Diaper Changing Station
ABC-300V Vertical Surface Mounting Polyethylene
Vertical Diaper Changing Station Installation Instructions
Instructions d’installation de la station à langer verticale
Instrucciones para la instalación de la estación vertical para cambiar pañales
WARNING
• Failure to follow these warnings and the
installation instructions could result in
serious injury or death.
• Read all instructions before installing
diaper changing station. Keep these
instructions. DO NOT discard.
AVERTISSEMENT
• Le non respect de ces avertissements
et instructions d’installation peut
entraîner des blessures graves ou la mort.
• Lisez attentivement toutes les instructions
avant d’installer la station à langer.
Conservez ces instructions. NE les jetez PAS.
World Dryer Corporation
5700 McDermott Drive
Berkeley, IL 60163 U.S.A.
800-323-0701
www.worlddryer.com
ADVERTENCIA
• El no seguir estas advertencias y las
instrucciones para la instalación podría
causar lesiones graves o la muerte.
• Lea todas las instrucciones antes de
instalar la estación para cambiar pañales.
Guarde estas instrucciones. NO las deseche.
68_700 rev02
ASSEMBLY INSTRUCTIONS
ADULT INSTALLATION REQUIRED.
A
B
TOOLS REQUIRED:
Level (A)
Measuring tape (B)
Power drill with 7/32”, 1/8” and 1/2” masonry bits (C)
C
D
Power screwdriver with bull nose phillips bit (D)
• READ ALL INSTRUCTIONS BEFORE ASSEMBLY OF Diaper Changing Station.
• Unpack carton and identify all parts.
PARTS LIST
Parts Description Quantity
Hardware for installation:
3” Wood Screws 4
3/4” Finishing Washers 4
3” Machine Screws 2
3/4” Flat Washers 4
Toggle Anchors 2
1-1/4” Caps 6
Door / Wall Plate 1
3” Wood Screws
30.5”
(775 mm)
32”
(813 mm)
For Wood Studs:
3/4” Finishing Washers
Toggle Anchors
19.5”
(495 mm)
3/4” Flat Washers
For Use With Toggle Anchors:
3” Machine Screws
1-1/4” Caps
A.D.A. Compliance:
4.4.1 Maximum Protruding Objects
4.2.5 Forward Reach
4.2.6 Parallel Approach
4.27.4 Operation
Compliant when properly installed.
3/4” Flat Washers
www.worlddryer.com
Door / wall plate to be
mounted on outside of
restroom door.
1
WARNING
A stud MUST be located and used for at least one side of the diaper changing station.
•
The diaper changing station is no stronger than the anchors or walls to which they are attached and, therefore, MUST be
•
firmly secured in order to support the weight they are intended to support. Contact an architect or building contractor
if any questions.
INSTALLATION
1. Locate wood stud where left side of changing station will be mounted to the wall.
2. Measure up 61” (155 cm) from the floor and mark the wall. This locates the position
for the top left attachment hole.
NOTE: Mark on wall MUST be in center of wood stud.
3. Align hole in top left corner of changing station with mark on wall and hold in place.
4. Using a level and measuring tape, mark the remaining three (3) holes. After marking holes,
set changing station down on ground.
5. Use a power drill and appropriate bit to drill four (4) holes in the wall. This may require
2 people.
NOTE 1: For wood studs:
- If finished wall surface is tile or masonry over wood studs, use
a 7/32” masonry bit for the pilot hole until you hit the wood
stud, then change to 1/8” bit.
- Use wood screws, finishing washers and flat washers (Fig. a)
NOTE 2: For use with toggles:
- If finished wall surface has wood studs that are not 16” on center,
has metal studs, or has an underlying surface of concrete block,
use 1/2” bit.
- Use machine screws and flat washers (Fig. b).
- For holes NOT located in a wood stud, toggle anchors MUST be
used (Fig. c). See “Using Toggle Anchors” section.
6. Align holes in changing station with drilled holes and secure top left corner of changing
station to wall stud using the appropriate screw and washer. Continue to secure the three (3)
remaining corners using the appropriate screws and washers as described in Note 1 or Note 2.
Flat
Washer
Finishing
Washer
Wood
Screw
Changing
Changing
Station
Wood Stud
Station
Wood Stud
Fig. a
Toggle
Anchor
Flat
Washer
Machine
Screw
Fig. b
Fig. c
WARNING
All 4 of these locations MUST be used for safe installation. The lower holes ensure
•
installation through the metal brackets.
7. Ensure all four (4) screws are tight and snap caps over screw heads.
Using Toggle Anchors:
1. Insert metal end of toggle anchor into 1/2” hole.
2. Slide zip strip down snugly against wall.
3. Snap off break-away pieces of toggle anchor (Fig. d).
4. Align holes in changing station with toggle anchors and secure top left corner of
changing station to wall using machine screws and flat washers. Continue to secure
the three (3) remaining corners using machine screws and flat washers.
5. Ensure all four (4) screws are tight and snap caps over screw heads.
2
Wood Stud
Break-Away
Toggle
Anchor
Fig. d