FAK-9: Bulkhead Entry Heat Shrink
for Tubing Bundles
INSTALLATION PROCEDURES
To be used in conjunction with
FAK-9S, FAK-9, FAK-9L and FAK-9LX Kits.
FAK-9: Bulkhead Entry Heat Shrink for Tubing Bundles
The following installation procedures are guidelines for the installation of FAK-9, FAK-9S, FAK-9L, and FAK-9XL Bulkhead Entry Heat Shrink kits. See Sizing Chart below.
The FAK-9: Bulkhead Entry Heat Shrink is designed to make one bulkhead entry into an enclosure or shelter. See separate instructions for details on terminating heat tracing.
Receiving, Storing and Handling . . .
1.Upon receiving, check to make sure the proper type has been received.
2.Inspect for any damage incurred during shipping.
3.Report all damages to the carrier for settlement.
4.Identify parts against the packing list to ensure the proper type and quantity has been received.
5.Store in a dry location.
FAK-9: Bulkhead Entry Heat Shrink . . .
1 |
2 |
3 |
FAK-9: Bulkhead Entry Heat Shrink Contents. . .
Item |
Quantity |
|
Description |
1 |
1 |
FAK-9 |
Bulkhead Entry Heat Shrink Flange Assembly |
2 |
1 |
FAK-9 |
Bulkhead Entry Heat Shrink Flange Nut |
3 |
1 |
FAK-9 |
Bulkhead Entry Heat Shrink Flange Nut O-Ring |
FAK-9: Sizing and Selection Chart. . .
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
“A” |
|
|
|
|
“B” |
|
“C” |
|
|
|
“D” |
|||||||||||
|
|
|
|
Catalog |
Overall |
|
|
TubeTrace |
I.D. After |
|
|
Hole |
|||||||||||||||||
|
|
|
|
No. |
Nom. Length |
|
|
Max. O.D. |
Shrinkage |
|
|
|
Size |
||||||||||||||||
|
|
|
|
|
|
|
in. (mm) |
|
|
|
in. (mm) |
in. (mm) |
in. (mm) |
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FAK-9S |
4.00 (101.6) |
1.60 (40.6) |
0.75 (19.0) |
2 (51.0) |
|
|
|||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FAK-9 |
4.75 (120.7) |
2.10 (53.3) |
0.75 (19.0) |
2.5 (64.0) |
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FAK-9L |
7.00 (177.8) |
2.90 (73.4) |
1.43 (36.3) |
3.5 (89.0) |
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FAK-9LX |
11.50 (292.1) |
3.75 (95.0) |
1.50 (38.1) |
4.5 (115.0) |
|
||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Installation Precautions . . .
•Keep ends of tube bundles, heat tracing and kit components dry before and during installation.
•For SE/ME electrically heated tubing de-energize all power sources before addressing circuit termination and power connection.
•Component approvals and performance ratings are based on the use of Thermon specified parts only. User supplied power connection fittings must be listed or certified for intended use.
•To minimize any risk of arcing in TubeTrace SE/ME bundles, The National Electrical Code (NEC) and Canadian Electrical Code (CEC) require ground-fault protection of equipment for each branch circuit supplying electric heat tracing.
•Installation must comply with Thermon requirements and be installed in accordance with all applicable national and local codes.
•Individuals installing these products are responsible for complying with all applicable safety and health guidelines. Proper Personal Protective Equipment (PPE) should be utilized during installation. For additional information, contact Thermon.
Tools Required . . .
Heat Gun
1