FX140 engine service
Engine unit removal:
1. Beam
2. Water lock
3. Exhaust pipe assy
4. Air cleaner case cover
5. Throttle cable
6. Fuel hose connector
7. Pilot water hose
8. Cooling water hose
9. Front inspection hatch
10. Wire harness couplers (fuel level, speedometer, switches)
11. Power coupling cover
12. Grease hose
13. Oil filter
14. Electrical box
15. Mounting bolts
(removed shims have to be packed individualy)
Preparation:
1. Air cleaner box removal (including intake assy)
2. Exhaust manifold removal
3. Oil tank
4. Front cover and reduction gear unit (powerr coupling have to be removed)
Disassembly:
1. Cylinder head cover removal (do not drop O-ring, bolt for water discharge pipe)
2. Make the crank shaft in position of No. 1 cylinder at TDC (confirm the marking
on the cam sprocket and the chain)
3. (camshaft journal clearance)
4. Camshaft removal(do not drop the chain)
5. Cylinder head removal (do not capsized the head or the shims dropping)
6. Crank case removal (note the stamped number)
7. Crank shaft removal (note the stamped number)
8. Piston assembly removal (note the stamped number)
9. Valve spring removal (note the direction of the springs)
Measuring:
1. Big end jounal clearance
2. Crank shaft bearing clearance
3. Camshaft journal clearance
Oil pump (two pumps in one casing, oil filters)
Chain tensioner retracting
Inspection sheet
Name: ________________________
Valve clearance: (IN: 0.11-0.20mm, EX: 0.25-0.34mm)
Cyl. No.1 Cyl. No.2 Cyl. No.3 Cyl. No.4
IN-1
IN-2
IN-3
EX-1
EX-2
Camshaft-Journal Clearance: (0.05-0.08mm @10Nm)
Cyl. No.1 Cyl. No.2 Cyl. No.3 Cyl. No.4 Sprocket
IN-1
IN-2
EX
Crank shaft Journal Clearance: (0.020-0.057mm @15Nm, 12Nm)
J1 J2 J3 J4 J5
Crank case
Crank shaft
Bearing size
Clearance
Big end bearing Clearance: (0.016-0.040mm @20Nm)
P1 P2 P3 P4
Con-rod
Crank shaft
Bearing size
Clearance