SMA SB 3000TL User Manual

Page 1
OperatingManual
SUNNYBOY 3000TL/ 3600TL/ 4000TL/ 5000TL
SB30-50TL-21-BE-en-11 | Version 1.1
AMERICAN ENGLISH
Page 2
Legal Provisions
SMA Solar Technology AG
Legal Provisions
The information contained in these documents is property of SMA Solar Technology AG. Any publication, whether in whole or in part, requires prior written approval by SMA Solar Technology AG. Internal reproduction used solely for the purpose of product evaluation or other proper use is allowed and does not require prior approval.
SMA Warranty
You can download the current warranty conditions from the Internet at www.SMA-Solar.com.
Trademarks
All trademarks are recognized, even if not explicitly identified as such. A lack of identification does not mean that a product or symbol is not trademarked.
The BLUETOOTH® word mark and logos are registered trademarks of BluetoothSIG,Inc. and any use of these marks by SMASolarTechnologyAG is under license.
Modbus® is a registered trademark of Schneider Electric and is licensed by the Modbus Organization, Inc.
QR Code is a registered trademark of DENSO WAVE INCORPORATED. Phillips® and Pozidriv® are registered trademarks of Phillips Screw Company. Torx® is a registered trademark of Acument Global Technologies, Inc.
SMA Solar Technology AG
Sonnenallee 1 34266 Niestetal Germany Tel. +49 561 9522-0 Fax +49 561 9522-100 www.SMA.de E-mail: info@SMA.de © 2004 to 2014 SMA Solar Technology AG. All rights reserved.
Operating ManualSB30-50TL-21-BE-en-112
Page 3
SMA Solar Technology AG
Table of Contents
Table of Contents
1 Information on this Document ................................................. 6
1.1 Validity................................................................................................ 6
1.2 Target Group...................................................................................... 6
1.3 Additional Information....................................................................... 6
1.4 Symbols .............................................................................................. 7
1.5 Nomenclature..................................................................................... 7
2 Safety......................................................................................... 9
2.1 Intended Use ...................................................................................... 9
2.2 Safety Information.............................................................................. 9
3 Scope of Delivery...................................................................... 11
4 Product Description................................................................... 12
4.1 Sunny Boy........................................................................................... 12
4.2 Interfaces and Functions .................................................................... 15
5 Mounting ................................................................................... 17
5.1 Requirements for Mounting ............................................................... 17
5.2 Mounting the Inverter......................................................................... 19
6 Electrical Connection................................................................. 21
6.1 Safety during Electrical Connection.................................................. 21
6.2 Overview of the Connection Area .................................................... 22
6.2.1 View from Below............................................................................ 22
6.2.2 Interior View ................................................................................... 23
6.3 AC Connection................................................................................... 24
6.3.1 Requirements for the AC Connection............................................ 24
6.3.2 Connecting the Inverter to the Utility Grid.................................... 25
6.3.3 Connecting Additional Grounding ............................................... 27
6.4 DC Connection................................................................................... 27
6.4.1 Requirements for the DC Connection............................................ 27
6.4.2 Connecting the PV Array............................................................... 28
7 Commissioning.......................................................................... 31
7.1 Commissioning Procedure ................................................................. 31
Operating Manual 3SB30-50TL-21-BE-en-11
Page 4
Table of Contents
SMA Solar Technology AG
7.2 Configuring the Country Data Set..................................................... 31
7.3 Setting the NetID................................................................................ 32
7.4 Commissioning the Inverter................................................................ 34
7.5 Self-Test in Accordance with CEI 0-21 for PV Systems ≤6 kW ....... 35
7.5.1 Starting the Self-Test....................................................................... 35
7.5.2 Restarting the Self-Test ................................................................... 36
8 Configuration ............................................................................ 38
8.1 Configuration Procedure.................................................................... 38
8.2 Changing the Display Language ...................................................... 38
8.3 Integrating the Inverter into the Network.......................................... 39
8.4 Changing Operating Parameters...................................................... 39
8.5 Deactivating Grounding Conductor Monitoring.............................. 40
8.6 Setting SMA OptiTrac Global Peak ................................................. 40
9 Operation.................................................................................. 41
9.1 LED Signals......................................................................................... 41
9.2 Display Overview............................................................................... 41
9.3 Activating and Operating the Display.............................................. 44
9.4 Calling Up Display Messages of the Start-Up Phase ...................... 44
10 Disconnecting the Inverter from Voltage Sources.................. 45
11 Technical Data........................................................................... 47
11.1 DC/AC ............................................................................................... 47
11.1.1 Sunny Boy 3000TL / 3600TL....................................................... 47
11.1.2 Sunny Boy 4000TL / 5000TL....................................................... 48
11.2 General Data ..................................................................................... 50
11.3 Protective Devices .............................................................................. 51
11.4 Climatic Conditions............................................................................ 52
11.5 Equipment........................................................................................... 52
11.6 Torques............................................................................................... 52
11.7 Electronic Solar Switch ...................................................................... 53
11.8 Data Storage Capacity...................................................................... 53
12 Accessories................................................................................ 54
Operating ManualSB30-50TL-21-BE-en-114
Page 5
SMA Solar Technology AG
Table of Contents
13 Contact....................................................................................... 55
14 EC Declaration of Conformity .................................................. 58
Operating Manual 5SB30-50TL-21-BE-en-11
Page 6

1 Information on this Document

SMA Solar Technology AG
1 Information on this Document

1.1 Validity

This document is valid for the following device types from firmware version2.55:
• SB3000TL-21 (SunnyBoy3000TL)
• SB3600TL-21 (SunnyBoy3600TL)
• SB4000TL-21 (SunnyBoy4000TL)
• SB5000TL-21 (SunnyBoy5000TL)

1.2 Target Group

This document is intended for qualified persons and end users. Only qualified persons are allowed to perform the activities marked in this document with a warning symbol and the caption "Qualifiedperson". Tasks that do not require any particular qualification are not marked and can also be performed by end users. Qualified persons must have the following skills:
• Knowledge of how an inverter works and is operated
• Training in how to deal with the dangers and risks associated with installing and using electrical devices and installations
• Training in the installation and commissioning of electrical devices and installations
• Knowledge of the applicable standards and directives
• Knowledge of and compliance with this document and all safety information

1.3 Additional Information

Links to additional information can be found at www.SMA-Solar.com:
Document title and content Document type
Troubleshooting, Cleaning, Replacement of Varistors and Decommissioning
"Overview of the Rotary Switch Settings" Overview of the rotary switch settings for config-
uring the country data set and display language "Efficiency and Derating"
Efficiency and Derating Behavior of the Sun­nyBoy, SunnyTripower and SunnyMiniCentral Inverters
"Criteria for Selecting a Residual-Current Device" Technical Information "Circuit Breaker"
Dimensioning and Selection of a Suitable AC Circuit Breaker for Inverters under PV-Specific In­fluences
Service Manual
Technical Information
Technical Information
Technical Information
Operating ManualSB30-50TL-21-BE-en-116
Page 7
SMA Solar Technology AG
Document title and content Document type
"Insulation Resistance (Riso) of Non-Galvanically Isolated PV Systems"
"IntegratedPlantControl and QonDe­mand24/7"
Detailed explanation of functions and descrip­tion for setting the functions
"Webconnect Systems in SunnyPortal" Registration in SunnyPortal
"Firmware Update with SD Card" Technical Description "Parameter list"
Overview of All Inverter Operating Parameters and Their Configuration Options
Technical Information
Technical Information
User Manual
Technical Information

1.4 Symbols

Symbol Explanation
Indicates a hazardous situation which, if not avoided, will result in death or serious injury
Indicates a hazardous situation which, if not avoided, can result in death or serious injury
Indicates a hazardous situation which, if not avoided, can result in minor or moderate injury
Indicates a situation which, if not avoided, can re­sult in property damage
Sections describing activities to be performed by qualified persons only
Information that is important for a specific topic or goal, but is not safety-relevant
Indicates a requirement for meeting a specific goal
Desired result
A problem that might occur
1 Information on this Document

1.5 Nomenclature

Complete designation Designation in this document
Sunny Boy Inverter, product
Operating Manual 7SB30-50TL-21-BE-en-11
Page 8
1 Information on this Document
SMA Solar Technology AG
Complete designation Designation in this document
Electronic Solar Switch ESS SMA BLUETOOTH Wireless Technology BLUETOOTH
Operating ManualSB30-50TL-21-BE-en-118
Page 9
SMA Solar Technology AG

2 Safety

2 Safety

2.1 Intended Use

The SunnyBoy is a transformerless PV inverter with two MPP trackers which converts the direct current of the PV array to grid-compliant alternating current and feeds it into the utility grid.
The product is suitable for indoor and outdoor use. The product must only be operated with PV arrays of protection class II in accordance with
IEC61730, application class A. The PV modules must be compatible with this product. PV modules with a high capacity to ground must only be used if their coupling capacity does not
exceed 1.4 μF (for information on how to calculate the coupling capacity, see the Technical Information "Leading Leakage Currents" at www.SMA-Solar.com).
All components must remain within their permitted operating ranges at all times. The product must only be used in countries for which it is approved or released by
SMASolarTechnologyAG and the grid operator. Use this product only in accordance with the information provided in the enclosed documentation
and with the locally applicable standards and directives. Any other application may cause personal injury or property damage.
Alterations to the product, e.g. changes or modifications, are only permitted with the express written permission of SMASolarTechnologyAG. Unauthorized alterations will void guarantee and warranty claims and usually void the operation permit. SMASolarTechnologyAG shall not be held liable for any damage caused by such changes.
Any use of the product other than that described in the Intended Use section does not qualify as appropriate.
The enclosed documentation is an integral part of this product. Keep the documentation in a convenient place for future reference and observe all instructions contained therein.
The type label must remain permanently attached to the product.

2.2 Safety Information

This section contains safety information that must be observed at all times when working on or with the product.
To prevent personal injury and property damage and to ensure long-term operation of the product, read this section carefully and observe all safety information at all times.
Operating Manual 9SB30-50TL-21-BE-en-11
Page 10
2 Safety
SMA Solar Technology AG
Danger to life due to high voltages of the PV array
When exposed to sunlight, the PV array generates dangerous DC voltage which is present in the DC conductors and the live components of the inverter. Touching the DC conductors or the live components can lead to lethal electric shocks. If you disconnect the DC connectors from the inverter under load, an electric arc may occur leading to electric shock and burns.
• Do not touch non-insulated cable ends.
• Do not touch the DC conductors.
• Do not touch any live components of the inverter.
• Have the inverter mounted, installed and commissioned only by qualified persons with the appropriate skills.
• If an error occurs, have it rectified by qualified persons only.
• Prior to performing any work on the inverter, disconnect it from all voltage sources as described in this document (see Section10 "Disconnecting the Inverter from Voltage Sources", page45).
Danger to life due to electric shock
Touching an ungrounded PV module or array frame can cause a lethal electric shock.
• Connect and ground the PV modules, array frame and electrically conductive surfaces so that there is continuous conduction. Observe the applicable local regulations.
Risk of burns due to hot enclosure parts
Some parts of the enclosure can get hot during operation.
• Do not touch any parts other than the lower enclosure lid of the inverter during operation.
Damage to the display or the type label due to the use of cleaning agents
• If the inverter is dirty, clean the enclosure, the enclosure lid, the type label, the display and the LEDs with a damp cloth only.
Operating ManualSB30-50TL-21-BE-en-1110
Page 11
SMA Solar Technology AG

3 Scope of Delivery

3 Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact your distributor if the scope of delivery is incomplete or damaged.
Figure 1: Components included in the scope of delivery
Position Quantity Designation
A 1 Inverter* B 1 Wall mounting bracket C 4 Positive DC connector D 4 Negative DC connector E 8 Sealing plug for DC connectors F 1 Cable gland M32x1.5 G 1 Counter nut for cable gland M32x1.5 H 1 Quick Reference Guide for Installation, installation manual
of the SMASpeedwire/Webconnect data module, instal­lation manual of the DC connectors, supplementary sheet with default settings, supplementary sheet with access data for registration in SunnyPortal
I 1 Warning label
* Optional without ElectronicSolarSwitch (ESS)
Operating Manual 11SB30-50TL-21-BE-en-11
Page 12

4 Product Description

SMA Solar Technology AG
4 Product Description

4.1 Sunny Boy

The SunnyBoy is a transformerless PV inverter with two MPP trackers which converts the direct current of the PV array to grid-compliant alternating current and feeds it into the utility grid.
Figure 2: Design of the SunnyBoy
Position Explanation
A Upper enclosure lid B Type label
The type label uniquely identifies the inverter. You will require the information on the type label to use the product safely and when seeking customer sup­port from the SMAServiceLine. You will find the following information on the type label:
• Device type (Model)
• Serial number (SerialNo.)
• Date of manufacture
• Device-specific characteristics
C Additional label with details for registration in SunnyPortal:
• Internet address of the PV System Setup Assistant
• Identification key (PIC)
• Registration ID (RID)
D LEDs
The LEDs indicate the operating state of the inverter (see Section9.1 "LED Sig­nals", page41).
Operating ManualSB30-50TL-21-BE-en-1112
Page 13
SMA Solar Technology AG
Position Explanation
E Display
The display shows the current operating data and events or errors (see Sec­tion9.2 "Display Overview", page41).
F ElectronicSolarSwitch (ESS)*
The ESS and the DC connectors together form a DC load-break switch. When plugged in, the ESS forms a conductive path between the PV array and the in­verter. Removing the ESS interrupts the DC electric circuit and removing all DC connectors disconnects the PV array completely from the inverter.
G Lower enclosure lid
* Optional
Symbols on the inverter, the type label and the ESS
Symbol Explanation
Inverter Together with the green LED, this symbol indicates the operating state of
the inverter. Observe the documentation
Together with the red LED, this symbol indicates an error (for trou­bleshooting, see the service manual at www.SMA-Solar.com).
BLUETOOTH Together with the blue LED, the symbol indicates active communication
via BLUETOOTH. Danger
This symbol indicates that the inverter must be additionally grounded if additional grounding or equipotential bonding is required at the installa­tion site (see Section6.3.3, page27).
QRCode Links to additional information on the inverter can be found at
www.SMA-Solar.com.
4 Product Description
Operating the inverter without the lower enclosure lid is prohibited. Al­ways operate the inverter with the lower enclosure lid.
Operating Manual 13SB30-50TL-21-BE-en-11
Page 14
4 Product Description
Symbol Explanation
Operating principle of the ESS:
If the ESS is plugged in, the DC electric circuit is closed.
To interrupt the DC electric circuit, you must perform the following steps in the given order:
Remove the ESS. – Unlock and remove all DC connectors.
Danger to life due to electric shock The product operates at high voltages. All work on the product must be
carried out by qualified persons only.
Risk of burns due to hot surfaces The product can get hot during operation. Avoid contact during opera-
tion. Allow the product to cool down sufficiently before carrying out any work.
Observe the documentation Observe all documentation supplied with the product.
Direct current
The product does not have a transformer.
SMA Solar Technology AG
Alternating current
WEEE designation Do not dispose of the product together with the household waste but in
accordance with the locally applicable disposal regulations for electronic waste.
CE marking The product complies with the requirements of the applicable EU direc-
tives. Device class ID
The product is equipped with a wireless component and complies with device class2.
Degree of protectionIP65 The product is protected against dust intrusion and water jets from any
angle.
Operating ManualSB30-50TL-21-BE-en-1114
Page 15
SMA Solar Technology AG
Symbol Explanation
The product is suitable for outdoor installation.
Certified safety The product is VDE-tested and complies with the requirements of the Ger-
man Equipment and Product Safety Act.
RCM (Regulatory Compliance Mark) The product complies with the requirements of the applicable Australian
standards.
4 Product Description

4.2 Interfaces and Functions

The inverter can be equipped or retrofitted with the following interfaces and functions:
BLUETOOTH
Via BLUETOOTH, the inverter can communicate with various BLUETOOTH devices (for information on supported SMA products, see www.SMA-Solar.com).
SMA Speedwire/Webconnect
The inverter is equipped with SMA Speedwire/Webconnect as standard. SMA Speedwire/ Webconnect is a type of communication based on the Ethernet standard. This enables inverter­optimized 10/100Mbit data transmission between Speedwire devices in PV systems and the software Sunny Explorer. The Webconnect function enables direct data transmission between the inverters of a small-scale system and the Internet portal SunnyPortal without any additional communication device and for a maximum of four inverters per SunnyPortal system. In large-scale PV power plants, data transmission to the Internet portal SunnyPortal is carried out via the SMAClusterController. You can access your SunnyPortal system from any computer with an Internet connection.
SMA Speedwire/Webconnect enables, for PV systems operated in Italy, the connection to or disconnection of the inverter from the utility grid and definition of the frequency limits to be used with IEC61850-GOOSE messages.
RS485 interface
The inverter can communicate via cables with special SMA communication products via the RS485 interface (information on supported SMAproducts at www.SMA-Solar.com). The RS485 interface can be retrofitted.
Grid Management Services
The inverter is equipped with service functions for grid management. Depending on the requirements of the grid operator, you can activate and configure the functions
(e.g. active power limitation) via operating parameters.
Operating Manual 15SB30-50TL-21-BE-en-11
Page 16
4 Product Description
SMA Solar Technology AG
SMA Power Control Module
The SMAPowerControlModule enables the inverter to implement grid management services and is equipped with an additional multifunction relay (for information on installation and configuration, see the installation manual of the SMAPowerControlModule). The SMAPowerControlModule can be retrofitted.
Multifunction Relay
You can configure the multifunction relay for various operating modes. The multifunction relay is used, for example, to switch fault indicators on or off (for information on installation and configuration, see the installation manual of the multifunction relay). The multifunction relay can be retrofitted.
Fan retrofit kit
The fan retrofit kit is used for additional inverter cooling at high ambient temperatures and also has a multifunction relay (for information on installation and configuration, see the installation manual of the fan retrofit kit). The fan retrofit kit can be retrofitted and must not be operated in parallel with the SMAPowerControlModule.
SMAOptiTracGlobalPeak
SMAOptiTracGlobalPeak is an advancement of SMAOptiTrac and allows the operating point of the inverter to follow the optimal operating point of the PV array (MPP) precisely at all times. In addition, with the aid of SMAOptiTracGlobalPeak, the inverter can detect the presence of several maximum power points in the available operating range, such as may occur particularly with partially shaded strings. SMA OptiTrac Global Peak is enabled by default.
All-pole sensitive residual-current monitoring unit
The all-pole sensitive residual-current monitoring unit detects alternating and direct differential currents. In single-phase and three-phase inverters, the integrated differential current sensor detects the current difference between the neutral conductor and the line conductor(s). If the current difference increases suddenly, the inverter disconnects from the utility grid.
Operating ManualSB30-50TL-21-BE-en-1116
Page 17
SMA Solar Technology AG

5 Mounting

5 Mounting

5.1 Requirements for Mounting

Requirements for the mounting location:
Danger to life due to fire or explosion
Despite careful construction, electrical devices can cause fires.
• Do not mount the inverter in areas containing highly flammable materials or gases.
• Do not mount the inverter in a potentially explosive atmosphere.
☐ The mounting location must be inaccessible to children. ☐ A solid support surface must be available for mounting, e.g. concrete or masonry. When
mounted on drywall or similar materials in the living area, the inverter emits audible vibrations during operation which could be perceived as annoying.
☐ The mounting location must be suitable for the weight and dimensions of the inverter (see
Section11 "Technical Data", page47). ☐ To ensure optimum operation, the ambient temperature should be between -25°C and 40°C. ☐ The mounting location should not be exposed to direct solar irradiation. Direct solar irradiation
can cause the inverter to overheat. As a result, the inverter reduces its power output. ☐ Climatic conditions must be met (see Section11 "Technical Data", page47). ☐ The mounting location should be freely and safely accessible at all times without the need for
any auxiliary equipment (such as scaffolding or lifting platforms). Non-fulfillment of these
criteria may restrict servicing.
Operating Manual 17SB30-50TL-21-BE-en-11
Page 18
5 Mounting
Dimensions for mounting:
SMA Solar Technology AG
Figure 3: Position of the anchoring points
Recommended clearances:
If you maintain the recommended clearances, adequate heat dissipation will be ensured. Thus, you will prevent power reduction due to excessive temperature.
☐ Maintain the recommended clearances to walls as well as to other inverters or objects. ☐ If multiple inverters are mounted in areas with high ambient temperatures, increase the
clearances between the inverters and ensure sufficient fresh-air supply.
Operating ManualSB30-50TL-21-BE-en-1118
Page 19
SMA Solar Technology AG
Figure 4: Recommended clearances
5 Mounting
Permitted and prohibited mounting positions:
☐ The inverter must be mounted in one of the permitted positions. This will ensure that no
moisture can penetrate the inverter. ☐ The inverter should be mounted in such way that display messages and LED signals can be
read without difficulty.
Figure 5: Permitted and prohibited mounting positions

5.2 Mounting the Inverter

Additionally required mounting material (not included in the scope of delivery):
☐ Three screws suitable for the support surface (diameter: at least 6mm) ☐ Three washers suitable for the screws (outer diameter: at least 18mm) ☐ If necessary, three screw anchors suitable for the support surface and the screws ☐ To secure the inverter against theft: one padlock suitable for outdoor use
Operating Manual 19SB30-50TL-21-BE-en-11
Page 20
5 Mounting
SMA Solar Technology AG
Risk of injury when lifting the inverter, or if it is dropped
The inverter weighs 30 kg. There is risk of injury if the inverter is lifted incorrectly or dropped while being transported or when attaching it to or removing it from the wall mounting bracket.
• Transport and lift the inverter carefully.
Procedure:
1.
Risk of injury due to damaged cables
There may be power cables or other supply lines (e.g. gas or water) routed in the wall.
• Ensure that no lines are laid in the wall which could be damaged when drilling holes.
2. Align the wall mounting bracket horizontally on the wall and mark the position of the drill holes. Use at least two holes on the right-hand and left-hand side and the lower hole in the middle of the wall mounting bracket. Useful hint: When mounting on a post, use the upper and lower central holes of the wall mounting bracket.
3. Set the wall mounting bracket aside and drill the marked holes.
4. Insert screw anchors into the drill holes if the support surface requires them.
5. Secure the wall mounting bracket using screws and washers.
6. Hook the inverter into the wall mounting bracket.
7. Ensure that the inverter is securely in place.
8. To protect the inverter against theft or from falling down in the event of an earthquake, use an appropriate padlock.
• Place the shackle of the padlock through the metal bracket on the wall mounting bracket and through the bracket on the rear of the inverter. Guide the shackle outwards from the center of the inverter.
• Close the padlock.
• Keep the key of the padlock in a safe place.
Operating ManualSB30-50TL-21-BE-en-1120
Page 21
SMA Solar Technology AG

6 Electrical Connection

6 Electrical Connection

6.1 Safety during Electrical Connection

Danger to life due to high voltages of the PV array
When exposed to sunlight, the PV array generates dangerous DC voltage which is present in the DC conductors and the live components of the inverter. Touching the DC conductors or the live components can lead to lethal electric shocks. If you disconnect the DC connectors from the inverter under load, an electric arc may occur leading to electric shock and burns.
• Do not touch non-insulated cable ends.
• Do not touch the DC conductors.
• Do not touch any live components of the inverter.
• Have the inverter mounted, installed and commissioned only by qualified persons with the appropriate skills.
• If an error occurs, have it rectified by qualified persons only.
• Prior to performing any work on the inverter, disconnect it from all voltage sources as described in this document (see Section10 "Disconnecting the Inverter from Voltage Sources", page45).
Damage to the inverter due to electrostatic discharge
Touching electronic components can cause damage to or destroy the inverter through electrostatic discharge.
• Ground yourself before touching any component.
Operating Manual 21SB30-50TL-21-BE-en-11
Page 22
6 Electrical Connection
SMA Solar Technology AG

6.2 Overview of the Connection Area

6.2.1 View from Below

Figure 6: Enclosure openings at the bottom of the inverter
Position Designation
A Pin connector for the ESS* B Cable gland M20x1.5 for the connection to the multifunction relay or
SMAPowerControlModule*
C Enclosure opening with filler plug for cable gland M32x1.5 with two-hole ca-
ble support sleeve D Enclosure opening with filler plug E Cable gland M32x1.5 for the AC cable
* Optional
Operating ManualSB30-50TL-21-BE-en-1122
Page 23
SMA Solar Technology AG

6.2.2 Interior View

Figure 7: Connection areas in the interior of the inverter
6 Electrical Connection
Posi-
Designation
tion
A 2 positive and 2 negative DC connectors, input A B Pin connector for the ESS* C 2 positive and 2 negative DC connectors, input B D Pin connector for connecting the multifunction relay, the SMAPowerControlModule or
the fan retrofit kit*
E Pin connector for connecting the Speedwire/Webconnect interface or the RS485 inter-
face* F Connecting terminal plate for connecting the AC cable G Switch for temporarily changing the display language to English (for service purposes) H Rotary switch C for configuring the NetID I Rotary switch A and B for setting the country data set and the display language K Slot for SD memory card L Mounting location for the fan retrofit kit* M Grounding terminal for additional grounding of the inverter
* Optional
Operating Manual 23SB30-50TL-21-BE-en-11
Page 24
6 Electrical Connection
SMA Solar Technology AG

6.3 AC Connection

6.3.1 Requirements for the AC Connection

Cable requirements:
☐ External diameter: 12 mm to 21 mm ☐ Conductor cross-section: 1.5mm² to 10mm² ☐ Insulation stripping length: 12 mm ☐ The cable must be dimensioned in accordance with the local and national directives for the
dimensioning of cables. The requirements for the minimum wire size derive from these directives. Examples of factors influencing cable dimensioning are: nominal AC current, type of cable, routing method, cable bundling, ambient temperature and maximum desired line losses (for calculation of line losses, see the design software "SunnyDesign" from software version2.0 at www.SMA-Solar.com).
Load-break switch and cable protection:
Damage to the inverter due to the use of screw-type fuses as load-break switches
Screw-type fuses (e.g. DIAZED fuse or NEOZED fuse) are not load-break switches.
• Do not use screw-type fuses as load-break switches.
• Use a load-break switch or circuit breaker as a load disconnection unit (for information and design examples, see the Technical Information "Circuit Breaker" at www.SMA-Solar.com).
☐ In PV systems with multiple inverters, protect each inverter with a separate circuit breaker.
Make sure to observe the maximum permissible fuse protection (see Section11 "Technical Data", page47). This will prevent residual voltage being present at the corresponding cable after disconnection.
☐ Loads installed between the inverter and the circuit breaker must be fused separately.
Residual-current monitoring unit:
☐ If an external residual-current device is required, install a residual-current device which trips at
a residual current of 100mA or higher (for details on selecting a residual-current device, see the Technical Information "Criteria for Selecting a Residual-Current Device" at www.SMA­Solar.com).
Overvoltage category:
The inverter can be used in grids of overvoltage categoryIII or lower in accordance with IEC60664-1. That means that the inverter can be permanently connected to the grid-connection point of a building. In case of installations with long outdoor cabling routes, additional measures to reduce overvoltage categoryIV to overvoltage categoryIII are required (see the Technical Information "Overvoltage Protection" at www.SMA-Solar.com).
Operating ManualSB30-50TL-21-BE-en-1124
Page 25
SMA Solar Technology AG
6 Electrical Connection
Grounding conductor monitoring:
The inverter is equipped with a grounding conductor monitoring device. This grounding conductor monitoring device detects when there is no grounding conductor connected and disconnects the inverter from the utility grid if this is the case. Depending on the installation site and grid configuration, it may be advisable to deactivate the grounding conductor monitoring. This is necessary, for example, in an IT system if there is no neutral conductor present and you intend to install the inverter between two line conductors. If you are uncertain about this, contact your grid operator or SMASolarTechnologyAG.
☐ Grounding conductor monitoring must be deactivated after initial start-up depending on the
grid configuration (see Section8.5, page40).
Safety in accordance with IEC62109 when the grounding conductor monitoring is deactivated
In order to guarantee safety in accordance with IEC62109 when the grounding conductor monitoring is deactivated, carry out one of the following measures:
• Connect a grounding conductor made of copper wire with a cross-section of at least 10mm² to the connecting terminal plate for the AC cable.
• Connect additional grounding with the same cross-section as the connected grounding conductor to the connecting terminal plate for the AC cable (see Section6.3.3, page27 ). This prevents touch current if the grounding conductor at the connecting terminal plate for the AC cable fails.
Connection of additional grounding
In some countries, additional grounding is generally required. In each case, observe the locally applicable regulations.
• If additional grounding is required, connect an additional grounding with the same cross­section as the connected grounding conductor to the connecting terminal plate for the AC cable (see Section6.3.3, page27). This prevents touch current if the grounding conductor at the connecting terminal plate for the AC cable fails.

6.3.2 Connecting the Inverter to the Utility Grid

Requirements:
☐ The connection requirements of the grid operator must be met. ☐ The grid voltage must be in the permissible range. The exact operating range of the inverter is
specified in the operating parameters.
Procedure:
1. Disconnect the circuit breaker and secure it against reconnection.
2. If an additional DC load-break switch is available, switch off the DC load-break switch and secure against reconnection.
3. If the ESS is installed and plugged in, remove the ESS.
4. If the lower enclosure lid is mounted, loosen all screws of the lower enclosure lid using an Allen key (AF3) and remove the enclosure lid.
Operating Manual 25SB30-50TL-21-BE-en-11
Page 26
6 Electrical Connection
SMA Solar Technology AG
5. Loosen the screw on the display and flip the display up to have more space to make the connection.
☑ The display clicks into place.
6. Unscrew the swivel nut from the cable gland.
7. If the outer diameter of the cable is between 15mm and 21mm, remove the inner sealing ring from the cable gland.
8. Move the swivel nut of the cable gland over the AC cable and then route the AC cable through the cable gland into the inverter.
9. Dismantle the AC cable.
10. Shorten L and N by 5mm each.
11. Strip the insulation of L, N and the grounding conductor by 18mm.
12. Push the locking levers of the connecting terminal plate for the AC cable right up to the stop.
13. Connect the grounding conductor, N and L to the connecting terminal plate for the AC cable in accordance with the labeling.
14.
Danger of crushing fingers when locking levers snap shut
The locking levers close by snapping down fast and hard.
• Press the locking levers of the connecting terminal plate for the AC cable down with your thumb only.
• Do not grip the entire connecting terminal plate for the AC cable.
• Do not place your fingers under the locking levers.
15. Make sure that all conductors are securely in place.
16. Screw the swivel nut onto the cable gland.
17. If the display is flipped up, flip it down and tighten the screw.
Operating ManualSB30-50TL-21-BE-en-1126
Page 27
SMA Solar Technology AG
6 Electrical Connection

6.3.3 Connecting Additional Grounding

If additional grounding or equipotential bonding is required locally, you can connect additional grounding to the inverter. This prevents touch current if the grounding conductor at the terminal for the AC cable fails.
Cable requirement:
☐ Grounding cable cross-section: max. 10mm²
Procedure:
1. Strip the grounding cable insulation.
2. Release the screw using an Allen key (AF4) until the grounding cable can be led under the clamping bracket.
3. Feed the grounding cable under the clamping bracket. Position the grounding conductor on the left-hand side.
4. Tighten the clamping bracket with the screw and conical spring washer (torque: 6Nm). The teeth of the conical spring washer must face the clamping bracket.

6.4 DC Connection

6.4.1 Requirements for the DC Connection

Requirements for the PV modules per input:
☐ All PV modules must be of the same type. ☐ All PV modules must be aligned and tilted identically. ☐ On the coldest day based on statistical records, the open-circuit voltage of the PV array must
never exceed the maximum input voltage of the inverter.
☐ The same number of series-connected PV modules must be connected to each string. ☐ The maximum input current per string must be maintained and must not exceed the through-
fault current of the DC connectors (see Section11 "Technical Data", page47).
☐ The thresholds for the input voltage and the input current of the inverter must be adhered to
(see Section11 "Technical Data", page47).
Operating Manual 27SB30-50TL-21-BE-en-11
Page 28
6 Electrical Connection
SMA Solar Technology AG
☐ The positive connection cables of the PV modules must be fitted with the positive DC
connectors (for information on assembling DC connectors, see the DC connector installation manual).
☐ The negative connection cables of the PV modules must be fitted with the negative DC
connectors (for information on assembling DC connectors, see the DC connector installation manual).
☐ If the inverter is not equipped with an ESS and the regulations in the country of installation
require an external DC load-break switch, you must install an external DC load-break switch.
Use of Y adapters for parallel connection of strings
The Y adapters must not be used to interrupt the DC circuit.
• Do not use the Y adapters in the immediate vicinity of the inverter. The adapters must not be visible or freely accessible.
• In order to interrupt the DC circuit, always disconnect the inverter as described in this document (see Section10, page45).
Reduced electromagnetic compatibility of the inverter in case of incorrect DC connection
If the positive terminal and the negative terminal of a string are not connected to the same input, electromagnetic compatibility of the inverter cannot be guaranteed. As a result, the inverter can cause electromagnetic interference in other devices.
• Always connect the positive terminal and the negative terminal of one string to the same input.

6.4.2 Connecting the PV Array

Destruction of the inverter due to overvoltage
If the open-circuit voltage of the PV modules exceeds the maximum input voltage of the inverter, the inverter can be destroyed due to overvoltage.
• If the open-circuit voltage of the PV modules exceeds the maximum input voltage of the inverter, do not connect any strings to the inverter and check the design of the PV system.
Destruction of the measuring device due to overvoltage
• Only use measuring devices with a DC input voltage range of 1,000 V or higher.
Operating ManualSB30-50TL-21-BE-en-1128
Page 29
SMA Solar Technology AG
6 Electrical Connection
Damage to the DC connectors due the use of contact cleaner of other cleaning agents
Some contact cleaners or other cleaning agents may contain substances that decompose the plastic of the DC connectors.
• Do not use contact cleaners or other cleaning agents for cleaning the DC connectors.
Procedure:
1. Ensure that the circuit breaker is switched off and that it cannot be reconnected.
2. If an additional DC load-break switch is available, switch off the DC load-break switch and secure against reconnection.
3. If the ESS is installed and plugged in, remove the ESS.
4. Ensure that there is no ground fault in the PV array (see service manual at www.SMA­Solar.com).
5. Check whether the DC connectors have the correct polarity. If the DC connector is equipped with a DC cable of the wrong polarity, the DC connector must
be assembled again. The DC cable must always have the same polarity as the DC connector.
6. Ensure that the open-circuit voltage of the PV array does not exceed the maximum input voltage.
7. Connect the assembled DC connectors to the inverter.
☑ The DC connectors snap into place.
8. Ensure that all DC connectors are securely in place.
Operating Manual 29SB30-50TL-21-BE-en-11
Page 30
6 Electrical Connection
SMA Solar Technology AG
9.
Damage to the inverter due to moisture ingress
The inverter is only properly sealed when all unused DC inputs are closed with DC connectors and sealing plugs.
• Do not insert the sealing plugs directly into the DC inputs on the inverter.
• For unused DC connectors, push down the clamping bracket and push the swivel nut up to the thread.
• Insert the sealing plug into the DC connector.
• Tighten the DC connector (torque: 2Nm).
• Insert the DC connectors with sealing plugs into the corresponding DC inputs on the inverter.
☑ The DC connectors snap into place.
• Ensure that all DC connectors with sealing plugs are securely in place.
Operating ManualSB30-50TL-21-BE-en-1130
Page 31
SMA Solar Technology AG

7 Commissioning

7 Commissioning

7.1 Commissioning Procedure

Before you can commission the inverter, you must check various settings and make changes if necessary. This section describes the procedure and gives an overview of the steps, which must always be performed in the prescribed sequence.
Procedure See
1. Connect to the communication interface. Installation manual of the communication interface
2. Check the country data set configuration of the inverter. Supplementary sheet with the default settings, type la­bel or display
3. If the country data set is not set correctly for your country
or your purpose, adjust to the required country data set and the corresponding display language within the first ten feed-in hours via the rotary switches in the inverter.
4. If the inverter is to communicate with several BLUETOOTH
devices, or if BLUETOOTH is not to be used as a type of communication, set the NetID.
5. Commission the inverter and start a self-test, if required. Section7.4, page34 and
Section7.2, page31
Section7.3, page32
Section7.5, page35

7.2 Configuring the Country Data Set

A display language is assigned to every country data set. Set the country data set appropriate for your country or purpose, with the corresponding display language, within the first ten feed-in hours via the rotary switches in the inverter. After the first ten feed-in hours, the country data set can only be changed by means of a communication product.
If the display language of the country data set does not match the required language, you can change it after commissioning (see Section8.2 "Changing the Display Language", page38).
The country data set must be set correctly.
If you select a country data set which is not valid for your country and purpose, it can cause a disturbance in the PV system and lead to problems with the grid operator. When selecting the country data set, you must always observe the locally applicable standards and directives as well as the properties of the PV system (e.g. PV system size, grid-connection point).
• If you are not sure which country data set is valid for your country or purpose, contact your grid operator for information on which country data set is to be configured.
Operating Manual 31SB30-50TL-21-BE-en-11
Page 32
7 Commissioning
Procedure:
1. Determine the rotary switch position for your country and purpose. Call up the Technical Information "Overview of the Rotary Switch Settings" at www.SMA-Solar.com.
2.
Danger to life due to high voltages
• Ensure that the inverter is disconnected from all voltage sources and that the enclosure lid is removed (see Section10, page45).
3. Set the rotary switches A and B to the required position using a flat-blade screwdriver (blade width: 2.5mm).
☑ The inverter will adopt the setting after commissioning. This can take up to five minutes.
SMA Solar Technology AG

7.3 Setting the NetID

By default, the NetID is set to 1 for all SMAinverters and SMAcommunication products with BLUETOOTH. If your PV system consists of an inverter and a maximum of one further BLUETOOTH device (e.g. computer with BLUETOOTH interface or SMAcommunication product), you can leave the NetID set to 1.
You must change the NetID in the following cases:
• If your PV system consists of one inverter and two other BLUETOOTH devices (e.g. computer with BLUETOOTH interface and SMA communication product) or of multiple inverters with BLUETOOTH, you must change the NetID of your PV system. This will enable communication with multiple BLUETOOTH devices.
• If another PV system with BLUETOOTH is located within 500m of your PV system, you must change the NetID of your PV system. This will help keep both PV systems separate.
• If you do not wish to communicate via BLUETOOTH, deactivate the BLUETOOTH communication on your inverter. This will protect your PV system from unauthorized access.
Operating ManualSB30-50TL-21-BE-en-1132
Page 33
SMA Solar Technology AG
7 Commissioning
All BLUETOOTH devices in a PV system must have the same NetID. You can set a new NetID in the inverter by means of the rotary switch C.
Figure 8: Positions of rotary switch C
Position Explanation
0 Communication via BLUETOOTH is deactivated. 1 Communication via BLUETOOTH with a further BLUETOOTH device 2 to F NetID for communication via BLUETOOTH with multiple BLUETOOTH devices
Procedure:
1.
Danger to life due to high voltages
• Ensure that the inverter is disconnected from all voltage sources (see Section10, page45 ).
2. To set a new NetID, set the rotary switch C to the determined NetID using a flat-blade screwdriver (blade width: 2.5mm).
3. To deactivate communication via BLUETOOTH, set the rotary switch C to position 0 using a flat­blade screwdriver (blade width: 2.5mm). This will protect your PV system from unauthorized access.
☑ The inverter will adopt the setting after commissioning. This can take up to five minutes.
Operating Manual 33SB30-50TL-21-BE-en-11
Page 34
7 Commissioning
SMA Solar Technology AG

7.4 Commissioning the Inverter

Requirements:
☐ The inverter must be correctly mounted. ☐ The circuit breaker must be correctly rated and mounted. ☐ All cables must be completely and correctly connected. ☐ Unused DC inputs must be sealed using the corresponding DC connectors and sealing plugs. ☐ The country data set must be set correctly for the country or the purpose.
Procedure:
1. Insert the lower enclosure lid from above and flip it down. The screws must protrude from the lower enclosure lid.
2. Tighten all screws of the lower enclosure lid using an Allen key (AF3) in the order 1 to 6 (torque: 2Nm ± 0.3Nm). Useful hint: If the screws fall out of the lower enclosure lid, insert the short screw in the upper middle hole and the five long screws in the other holes.
3. If the ESS is available, plug it in. The ESS must be aligned parallel to and flush with the enclosure.
4.
Currents in the DC cabling after plugging in the ESS
After plugging in the ESS, DC currents may occur in the DC cabling, even when there is no AC-side supply. This is not an error but normal behavior of the inverter when in operation.
5. Attach the supplied warning labels so that they are clearly visible on the disconnection point on the AC side.
6. Switch on the circuit breaker.
7. If an external DC load-break switch is installed, switch it on.
8. If the multifunction relay is used, connect the supply voltage to the load.
☑ All three LEDs start to glow and the start-up phase begins. The start-up phase may take several
minutes.
Operating ManualSB30-50TL-21-BE-en-1134
Page 35
SMA Solar Technology AG
Self-test in accordance with CEI0-21 during commissioning (applies to Italy only)
The Italian standard prescribes that an inverter can only be operated on the utility grid after the disconnection times for overvoltage, undervoltage, minimum frequency and maximum frequency have been checked.
• If the country data set is configured to CEI 0-21Int / CEI0-21internal, start the self-test as soon as the display shows the country data set (see Section7.5.1 "Starting the Self­Test", page35).
☑ The green LED is glowing and the display alternates automatically between the device type,
firmware version, the serial number or designation of the inverter, the NetID, the configured country data set and the display language.
✖ The green LED is flashing?
Possible cause of error: the DC input voltage is still too low or the inverter is monitoring the utility grid.
• Once the DC input voltage is sufficiently high and the grid-connection conditions are met, the inverter will start operation.
✖ The red LED is glowing and an error message and event number appear in the display?
An error has occurred.
• Rectify the error (see service manual at www.SMA-Solar.com).
7 Commissioning
7.5 Self-Test in Accordance with CEI 0-21 for PV Systems ≤6kW

7.5.1 Starting the Self-Test

The self-test only applies to inverters that are configured with the country data set CEI 0-21 Int or CEI 0-21 internal.
The self-test is only valid for inverters licensed for Italy and configured with the country data set CEI 0-21 Int or CEI 0-21 internal.
If the inverter is configured to the country data set CEI 0-21Ext or CEI0-21external, no self-test is required.
The self-test is only required for inverters to be commissioned in Italy. The Italian standard requires that all inverters feeding into the utility grid are equipped with a self-test function in accordance with CEI0-21. During the self-test, the inverter will consecutively check the reaction times for overvoltage, undervoltage, maximum frequency and minimum frequency.
The self-test changes the upper and lower disconnection values for each protective function on a linear basis for frequency monitoring and voltage monitoring. As soon as the measured value exceeds the permitted disconnection threshold, the inverter disconnects from the utility grid. In this way, the inverter determines the reaction time and checks itself.
After the self-test has been completed, the inverter automatically switches back to feed-in operation, resets the original disconnection conditions and connects to the utility grid. The test takes approximately threeminutes.
Operating Manual 35SB30-50TL-21-BE-en-11
Page 36
7 Commissioning
Requirements:
☐ Configured country data set: CEI0-21 Int or CEI0-21 internal or amended country data set
trimmed or Specialsetting based on one of the country data sets mentioned above.
☐ A report for entering the test results according to CEI0-21 must be available. ☐ The inverter must be in operation and in the start-up phase.
Procedure:
1. As soon as the configured country data set appears in the display, tap once on the display within tenseconds.
☑ A message informing you that the self-test has started is shown in the display:
AvvioAutotest.
✖ The message AvvioAutotest is not shown in the display?
The tenseconds have elapsed so the self-test cannot start.
• Restart the self-test (see Section7.5.2, page36).
2. Tap on the display within 20seconds and enter the subsequent test results into the test report.
☑ The self-test starts. ☑ The inverter displays the results of the individual tests for overvoltage, undervoltage, maximum
frequency and minimum frequency. The results are displayed threetimes in succession for tenseconds each. Useful hint: If you want to have the next result displayed without waiting tenseconds, tap twice on the enclosure lid.
✖ The information Autotestinterroto is shown in the display?
The self-test was cancelled due to an unexpected disconnection condition or the DC voltage is too low to continue grid feed-in.
• Restart the self-test (see Section7.5.2, page36).
SMA Solar Technology AG
Example: Display messages for overvoltage test
- Name of the test: Autotest (59.S1) 240.00V
- Disconnection value: Valore di soglia con 230.00V
- Normative value: Va. taratura 253.00V
- Disconnection time: Tempo die intervento 0.02 s
- Current grid voltage: Tensione di rete Val.eff.: 229.80V

7.5.2 Restarting the Self-Test

1. Disconnect the circuit breaker and secure it against reconnection.
2. If the multifunction relay is used, disconnect the supply voltage to the load.
3. If an external DC load-break switch is used, switch it off for fiveminutes and then switch it on again.
Operating ManualSB30-50TL-21-BE-en-1136
Page 37
SMA Solar Technology AG
7 Commissioning
4. If an ESS is in use, pull it out of the inverter for fiveminutes and then plug it in again firmly.
5. Recommission the inverter.
☑ The inverter is back in the start-up phase and you can start the self-test once again (see
Section7.5.1, page35).
Operating Manual 37SB30-50TL-21-BE-en-11
Page 38

8 Configuration

SMA Solar Technology AG
8 Configuration

8.1 Configuration Procedure

Once you have commissioned the inverter, you may have to adjust various settings via the rotary switches in the inverter or via a communication product. This section describes the procedure for configuration and gives an overview of the steps you must perform in the prescribed order.
Procedure See
1. If the display language is not set correctly, adjust the set­tings.
2. In order to use the Webconnect function, integrate the in­verter into the network.
3. To manage the PV system data or to set the inverter pa­rameters, capture the inverter in a communication product.
4. In order to receive control commands of the grid operator via SMASpeedwire/Webconnect for PV systems in Italy, set the parameters.
5. Change the system time and system password. Manual of the communica-
6. If the inverter is installed in an IT network or another grid configuration where deactivation of the grounding con­ductor monitoring is required, deactivate the grounding conductor monitoring.
7. For partially shaded PV modules and depending on the given shading situation, you should set the interval at which the inverter optimizes the MPP of the PV system.
Section8.2, page38
Section8.3, page39
Manual of the communica­tion product at www.SMA­Solar.com
Manual of the Speedwire/ Webconnect interface
tion product at www.SMA­Solar.com
Section8.5, page40
Section8.6, page40

8.2 Changing the Display Language

If the language for the country data set is not the language you want to use, you can change the display language as follows:
Procedure:
1.
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources and open the enclosure lid (see Section10, page45).
Operating ManualSB30-50TL-21-BE-en-1138
Page 39
SMA Solar Technology AG
2. Determine the rotary switch setting for the desired display language. Call up the Technical Information "Overview of the Rotary Switch Settings" at www.SMA-Solar.com.
3. Set the rotary switch A to 0 using a flat-blade screwdriver (blade width: 2.5mm). This ensures that the selected data country set remains unchanged.
4. Set the rotary switch B to the required language using a flat-blade screwdriver (blade width:
2.5mm).
5. Recommission the inverter (see service manual at www.SMA-Solar.com).
☑ The inverter adopts the settings after commissioning. This can take up to five minutes.
8 Configuration

8.3 Integrating the Inverter into the Network

If the router supports DHCP and DHCP is enabled, the inverter will automatically be integrated into the network. You will not need to carry out network configuration.
If the router does not support DHCP, automatic network configuration will not be possible and you will need to use the SMA Connection Assist to integrate the inverter into the network.
Requirements:
☐ The inverter must be in operation. ☐ There must be a router with Internet connection in the local network of the system. ☐ The inverter must be connected to the router.
Procedure:
• Integrate the inverter into the network by means of the SMAConnectionAssist. Download the SMA Connection Assist and install it on the computer (see www.SMA-Solar.com).

8.4 Changing Operating Parameters

This section describes the basic procedure for changing operating parameters. Always change operating parameters as described in this section. Some parameters that have sensitive functions can only be viewed and changed by qualified persons (for further information on changing parameters, refer to the manual of the communication product).
The operating parameters of the inverter are set to certain values by default. To optimize inverter operation, you can change the operating parameters using a communication product.
Requirements:
☐ Depending on the type of communication, a computer with BLUETOOTH or Ethernet interface
must be available.
Operating Manual 39SB30-50TL-21-BE-en-11
Page 40
8 Configuration
☐ A communication product corresponding to the type of communication used must be
available.
☐ The inverter must be registered in the communication product. ☐ The changes to the grid-relevant parameters must be approved by the responsible grid
operator.
☐ When changing grid-relevant parameters, the SMAGridGuardcode must be available (see
"Application for SMAGridGuard Code" at www.SMA-Solar.com).
Procedure:
1. Call up the user interface of the communication product or software and log in as Installer or User.
2. If required, enter the SMAGridGuardcode.
3. Select and set the required parameter.
4. Save settings.
SMA Solar Technology AG

8.5 Deactivating Grounding Conductor Monitoring

If the inverter is to be installed in an IT network or another grid configuration in which deactivation of the grounding conductor monitoring is required, deactivate the grounding conductor monitoring as follows.
The basic procedure for changing operating parameters is explained in another section (see Section8.4 "Changing Operating Parameters", page39).
Procedure:
• Set the parameter PE connection monitoring or PEOpnMon to Off.

8.6 Setting SMA OptiTrac Global Peak

For partially shaded PV modules, you should set the interval at which the inverter is to optimize the MPP of the PV system.
The basic procedure for changing operating parameters is explained in another section (see Section8.4 "Changing Operating Parameters", page39).
Procedure:
• Select the parameter Cycle time of the OptiTrac Global Peak algorithm or MPPShdw.CycTms and set the required time interval. The ideal time interval is usually six
minutes. This value should only be increased if the shading situation changes extremely slowly.
☑ The inverter optimizes the MPP of the PV system at the predetermined time interval.
Operating ManualSB30-50TL-21-BE-en-1140
Page 41
SMA Solar Technology AG

9 Operation

9 Operation

9.1 LED Signals

The LEDs indicate the operating state of the inverter.
LED Status Explanation
Green LED glowing Feed-in operation
If an event occurs during feed-in operation, an event mes­sage will be shown on the display (for event messages see the service manual at www.SMA-Solar.com).
flashing The conditions for feed-in operation are not yet met. As
soon as the conditions are met, the inverter will start feed­in operation.
Red LED glowing Error
If an error occurs, the error message and the correspond­ing event number will be shown in the display. The error must be rectified by a qualified person (for troubleshoot­ing, see the service manual at www.SMA-Solar.com).
Blue LED glowing BLUETOOTH communication is activated.

9.2 Display Overview

The display shows the current operating data of the inverter (e.g. current power, daily energy, total energy) as well as events or errors. Power and energy are displayed as bars in a diagram.
Operating Manual 41SB30-50TL-21-BE-en-11
Page 42
9 Operation
SMA Solar Technology AG
There is a slot for an SD memory card on the left edge of the display enclosure. You can use the SD memory card to carry out an inverter firmware update, for example (for information on firmware updates with an SD memory card see the technical description "Firmware Update with SD Card" at www.SMA-Solar.com).
Figure 9: Layout of the display (example)
Position Symbol Explanation
A - Current power B - Energy on the current day C - Total amount of energy fed in
Operating ManualSB30-50TL-21-BE-en-1142
Page 43
SMA Solar Technology AG
Position Symbol Explanation
D Active BLUETOOTH connection
Quality of the BLUETOOTH connection
Active connection to a Speedwire network
Active connection to SunnyPortal
Multifunction relay is active
Power limitation due to excessive temperature
Active power limitation via PV system control
E - Line conductor to which the displayed values apply F Utility grid
G - Event number of an error on the utility grid side H - Output voltage or output current of a line conductor I - Event number of an error in the inverter K Grid relay
When the grid relay is closed, the inverter feeds into the utility grid.
When the grid relay is open, the inverter is disconnected from the utility grid.
L Inverter
9 Operation
M - Input voltage or input current of a line conductor N - Event number of an error on the PV array side O - Text line to display event and error messages P PV Array
Operating Manual 43SB30-50TL-21-BE-en-11
Page 44
9 Operation
Position Symbol Explanation
Q - Diagram with the power curve of the last 16feed-in hours or
energy yields of the last 16days
• In order to switch between diagrams, tap once on the enclosure lid.
R You can operate the display by tapping on the enclosure lid
(see Section9.3, page44).
The displayed error must be rectified on-site by a qualified per­son (for troubleshooting, see service manual at www.SMA-So­lar.com).
The displayed error cannot be rectified on-site.
• Contact Service (see Section13, page55).
SMA Solar Technology AG

9.3 Activating and Operating the Display

You can activate and operate the display by tapping on the enclosure lid.
Procedure:
1. Activate the display. Tap on the enclosure lid once. ☑ The backlight is switched on.
2. To move to the next line, tap on the enclosure lid once.
3. In order to switch between the power curve of the last 16feed-in hours and the energy yields
of the last 16days in the diagram, tap on the enclosure lid once.

9.4 Calling Up Display Messages of the Start-Up Phase

Various inverter information is displayed during the start-up phase that can be called up whenever required during operation.
Procedure:
• Tap on the enclosure lid twice.
☑ The display shows all messages of the start-up phase in sequence.
Operating ManualSB30-50TL-21-BE-en-1144
Page 45
SMA Solar Technology AG

10 Disconnecting the Inverter from Voltage Sources

10 Disconnecting the Inverter from Voltage Sources
Prior to performing any work on the inverter, always disconnect it from all voltage sources as described in this section. Always adhere to the prescribed sequence.
Destruction of the measuring device due to overvoltage
• Only use measuring devices with a DC input voltage range of 1,000 V or higher.
Procedure:
1. Disconnect the circuit breaker and secure it against reconnection.
2. If an additional DC load-break switch is available, switch off the DC load-break switch and
secure against re-connection.
3. If an ESS is plugged in, remove the ESS.
4. If the multifunction relay is used, switch off any supply voltage to the load.
5. Wait until the LEDs, the display and if necessary, the load connected to the multifunction relay,
are switched off.
6. Use a current clamp to ensure that no current is present in the DC cables.
7. Remove all screws of the lower enclosure lid using an Allen key (AF3) and remove the
enclosure lid.
8. Release and remove all DC connectors. Insert a
slotted screwdriver or an angled screwdriver (blade width 3.5mm) into one of the slide slots and pull the DC connectors out downwards. Do not pull on the cable.
9. Ensure that no voltage is present at the DC inputs of the inverter.
10. Use a suitable measuring device to check that no voltage is present at the AC connecting terminal plate between L and N and L and PE. Insert the test probe (maximum diameter: 2mm) in each round opening of the terminal.
11. Flip the display up to have more space to make the measurement. Loosen the screw on the display.
☑ The display clicks into place.
12. Ensure that no voltage is present between any terminal of the multifunction relay and PE of the AC connecting terminal plate.
Operating Manual 45SB30-50TL-21-BE-en-11
Page 46
10 Disconnecting the Inverter from Voltage Sources
SMA Solar Technology AG
13.
Damage to the inverter due to electrostatic discharge
The internal components of the inverter can be irreparably damaged by electrostatic discharge.
• Ground yourself before touching any component.
Operating ManualSB30-50TL-21-BE-en-1146
Page 47
SMA Solar Technology AG

11 Technical Data

11 Technical Data

11.1 DC/AC

11.1.1 SunnyBoy3000TL/ 3600TL
DC Input
SB3000TL-21 SB3600TL-21
Maximum DC power at cosφ=1 3,200W 3,880W Maximum input voltage 750V 750V MPP voltage range 175Vto500V 175Vto500V Rated input voltage 400V 400V Minimum input voltage 125V 125V Initial input voltage 150V 150V Maximum input current, input A 15A 15A Maximum input current, input B 15A 15A Maximum short-circuit current per input* 20 A 20 A Maximum reverse current from the inverter in the
system for max. 1ms Number of independent MPP inputs 2 2 Strings per MPP input 2 2 Overvoltage category in accordance with
IEC60664-1
* In accordance with IEC62109-2: I
SCPV
AC Output
0 A 0 A
II II
SB3000TL-21 SB3600TL-21
Rated power at 230V, 50Hz 3,000W 3,680W Maximum apparent AC power 3,000VA 3,680VA Rated grid voltage 230V 230V Nominal AC voltage 220V / 230V/
240V AC voltage range* 180Vto280V 180Vto280V Nominal AC current at 220V 13.6A 16.0A Nominal AC current at 230V 13.0A 16.0A Nominal AC current at 240V 12.5A 15.3A
Operating Manual 47SB30-50TL-21-BE-en-11
220V / 230V/
240V
Page 48
11 Technical Data
SMA Solar Technology AG
SB3000TL-21 SB3600TL-21
Maximum output current 16A 16A Total harmonic distortion of the output current
≤4% ≤4% with total harmonic distortion of the AC voltage <2%, and AC power >50% of the rated power
Inrush current < 20% of the nominal
AC current for a
maximum of 10ms
< 20% of the nominal
AC current for a
maximum of 10ms Maximum output current under fault conditions 34A 34A Rated power frequency 50Hz 50Hz AC power frequency* 50Hz / 60Hz 50Hz / 60Hz Operating range at AC power frequency 50Hz 45Hz to 55Hz 45Hz to 55Hz Operating range at AC power frequency 60Hz 55Hz to 65Hz 55Hz to 65Hz Power factor at rated power 1 1 Displacement power factor cosφ, adjustable
0.8underexcited to 1 to 0.8overexcited
0.8underexcited to 1 to 0.8overexcited
Feed-in phases 1 1 Connection phases 1 1 Overvoltage category in accordance with
III III
IEC60664-1
* depending on the configured country data set
Efficiency
SB3000TL-21 SB3600TL-21
Maximum efficiency, η
max
European weighted efficiency, η
EU
97.0% 97.0%
96.0% 96.4%
11.1.2 SunnyBoy4000TL/ 5000TL
DC Input
SB4000TL-21 SB5000TL-21
Maximum DC power at cosφ=1 4,200W 5,200W Maximum input voltage 750V 750V MPP voltage range 175Vto500V 175Vto500V Rated input voltage 400V 400V Minimum input voltage 125V 125V
Operating ManualSB30-50TL-21-BE-en-1148
Page 49
SMA Solar Technology AG
11 Technical Data
SB4000TL-21 SB5000TL-21
Initial input voltage 150V 150V Maximum input current, input A 15A 15A Maximum input current, input B 15A 15A Maximum short-circuit current per input* 20 A 20 A Maximum reverse current from the inverter in the
0 A 0 A
system for max. 1ms Number of independent MPP inputs 2 2 Strings per MPP input 2 2 Overvoltage category in accordance with
II II
IEC60664-1
* In accordance with IEC62109-2: I
SCPV
AC Output
SB4000TL-21 SB5000TL-21
Rated power at 230V, 50Hz 4,000W 4,600W Maximum apparent AC power 4,000VA 5,000VA Rated grid voltage 230V 230V Nominal AC voltage 220V / 230V/
240V AC voltage range* 180Vto280V 180Vto280V Nominal AC current at 220V 18.2A 20.9A Nominal AC current at 230V 17.4A 20.0A Nominal AC current at 240V 16.7A 19.2A Maximum output current 22A 22A Total harmonic distortion of the output current
≤4% ≤4% with total harmonic distortion of the AC voltage <2%, and AC power >50% of the rated power
Inrush current < 20% of the nominal
AC current for a
maximum of 10ms Maximum output current under fault conditions 34A 34A Rated power frequency 50Hz 50Hz AC power frequency* 50Hz / 60Hz 50Hz / 60Hz Operating range at AC power frequency 50Hz 45Hz to 55Hz 45Hz to 55Hz
220V / 230V/
240V
< 20% of the nominal
AC current for a
maximum of 10ms
Operating Manual 49SB30-50TL-21-BE-en-11
Page 50
11 Technical Data
SMA Solar Technology AG
SB4000TL-21 SB5000TL-21
Operating range at AC power frequency 60Hz 55Hz to65Hz 55Hz to65Hz Power factor at rated power 1 1 Displacement power factor cosφ, adjustable
0.8underexcited to 1 to 0.8overexcited
0.8underexcited to 1 to 0.8overexcited
Feed-in phases 1 1 Connection phases 1 1 Overvoltage category as per IEC60664-1 III III
* depending on the configured country data set
Efficiency
SB4000TL-21 SB5000TL-21
Maximum efficiency, η
max
European weighted efficiency, η
EU
97.0% 97.0%
96.4% 96.5%

11.2 General Data

Width x height x depth, without ElectronicSo-
490mmx490mmx185mm
larSwitch Width x height x depth, with ElectronicSo-
490mmx519mmx185mm
larSwitch Weight 26kg Length x width x height of the packaging 597mmx617mmx266mm Transport weight 30kg Climatic category in accordance with
4K4H
IEC60721-3-4 Environmental category Outdoors Pollution degree outside the enclosure 3 Pollution degree inside the enclosure 2 Operating temperature range -25°C to +60°C Maximum permissible value for relative humid-
100%
ity, non-condensing Maximum operating altitude above mean sea
2,000m
level (MSL) Typical noise emission 25dB(A) Power loss in night mode <1W
Operating ManualSB30-50TL-21-BE-en-1150
Page 51
SMA Solar Technology AG
11 Technical Data
Maximum data volume per inverter with Speed-
550 MB/month
wire/Webconnect Additional data volume when using the Sun-
660 kB/hour
nyPortal live interface Topology Transformerless Cooling method Convection Degree of protection for electronics in accor-
IP65
dance with IEC60529 Protection class in accordance with IEC61140 I Grid configurations* IT, Delta-IT, TN-C, TN-S, TN-C-S, split phase, TT
(if V
< 20V)
N_PE
Approvals and national standards, as per 10/2014**
AS4777:2005, CE, CEI0-21, C10/11:2012,
DINEN62109-1, EN50438:2013, G59/3,
G83/2, IEC61727, IEC 62109-1,
IEC62109-2, IEC62116, NRS97-2-1, PPC,
PPDS, RD661/2007, RD1699:2011, SI4777,
TOR D4, VDE0124-100, VDE0126-1-1:2006,
VDE0126-1-1 / UTEC15-712-1, VDE-AR-
N4105, VFR2014
* IT, Delta-IT: When using in these systems, the grounding conductor monitoring must be deactivated and
an additional grounding connected to the inverter.
** EN50438: does not apply to all national appendices of EN50438
IEC62109-2: This standard requires that either the multifunction relay in the inverter is used as fault indicator or that the inverter is connected to SunnyPortal and that the fault alert is activated in SunnyPortal. NRS97-2-1: This standard requires a separate label attached to the AC distribution board which indicates the AC-side disconnection of the inverter in case of a grid failure (for further details, see NRS97-2-1, Sect.4.2.7.1 and 4.2.7.2) RD661/2007, RD1699:2011:Contact the Service for restrictions in specific regions(see Section13, page55).

11.3 Protective Devices

DC reverse polarity protection Short-circuit diode Input-side disconnection point ElectronicSolarSwitch, SUNCLIX DC connector DC overvoltage protection Thermally monitored varistors AC short-circuit current capability Current control Grid monitoring SMAGridGuard3 Maximum permissible fuse protection for
SB3000TL-21
Operating Manual 51SB30-50TL-21-BE-en-11
25A
Page 52
11 Technical Data
SMA Solar Technology AG
Maximum permissible fuse protection for
32A
SB3600TL-21 Maximum permissible fuse protection for
32A
SB4000TL-21 Maximum permissible fuse protection for
32A
SB5000TL-21 Ground-fault monitoring for SB3000TL-21 Insulation monitoring: R Ground-fault monitoring for SB3600TL-21 Insulation monitoring: R Ground-fault monitoring for SB4000TL-21 Insulation monitoring: R Ground-fault monitoring for SB5000TL-21 Insulation monitoring: R
iso
iso
iso
iso
All-pole sensitive residual-current monitoring unit Available

11.4 Climatic Conditions

Installation in accordance with IEC60721-3-3, Class4K4H
Extended temperature range -25°Cto+60°C Extended humidity range 0%to100% Extended air pressure range 79.5kPato106kPa
Transport in accordance withIEC60721-3-2, Class2K3
Temperature range -25°Cto+70°C
> 625kΩ > 550kΩ > 500kΩ > 400kΩ

11.5 Equipment

DC connection SUNCLIX DC connector AC connection Spring-cage terminal Display LC graphic display BLUETOOTH As standard Speedwire/Webconnect data module As standard RS485, galvanically isolated Optional Multifunction relay Optional SMAPowerControlModule Optional

11.6 Torques

Upper enclosure lid screws 6Nm ± 0.3Nm Lower enclosure lid screws 2Nm ± 0.3Nm
Operating ManualSB30-50TL-21-BE-en-1152
Page 53
SMA Solar Technology AG
Additional grounding 6.0Nm SUNCLIX swivel nut 2.0Nm RS485 communication or Speedwire/Webcon-
nect connection Multifunction relay connection 1.5Nm
1.5Nm
11.7 ElectronicSolarSwitch
11 Technical Data
Electrical endurance in the event of short circuit, at nominal current of 35A
Maximum switching current 35 A Maximum switching voltage 800 V Maximum power 12 kW Degree of protection when plugged in IP65 Degree of protection when unplugged IP21 Fuses for ElectronicSolarSwitch F200, 600 V/4 A, fast acting and
At least 50switching operations
F201, 600V/ 4A, fast acting (soldered, not
replaceable)

11.8 Data Storage Capacity

Energy yields in the course of the day 63days Daily yields 30 years Event messages for users 250 events Event messages for installers 250 events
Operating Manual 53SB30-50TL-21-BE-en-11
Page 54

12 Accessories

SMA Solar Technology AG
12 Accessories
You will find the accessories for your product in the following overview. If required, these can be ordered from SMASolarTechnologyAG or your distributor.
Designation Brief description SMA order number
RS485 data module RS458 interface as retrofit kit DM-485CB-10 SMAPowerControlModule Multifunction interface for implementing
grid management systems for one inverter Multifunction relay Multifunction relay as retrofit kit MFR01-10 Fan retrofit kit Fan to be installed in the inverter for supple-
mentary cooling
PWCMOD-10
FANKIT01-10
Operating ManualSB30-50TL-21-BE-en-1154
Page 55
SMA Solar Technology AG

13 Contact

13 Contact
If you have technical problems with our products, contact the SMAServiceLine. We need the following information in order to provide you with the necessary assistance:
• Inverter device type
• Inverter serial number
• Inverter firmware version
• Special country-specific settings of the inverter (if applicable)
• Type and quantity of PV modules connected
• Mounting location and altitude of the inverter
• Inverter message
• Optional equipment, e.g. communication products
• Operating mode of the multifunction relay (if present)
Australia SMA Australia Pty Ltd.
Sydney
Belgien/Bel­gique/België
Brasil Vide España (Espanha) Česko SMA Central & Eastern Europes.r.o.
Chile Ver España Danmark Se Deutschland (Tyskland) Deutschland SMA Solar Technology AG
España SMA Ibérica Tecnología Solar,
SMA Benelux BVBA/SPRL Mecheln
Praha
Niestetal
S.L.U. Barcelona
Toll free for Australia: 1800SMAAUS (1800762287)
International: +61294914200 +3215286 730
+420235010417
Medium Power Solutions Wechselrichter: +495619522‑1499 Kommunikation: +495619522‑2499 SMA Online Service Center:
www.SMA.de/Service Hybrid Energy Solutions
Sunny Island: +495619522-399 PV-Diesel Hybridsysteme:
+495619522-3199 Power Plant Solutions
Sunny Central: +495619522-299 Llamada gratuita en España:
900142222 Internacional: +34902142424
Operating Manual 55SB30-50TL-21-BE-en-11
Page 56
13 Contact
SMA Solar Technology AG
France SMA France S.A.S.
Lyon
Medium Power Solutions Onduleurs : +33472090440 Communication : +33472090441
Hybrid Energy Solutions Sunny Island : +33472090442
Power Plant Solutions Sunny Central : +33472090443
India SMA Solar India Pvt. Ltd.
+912261713888
Mumbai
Italia SMA Italia S.r.l.
+39028934-7299
Milano Κύπρος/Kıbrıs Βλέπε Ελλάδα/ Bkz. Ελλάδα (Yunanistan) Luxemburg/
Luxembourg
Siehe Belgien
Voir Belgique Magyarország lásd Česko (Csehország) Nederland zie Belgien (België) Österreich Siehe Deutschland Perú Ver España Polska Patrz Česko (Czechy) Portugal SMA Solar Technology Portugal,
Unipessoal Lda
Gratuito em Portugal: 800208987 Internacional: +351212377860
Lisboa România Vezi Česko (Cehia) Schweiz Siehe Deutschland Slovensko pozri Česko (Česká republika) South Africa SMA Solar Technology South Africa
Pty Ltd.
08600SUNNY (0860078669) International: +27(12)6431785
Centurion (Pretoria) United King-
dom
Ελλάδα SMA Hellas AE
SMA Solar UK Ltd.
Milton Keynes
Αθήνα
+441908304899
8012229222 International: +302122229222
България Вижте Ελλάδα (Гърция)
Operating ManualSB30-50TL-21-BE-en-1156
Page 57
/01,234
9:;
5%6!78%
9:;*<+%,='3)>+%
SMA Solar Technology AG
SMA Solar (Thailand) Co., Ltd. +6626706999
대한민국 SMA Technology Korea Co., Ltd.서울+82-2-520-2666
+9712234-6177 SMA Middle East LLC
13 Contact
Other countries International SMA Service Line
Niestetal
Toll free worldwide: 00800SMASERVICE (+8007627378423)
Operating Manual 57SB30-50TL-21-BE-en-11
Page 58

14 EC Declaration of Conformity

SMA Solar Technology AG
14 EC Declaration of Conformity
within the meaning of the EC directives
• 2004/108/EG (Electromagnetic compatibility, EMC)
• 2006/95/EG (Low voltage directive)
• 1999/5/EC (Radio and Telecommunications Terminal Equipment, R&TTE)
SMASolarTechnologyAG confirms herewith that the inverters described in this document are in compliance with the fundamental requirements and other relevant provisions of the above­mentioned directives. The entire EC Declaration of Conformity can be found at www.SMA­Solar.com.
Operating ManualSB30-50TL-21-BE-en-1158
Page 59
Page 60
SMA Solar Technology
www.SMA-Solar.com