4210W / 4211
For the most recent version of the manual, please visit
www.ysi.com
.
Contact YSI
1725 Brannum Lane
Yellow Springs, OH 45387 USA
Tel: +1 937-767-7241
800-765-4974
Email: info@ysi.com
Internet: www.ysi.com
Copyright © 2018 Xylem Inc.
2 ba76138e05 06/2018
4210W / 4211 General information
1 General information
Automatic sensor
recognition
The sensor electronics with the stored sensor data are in the connecting
head of the electrode. The data include, among other things, the sensor type
and series number. The data are recalled by the meter when the sensor is
connected and are used for measurement and for measured value documentation.
The digital transmission technique guarantees the failure-free communication with the meter even with long connection cables. The sensor firmware
can be updated via the meter.
2 Commissioning, measuring, checking
2.1 Commissioning
Scope of delivery Electrode 4210W or 4211
Operating manual
Commissioning Prepare the electrode for measuring as follows:
Open the refilling opening for the reference electrolyte solution. Depend-
ing on the model, the stopper of the refilling opening is an elastomer stopper or a slider.
The refilling opening must always be open during measurement!
ba76138d05 06/2018
Remove the watering cap from the electrode tip. Possible salt deposits in
the area of the watering cap do not affect the measuring characteristics
and can easily be removed with deionized water.
Please keep the watering cap. It is required for the electrode to
be stored. Always keep the watering cap clean.
Connect the sensor to the meter.
The sensor is immediately ready to measure.
4211 – via the sensor cable to a free IDS connec-
tor on the meter
3
Commissioning, measuring, checking 4210W / 4211
4210W – via a connecting cable (accessory) to a
free IDS connector on the meter
or
– wireless via an IDS WA-S adapter (acces-
sory) to a WA-capable meter
Accessories for the connection of the 4211W
sensor to the meter: See chapter 7 W
PARTS AND ACCESSORIES.
EAR
Opening and closing the IDS plug connection,
see section 2.2O
PLUG CONNECTION.
PENING AND CLOSING THE IDS
Measure with the electrode according to the operating manual of the meter
and observe the following rules while doing so:
4
ba76138d05 06/2018