Siemens BAAP Installation Instructions Manual

Page 1
POWER SUPPLY
FP2011-U1 (170W)
OR
PAB-ENCL/-R
BAAP ADAPTER PLATE
P/N S54339-A14-A1
BOOSTER
AMPLIFIER
BOARD
P/N S54400-B137-A1
AUDIO
TRANSFORMER
KIT
P/N S54400-B58-A1
GROUND LUG
18AH BP-61 BATTERIES
P/N 175-387194
INSTALLATION INSTRUCTIONS Model BAAP
Booster Amplifier Adapter Plate for use with 1HU and 2HU Universal Enclosures, Models PAB-ENCL/-R and PAB2-ENCL/-R
1. PAB-ENCL, P/N S54339-A8-A1 (1HU Enclosure, Black)
2. PAB-ENCL-R, P/N S54339-A9-A1 (1HU Enclosure, Red)
3. PAB2-ENCL, P/N S54339-A10-A1 (2HU Enclosure, Black)
4. PAB2-ENCL-R, P/N S54339-A11-A1 (2HU Enclosure, Red)
INSTALLATION
Figure 1: Mounting the Adapter Plate in a PAB Enclosure (Black & Red)
A6V101061186_enUS_a Siemens Industry, I nc.
Building Technologies Division
Page 2
2
POWER SUPPLY
OR
PAB-ENCL/-R
BAAP ADAPTER PLATE
P/N S54339-A14-A1
BOOSTER
AMPLIFIER
BOARD
P/N S54400-B137-A1
AUDIO
TRANSFORMER
KIT
P/N S54400-B58-A1
GROUND LUG
UP TO 33AH
BATTERIES
Figure 2: Mounting the Adapter Plate in a PAB2 Enclosure (Black & Red)
Hardware included in the kit:
1. #10-32 steel-zinc plated locknuts, QTY = 4
2. #4-40 x 7/8” long standoffs to be used to mount the audio transformer kit, QTY = 2.
3. Ground lug to be used for landing the shielding wires, QTY = 1.
Installation Steps:
1. It is preferable to mount the Booster assembly on the adapter plate first using the hardware provided with the Booster Assembly.
2. Using the four locknuts provided, mount the adapter plate assembly inside the enclosure as shown in Figures 1 and 2.
A6V101061186_enUS_a
Page 3
3
SPECIFICATIONS BAAP, Booster Amplifier Adapter Plate, P/N S54339-A14-A1 Adapter Plate Material: 16GA C.R. Steel Finish: Clear Zinc Plate Dimensions: 15.25 x 9.0 x .50” Weight: 3 lbs
A6V101061186_enUS_a
Page 4
Cyber security disclaimer
Siemens products and solutions provide security functions to ensure the secure operation of building comfort, fire safety, security management and physical security systems. The security functions on these products and solutions are important components of a comprehensive security concept.
It is, however, necessary to implement and maintain a comprehensive, state-of-the-art security concept that is customized to individual security needs. Such a security concept may result in additional site-specific preventive action to ensure that the building comfort, fire safety, security management or physical security system for your site are operated in a secure manner. These measures may include, but are not limited to, separating networks, physically protecting system components, user awareness programs, defense in depth, etc.
For additional information on building technology security and our offerings, contact your Siemens sales or project department. We strongly recommend customers to follow our security advisories, which provide information on the latest security threats, patches and other mitigation measures.
http://www.siemens.com/cert/en/cert-security-advisories.htm
Document ID A6V101061186_enUS_a P/N A5Q00072526
Loading...