Thermon Terminator ZE-S Installation Instructions Manual

End Termination Kit
Installation Instructions
Terminator ZE-S
for use with HPT power-limiting and FP constant watt heating cables
For End Termination Applications
1-2 Cables - Standard
3 Cables - w/ Optional End Cap
Kit Contents
Item Qty Description
12
1 1 Splice Cap 2 1 Expediter Assembly
Grommet Compressor Grommet Support Base w/ O-ring
3 1 Banding 4 1 Banding Guide
5 1 RTV Tube 6 2 End Caps
7 2 Tape Strips
8 1 Optional End Cap
T ools R equired
1
2
- for 3 cable installations
- not provided in kit
Certifications/Approvals
°°
≤≤
≤ ≤
IP66 NEMA/Type 4X -60 Listed Heat Tracing Cable System 137M Ordinary & Hazardous Locations Class I, Division 2, Groups A, B, C & D Class II, Division 2, Groups F & G, Class III Class I, Zone 1, AEx e II T4/T6 Ex e II T4/T6
II 2
G & D
EEx e II T4/T6
°C
°°
Ta
≤≤
°°
+55
°C
≤ ≤
°°
01ATEX0021995
Warnings
Due to the risk of electrical shock, arcing and fire caused by product damage or improper usage, installation or maintenance, a ground-fault protection device is required.
Installation must comply with Thermon requirements and be installed in accordance with the NEC, CEC, or any other applicable national and local codes.
3
4
5 6
7
Component approvals and performance ratings are based on the use of Thermon specified parts only.
De-energize all power sources before opening enclosure. Keep ends of heating cable and kit components dry before and during
installation.
Installation Instructions
34
1.
Locate bus connection and cable as shown. Cut end of cable at angle to aid in piercing grommet. Leave additional cable for expansion loop. See pages 9-10 for multiple cable installation tips.
Insert cable into expediter. If mounted on bottom of
pipe, punch out weep hole. 2.
4.
Insert banding guide into expediter and snap into place.
Mount expediter to pipe using pipe band. Do not band
over cable. 5.
Slide expediter toward pipe and route cable through
support base entry. 3.
6.
Cut off end of cable.
Installation Instructions
56
7.
8.
Cut and remove overjacket.
Trim away exposed braid from cable.
10.
11.
Cut and remove fiberglass braid. Omit this step for FP cable.
Cut and remove heating element and fiberglass overlay (FP cable only). Push any remaining heating element wire under the primary insulation jacket.
9.
Cut and remove primary insulation jacket.
12.
Cut and remove pairing jacket. Do not cut bus wire insulation.
Installation Instructions
78
13.
14.
Stagger cut one of the bus wires.
Tape bus wires individually and then together. Continue taping to cover overjacket.
Push excess cable back through expediter. Tighten cap
securely. Tape cable expansion loop to pipe. 16.
Completed end termination kit. Make sure latch
mechanism is in the locked position. 17.
15.
Apply a liberal amount of RTV sealant to cable and slide end cap onto the end of the cable.
18.
To remove cap, lift latch mechanism and unscrew cap.
Two Cable Layout Tips
9
Three Cable Layout Tips
10
A1.
A2.
Locate bus connection and cable as shown. Cut end of cable at angle to aid in piercing grommet. Leave additional cable for expansion loop.
Insert two cables into expediter.
B1.
B2.
Locate bus connection and cable as shown. Cut end of cable at angle to aid in piercing grommet. Leave additional cable for expansion loop.
Insert three cables into expediter.
Mount expediter with three cables.
Do not band over cable. B3.
Thermon Manufacturing Company
100 Thermon Drive P.O. Box 609 San Marcos, Texas 78667-0609 Phone: (512) 396-5801 Fax: (512) 396-3627 1-800-820-HEAT www.thermon.com
Form No. 50823 (08/25/04)