Vulcan-Hart EF5, EF3, EF4, ML-114944, ML-52099 User Manual

...
INSTALLATION &
OPERATION MANUAL
MODELS EF3, EF4, & EF5 ECONOFRY GAS FRYERS
MODELS EF3 ML-52099 EF4 ML-114943 EF5 ML-114944
Model EF3
VULCAN-HART COMPANY, P.O. BOX 696, LOUISVILLE, KY 40201-0696, TEL. (502) 778-2791
FORM 31052 (1-98)
IMPORTANT FOR YOUR SAFETY
THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL.
POST IN A PROMINENT LOCATION THE INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE SMELL OF GAS IS DETECTED. THIS INFORMATION CAN BE OBTAINED FROM THE LOCAL GAS SUPPLIER.
IMPORTANT
IN THE EVENT A GAS ODOR IS DETECTED, SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE.
WARNING
IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE, INJURY OR DEATH. READ THE INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT.
IN THE EVENT OF A POWER FAILURE, DO NOT ATTEMPT TO OPERATE THIS DEVICE.
— 2 —
Installation, Operation and Care of
MODELS EF3, EF4 & EF5 ECONOFRY GAS FRYERS
KEEP THESE INSTRUCTIONS FOR FUTURE USE
GENERAL
Your Vulcan-Hart Gas Fryer is produced with quality workmanship and material. Proper installation, usage and maintenance will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions provided.
INSTALLATION
Before installing the fryer, verify that the type of gas (natural or propane) agrees with the specifications on the fryer data plate which is located on the inside of the door. Also be sure the fryer is built for the installation elevation.
The fryer must be restrained with adequate ties to prevent tipping when installed in order to avoid the splashing of hot liquid.
UNPACKING
This fryer was carefully inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking the fryer, check for possible shipping damage. If the fryer is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Accessories packed in the fry tank include:
Crumb Screen Drain Pipe Basket Hanger (2) Twin Fry Baskets (4) Legs
Do not use the door or its handle to lift or move the fryer.
— 3 —
LOCATION
The equipment area must be kept free and clear of combustible substances. Minimum clearance from combustible construction is 6" (152.4mm) from the sides and 6" (152.4mm) from the back of the fryer; minimum clearance from non-combustible construction is 0" from the sides and back of the fryer. There must be at least 16" (406.4mm) clearance between the fryer and any open top flame units. Adequate clearances for servicing and proper operation must be allowed.
Install the fryer in an area with sufficient air supply for combustion of the gas at the fryer burners. Provide adequate clearance for air openings into the combustion chamber. Do not obstruct the flow of combustion and ventilation air.
Do not permit fans to blow directly at the fryer. Wherever possible, avoid open windows next to the sides or back of the fryer. Avoid wall-type fans which create air cross currents within the room.
INSTALLATION CODES AND STANDARDS
Vulcan-Hart Fryers should be installed in accordance with:
In the United States of America:
1. State and local codes.
2. The National Fuel Gas Code, ANSI-Z223.1 (latest edition), available from The American Gas Association, Inc., 1515 Wilson Boulevard, Arlington, VA 22209.
3. ANSI-NFPA Standard #96, Vapor Removal from Cooking Equipment, (latest edition), available from the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.
In Canada:
1. Local Codes.
2. CAN/CGA-B149.1 Natural Gas Installation Code (latest edition).
3. CAN/CGA-B149.2 Propane Installation Code (latest edition) available from the Canadian Gas Association, 178 Rexdale Blvd., Etobicoke, Toronto (Ontario), Canada M9W 1R3.
ASSEMBLY Legs
Position fryer in an open space near the final installation area. Tilt fryer back, being careful to avoid scratching the finish. Thread front legs clockwise into mounting plates provided on the bottom of the fryer until seated. Tilt to front and thread back legs similarly. Carefully raise fryer to its normal position and place it in the installing location.
Casters (Optional)
If the fryer is equipped with casters, the gas connector (available from Vulcan-Hart) must comply with the Standard for Connectors of Movable Gas Appliances, ANSI-Z21.69 (latest edition), and a quick­disconnect device that complies with the Standard for Quick-Disconnect Devices for Use With Gas Fuel, ANSI-Z21.41 (latest edition).
When casters are installed, provide a restraining device for the gas line to limit movement of the fryer without depending on the connector and/or any quick-disconnect device or its associated piping to limit fryer movement. Attach the restraining device to the rear of the fryer (Fig. 1).
If it is necessary to disconnect the restraint, turn off the gas supply before disconnection. Reconnect the restraint before turning the gas supply on and returning the fryer to its installation position.
Instructions for installing casters to the fryer are included with the casters.
— 4 —
Loading...
+ 8 hidden pages