Rohde&Schwarz TM G5 Getting started

R&S® TM G5 Test Management Software G5
Getting Started
Test & Measurement
Getting Started
The Getting Started Manual describes the following R&S® software product:
Test Management Software G5
This product includes software developed by the OpenSSL Project for use in the Open SSL Toolkit (http://www.openssl.org/).
© 2012 Rohde & Schwarz GmbH & Co. KG 81671 Munich, Germany Printed in Germany – Subject to change – Data without tolerance limits is not binding. R&S® is a registered trademark of Rohde & Schwarz GmbH & Co. KG. Trade names are trademarks of the owners.
The following abbreviations are used throughout this manual:
Test Management Software G5 is abbreviated as TM G5.
R&S TM G5 Table of Contents

Table of Contents

1 How to use the manual ....................................................................... 2
1.1 Introduction .................................................................................................................. 2
1.2 Glossary ........................................................................................................................ 3
1.3 Abbreviations ............................................................................................................... 4
2 Starting the Test Program .................................................................. 5
3 Setting up DUT and Test Configuration ............................................ 6
3.1 Filling in DUT specific Data ........................................................................................ 7
3.2 Filling in Test specific Data ........................................................................................ 9
4 Performing a DUT Test ..................................................................... 10
4.1 Performing the Master Test Sequence ....................................................................10
4.2 Performing the Master Test Sequence Appendix ...................................................11
4.3 Viewing the Test Overview .......................................................................................12
4.4 Filling in Test Report Front Page Data ....................................................................14
5 Completing a DUT Test .................................................................... 15
5.1 Adjusting the Test Overview Test Sequence ..........................................................15
5.2 Performing the Test Overview Test Sequence .......................................................16
6 Interrupting and Aborting a Test Sequence ................................... 17
6.1 Continuing the Master Test Sequence (Appendix) ................................................17
7 Printing of the current Customer Test Report ................................ 19
8 Transferring Measurement Files ..................................................... 20
8.1 Automatic Transfer ....................................................................................................20
8.2 Manual Transfer .........................................................................................................21
Getting Started 3553.2999.12 - 01 1
R&S TM G5 How to use the manual
The program runs under the Microsoft Windows XP operating system. It is assumed that the user has some basic knowledge in the operation of the Windows user interface.
Do not make any manual settings on the individual devices or changes in the cabling of the DUT (Device Under Test) while the program is running unless requested to do so by the program.
Device-specific error messages will not be dealt with in this manual.
Information: Important or supplementary information.
Convention
Description
"Graphical user interface elements"
All names of graphical user interface elements on the screen, such as dialog boxes, menus, options, buttons, and softkeys are enclosed by quotation marks.
KEYS
Key names are written in capital letters.
File names, commands, program code
File names, commands, coding samples and screen output are distinguished by their font.
Input
Input to be entered by the user is displayed in italics.
Links
Links that you can click are displayed in blue font.
"References"
References to other parts of the documentation are enclosed by quotation marks.
Introduction

1 How to use the manual

1.1 Introduction

This document contains a brief overview of performing a device test and printing an Customer Test Report by means of the Test Management Software G5. For further information see the User Manual.
The symbols used in the manual are explained in this section.
1. Working step 1 to indicate order of tasks to be performed.
2. Working step 2 to indicate order of tasks to be performed. Only one working step or working steps without defined order. The following text markers are used throughout this documentation:
Getting Started 3553.2999.12 - 01 2
R&S TM G5 How to use the manual
For detailed information on the Test Management Software G5 refer to "User Manual – Test Management Software G5".
Customer Test Report
Test Report containing all Tests provided for the customer.
Device Test
Entirety of Tests required to determine the presence, quality, or truth of all DUT properties.
Master Test Sequence
Test Sequence containing all Tests which are required for a Device Test and can be performed automatically without user intervention.
Master Test Sequence Appendix
Test Sequence containing all Tests which are required for a Device Test and need user intervention.
Test
Smallest executable procedure for critical evaluation. A means of determining the presence, quality, or truth of DUT properties.
Test Application
Combination of Test Management Software and Test Program.
Test Management Software
Entirety of runtime environment, drivers and components required to perform a Device Test.
Test Manager
Software program providing a GUI to perform Tests and controlling the test procedure.
Test Overview
Test Report containing the Tests of the Master Test Sequence and
the Master Test Sequence Appendix.
Test Program
Software program controlling the Test System and the DUT to perform a Device Test.
Test Report
Document presenting the Test results in detail.
Test Report Manager
Software program administrating and displaying the Test results.
Test Sequence
Collection of Tests.
Test System
Entirety of instruments and measurement equipment used to perform a Device Test.
Glossary

1.2 Glossary

Getting Started 3553.2999.12 - 01 3
R&S TM G5 How to use the manual
DUT
Device under test
TM G5
Test Management Software G5
UCS
Universal Calibration System
UGB
Uncertainty Guard Band
Abbreviations

1.3 Abbreviations

Getting Started 3553.2999.12 - 01 4
R&S TM G5 Starting the Test Program
For each DUT (-family) there is separate Test Program.

2 Starting the Test Program

The TM G5 is not intended to run as a standalone package. The TM G5 runs in the background with a specific DUT Test Program.
Double click on the icon presented by the Test Program (e.g. UCS2010 for
SMU/SMA or UCS2150 for CMU/CRTU) to start the Test Program.
The Test Program shows a Splash Screen during the initialization and opens the TM G5 Desktop afterwards.
Getting Started 3553.2999.12 - 01 5
R&S TM G5 Setting up DUT and Test Configuration

3 Setting up DUT and Test Configuration

Before starting a DUT test, some device and test specific data has to be completed. Use the menu entry or click on the toolbar button marked below to open the Test
and Test Report Configuration Data panel.
Getting Started 3553.2999.12 - 01 6
Loading...
+ 16 hidden pages