NOTE TO INSTALLER: Please give this manual to the customer after installation.
To learn more about American Standard Selectronic® Products visit our website at: www.americanstandard-us.com
or e-mail us at: CRTTEAM@lixilamericas.com
OPERATING PRESSURE:
20 psi (owing)-80 psi (static)
FLOW REQUIREMENT:
10 gpm (37.9 L/min.)
For Parts, Service, Warranty or other Assistance,
please call (844) CRT-TEAM / (844) 278-8326 (In Canada: 1-800-387-0369)
(In Toronto Area only: 1-905-306-1093)
Thank you for selecting American-Standard...the benchmark of ne quality for over 100 years. To ensure
that your installation proceeds smoothly--please read these instructions carefully before you begin.
UNPACKING
Some Residual Water May Remain In The Valve During Shipping
Remove the Flush Valve items from the carton. The illustration below shows all items
after they have been removed from the carton. Some items may be packaged partially
assembled to other items.
All American Standard Products Are Water Tested At Our Factory.
1. Flush Valve Assembly
2. Vacuum Breaker Assembly for Toilet
2a. Vacuum Breaker Assembly for Urinal
3. Spud Coupling Nut and Washers for Toilet
3a. Spud Coupling Nut and Washers for Urinal
4. Spud Flange for Toilet
4a. Spud Flange for Urinal
5. Sweat Solder Adapter
6. Cover Tube
7. Wall Escutcheon
8. Supply Stop
9. Installation Instruction
CARE INSTRUCTIONS:
DO: CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A
CLOTH WITH A COARSE SURFACE.
6
7
5
8
1
OPERATING PRESSURE:
20 psi (owing)-80 psi (static)
FLOW REQUIREMENT:
10 gpm (37.9 L/min.)
MODEL NUMBERS
6147 SERIES
6145 SERIES
M965874 Rev. 1.1 (1/19)
MANUAL FLUSH VALVE
Toilet, Urinal & Clinic Sink with Manual
Operation Flushometer
ToiletUrinal
OPERATING PRESSURE:
25 psi (owing)-80 psi (static)
FLOW REQUIREMENT:
25 gpm (94.6 L/min.)
2
2a
Installation Instructions
Certied to comply with:
• ASSE 1037
• ANSI/ASME A112.19.2
9
• ADA Compliant
NOTE TO INSTALLER: Please give this manual to the customer after installation.
To learn more about American Standard Products visit our website at: www.americanstandard-us.com
or e-mail us at: CRTTEAM@lixilamericas.com
For Parts, Service, Warranty or other Assistance,
please call (844) CRT-TEAM / (844) 278-8326 (In Canada: 1-800-387-0369)
(In Toronto Area only: 1-905-306-1093)
Turn off hot and cold water
supplies before beginning.
Fig.3
Fig.3a
FINISHED WALL
A
CENTER LINE OF
FIXTURE SPUD
1. Measure the distance (A) from the nished wall to the
center of the inlet spud on the xture.
2. Cut the supply pipe 1-1/4" (A-B=C) shorter then the
measurement taken in Step 1. File any rough edges off the
end of the supply pipe.
3. Clean the end of the supply pipe. Push the threaded
Adapter on until it is seated against the internal stop.
Sweat the Adapter to the pipe.
2
INSTALL COVER TUBE, WALL
ESCUTCHEON and SUPPLY STOP; Fig. 4
1. Measure from nished wall to rst thread of Adapter or
threaded supply pipe (dimension “X”). Cut COVER
TUBE (1) to length (X). Apply Teon Tape to the threaded
end of the Adapter or supply pipe. Fig. 4a.
2. Push the COVER TUBE (1) into the WALL
ESCUTCHEON (2). Slide both onto the SUPPLY PIPE (3).
Fig. 4b.
3. Push the COVER TUBE (1) in to expose the threads of the
supply pipe. Fig. 4c. With a wrench thread the SUPPLY
STOP (4) onto the SUPPLY PIPE (3). Align and tighten.
Fig. 4c.
4. Pull COVER TUBE (1) against SUPPLY STOP (4) and push
WALL ESCUTCHEON (2) against nished wall.
Fig. 4
Fig. 4a
Fig. 4b
Fig. 4c
(A-B)=
C
FILE EDGES
CLEAN
ADAPTER
SOLDER
ADAPTER
3
B
FINISHED WALL
X
2
32mm
(1-1/4)
TEFLON TAPE
2
1
X
4
INSTALL VACUUM BREAKER TUBE; Fig. 5
3
1. Place the SPUD FLANGE (1) over the spud on the Fixture.
2. Place FRICTION WASHER (3) and SEAL WASHER (4)
inside SPUD COUPLING NUT (2) and thread onto Spud.
Do not tighten fully.
3. Insert the VACUUM BREAKER TUBE (5) or (5a) into the
SPUD COUPLING NUT (2) and push it down.
Note: If cutting VACUUM BREAKER TUBE (5) to size, note
that Critical Line (C/L) on Vacuum Breaker must
typically be 6" (152mm) above xture. Consult Code
for details.
4
Fig. 5
5a
5a
2
1
1
3
4
M965874 Rev. 1.1 (1/19)
INSTALL FLUSH VALVE; Fig. 6a & 6b
4
1. As shown in Fig. 6a, insert the TAILPIECE (1) on the
FLUSH VALVE (2) into the SUPPLY STOP (3). Lubricate
the INLET FLANGE O-RING (4) with water if necessary.
Lightly tighten COUPLING NUT (5). Fig. 6a.
Important: Do not use lubricants (other than water) or
any type of thread sealing paste or tape
Fig. 6a
3
2. Align the FLUSH VALVE (2) (Fig. 6b) directly above the
VACUUM BREAKER (7) and VACUUM BREAKER
COUPLING NUT (6).
Note: There is a ±13 mm, (±1/2") tolerance for the 121 mm
(4-3/4") dimension Fig. 6b.
3. Pull the VACUUM BREAKER COUPLING NUT (6) up
to meet the threaded FLUSH VALVE CONNECTION (8)
and hand tighten. Align all components of the ush valve
assembly. Fig. 6b.
4. Lightly tighten the COUPLING NUT (5) connection rst,
then the VACUUM BREAKER COUPLING NUT (6) and
nally the SPUD COUPLING NUT (9). Once alligned
correctly, use a wrench to tighten couplings to make water
tight connections. Fig. 6b.
Fig. 6b
2
4
5
+
121mm, 13mm
–
+
(4-3/4")( 1/2")
–
5
2
8
6
7
9
1
FLUSH OUT SUPPLY LINES Fig. 7
5
1. Make sure supply stop is closed. Remove COVER (1) from
SUPPLY STOP (2). With a at blade screwdriver close
CONTROL STOP (2).
2. Remove FLUSH VALVE CAP (3 & 4). Pull out
DIAPHRAGM ASSEMBLY (5). Replace FLUSH VALVE
CAP (3 & 4) and tighten.
3. With a at blade screwdriver open SUPPLY STOP (2).
to ush line of any debris or sediment.
4. Close SUPPLY STOP (2). Remove FLUSH VALVE
CAP (3 & 4). Replace DIAPHRAGM ASSEMBLY (5).
Replace FLUSH VALVE CAP (3 & 4) and tighten
5
Fig. 7
3
4
5
REMOVE COVER
2
COUNTER-CLOCKWISE
OPENS CONTROL STOP
CLOCKWISE
CLOSES CONTROL STOP
1
M965874 Rev. 1.1 (1/19)
ADJUST SUPPLY STOP; Fig. 13
6
IMPORTANT: To avoid overowing, the SUPPLY STOP (3)
must never be opened to the point where the ow from
the valve exceeds the ow capacity of the xture. Valve
is designed to provide stated ush volume with a 25 gpm
ow rate for toilet and 10 gpm ow rate for urinal.
1. Remove COVER (2) from SUPPLY STOP (3).Turn on water
supply 1/4 turn to 1/2 turn(CCW) and test for leaks.
Note: Unit may ush for approximately 5 to 10 sec. when
water is rst turned on.
2. Push down on HANDLE (4) to initiate ush.
3. Adjust SUPPLY STOP (3) after each ush until the stated
ush volume is achieved, no splashing occurs and the xture
is properly cleansed.
4. When adjustment is complete, reinstall COVER (2) and
tighten to ensure vandal-resistance.
7
HOW TO RETROFIT OUR VALVE; Fig. 14
Replaces Industry Standard Manual and Electronic Valves)
Note: In most Retrots the wall escutcheon, supply
stop, cover tube and vacuum breaker do not have to be
replaced. If these items do need replacement they must
be purchased separately or order the complete ush valve
assembly from American Standard.
1. Remove COVER (1) from SUPPLY STOP (2) if installed.
Fig. 14.
To learn more about American Standard Selectronic® Products visit our website at:
www.americanstandard-us.com or e-mail us at: CRTTEAM@lixilamericas.com
To learn more about American Standard Selectronic® Products visit our website at:
www.americanstandard-us.com or e-mail us at: CRTTEAM@lixilamericas.com
Weekdays 8:00 a.m. to 7:00 p.m. EST
M970355-0020A
STOP VALVE
REPAIR KIT
M924347-0020A
SUPPLY STOP CAP
HOT LINE FOR HELP
IN MEXICO 01-800-839-1200
M964412-0020A
3/4" VACUUM BREAKER
ASSEMBLY
M952262-0020A
(6145 SERIES)
ESCUTCHEON KIT
8
M965874 Rev. 1.1 (1/19)
Loading...
+ 16 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.