Thermon Terminator DE-B Installation Procedures Manual

Terminator
LED End of Circuit Light Kit
INSTALLATION PROCEDURES
TM
DE-B Beacon
TerminatorTM DE-B Beacon
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the proper type and quantity has been received.
4. Store in a dry location.
Kit Contents . . .
1
Item Quantity Description
11
2 1 Light Module Cover
3 1 Banding Guide
4 1 Banding (fi ts 10" pipe and below)
5 1 LED Light Module
2
Expediter Assembly Grommet Compressor Grommet Support Base with O-Ring
3
5
4
Order Separately . . . SCTK Connection Termination Kits (per cable)
SCTK-1D for BSX, RSX, VSX SCTK-2D for KSX, HTSX SCTK-3D for FP, HPT
2 43 5
61
Dimensions . . .
64mm
(2.5")
210mm
(8.25")
76mm
(3")
89mm
(3.5")
Installation Precautions . . .
• To minimize the potential for arcing and fi re caused by product damage or improper installation use ground-fault protection. The National Electrical Code (NEC) and Canadian Electrical Code (CEC) require ground-fault protection of equipment for each branch circuit supplying electric heat tracing.
• Installation must comply with Thermon requirements and be in­stalled in accordance with the NEC, CEC, or any other applicable national and local codes.
• Component approvals and performance ratings are based on the use of Thermon specifi ed parts only. User supplied power connection fi ttings must be listed or certifi ed for intended use.
• De-energize all power sources before opening enclosure.
• Keep ends of heating cable and kit components dry before and during installation.
• Individuals installing these products are responsible for complying with all applicable safety and health guidelines. Proper personal protective equipment, or PPE, should be utilized during installa­tion. Contact Thermon if you have any additional questions.
Item Quantity Description
1 2 Connection Boots
2 2 Large Wire Nut
3 2 Medium Wire Nuts
4 2 Small Wire Nuts
5 1 RTV Tube
6 1 GRW-G Grommet (SCTK-3D only)
Certifi cations/Approvals . . .
IP66/Type 4X -60°C Ta +45°C
Ordinary & Hazardous Locations Class I, Division 2, Groups A, B, C, & D, Zone 2 IIC T6 Class II, Division 2, Groups F & G, Class III
Tools Required . . .
TerminatorTM DE-B Beacon
300mm
50mm
(2")
Max.
(12")
Weep Hole
Bus
Connection
Min.
300mm
(12")
1. Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to aid in piercing grommet. Leave additional cable for expansion loop.
4. Insert banding guide into expediter and snap into
place.
2. Insert cable into expediter. If mounted on bottom
of pipe, punch out weep hole.
Do Not Band
Over Cable
5. Mount expediter to pipe using pipe band. Do not
band over cable.
3. Slide expediter toward pipe and route cable
through support base entry.
180mm
(7") Min.
6. Cut off end of cable.
Boot
Expediter Assembly
7. Terminate cable with appropriate SCTK termination
kit. Refer to SCTK installation instructions. Push excess cable back through expediter. Tape cable expansion loop to pipe.
Light Module
Wire Connector
Expediter Assembly
8. Connect bus wires using small wire nuts (for BSX,
HTSX and KSX) or medium wire nuts (for RSX, VSX, HPT and FP). See wiring schematic for connec­tions.
LED Light PigtailHeating Cable
Wiring Schematic for LED Light
Light Module
Cover
Light Module
Lens
Unlocked
Position
Expediter Assembly
Locked
Position
9. Slide the light module cover over light module.
10. Engage threads. Rotate light module cover
clockwise and tighten cap securely. Make sure latch mechanism is in the locked position.
11. To remove cap, lift latch mechanism, as shown
and unscrew cap. De-energize all power sources before opening enclosure.
THERMON . . . The Heat Tracing Specialists