Badger Meter PFA User Manual

Ellipse® Pitot Tube Meter
PFA Fire Pump System
2000
1500
1000
2500
3000
GPM
M
F
APPROVED
PFA-XXX
X inch
X/XX
S/N AXXXXXXX
3500
4000
M
F
APPROVED
FLOW M ETERS
DEBITM ETERS
MEDIDO R DE F LUJO
PTT-UM-00523-EN-02 (April 2014)
User Manual
Ellipse® Pitot Tube Meter, PFA Fire Pump System
CONTENTS
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Specications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Pipe Orientation and Sensor Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Installation Instructions, Single Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Installation Instructions, Double Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Gage Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Location Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Gage Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Gage Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Page ii April 2014

INTRODUCTION

The Preso Model PFA Fire Pump System is FM-approved and features the Preso Ellipse primary flow sensor. The Preso patented elliptical design outperforms and provides greater accuracy than traditional differential pressure flow measurement devices. This differential pressure flow meter is designed with a series of ports facing the upstream velocity pressures, as well as flow sensing ports strategically located ahead of the trailing edge flow separation.
The multi-ported, self-averaging flow element consists of an elliptical shape with two independent flow sensing chambers. The impact velocity sensing holes (high pressure) are located along the leading edge and the true static sensing holes (low pressure) are on the exterior probe side. Model PFA Fire Pump System comes with instrument shutoff valves with provisions to accept a direct indicating meter.

SPECIFICATIONS

User Manual
True static sensing holes
Impact velocity sensing holes
Figure 1: PFA pressure sensing holes
Applications Liquids
Pipe Sizes 2…16 in. (5…406.4 mm)
Pressure 400 psi (2758 kPa) maximum
Temperature Gage 180° F (80° C) maximum
PFA Velocity Sensor 250° F (121° C) maximum
Accuracy ±1.75% of reading
Turndown Ratio 17:1 with no vacuum effect
Standard Components Y-type head, brass
Compression fitting;
2…5 in., brass
6…16 in., CS with SS ferrule
CS 3000 lb weld fitting, ASTM A105
316/316L SS Ellipse sensor
Instrument valves (2 per sensor), 1/4" male SAE flare brass ball
Polycarbonate ID tag with wire
Direct reading gage, brass body, 270° arc
Reynolds Number Greater than 75,000 maintains most accurate flow measurements
Less than 75,000 consult factory for estimated results
Double Support Double support required for the following Systems
Pipe Size Pump Ratings
4" 400 and 450 gpm
8" > 2000 gpm 10" > 2500 gpm 12" > 3000 gpm 16" > 5000 gpm
Table 1: PFA specifications
Page 3 April 2014
Ellipse® Pitot Tube Meter, PFA Fire Pump System

PIPE ORIENTATION AND SENSOR MOUNTING

FLOW
10° 10°
FIELD WELD
H
M
F
APPROVED
FLOW METER S DEBITMETER S
L
MEDIDOR DE FLUJO
LIQUID
L
M
F
APPROVED
FLOW METER S DEBITMETER S MEDIDOR DE FLUJO
OTE:N Pipe must remain full at all times during measurements.
Figure 2: Horizontal pipe installation
MEDIDOR DE FLUJO
DEBITMETER S
FLOW METER S
APPROVED
M
F
L
H
FIELD
WELD
FLOW
FLOW
FIELD WELD
FLOW METER S
DEBITMETER S
MEDIDOR DE FLUJO
H
L
F
APPROVED
M
LIQUID
OTE:N Pipe must remain full at all times during measurements.
Figure 3: Vertical pipe installation
Page 4 April 2014
User Manual

INSTALLATION INSTRUCTIONS, SINGLE SUPPORT

1. Choose the proper location to install the PFA Fire Pump System Ellipse using AGA/ASME standards (or equivalent). See
“Preso Ellipse Location Instructions” on page 7.
2. Grind the surface of the pipe where the PFA Fire Pump System Ellipse is to be inserted to provide a clean area for welding.
3. Weld the supplied weld-o-let to the pipe using standard codes for your application (1/16" weld gap recommended). Takecare to protect the threads during the welding process.
4. Drill a hole through the pipe wall according to Table 2.
5. Deburr the hole just drilled, especially on the inside of the pipe.
Pipe Size Model / Sensor Weld Connector Drill Bit
2…5 in. PFA (1/2") 1/2" 5/8"
6…12 in. PFA (7/8") 1" 1-1/8"
14…16 in. PFA (1-1/4") 1-1/4" 1-3/8"
Table 2: Single support drill bit size
6. Install the supplied compression tting by threading it into the weld-o-let manually. Then with a wrench, tighten the tting another 1-1/4 turns, taking care not to tighten the compression nut.
7. Install the instrument valves at the PFA Fire Pump System Ellipse head connections. Make sure the valves are FULLY CLOSED to prevent them from leaking during startup.
8. Insert the PFA Fire Pump System Ellipse through the compression tting. See Figure 4. Carefully push the sensor by hand further into the pipe until it reaches the opposite wall.
9. While holding the PFA Fire Pump System Ellipse in its fully inserted position, align the arrow located on the sensor head with the direction of ow. See Figure 5.
10. Thoroughly tighten the compression nut in order to prevent leakage. After tightening the compression nut manually, turn it another 1-1/4 turns with a wrench.

INSTALLATION INSTRUCTIONS, DOUBLE SUPPORT

1. Follow steps 1 through 7 in “Installation Instructions, Single Support”. At 180° from and on the same plane as the previously drilled hole, grind the surface of the pipe to provide a clean area for welding. Drill a hole and deburr, especially on the inside of the pipe. The hole used for the double support should be sized according to Table 3.
2. Weld the double support weld-o-let making sure that it is centered with the drilled hole (1/16" weld gap recommended).
3. Install the PFA Fire Pump System Ellipse sensor through the two holes. Make sure that the double support pin passes through the guide ring. See Figure 6.
4. Align the arrow located on the sensor head in the direction of ow as in step 9, “Installation Instructions, Single Support”.
5. Ensure that the PFA Fire Pump System Ellipse is in the correct orientation and spans the inside of the pipe. Tighten the compression nut. After tightening the compression nut manually, tighten it 1-1/4 turns more using a wrench.
6. Install the plug into the end of the double support weld-o-let. Tighten the plug to prevent leakage.
Nut
Insert
Body
Figure 4: Compression fitting assembly
Thread nut loosely onto body of the compression tting
Install insert as shown
Threaded portion to be installed into weld tting on pipe
Page 5 April 2014
Ellipse® Pitot Tube Meter, PFA Fire Pump System
FLOW
Pipe Size Model / Sensor Weld Connector Drill Bit
2"…5" PFA (1/2") 1/8" 3/8"
6"…12" PFA (7/8") 1/2" 1/2"
14"…16" PFA (1-1/4") 1" 7/8"
L
H
M
F
APPROVED
FLOW METERS
DEBITMETERS
MEDIDOR DE FLUJ O
FIELD WELD
Figure 5: Sensor alignment
Table 3: Double support drill bit size
L
H
Figure 6: Double support pin

GAGE MOUNTING

1. The FGE gage can be line, bracket or panel mounted.
2. For liquid applications, install the FGE below the PFA Fire Pump System in a level position. See Figure 7.
OTE:N If recommended mounting is not possible, make sure the
gage is vented periodically.
Ellipse Sensor
Double Support Pin
Guide Ring
FLOW
H
2000
1500
1000
M
F
APPROVED
L
FLOW METERS DEBITMETERS MEDIDOR DE FLUJO
VENT
VALVES
3000
2500
GPM
M
F
3500
APPROVED
4000
PFA-XXX X inch 250 SWP
X/XX
S/N AXXXXXXX
BYPASS
VALVE
Figure 7: Recommended installation
Page 6 April 2014
User Manual

LOCATION INSTRUCTIONS

Straight pipe requirements: Accuracy is affected by the piping configurations due to the disturbances of the flow profile. A fully developed symmetrical flow profile is achieved with the minimum upstream and downstream recommended lengths.
DISTANCES ARE EXPRESSED IN
NUMBER OF NOMINAL PIPE DIAMETERS
THROTTLED VALVE OR REGULATOR
27
FLOW
REGULATORY OR
PARTIALLY CLOSED
VALVE
6
2
5
FLOW
STRAIGHTENING VANE
4
9
FLOW
10
6
4
2
FLOW METERS DEBITMETERS MEDIDOR DE FLUJO
4
FLOW METERS DEBITMETERS MEDIDOR DE FLUJO
PRESO
PRESO
9
10
4
2
FLOW
6
4
411
FLOW METERS DEBITMETERS
MEDIDOR DE FLUJO
FLOW METERS DEBITMETERS
MEDIDOR DE FLUJO
PRESO
PRESO
4
FLOW METERS DEBITMETERS MEDIDOR DE FLUJO
4
FLOW METERS DEBITMETERS MEDIDOR DE FLUJO
PRESO
PRESO
TWO ELBOWS IN DIFFERENT PLANES
24
10
5 5
2
FLOW
FLOW
4
FLOW METERS DEBITMETERS MEDIDOR DE FLUJO
4
FLOW METERS DEBITMETERS MEDIDOR DE FLUJO
STRAIGHTENING VANE
TWO ELBOWS IN THE SAME PLANECHANGE IN PIPE SIZE
11 3
FLOW
9
4 5
2
FLOW
FLOW METERS DEBITMETERS
MEDIDOR DE FLUJO
3
FLOW METERS DEBITMETERS
MEDIDOR DE FLUJO
PRESO
PRESO
PRESO
PRESO
F
APPROVED
Discharge
Optional to
Pump Inlet
Supply
M
FLOW
FLOW
STRAIGHTENING VANESTRAIGHTENING VANE
PRESO FIRE PUMP SYSTEM
Throttle Valve
Air Vent
Fire Pump
3000
2500
GPM
M F
3500
2000
APPROVED
1500
1000
4000
PFA-XXX X inch 250 SWP X/XX
S/N AXXXXXXX
PRESO
PFA
Pipe Diameters From Valve
Valve
Figure 8: Location instructions
System Bypass Valve
Flow
73
Flow
STRAIGHTENING VANE
F
APPROVED
Throttle Valve
M
Page 7 April 2014

GAGE INSTALLATION

1. The connecting tubing between the PFA Fire Pump System and the gage should be as short as possible and should slope down a minimum of 1 inch per foot.
2. Secure and support the tubing to prevent sagging and/or vibration.
3. Make sure the head heights are even.
4. Run a bleed line from the gage vent valves to a pan or drain.

GAGE OPERATION

1. Identify Hi and Lo pressure inlets on the gage.
2. Make sure the bypass valve (blue) is OPEN!
GAGE MAY BE DAMAGED IF INITIALLY PRESSURIZED WITH THE BYPASS VALVE CLOSED.
3. Connect the gage to the corresponding Hi and Lo pressure taps of the PFA Fire Pump System (via three-valve manifold, if being used).
4. Open the Hi and Lo instrument valves on the PFA Fire Pump System .
5. Alternately open the Hi and Lo vent valves to purge the lines.
6. When venting is complete, close the bypass valve to begin taking reading.
Control. Manage. Optimize.
PRESO is a registered trademark of Badger Meter, Inc. Other trademarks appearing in this document are the property of their respective entities. Due to continuous research, product improvements and enhancements, Badger Meter reserves the right to change product or system specications without notice, except to the extent an outstanding contractual obligation exists. © 2014 Badger Meter, Inc. All rights reserved.
www.badgermeter.com
The Americas | Badger Meter | 4545 West Brown Deer Rd | PO Box 245036 | Milwaukee, WI 53224-9536 | 800-876-3837 | 414-355-0400 México | Badger Meter de las Americas, S.A. de C.V. | Pedro Luis Ogazón N°32 | Esq. Angelina N°24 | Colonia Guadalupe Inn | CP 01050 | México, DF | México | +52-55-5662-0882 Europe, Middle East and Africa | Badger Meter Europa GmbH | Nurtinger Str 76 | 72639 Neuen | Germany | +49-7025-9208-0 Europe, Middle East Branch Oce | Badger Meter Europe | PO Box 341442 | Dubai Silicon Oasis, Head Quarter Building, Wing C, Oce #C209 | Dubai / UAE | +971-4-371 2503 Czech Republic | Badger Meter Czech Republic s.r.o. | Maříkova 2082/26 | 621 00 Brno, Czech Republic | +420-5-41420411 Slovakia | Badger Meter Slovakia s.r.o. | Racianska 109/B | 831 02 Bratislava, Slovakia | +421-2-44 63 83 01 Asia Pacic | Badger Meter | 80 Marine Parade Rd | 21-04 Parkway Parade | Singapore 449269 | +65-63464836 China | Badger Meter | 7-1202 | 99 Hangzhong Road | Minhang District | Shanghai | China 201101 | +86-21-5763 5412 Legacy Document Number: 10-PTT-UM-00311
Loading...