
1
2
3
4
SWITCH CONTACT ARRANGEMENT
VIEWED FROM REAR
ON SWITCH
12
43
S1
1
2
R
LOW WATER
12
Y
FILL
1
2
R
HI PRESSURE
RESET SWITCH
S2-1S2-2
B
A
R
RESET
S2-A
S2-B
G
READY LIGHT
S2
2
1
A
P2
J2
4 RED
2B LUE
12 BLUE
9 BLACK
5 BLACK
10 RED
6
7
8 WHITE
GRN
RED1
ORANGE3
ORANGE
BROWN
4
3
B
TO T3
@
STEAMER
WHITE
BLACK
78
K1
SINGLE WATER LEVEL CONTROL
01
K1
TO 120V AC
HNGND
1
CB1
10A
2
120V
3A
24VAC
HI
75VA
T1
DUAL WATER LEVEL CONTROL
3
2
C1
C2
BROWN
C
K1
NC1
NO2
NO
H
LLCO
G
PC2
LLCO
G
4
WHITE
WHITE
N01
NC2
NC
L1
L2
L1
L2
FROM T2
@ STEAMER
TO K7 COIL
@ STEAMER
COM
BLACK
WHITE
21
SPRAY VALVE
LO
BROWN
PC1
P1J1
11WHITE
1RED
2BLUE
3BROWN
5BLUE
6BROWN
8BLACK
7YELLOW
4BLACK
9RED
10BLACK
12BLACK
1
TSTAT
CLOSES @ 170°
14.5 PSI
HI LIMIT
C
HL
12
2
DRAIN VALVE
12
FILL VALVE
HI
PROBE
MID
PROBE
NO
NC
LO
PROBE
OPERATING PRESSURE
SW
9.5 PSI
C
PS
NC
TO SPARK
32 OM-G-SB
24V
SPARK
GND
SPARK IGNITION MODULE
PV
GND BURN
MV/PV
BLACK
YELLOW
BLUE
WHITE
G
MAIN
PILOT
H
C
G
MV
GAS VALVE
Page 35
Service Log
Model No:Purchased From:
Serial No:Location:
Date Purchased:Date Installed:
Purchase Order No:For Service Call:
DateMaintenance PerformedPerformed By
OM-G-SB 33
Page 36
BLODGETT OVEN COMPANY
www.blodgett.com
44 Lakeside Avenue, Burlington, Vermont 05401 USA
Telephone: 866-518-3977
PART NUMBER 170220 REV A (04/11)
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.