PANASONIC DMC-LZ2PP, DMC-LZ2PL, DMC-LZ2EB, DMC-LZ2EG, DMC-LZ2EGM Service Manual

...
DMC-LZ2PP DMC-LZ2PL DMC-LZ2EB DMC-LZ2EG DMC-LZ2EGM DMC-LZ2GC DMC-LZ2GD
ORDER NO. DSC0502001C0
B26
Digital Camera
DMC-LZ1PP DMC-LZ1PL DMC-LZ1EB DMC-LZ1EG DMC-LZ1EGM DMC-LZ1GC DMC-LZ1GD DMC-LZ1GK DMC-LZ1GN DMC-LZ1GT
Vol. 1
Colour
DMC-LZ2
(S)...........Silver Type
(K)...........Black Type (PP,EB,EG,EGM and GC only)
DMC-LZ1
(S)...........Silver Type
© 2005 Matsushita Electric Industrial Co., Ltd. All rights reserved. Unauthorized copying and distribution is a violation of law.
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
CONTENTS
Page Page
1 INTRODUCTION 4
1.1. INTRODUCTION
1.2. ABOUT LEAD FREE SOLDER (PbF)
1.3. IMPORTANT NOTICE 1: (Other than U.S.A. and
Canadian Market)
1.4. HOW TO DEFINE THE MODEL SUFFIX (NTSC or PAL
model)
2 SAFETY PRECAUTIONS
2.1. GENERAL GUIDELINE S
2.2. LEAKAGE CURRENT COLD CHECK
2.3. LEAKAGE CURRENT HOT CHECK (See Figure 1.)
3 PREVENTION OF ELECTRO STATIC DISCHARGE (ESD) TO
ELECTROSTATICALLY SENSITIVE (ES) DEVICES
4 HOW TO REPLACE THE LITHIUM BATTERY
4.1. REPLACEMENT PROCEDURE
5 OPERATING GUIDE
11
6 SERVICE NOTES
4
4
4
5
7
7
7
7
8
9
9
6.1. WHEN REPLACING THE MAIN C.B.A.
6.2. SERVICE POSITION
6.3. HOW TO DISCHARGE THE CAPACITOR ON FLASH
TOP C.B.A.
6.4. CLEANING LENS AND LCD PANEL
7 ADJUSTMENT PROCEDURES
7.1. SERVICE FIXTURE AND TOOLS
8 ERROR CODE MEMORY FUNCTION
9 CONFIRMATION OF FIRMWARE VERSION
10 DISASSEMBLY PROCEDURE
10.1. DISASSEMBLY FLOW CHART
10.2. C.B.A. LOCATION
10.3. DIASSEMBLY PROCEDURE
10.4. DISASSEMBLY PROCEDURE FOR THE LENS
10.5. ASSEMBLY PROCEDURE FOR THE LENS
2
13
13
13
14
14
15
16
17
20
21
21
21
22
26
28
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
10.6. REMOVAL OF THE CCD 31
10.7. THE APPLYMENT OF GREASE METHOD
11 SCHEMATIC DIAGRAMS
11.1. OVERALL BLOCK DIAGRAM
11.2. WIRING CONNECTION DIAGRAM
11.3. FLASH TOP SCHEMATIC DIAGRAM
11.4. CCD SCHEMATIC DIAGRAM
11.5. LENS FLEX SCHEMATIC DIAGRAM
12 CIRCUIT BOARD ASSEMBLIES
12.1. CCD C.B.A.
32
33
33
34
35
35
36
37
12.2. FLASH TOP C.B.A.
12.3. LENS FLEX C.B.A.
13 EXPLODED VIEWS
13.1. FRAME & CASING SECTION
13.2. PACKING PARTS & ACCESSORIES SECTION
14 REPLACEMENT PARTS LIST
14.1. MECHANICAL REPLACEMENT PARTS LIST
14.2. ELECTRICAL REPLACEMENT PARTS LIST
37
38
39
40
40
42
43
43
45
3
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
1 INTRODUCTION
1.1. INTRODUCTION
This service manual contains technical information, which allow service personnel’s to understand and service this model.
Please place orders using the parts list and not the drawing reference numbers.
If the circuit is changed or modified, the information will be followed by service manual to be controlled with original service manual.
1.2. ABOUT LEAD FREE SOLDER (PbF)
Distinction of PbF PCB:
PCBs (manufacture d) using lead free solder will have a PbF stamp on the PCB.
Caution:
· Pb free solder has a higher melting point than standard solder, Typically the melting point is 50-70°F (30-40°C) higher.
Please use a high temperature soldering iron. In case of soldering iron with temperature control, please set it to 700±20°F (370±10°C)
· Pb free solder will tend to splash when heated too high (about 1100°F/600°C).
When soldering or unsoldering, please completely remove all of the solder on the pins or solder area, and be sure to heat the soldering points with the Pb free solder until it melts enough.
1.3. IMPORTANT NOTICE 1: (Other than U.S.A. and Canadian Market)
1. The service manua l does not contain the following information, because of the impossibility of servicing at component level.
a. Schematic diagram, Block Diagram and C.B.A. layout of Main C.B.A.
b. Parts list for individual parts of Main C.B.A.
When a part replacement is required for repairing Main C.B.A., replace as an assembled parts. (Main C.B.A.)
2. The following category is/are recycle module part. please send it/them to Central Repair Center.
· MAIN C.B.A. (DMC-LZ2: VEP56019B, DMC-LZ1: VEP56019A) : Excluding replacement of Lithium Battery
4
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
1.4. HOW TO DEFINE THE MODEL SUFFIX (NTSC or PAL model)
There are seven kinds of DMC-LZ2/LZ1, regardless the colours.
· DMC-LZ2S
· DMC-LZ2/LZ1PP
· DMC-LZ2/LZ1EB/EG/EGM/GN
· DMC-LZ2GC/SG, LZ1GC
· DMC-LZ2/LZ1GD
· DMC-LZ2/LZ1GT
· DMC-LZ2/LZ1PL/GK
(DMC-LZ2S is exclusively Japan domestic model.)
What is the difference is that the “INITIAL SETTING” data which is stored in Flash ROM mount ed on Main C.B.A.
1.4.1. Defining methods:
To define the model suffix to be serviced, refer to the caution label which is putted on the bottom side of the Unit.
NOTE:
After replacing the MAIN C.B.A., be sure to achieve adjustment.
The adjustment instruction is available at “software download” on the “CS-Web from AVC” web-site in “TSN system”.
5
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
1.4.2. INITIAL SETTINGS:
When you replace the Main C.B.A., be sure to perform the initial settings after achieving the Adjustment, by ordering the following procedure in accordance with model suffix.
· Step 1. The temporary cancellation of factory setting:
Set the mode dial to “ Normal Picture
While keep pressing Optical Image Stabilizer
· Step 2. The cancellation of factory setting:
Set the mode dial to “ Playback
While keep pressing Optical Image Stabilizer
· Step 3. Turn the Power on:
Set the mode dial to “ Normal Picture
· Step 4. Display the INITIAL SETTING:
While keep pressing MENU
and “ RIGHT of Cross key” simultaneously, turn the Power off.
(Red camera mark)”.
and “ UP of Cross key” simultaneously, turn the Power on.
”.
and “ UP of Cross key” simultaneously, turn the Power off.
(Red camera mark)”, and then turn the Power on.
· Step 5. Set the INITIAL SETTING:
Select the area with pressing “ UP
/ DOWN of Cross key”, and then press the “ RIGHT of Cross key”.
The only set area is displayed, and then press the " RIGHT of Cross key" after confirmation. (The unit is powered off automatically.)
Confirm the display of “PLEASE SET THE CLOCK” in English when the unit is turned on again. (For China and Taiwan market, the display shows “PLEASE SET THE CLOCK” in Chinese.)
· NOTE:
The display shows “SET THE CLOCK” when turn the Power on again.
Connect the unit to PC with USB cable and is detected as removable media.
1) As for your reference Default setting condition is given in the following table.
· Default setting (After “INITIAL SETTINGS”)
MODEL VIDEO OUTPUT LANGUAGE DATE REMARKS a) DMC-LZ2S NTSC Japanese Year/Month/Date b) DMC-LZ2/1PP/PL NTSC English Month/Date/Year c) DMC-LZ2/1EB/E G/EGM/GC/GN/SG PAL English Date/Month/Year SG=DMC-FZ2 only d) DMC-LZ2/1GK PAL Chinese (simplified) Year/Month/Date e) DMC-LZ2/1GT NTSC Chinese (traditional) Year/Month/Date
f) DMC-LZ2/1GD NTSC English Year/Month/Date
6
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
2 SAFETY PRECAUTIONS
2.1. GENERAL GUIDELINES
1. IMPORTANT SAFETY NOTICE
There are special components used in this equipment which are important for safety. These parts are marked by
in the Schematic Diagrams, Circuit Board Layout, Exploded Views and Replacement Parts List. It is essential that these critical parts should be replaced with manufacturer’s specified parts to prevent X-RADIATION, shock, fire, or other hazards. Do not modify the original design without permission of manufacturer.
2. An Isolation Transformer should always be used during the servicing of AC Adaptor whose chassis is not isolated from the AC power line. Use a transformer of adequate power rating as this protects the technician from accidents resulting in personal injury from electrical shocks. It will also protect AC Adaptor from being damaged by accidental shorting that may occur during servicing.
3. When servicing, observe the original lead dress. If a short circuit is found, replace all parts which have been overheated or damaged by the short circuit.
4. After servicing, see to it that all the protective devices such as insulation barriers, insulation papers shields are properly installed.
5. After servicing, make the following leakage current checks to prevent the customer from being exposed to shock hazards.
2.3. LEAKAGE CURRENT HOT CHECK (See Figure 1.)
1. Plug the AC cord directly into the AC outlet. Do not use an
isolation transformer for this check.
2. Connect a 1.5 kΩ, 10 W resistor, in parallel with a 0.15 µF
capacitor, between each exposed metallic part on the set and a good earth ground, as shown in Figure 1.
3. Use an AC voltmeter, with 1 kΩ/V or more sensitivity, to
measure the potential across the resistor.
4. Check each exposed metallic part, and measure the
voltage at each point.
5. Reverse the AC plug in the AC outlet and repeat each of the
above measuremen ts.
6. The potential at any point should not exceed 0.75 V RMS.
A leakage current tester (Simpson Model 229 or equivalent) may be used to make the hot checks, leakage current must not exceed 1/2 mA. In case a measurement is outside of the limits specified, there is a possibility of a shock hazard, and the equipment should be repaired and rechecked before it is returned to the customer.
2.2. LEAKAGE CURRENT COLD CHECK
1. Unplug the AC cord and connect a jumper between the two
prongs on the plug.
2. Measure the resistance value, with an ohmmeter, between
the jumpered AC plug and each exposed metallic cabinet part on the equipment such as screwheads, connectors, control shafts, etc. When the exposed metallic part has a return path to the chassis, the reading should be between 1 Mand 5.2 M. When the exposed metal does not have a return path to the chassis, the reading must be infinity.
7
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
3 PREVENTION OF ELECTRO STATIC DISCHARGE (ESD)
TO ELECTROSTATICALLY SENSITIVE (ES) DEVICES
Some semiconductor (solid state) devices can be damaged easily by static electricity. Such components commonly are called Electrostatically Sensitive (ES) Devices. Examples of typical ES devices are integrated circuits and some field-effect transistors and semiconductor "chip" components. The following techniques should be used to help reduce the incidence of component damage caused by electro static discharge (ESD).
1. Immediately before handling any semiconductor component or semiconductor-equipped assembly, drain off any ESD on your body by touching a known earth ground. Alternatively, obtain and wear a commercially available discharging ESD wrist strap, which should be removed for potential shock reasons prior to applying power to the unit under test.
2. After removing an electrical assembly equipped with ES devices, place the assembly on a conductive surface such as aluminum foil, to prevent electrostatic charge buildup or exposure of the assembly.
3. Use only a grounded-tip soldering iron to solder or unsolder ES devices.
4. Use only an antistatic solder removal device. Some solder removal devices not classified as "antistatic (ESD protected)" can generate electrical charge sufficient to damage ES devices.
5. Do not use freon-propelled chemicals. These can generate electrical charges sufficient to damage ES devices.
6. Do not remove a replacement ES device from its protective package until immediately before you are ready to install it. (Most replacement ES devices are packaged with leads electrically shorted together by conductive foam, aluminum foil or comparable conductive material).
7. Immediately before removing the protective material from the leads of a replacement ES device, touch the protective material to the chassis or circuit assembly into which the device will be installed.
CAUTION :
Be sure no power is applied to the chassis or circuit, and observe all other safety precautions.
8. Minimize bodily motions when handling unpackaged replacement ES devices. (Otherwise harmless motion such as the brushing together of your clothes fabric or the lifting of your foot from a carpeted floor can generate static electricity (ESD) sufficient to damage an ES device).
8
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
4 HOW TO REPLACE THE LITHIUM BATTERY
4.1. REPLACEMENT PROCEDURE
1. Remove the MAIN C.B.A. (Refer to Disassembly Procedures.)
2. Remove the Lithium battery (Ref. No. “Z9101” at foil side of MAIN C.B.A.) and then replace it into new one.
NOTE:
This Lithium battery is a critical component. (Type No.: ML-614S/ZT Manufactured by Matsushita Battery Industrial Co.,Ltd.)
It must never be subjected to excessive heat or discharge.
It must therefore only be fitted in requirement designed specifically for its use.
Replacement batteries must be of same type and manufacture.
They must be fitted in the same manner and location as the original battery, with the correct polarity contacts observed.
Do not attempt to re-charge the old battery or re-use it for any other purpose.
It should be disposed of in waste products destined for burial rather than incineration.
9
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
NOTE:
Above caution are also applicable for below batteries which is for DMC-LZ2 and DMC-LZ1 all series, as well.
1. AA Oxyride batteries
2. AA Alkaline batteries
3. AA Rechargeable Ni-MH (nickel-metal hydride) batteries
10
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
5 OPERATING GUIDE
11
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
12
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
6 SERVICE NOTES
6.1. WHEN REPLACING THE MAIN C.B.A.
After replacing the MAIN C.B.A., be sure to achieve adjustment.
The adjustment instruction is available at “software download” on the “CS-Web from AVC” web-site in “TSN system”, together with Maintenance software.
6.2. SERVICE POSITION
This Service Position is used for checking and replacing parts. Use the following Extension cables for servicing.
No. Parts No. Connection Form
1 VFK1870 PP9002 (MAIN) - PS8001 (FLASH TOP) 30PIN B to B 2 VFK1576DC202 P9002 (MAIN) - LCD BACK LIGHT 2PIN CABLE 3 VFK1582A2125 FP9002 (MAIN) - CCD UNIT 21PIN 0.5 FFC 4 VFK1950 FP9003 (MAIN) - LCD UNIT 33PIN 0.3 FFC 5 VFK1951 FP9001 (MAIN) - LENS UNIT 39PIN 0.3 FFC
NOTE:
· W hen the Main C.B.A. is energized, be sure to connect the LCD back light connector (P9002) to the Main C.B.A..
If the Main C.B.A. is energized that the LCD back light connector (P9002) is opened, it may be caused to the case not only the power does not turn on but also transisitor (Q1070) is broken.
Table S1 Extension Cable List
CAUTION
1. Be sure to discharge the capacitor for flash, which is connected with FLASH TOP C.B.A. (Refer to “HOW TO DISCHARGE THE CHARGING CAPACITOR ON FLASH TOP C.B.A.”.)
13
DMC-LZ2PP / DMC- LZ2PL / DMC-LZ2EB / DMC-LZ2EG / DMC-LZ2EG M / DMC-LZ2GC / DMC-LZ2GD / DMC-LZ2GK / DMC- LZ2GN / DMC-LZ2G T / DMC-LZ2SG
6.3. HOW TO DISCHARGE THE CAPACITOR ON FLASH TOP C.B.A.
CAUTION:
1. Be sure to discharge the capacitor on FLASH TOP C.B.A..
2. Be careful of the high voltage circuit on FLASH TOP C.B.A. when servicing.
[Discharging Procedure]
1. Refer to the disassemble procedure and Remove the necessary parts/unit.
2. Put the insulation tube onto the lead part of Resistor (ERG5SJ102:1kΩ /5W).
(an equivalent type of resistor may be used.)
3. Put the resistor between both terminals of capacitor on FLASH TOP C.B.A. for approx. 5 seconds.
4. After discharging, confirm that the capacitor voltage is lower than 10V using a voltmeter.
6.4. CLEANING LENS AND LCD PANEL
Do not touch the surface of lens and LCD Panel with your hand.
When cleaning the lens, use air-Blower to blow off the dust.
When cleaning the LCD Panel, dampen the lens cleaning paper with lens cleaner, and the gently wipe the their surface.
Note:
A lens cleaning paper and lens cleaner are available at local camera shops and market place.
14
Loading...
+ 32 hidden pages