![](/html/1d/1d94/1d943b1f009bc8f48f9d50585f7974cc494ddf32202f657054a4fd1aed3fdc9f/bg1.png)
UC409, UC407, UC407SQ
9’
OC
/7.5’
OC
/7’
SQ
Commercial
Assembly and Operation Guide
![](/html/1d/1d94/1d943b1f009bc8f48f9d50585f7974cc494ddf32202f657054a4fd1aed3fdc9f/bg2.png)
Thank you for your purchase of Treasure Garden’s Commercial Umbrella.
Please remove all contents from the package, inspect and review checklist.
CHECKLIST
A - (1) Finial
B - (1) Canopy/Mainframe
A -
B -
S T E P 1 Set Up
Carefully remove umbrella from box. Attach finial to top of canopy/mainframe by turning
clockwise.
S T E P 2 Opening Umbrella
Turn the umbrella upright and insert in free standing base or through center of table. Push
center hub up pole to its fully open position. Insert pin through holes on pole to secure.
S T E P 3 Closing Umbrella
Remove pin from center pole and guide hub down pole to
bring umbrella back to its original upright position.