State on delivery, prerequisites and highlighting
Designation of components and direction
Important notes on installation
Required
2 Installation
Basic unit
Tube support arm
Standard cabinets
3 System cabling
Page
1
2
l-l
l-2 01
1-3 01
l-4
2-l
2-5
2-7
Rev.
01
01
02
01
01
01
01
4
5
System overview
General and important notes
UROSKOP D3 cable connection table
UROSKOP D2 cable connection table
UROSKOP Dl cable connection table
Cable connections in the power cabinet
Final work
Miscellaneous
Attaching the swivel frame panelling
Attaching the lifting column panelling
Attaching other panelling parts
Checking the ground wire connections
3-l 01
3-2
3-3
3-5
3-7 02
4-1
5-l
5-2
5-4
5-7
5-8
01
01
01
01
01
01
01
01
01
Siemens AG
Medical Engineering Group
FILL51 10.031.01.02.02
Rev.
02
General information l-l
State on delivery, prerequisites and highlighting
State on delivery
- At the factory, the system has been preinstalled, programmed and checked
as a whole system
The following startup and the function checks of the system are performed according to startup instructions RLL5310.034.01.. .
Prerequisites
At the beginning of the installation, the power connection must be ready and
equipped with system contactor, EMERGENCY SHUTDOWN button and
leakage current safety switch according to planning guidelines RLL5-
310.021 .Ol . .
The type of current. the voltage and the frequency must correspond to the
corresponding measured values of the test certificate, RLL5-310.035.01...
The fastening devices of the unit to the floor (Liebig anchor bolts / bottom
plate) must be in place according to planning guidelines RLL5-310.021 .Ol_..
The state of the transport routes within the buildings and the state and
expansion of the operating room must correspond to the project drawings and
the indications made in the “General installation and supply conditions -
Medical Engineering Group - “.
Highlighting
- All texts marked with “Attention!” contain danger notes and measures to prevent dangers.
- All texts marked with “Note:” contain additional information on the following
operating sequence which serves for a better understanding or to prevent un-
necessary and avoidable difficulties.
- All texts, adjustments or installation steps marked with the sign ” > ” must
be confirmed by the service contractors in the installation certificate.
Siemens AG
Medical Engineering Group
RLL5310.031 .01.02.02
Rev.
02
1-2
General information
Designation of components and direction
Designation of components
support
tabletop
Designation of direction
arm
--.
I
/
---
,
wall side
/-
-./
7
doctor’s side
Siemens AG
Medical Engineering Group
L
longitudinal movement _A
head end
RLL5310.031.01.01.02
Rev.
01
General information
Important notes on installation
Connection
Connect rotating anode cables according to information:
“stator connection”, MF file R71-020.
Connect high voltage cables according to information: “Overview and regulations
for high voltage cables and sealing ends” . MF file R98-031.
Connect highly insulated measuring leads according to information: “Treatment of
highly insulated cables”.
MF file RAO-10.
Red painted parts
All red painted parts on the unit and subassemblies are transport safety devices
which may be removed only according to instructions.
1-3
Cleaning
it is essential to switch off or disconnect the unit before cleaning.
Clean the unit only with a cloth soaked with cleaning agents.
For further information, see operating manual “Cleaning/disinfection”
Delivery
Technical documents
Siemens
Medical Engineering Group Rev.
AG
RLL5-310.031 .Ol .01.02
01
I-4 General information
required
Documents
Wiring diagram
Planning guidelines PG
Measuring equipment
Torque wrench (20 to 100 Nm)
Spirit level
Angle spirit level
Lubricant
Optimol Longtime PD2
Installation tools
Transport carriage
Installation lift for MTS I (as 3Dlll)
RLL5310.021 .Ol . .
Part no. 44 30 906 RH 090
Part no. 28 99 441 RE 002
Part no. 28 69 436 RE 999
Part
no.34 91 271
Part no. 97 84 505 G5353
Part no. 87 63 872 G2122
SRN 30022
Siemens AG
Medical Engineering Grnlrp
RLL5-310.031 .Ol .01.02
Rev.
01
Installation
Basic unit
Fig.2
Fig.3
l
Remove the side panels and the cover of the transport box, if provided (Fig.1).
l
Remove the support box (liFig.2) above the recess of the transport pallet and
prepare for further use.
l
Attach the fork-type part of the transport trolley with the single transport roller
(3) to the unit according to Fig. 3;
align the transport roller (3) in the recess according to the figure.
l
Attach the trolley part with the two transport rollers (2/Fig.4) to the fork-type
part of the transport trolley using 8 Allen screws;
the four pins of the two transport trolley parts must lock in the corresponding
holes (1() on the unit (detaillFig.4).
Siemens AG
Medical Engineering Group
Fig.4
RLL5310.031.01 .01.02
Rev. 01
installation
Basic unit
Fig.5
9
b
9
b
9
B
B
B
l
Lower all transport rollers by turning the spindle and slightly lift the unit.
0
Lower the unit with the transport frame from the pallet in the direction of the
arrow according to Fig. 5 until the rear pair of wheels on the 1.1. side comes
on to the strip that has been fixed with nails (4/Fig.6).
0
Place the supplied support box (ljFig.6) under the unit.
l
Using the two rear spindles on the 1.1. side (2), lower the unit onto the support
box (1) (Fig.6).
l
Remove the pallet (5).
l
Using the two spindles (2), lift the unit again and remove the support box (1)
(Fig.6).
0
Using all spindles, lower the unit to approx. 3 cm above floor.
0
Transport the unit to the installation site.
Fig.6
Siemens AG
Medical Engineering Group
RLL5310.031.01.01.02
Rev. 01
Installation
Basic unit
2-3
Fig.8
Remove the transport securing device below the lifting column (Fig.7)!
Loosen 3 PCS. size 10 Allen screws from below.
Place the two insulating plates (B and C) from the installation set on the
dowels or on the bottom plate (A) (Fig.8).
Lay the floor tray (DIFig.8) on the larger of the two insulating plates so that the
threads of the bottom plate/dowels lie open.
Move the unit with the transport trolley above the installation site.
Carefully position the unit over the bottom plate or over the fastening dowels
and lower into the floor tray with the transport trolley spindles.
Siemens AG
Medical Engineering Group
FILL!%310.031.01.01.02
Rev.
01
2-4
Fig.9
Installation
Basic unit
B
l
Attach the lifting base of the basic unit to the floor by using the supplied
insulating sleeves and plain washers (Fig.9).
Attention: Ensure insulated installation!
B
l
Detach the transport trolley
Siemens
Medical Engineering
AG
Group
RLL5310.031 .01.01.02
Rev. 01
Installation
Tube support arm
2-5
Fig.10
B
b
B
ATTENTION! For this, you need 4 persons for a short time!
l
Remove the carton with the cables from the tabletop.
l
Remove the transport safety bracket (BiFig.10) from the tube assembly.
l
Loosen the tube support arm from the transport securing device (VIFig.10).
l
Lift the tube support arm and attach it to the basic unit (Fig.1 l),
let the guide pin (Z/Fig.1 1) engage in the hole of the tube support arm.
Fig.1 1
Siemens AG
Medical Engineering Group
RLL5310.031 .Ol .01.02
Rev. 01
Loading...
+ 23 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.