WHITE-RODGERS
Operator: Save these instructions for future use!
FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE
INSTALLING OR OPERATING THIS CONTROL COULD CAUSE PERSONAL
INJURY AND/OR PROPERTY DAMAGE.
These controls have close-on-rise switch action and are
designed for use on hot water heating installations. They
prevent operation of the circulator or unit heater fan if the
boiler water is not hot enough for proper heating.
Models are available with either horizontal or vertical well.
Some of these models also have excess capillary stored
within the enclosure, permitting them to be used with wells
having either a standard or extended shank.
Another model, ideal for replacement purposes, has a
slotted case and excess capillary stored within the enclosure. This control can be used with either a standard or
extended shank well, on either horizontal or vertical well
installations.
THESE CONTROLS MUST BE INSTALLED BY A
QUALIFIED INSTALLER.
Do not exceed the specification ratings.
All wiring must conform to local and national electrical
codes and ordinances.
This control is a precision instrument, and should be
handled carefully. Rough handling or distorting components could cause the control to malfunction.
This control has been accurately calibrated at the factory.
Any attempt to calibrate this control will void the WhiteRodgers warranty.
WARNING
Do not use on circuits exceeding specified
voltages. Higher voltages will damage control
and could cause shock or fire hazard.
11B05
HOT WATER CONTROL
Reverse Acting – Well-Immersion
Adjustable Differential
INSTALLATION INSTRUCTIONS
DESCRIPTION
PRECAUTIONS
CAUTION
Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.
Following installation or replacement, follow
appliance manufacturer’s recommended installation and/or service instructions to insure proper
operation.
CAUTION
To prevent electrical shock and/or equipment
damage, disconnect electric power to system, at
main fuse or circuit breaker box, until installation
is complete.
Shut off main gas to heating system until installation is complete.
Convertible controls have a Knockout Plate on back of
case (secured by Hex Nut on Horizontal models, and by
Knockout Plug on Vertical models). To convert from
Horizontal to Vertical:
1. Remove control cover. Then remove bottom knockout.
2. Remove Hex Nut (inside control) from Well Mounting
Stem. (To loosen, hold Hex Nut inside while turning
Hex Nut on back of control counterclockwise.)
WHITE-RODGERS DIVISION
EMERSON ELECTRIC CO.
9797 REAVIS RD., ST. LOUIS, MO. 63123
(314) 577-1300, FAX (314) 577-1517
9999 HWY. 48, MARKHAM, ONT. L3P 3J3
(905) 475-4653, FAX (905) 475-4625
Printed in U.S.A.
CONVERTIBLE CONTROLS
3. Pull Well Mounting Stem away from case and remove
Knockout Plate.
4. Swing capillary down through slot into bottom knockout.
5. Secure Knockout Plate to back of case by using
Knockout Plug provided in envelope.
6. Insert Well Mounting Stem into bottom knockout and
tighten Hex Nut (inside control) securely.
PART NO. 37-2070B
Replaces 37-2070 & 37-9197
9546
CONVERTIBLE CONTROLS CONT.
NOTE
To convert from Vertical to Horizontal model, remove
Knockout Plug and Plate. Remove Hex Nut (inside control) and swing capillary upward into back knockout. Place
Knockout Plate beneath Hex Nut on back of control and
tighten Hex Nut (inside control). If bottom knockout is not
used for wiring, insert Knockout Plug.
EXTENDING CAPILLARY
Some controls have excess stored capillary which may be
extended for use with an extended shank well. Use reasonable care when straightening and forming the capillary.
INSTALLATION
If the manufacturer of the boiler recommends a control
location, follow such recommendations.
If none are offered, locate the control at the top of the
boiler near an outlet pipe or in the outlet pipe.
To remove the well from the control, loosen the set screw
in the large nut, then slide the well off which exposes the
bulb. Screw the well into the proper tapping. Slide the bulb
HEX NUT
MOUNTING STEM
CAPILLARY
BULB
Convertible Control converted to Vertical Model.
KNOCKOUT PLUG
KNOCKOUT PLATE
With the capillary fully extended, the bulb should slide all
the way to the end of the well.
back into the well, making sure that the bulb enters the
well as far as it will go and tighten the set screw.
CAUTION
Do not dent or bend the bulb as this will prevent
it from fitting into the well properly.
WIRING
All wiring should be done in accordance with local and national electrical codes and ordinances.
If the boiler manufacturer recommends a wiring diagram, then follow such recommendations. If none is offered, these
diagrams show suggested circuits.
LINE VOLTAGE
THEMOSTAT
HOT
LINE
N
TYPE
11B05
FAN
MOTOR
Used as Hot Water Control to prevent unit heater fan from
HOT
LINE
N
Used as Hot Water Control to start and stop the circulator.
TYPE
11B05
CIRCULATOR
MOTOR
operating until coils are warm.
SETTING THE CONTROL
CONTROLS WITH ADJUSTABLE DIFFERENTIAL
The movable indicator points to the temperature at which
the contacts close. The fixed indicator points to the
temperature at which the contacts open. The difference
between these two indicators is the differential.
To set the control:
1. Use a screwdriver in the adjusting slot (A) on the front
of the control to turn the dial so that the fixed indicator
(B) points to the temperature at which the contacts will
open.
2. Turn the differential adjusting screw (C) until the
movable indicator (D) points to the temperature at
which the contacts will close.
“B” Fixed indicator
(cut-out point)
“C” Differential
adjusting screw
“D” Movable indicator
(cut-in point)
“A” Adjusting
slot
2