Installation
Instructions
DECK MOUNT
TUB SYSTEMS
R800 SERIES
R810 SERIES
ROUGH VALVE KIT
Thank you for selecting American-Standard...
the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
ROUGHING-IN
1
1. DECK THICKNESS
2. FINISHED DECK
3. FITTING MOUNTING SURFACE
4. ACRYLIC BATHS
1
(2) 1-3/8 D
HOLES
3
FITTING
MOUNTING
SURFACE
2
FINISHED
DECK
1-3/8 D
MAX.
1" D
1/2" COPPER
INLET SUPPLIES
8" to 12"
10" for R810
1 D MAX.
ACRYLIC
BATH
MOUNTING
4
7-1/8
R810 SERIES
R800 SERIES
Certified to comply with ANSI A112.18.1
U.S. Patent No. D403,750
TOTAL DECK THICKNESS UP TO 2-1/2"
FINISHED DECK VARIABILITY ACCOMMODATES
DECKING MATERIAL (TILE, MARBLE, CORIAN®...)
TO 1" THICK
ADJUSTABILITY, TO 1-1/2" THICK
ADJUSTABILITY, TO 1-1/2" THICK
1" D
8" to 12"
10" for R810
DECK MOUNTING HOLES
M968650C
(2) 1-3/8 D
HOLES
MOUNT SPOUT SHANK
2
Drill holes in mounting deck as shown. The maximum allowable deck thickness is 1-1/2".
Insert the SPOUT SHANK through the mounting deck from below. Assemble the SPOUT SHANK LOCK RING so it
is flush with the top of the threads on the SHANK.
SPOUT SHANK
LOCK RING
SPOUT SHANK LOCK RING FLUSH WITH
TOP OF THREADS ON SPOUT SHANK
FRICTION WASHER
MOUNTING NUT
SPOUT SHANK
1-1/2 MAX.
SPOUT SHANK
FITTING
MOUNTING
DECK
MOUNT VALVE BODIES
3
Cut the copper outlet tubes of the VALVE BODIES as required.
(Not necessary for R810).
Insert the HOT and COLD VALVE BODIES into the TEE. (Not
necessary for R810). The HOT VALVE BODY is
marked with a red label.
Insert the VALVE BODIES and TEE through the mounting
deck from below. Assemble the VALVE LOCK RINGS so
they are flush with the top of the VALVE BODIES.
Insert the SPOUT SHANK into the TEE.
(Not necessary for R810).
Tighten the VALVE BODY and SHANK MOUNTING
NUTS securely.
FRICTION WASHER
Fasten the VALVE LOCK RING to the wooden mounting
surface with #8 screws (not provided).
SOLDER CONNECTIONS
4
Connect the water supply lines to the copper inlet tubes of the VALVE BODY.
VALV E
BODY
FITTING
MOUNTING
DECK
VALV E
LOCK RING
MOUNTING NUT
VALVE LOCK RING FLUSH WITH
TOP OF THREADS ON VALVE SHANK
VALVE
LOCK RING
# 8 SCREWS
SPOUT
SHANK
HOT
TEE
OUTLET TUBE
(CUT AS REQUIRED)
SPOUT GUARD
1/4" PLUG
COLD
Solder all TEE and WATER SUPPLY CONNECTIONS.
Remove the GUARD from the SPOUT SHANK. Assemble the 1/4" PLUG to
the SPOUT SHANK with a thread sealant.
Turn on the water supplies and check all connections for leakage.
Replace the GUARD on the SPOUT SHANK. Turn off the water supplies.
SERVICE
5
TO CHANGE THE DIRECTION OF HANDLE ROTATION
Turn off the water supplies.
Turn HANDLE to the off position.
Unscrew the VALVE LOCK NUT and remove.
A 17mm deep socket is required.
Remove the CARTRIDGE by pulling upon the SLEEVE.
Remove the SLEEVE from the CARTRIDGE.
Remove the SPRING CLIP.
Remove the STOP WASHER. Turn it 90˚ and replace.
Replace the SPRING CLIP.
Reverse the above steps to reassembly the components.
If the spout drips, operate the handles several times
from the off to the on position. Do not force - the handles only turn 90˚
STOP
WASHER
90
VALV E
CARTRIDGE
TEE
CONNECTIONS
WATER SUPPLY
CONNECTIONS
DEEP SOCKET
17mm (11/16")
VALV E
LOCK NUT
SCREW
SLEEVE
SPRING
CLIP
M968650C