INSTALLATION INSTRUCTIONS
RGS Self-Regulating Heating Cables
Power Connection and End Termination Kit
RGSTM-CFK Power Connection and End Termination Kit
Tools Required for Installation
Scissors, crimper/cutter, flat-blade screw­driver, and utility knife
Step 2: Cut overjacket back a distance of 5" (120 mm).
Kit Contents
User supplied junction box must be rated Type 4X (water-tight) and approved for use in ordinary locations.
Step 3: Separate braid strands at overjacket and pull cable back through opening in braid.
Power Connection
Step 1: Slide the junction box fitting cap,
strain relief disk, grommet, and then gland fitting body onto the power end of cable.
Step 4: Cut insulating jacket of cable back
3.5" (90 mm). Wind braid into a pigtail.
Step 5: Skive outer matrix material from conductors with a utility knife.
Step 6: Peel ex­posed wires back from center ma­trix and cut cen­ter matrix away, leaving bare conductors. Twist end of bus wires before inserting into boot to avoid contact with ground wire.
Step 7: Squeeze RTV into the sili­cone rubber boot and slide over cable end. Verify bus wires do not contact ground wire.
INSTALLATION INSTRUCTIONS
Step 8: Tighten the gland fitting to the
cable such that the leading edge of the fitting is 1" (25 mm) back from the braid pigtail. Be careful to leave enough cable to easily reach the junction box without straining the cable.
Step 11: Secure the water-tight cover to the junction box. Before the system is energized, make sure it is connected to a ground-fault-circuit-interrupting (GFCI or ELCI) type of outlet or circuit breaker.
Step 9: Mount NEMA 4X junction box (not supplied) to support structure. The junc­tion box should have one opening for in­coming power and a 1" (25 mm) opening for the heating cable. For roof-and-gutter installations, mount box underneath roof eave if possible.
Install the completed cable connection and gland fitting into the 1" (25 mm) open­ing. Tighten down grounding lock ring. The cable should come up to the junction box from underneath, or should have drip­loop of cable provided.
Step 12: The cable installation instructions are provided separately.
Step 10: The incoming power cable should also be provided with a drip-loop before it enters the enclosure. Connect the power conductors to the cable leads. Connect the incoming supply ground wire to the cable braid and to the green ground wire. Crimp the ring terminal to the other end of the green ground wire and then connect it to the grounding screw on the lock-ring.
End Termination
Step 13: Cut back overjacket 0.5" (12
mm).
Step 16: Slide the end cap on the end of the cable until fully seated.
Step 14: Trim ALL of the braid strands back to the overjacket with scissors
Step 17: Put a small amount of RTV into the opening of the larger over-cap.
Step 15: Fill the smaller end cap with RTV.
Step 18: Slide
the over-cap over the end cap until fully seated.