Sealer Sales SS-1519ECM, SS-1519ECMC User Manual

S
M
D
e
s
S
e
w
a
o
1
o
c
o
e
S-Serie
odel:
L-Bar
S-1519
Sealers
EC Ec
Shrink
nomy
Tunnel
Comb
Comb
, 110V
s
istribut
V
rsion 1.0
st Updated:
d By:
10/15/19
S
aler Sales |
ww.sealers
les.com | Tel
: 818-718-88
8 | E-mail:
ontact@seal
rsales.com
2
IMPORTANT - PLEASE READ THIS CAREFULLY
The development of a good safety program, that is rigidly enforced, is absolutely imperative when involved in the operation of industrial equipment. Our machinery is well designed and includes extremely important safety features. The part you the user play through proper installation and maintenance procedures is of far greater significance than our designs. Only properly trained individuals following rigidly enforced safety rules, as recommended by A.N.S.I. and O.S.H.A., should be allowed to operate these machines.
TABLE OF CONTENTS
___________________________________________________________
Preface
Unpacking 4-7
Warranty Notice 8
Warranty 9-10
Warranty Exceptions 11
Warnings 12-14
Tunnel Section
Description and Specifications
Installation and Basic Set-Up
Film Threading Diagram
Front Panel Diagram
Temperature Control Adjustment
Sequence of Operation
Troubleshooting -- L-Bar Sealer
Troubleshooting – Tunnel
Maintenance Tunnel
Maintenance – L-Bar Sealer
15
16-21
22 23
24 25-30 31-45 46-54 55-69 70-79
3
Electrical Schematic – NOTICE! 80
Electrical Schematic Model SS-1519EC
Electrical Panel Diagram Model SS-1519EC
Electrical Schematic Model SS-1519ECM Electrical Panel Diagram Model SS-1519ECM
Electrical Schematic Model PP-1519ECMC
81
82
83
84
85-86
Electrical Panel Diagram Model PP-1519ECMC 87
Parts Nomenclature 88 Replacement Parts List -- Sealer 89-90 Replacement Parts List – Tunnel 91-92 Spare Parts List 93
4
UNPACKING
THOROUGHLY INSPECT EQUIPMENT UPON ARRIVAL.
If goods are received short or in a damaged condition, it
is important that you notify the carrier’s driver before he leaves your company and insist on a notation of the loss or damage
across the face of the freight bill. Unless this is done, no claim can be enforced against the transportation company.
If concealed loss or damage is discovered, notify the carrier at once and insist on an inspection. This is absolutely necessary! A concealed damage report must be made no later than five (5) days from the date the shipment was delivered. Unless you do this, the carrier will not consider any claim for loss or damage.
The carrier’s agent will then make an inspection and grant a
concealed damage notation. If you give the transportation company a clear receipt for the goods that have been damaged or lost in transit, you do so at your own risk and expense.
All claims must be filed within 5 days of delivery date or carrier will not accept them.
Sealer Sales is willing to assist in every possible manner to collect claims for loss or damage; however, this does not hold Sealer Sales responsible for collection on claims or replacement of material.
Do not throw away damaged pallets or box until freight inspection has occurred.
UNPACKING
Your new Model SS-1519EC comes bolted to a pallet and has
a tri-walled corrugated box strapped to the pallet to protect it.
5
1. If your machine does not arrive in this condition, write on
shipping paperwork that outside of box is damaged. Concealed damage may have occurred.
2. Remove stretch film and Poly Bag covering machine.
UNPACKING
3. Remove film rack from under L-Bar Sealer.
Film Rack
6
4. Check film rack. You should have
(a) (1) Film Rack (b) (1) adjustable center knob (c) (2) film roll guides
5. Cut plastic strap from top and bottom of conveyor rollers
before attempting to operate conveyor.
UNPACKING
6. Mount film rack on right side at end of machine (see page 18
for instructions).
7
7. Remove bolts holding L- Bar Sealer to pallet using 13-mm
wrench.
8. Place forks of forklift under center of frame of machine and lift
off pallet.
9. Place in desired location and use locking casters to set in
place.
UNPACKING
8
IMPORTANT WARRANTY NOTICES
OPERATING AND MAINTENANCE MANUAL
The operating and maintenance manual has been carefully prepared to provide the user with all the information needed to properly install, operate, and maintain your Sealer Sales equipment.
Please read this manual carefully and refer to it for information on the care and use of your Sealer Sales equipment. It is recommended that additional copies be ordered for use by production, maintenance, and supervisory personnel. Although the design of this equipment incorporates safeguards to protect personnel, care should be used in operating, adjusting, and servicing.
Attention is directed to the warranty that accompanies all your Sealer Sales equipment. The terms and conditions of this warranty apply only to unmodified units. Any
unauthorized modifications to the equipment automatically voids this warranty.
Sealer Sales provides a one-year warranty on parts,
excluding shipping or freight costs for replacement parts. All warranty parts are shipped F.O.B. Rancho Cucamonga, California.
WARRANTY NOTICE
9
Sealer Sales
WARRANTY
Sealer Sales, Inc. warrants each new product manufactured to be free from defects in material and workmanship for a period of (1) years from date of shipment by Sealer Sales.
This warranty is not transferable with any subsequent resale.
Defective parts under warranty must be returned to Sealer Sales freight prepaid. Sealer Sales’s sole obligation
and purchaser’s sole remedy in the event of a warranty dispute shall be, at Sealer Sales’s option, to repair or replace the part in
question. Labor incurred in removing or installing the defective part is not covered by this warranty. Prior to returning any parts for any reason, contact Sealer Sales for a Return Authorization Number. This number must accompany all returns.
This warranty shall not apply if equipment has been tampered with, misused, improperly installed, altered, or has received damage due to abuse, carelessness, accident or failure to follow recommended regular maintenance procedures or has been serviced by someone other than a duly authorized factory representative without the express written consent of Sealer Sales, Inc.
This warranty is in lieu of all other warranties, expressed or implied, including but not limited to warranties of merchantability and fitness for a particular purpose, non-infringement or any other matter. Sealer Sales shall have no liability to any person for direct, indirect, incidental or consequential damages or delay resulting from any defect negligence, or tort and customer hereby waives for itself
WARRANTY
10
any and all claims for punitive damages and all claims of negligence of strict liability or both. In no event shall our liability exceed the purchase price of the product that was actually paid.
Sealer Sales reserves the right to make changes, additions, or improvements to our products with no obligation to make such changes in any previously shipped product covered by this warranty.
Sealer Sales shall not be held liable for any damages arising out of nor in connection with the operation of the equipment should customer or its agent fail to maintain equipment in safe operating condition. This warranty shall become unenforceable if and to the extent the customer or its agents remove, disconnect, or otherwise render useless any safety device and or parts designed or affixed by us or fails to maintain and service equipment in a manner as advised.
Sealer Sales provides a one-year warranty on parts, excluding shipping or freight costs for replacement parts. All warranty parts are shipped F.O.B. Rancho Cucamonga, California. Service Labor to install part is not covered under warranty!
WARRANTY
11
WARRANTY EXCEPTIONS
The following parts are an exception to the general warranty list on page 10. Each part listed below shall carry a 30-day warranty unless designated otherwise.
SS-1519EC Series Sealer
Parts
1. Fuses
2. Conveyor Belt (Optional)
Tunnel Parts
1. Silicone Tubing (Roller Covers)
2. Tunnel Curtains
The following sealer parts are considered to be consumable and
not under warranty:
1. Silicone Sponge
2. Band Ribbon
3. Teflon Tapes
WARRANTY EXCEPTIONS
12
WARNINGS
Every effort has been taken to ensure your safety while operating this machine; however, there still remain certain risks. Do not allow this machine to be operated before informing all personnel of the following warnings.
WARNING........
Do not tamper with the electrical wiring. Only use a licensed electrician for maintenance. Always disconnect the electrical power before attempting any maintenance to all electrical and/or moving parts.
WARNING........
In order to prevent injury to personnel and/or machinery DO NOT INCREASE SETTINGS OR RATINGS ON EITHER ELECTRICAL OR MECHANICAL OVERLOAD SAFETY DEVICES.
WARNING........
KEEP HANDS AWAY FROM MOVING CONVEYORS AND ASSEMBLIES. Conveyor belts that have become worn or frayed are capable of being hazardous. They should be replaced promptly.
WARNING........
NEVER OPERATE THIS OR ANY MOVING EQUIPMENT WITHOUT ALL COVERS AND GUARDS IN PLACE. The internal mechanism of most packaging machinery contains numerous shear, pinch, and inrunning nip points, many of which are capable of causing severe injury and/or permanent disfigurement.
WARNINGS
13
WARNING........
To minimize the potential for personnel injury, always be sure that machine operators and others working on the machinery are properly trained in the correct usage of the equipment and properly instructed regarding the safety procedures for operation.
WARNING........
Heat sealing arms and jaws on packaging machinery can become very warm after a period of use. KEEP HANDS AWAY WHILE IN OPERATION AND USE CAUTION IF THE MACHINE HAS BEEN RUNNING RECENPPY.
WARNING........
ANY MODIFICATIONS TO EITHER THE ELECTRICAL CIRCUITRY OR THE MECHANICAL ASSEMBLIES OF THE MACHINERY WILL VOID ANY WARRANTIES ASSOCIATED WITH THIS EQUIPMENT. Such modifications may introduce hazards that would not otherwise be associated with this machinery. Sealer Sales will not be responsible for any consequences resulting from such unauthorized modifications.
WARNING........
The use of certain types of plastic films in sealing and/or shrinking equipment may result in the release of HAZARDOUS FUMES due to the degradation of the film at high temperatures. Before using any plastic film in this equipment, the manufacturer or supplier of the film should be contacted for specific information concerning the potential release of hazardous fumes. ADEQUATE VENTILATION MUST BE PROVIDED AT ALL TIMES.
WARNING........
It is important that the machine operator unplug the machine when he/she has finished operating the unit.
WARNINGS
WARNING........
Turn off machine and disconnect power cord from power source before attempting to work on machine.
14
WARNINGS
15
DESCRIPTION AND SPECIFICATIONS OF
MODESS-1519ECC SERIES COMBINATION
SEALER TUNNEL
DESCRIPTION
The purpose of a SS-1519EC Series is for low to medium volume packaging requiring excellent seals and minimal maintenance. It features an impulse mode for sealing of films. This model incorporates an optional electromagnetic hold­down system, allowing the operator to load another package while the preceding package is being sealed. This system provides consistent seals. In addition, an optional package take-away conveyor increases production speed by automatically discharging product into the tunnel.
SPECIFICATIONS
Model: Series Seal Area:
Volts: 110 Amperage: 20 Weight: 400 lbs. Tunnel Chamber Size: Length: 20”
SS-1519EC
Length: 19" Width: 15"
Machine Size: Wi dth: 26" Length: 74”
Height: 53”
Width: 16” Height: 6”
SPECIFICATIONS
16
INSTALLATION AND BASIC SET-UP
OF L-Bar Sealer PORTION OF
MACHINE
IMPORTANT
Read this manual carefully, and make it available to everyone connected with the supervision, maintenance, or production of this machine. Additional copies are available at your request. (Contact your distributor for this information.) Be very careful when operating, adjusting, or servicing this equipment. If in doubt, stop and obtain qualified help before proceeding.
INSTALLATION OF SS-1519EC SERIES
Place the SS-1519EC in the desired location with the required electrical power source available. (See power requirements.) Make certain that proper electrical wiring is provided to guard against low voltage. If the voltage is too low, the equipment will not function properly. Machine comes complete with power cord and 110 volt plug.
Finding the proper location is a most important function of the initial set-up. One must take several factors into consideration:
1. Adequate power source.
2. Relationship to source of product.
3. Relationship to L’Sealer.
INSTALLATION
17
4. Relationship to any conveyors necessary to remove finished product.
5. Convenience of operator.
Make sure to connect machine to an Independent Power
Source. DO NOT run any other equipment on the same power
line as your machine.
Do not attempt to install, adjust, or operate this machine without first reading the contents of this manual. Although the design of the equipment incorporates safeguards to protect operating and maintenance personnel, care should be used in operating, adjusting, and servicing.
INSTALLING FILM RACK
IMPORTANT: Remove film rack from under sealer and
install at the end of the sealer on the right hand side with the four bolts and center knob provided. Mounting holes are slotted for adjustment, set film rack flush with backside of the machine frame.
INSTALLATION
18
MOUNTING FILM
Select the proper width of centerfold film for the item being packaged, allowing for width and height of package. With the package properly positioned within the film in the sealing area, allow sufficient film to overlap the sealing bars so that a seal may readily be made without any possibility of open areas due to insufficient film.
Place film roll on cradle mount film rack. The centerfold is to be placed away from the operator, toward the rear of the machine. Use core chucks to position film roll on rack and tighten film guide nuts to hold film roll in position.
PIN PERFORATOR
Located between the lower idler rollers, the pin perforator creates holes for air escape as the operator pulls on the film. This allows the air to escape as the package travels through the tunnel.
The pin perforator is adjustable and must be properly placed in conjunction with the width of the desired package. The positioning
INSTALLATION
19
CAM Design to
Adjust Depth
should always be re-evaluated when setting the machine for different size product or different size film.
Thread film through the Pin Perforator. Note that the perforator wheel turns freely and is not binding. You can adjust the depth of pin holes by Loosening the Allen screw on the sponge wheel and rotate the cam to allow the pin to push deeper or shallower into the film.
INSTALLATION
20
PRODUCT TRAY
The product tray is an adjustable metal platform used to separate film and to insert product between top and bottom layers of film.
Once threaded, separate film top from bottom and insert product tray between. Make sure that the centerfold of film is placed at the rear of the product tray. This allows the operator to insert product between the layers of film on the product tray and to prepare to move product and film into the sealing area. When threading film, make sure to pull more than sufficient film through the rollers, across the product tray, and into the sealing area to ensure sufficient film to begin operation.
The tray is adjustable to achieve proper depth, equal to the depth of the package, allowing product to be placed exactly in the centerfold of the film each time. A locking wing screw allows you to set tray position.
Place product against rear of film separator tray. Then move product into seal area. Be sure to leave the bag loose around the product when making the seal. This helps eliminate the seals from blowing out in the shrink tunnel.
INSTALLATION
LOCKING WING SCREW
Once the product is placed in the desired location, tighten the wing screw under the loading tray to lock tray in position.
21
Optional Power Discharge Conveyor
Lower Power Discharge Conveyor using the crank wheel located underneath the Power Discharge Conveyor. The Conveyor should be set so the package height is centered to the seal pad. In essence, ½ of the package is above the seal pad and the other ½ of the package is below the seal pad. This will place the seal in the center of your package and help release any film tension that may occur.
INSTALLATION
FILM THREADING DIAGRAM
Product
= Film
Pin Perf.
Film Roll
22
FILM THREADING
Front Panel Diagram
SS-1519EC
23
1. Start Switch -- Green
2. Heater Switch -- White
3. Temperature Control
4. Tunnel Conveyor Speed Control – Small Black Knob
FRONT PANEL DIAGRAM
Temperature Control Adjustment
PV = Present Value SV = Set Value
24
On the above temperature controller the set value is 300 degrees and its present temperature is at 298 degrees.
To Adjust Temperature Up or Down:
First you must press the arrow key that points left (). When pressing this key the set value temperature will flash first in the ones column. While flashing, you may adjust temperature by now pressing the arrow keys either up or down () to the desired temperature in the ones column. Repeat this procedure by pressing the left arrow () to move flashing light to the tens column or the hundreds column and adjust up or down to desired temperature. Once you have adjusted to desired temperature press the set key and the temperature will now become your new set value (SV).
FRONT PANEL DIAGRAM
Sealer Sales Page 25
1 2 4
3
SS-1519EC110 Volt Sealer/Tunnel Combination Service Manual
SEQUENCE OF OPERATION
A. Turn the START switch (1) to the on position to start the
machine. (Temperature will be displayed on temperature
control at this time. This will also start the cooling fan motor.)
B. Turn the HEATER switch (2) to the on position, this will start
the blower, conveyor motors and heater.
C. Set the Conveyor Speed Control (3) between 1 and 3 until
the exact desired conveyor speed is determined later (based on
package size and sealer speed). Factory setting is 2.
D. Set the Temperature Controller (4) at the temperature you
believe will shrink your product. This temperature may need to
be adjusted higher or lower until you have achieved the shrink
you are happy with for that product. As long as you are
running the same product, this temperature should not have to
be adjusted again. Factory setting is 325 degrees. Your 110
volts machine requires approximately 30 minutes to
reach set temperature.
Sealer Sales Page 26
5 6 7
SS-1519EC110 Volt Sealer/Tunnel Combination Service Manual
E. Set (Optional) Magnet Time (5) to approximately ½ to ¾
seconds. The sealing timer controls the length of time the
magnets stay down in the sealing position.
F. Set Sealing Timer (6) to approximately ½ or .5 seconds. The
Band Seal Technology seals very quickly with either PVC or
Polyolefin shrink films. Use only enough Sealing Time to seal
and cut film – no longer – otherwise overheating of Band
Ribbon and Films will occur.
G. Set (Optional) Conveyor Time (7) just enough to transfer
product into shrink tunnel. If you are running a very small
product, set conveyor time just long enough to move package
out of immediate seal area and allow it to transfer into tunnel
on the next cycle. This will allow you to speed up the operation
of machine.
Sealer Sales Page 27
SS-1519EC110 Volt Sealer/Tunnel Combination Service Manual
SEQUENCE OF OPERATION
A. Product is placed on the film separator tray.
B. The product tray functions as a means to separate the film,
allowing placement of product between upper and lower
portions of the film.
C. Move product into seal head area by pushing the product to the
left.
D. Manually pull the seal head down. As the seal head meets the
lower seal pad, the machine automatically activates the band
ribbon. The optional magnet hold down timer is activated,
automatically holding seal bar down during seal cycle. Timer is
adjustable from one to six seconds.
E. Take-away Conveyor Unit Optional. Once the seal is
completed, the seal head automatically releases and the take-
away conveyor begins to run. It is adjustable from one (1) to
six (6) seconds. The timer is located on the front of the
machine.
NOTE: If too much tension is on the film while the bag is
being made, the seals will, more than likely, be
weak or will “blow out” in the seal area while
passing through the shrink tunnel. Make sure to relax the film tension prior to sealing.
Sealer Sales Page 28
SS-1519EC110 Volt Sealer/Tunnel Combination Service Manual
SEQUENCE OF OPERATION
1. After completion of basic setup as described on pages 17-23
plug the sealer’s cord into the power source.
A. With film threaded, (see instructions for mounting film)
place right hand on package and slide product into the upper left hand corner of the film (i.e. corner formed by folded rear edge of film and previously sealed left edge of
film), pushing the package up against the ½” high
package stop at rear of product loading tray.
B. Place right hand under top sheet of film and on front
right corner of product. Place left hand on tail of both sheets of film. Now push the package with right hand and pull the film with left hand moving package and film
Loading...
+ 65 hidden pages