View Installation Video - Scan
QR code with a mobile device
Voir Vidéo d'installation - Balayer
QR code avec un dispositif mobile
Read all instructions carefully before proceeding.
SAVE THIS GUIDE FOR FUTURE REFERENCE.
ACCESORIOS INCLUIDOS
EN LAS CAJAS
OPEN ALL BOXES
BEFORE YOU START
OUVREZ TOUTES LES
BOÎTES AVANT DE
COMMENCER
ABRIR TODAS LAS CAJAS
ANTES DE EMPEZAR
A two person installation is required.
Une installation par deux
personnes est requise.
Se recomienda realizar la
instalación entre dos personas
Lire toutes les instructions attentivement avant de
commencer l’installation.
CONSERVER POUR UN USAGE ULTÉRIEUR.
Leer detenidamente todas las instrucciones antes de
comenzar la instalación
CONSERVAR ESTE MANUAL COMO REFERENCIA.
IMPORTANT • Record the serial numbers
IMPORTANT • Noter les numéros de série
IMPORTANTE • Registre el número de serie
Serial numbers • Numéros de série • Números de serie
For installation steps in ENGLISH go to page 6
Table of contents: Page
Tools and supplies.......................................................................................................................................... 3
Parts and components.................................................................................................................................... 4
1. Building the structure.................................................................................................................................. 6
2. Installing the base....................................................................................................................................... 7
2. Installing the base (Olympia)...................................................................................................................... 8
2. Installing the base (B3)............................................................................................................................... 9
2. Installing the base (Distinct / Zone square)................................................................................................ 10
3. Installing Ulok system on the walls............................................................................................................. 13
4. Temporary installation of back wall............................................................................................................. 14
5. Temporary installation of side wall.............................................................................................................. 15
6. Final installation of back wall...................................................................................................................... 17
7. Final installation of side wall....................................................................................................................... 18
8. Marking and drilling the glass shelf holes................................................................................................... 19
Pour les étapes d'installation en FRANÇAIS aller à la page 23
Table de matières: Page
Outils et materiaux.......................................................................................................................................... 3
Pièces et composantes...................................................................................................................................4
1. Construction de la structure........................................................................................................................ 23
2. Installation de la base................................................................................................................................. 24
2. Installation de la base (Olympia)................................................................................................................ 25
2. Installation de la base (B3)......................................................................................................................... 26
2. Installation de la base (Distinct / Zone square)........................................................................................... 27
3. Installation du système Ulok sur les murs.................................................................................................. 30
4. Installation temporaire du mur arrière......................................................................................................... 31
5. Installation temporaire du mur de côté....................................................................................................... 32
6. Installation nale du mur arrière................................................................................................................. 34
7. Installation nale du mur de côté................................................................................................................ 35
8. Marquage et perçage des trous pour la tablette......................................................................................... 36
10. Installation de la tablette............................................................................................................................37
11. Finition du mur........................................................................................................................................... 38
Herramientas y materiales.............................................................................................................................. 3
Piezas y componentes....................................................................................................................................4
1. Construcción de la estructura..................................................................................................................... 40
2. Instalación de la base................................................................................................................................. 41
2. Instalación de la base (Olympia)................................................................................................................ 42
2. Instalación de la base (B3)......................................................................................................................... 43
2. Instalación de la base (Distinct / Zone square)........................................................................................... 44
3. Instalación del sistema Ulok sobre los muros............................................................................................ 47
4. Instalación temporal del muro posterior..................................................................................................... 48
5. Instalación temporal de los muros laterales............................................................................................... 49
6. Instalación nal del muro posterior............................................................................................................. 51
7. Instalación nal de los muros laterales....................................................................................................... 52
8. Marcado y perforación de agujeros para la repisa..................................................................................... 53
10. Instalación de la repisa..............................................................................................................................54
11. Acabado del muro..................................................................................................................................... 55
12. Consejos de mantenimiento..................................................................................................................... 56
* Desagüe requerido para la base de ducha Distinct
3
www.maax.com
10060303 – ULOK Skin pack for Utile - 1 junction
3
1
2
4
1
2
BACK WALL
MUR ARRIÈRE
MURO POSTERIOR
INSIDE VIEW
VUE INTÉRIEURE
VISTA INTERIOR
SIDE WALL
MUR DE CÔTÉ
MURO LATERAL
3
4
INSIDE VIEW
VUE INTÉRIEURE
VISTA INTERIOR
by/par
MAAX
* Extra parts are included in this pack in case of loss or damage
* Des pièces supplémentaires sont incluses en cas de perte ou bris
* Piezas extras están incluidas en este empaque en caso de perdida o daño
PARTSPIÈCESPIEZAS
Inside the sidewall box
À l'intérieur de la boîte
du mur de côté
En el interior de la caja
del muro lateral
Inside the backwall box
À l'intérieur de la boîte
du mur arrière
En el interior de la caja
del muro posterior
PARTS INCLUDED IN PARTS PACK | PIÈCES COMPRISES DANS L'EMBALLAGE DES PIÈCES
| PIEZAS INCLUIDAS EN PAQUETE DE PIEZAS
1
2
43
#PartNom de la piècePiezaQty/Qté Code
1X fastenerFixation en forme de XSujetador en forma de X4
2
#8 x 1¼’’ Screw
(for X fastener)
Vis #8 x 1¼’’ (Pour
xation en X)
Tornillos #8 x 1¼’’
(Para sujetador en X)
4
3Retraction pinCheville d'ancragePasador de retracción4
#8 x ⅜ Screw (for
4
retraction pin)
Vis #8 x ⅜ (pour
cheville d'ancrage)
Tornillos #8 x ⅜ (para
pasador de retracción)
4
PARTS INCLUDED IN SHELF PACK | PIÈCES COMPRISES DANS LA BOÎTE DE LA TABLETTE
| PIEZAS INCLUIDAS EN LA CAJA DE LA REPISA
10060303
5
6
109
7
11
8
12
#PartNom de la piècePiezaQty/Qté Code
5Glass shelfTablette en verreRepisa1
6BracketSupportSoporte de repisa2
7#10 x 2’’ screwsVis #10 x 2’’Tornillos #10 x 1½’’ (repisa)2
8Plastic washerRondelle en plastique Arandela en plástico para repisa2
9Support capCapuchonTapa de la jación de repisa2
10060011
10#10 x ½ screwsVis #10 x ½Tornillos #10 x ½ (para repisa)2
11Allen keyClé AllenLlave allen1
12TemplateGabaritPlantilla de perforación1
COMPONENTSCOMPOSANTESCOMPONENTES
#PartNom de la piècePiezaQt Code
13BaseBaseBase1*
13a
Drain cover (with
Distinct base only)
14Back wallMur arrièreMuro posterior1*
15Side wallMur de côtéMuro lateral1*
Drain (included with Zone square
16
and B3Square base only)
Couvercle du drain lineaire (inclus
avec la base Distinct seulement)
Drain (inclus avec la base Zone
square et B3Square seulement)
4
Cubierta del desagüe (incluido
con la base Distinct únicamente)
Desagüe (incluido con la base Zone
square y B3Square únicamente )
110037090
110028619
OVERVIEWVUE D'ENSEMBLE
9
VISTA GENERAL
14
6
7
8
3
10
5
INSIDE VIEW
VUE INTÉRIEURE
VISTA INTERIOR
4
14
15
2
1
INSIDE VIEW
VUE INTÉRIEURE
13
VISTA INTERIOR
13
5
6"
6"
For a worry free installation follow
A
B
C
D
6"
A
B
C
D
6"
A
B
C
D
all instructions and check them off
as you go.
STEP Building the structure
1
Before starting make sure to have all
parts and components refer to page 4.
Build a structure based on the dimensions in the chart
below.
Top view of structure
1.1
Check me!
C
IF STRUCTURE IS ALREADY BUILD CHECK THAT
IT RESPECTS THE DIMENSIONS BELOW
Respect front and inside corner studs position, others may vary.
1.2
Verify the walls are square, plumb and the ooring is
Check me!
perfectly level.
Leveling the oor is critical for a properly aligned
installation. Auto leveling cement can be used to level
oor. Be careful not to block the drain hole position.
Cut out an approximate 6" x 6" opening around
the drain center outlined by measurements C and
D. See image to the right and the chart above. We
recommend that a plumber completes the drain pipe
connection.
1.3
Check me!
6
D
C
STEPInstalling the base
2
B3 / Olympia / Zone Square / Distinct
Drain assembly (included with Zone square and B3Square, required for the Distinct base)
Remove the clear plastic lm from around the drain hole
and threshold before applying silicone. Keep the lm on
the base oor as protection untilinstallation is complete.
Apply silicone around the edge of the drain hole in
the base (surface between the top part of the drain
and the base). Assemble as shown.
HAND TIGHTEN ONLY !
VERIFY THE MAAX LOGO ON THE DRAIN COVER
IS FACING THE RIGHT WAY
REMOVE SILICONE EXCESS!
2.1
Check me!
Top view
Drain position varies according to base model
Rubber
Cardboard
Threshold
Install the base (13) pushing it completely against the
studs.
2.2
Check me!
7
Top view
Flush
Flush
Studs
13
STEPInstalling the base (cont'd)
2
Verify that the base is completely level on all sides. Conrm
that the drain pipe is centered in the drain head.
We recommend a plumber to complete the drain pipe
connection.
Olympia
Leveling the base is critical
for wall alignment
COMPATIBLE BASESNo.
Olympia square 4832106011
Olympia square 6032106012
2.3
Check me!
13
If needed use wooden shims between the studs and
the fastening ange to maintain the position of the
base.
FOR OLYMPIA BASES DO NOT USE SHIMS UNDER
THE BASE TO LEVEL!
DOING SO WILL VOID THE MAAX WARRANTY!
With a 1/8" bit, drill holes in the fastening ange then
secure the base to all the wall studs with #8 x 1¾ "
screws (not included). Only pre-drill the flange not
the studs.
HAND TIGHTEN ONLY !
THE BOTTOM OF ALL HOLES IN THE FLANGE
HAVE TO BE AT LEAST 8MM (3/8") ABOVE THE
BASE THRESHOLD! HOLES MUST BE FILLED WITH
SILICONE BEFORE SCREWING
CUT THE EXCESS PART OF SHIMS
2.4
Check me!
13
2.5
Check me!
13
3/8" (8 mm)
Ø 1/8"
8
Shims and cementCales et cimentCuñas y cemento
STEPInstalling the base (cont'd)
2
Lift the base. Place cement or wood shims under all legs to
support the shower base oor. Lower the shower base and
validate leveling and stability of the base on the oor. If needed,
use additional wood shims or cement.
We recommend that a plumber completes the drain pipe
connection.
B3
COMPATIBLE BASESNo.
B3 Square 4832420001-5XX
B3 Round 4832410001-5XX
B3 Square 4836420003-5XX
B3 Round 4836410003-5XX
B3 Square 6032410005-5XX
B3 Round 6032410005-5XX
B3 Square 6036410006-5XX
B3 Round 6036410006-5XX
2.3
Check me!
13
Leveling the base is critical
for wall alignment
If needed use wooden shims between the studs and
the fastening ange to maintain the position of the
base.
FOR B3 BASES YOU MAY USE SHIMS UNDER
THE BASE TO LEVEL (UNDER THE BASE LEGS
IDEALLY)
Shims and
cement under
to level B3
bases
2.4
Check me!
13
With a 1/8" bit, drill holes in the fastening ange then
secure the base to all the wall studs with #8 x 1¾ "
screws (not included). Only pre-drill the flange not
the studs.
HAND TIGHTEN ONLY !
THE BOTTOM OF ALL HOLES IN THE FLANGE
HAVE TO BE AT LEAST 8MM (3/8") ABOVE THE
BASE THRESHOLD! HOLES MUST BE FILLED WITH
SILICONE BEFORE SCREWING
CUT THE EXCESS PART OF SHIMS
2.5
Check me!
13
3/8" (8 mm)
Ø 1/8"
9
STEPInstalling the base (cont'd)
2
Distinct / Zone Square
COMPATIBLE BASESNo.
Distinct 4832106350
Zone square 4832106351
Zone square 6032106352 - 106353
Verify the base leveling. Mark the studs and the oor
where shims will be required to perfectly level the base.
If the base is completely leveled go to step 2.5
Leveling the base is critical
for wall alignment
2.3
Check me!
13
Lift the base. Insert wood shims on the oor around the
outline of the base on the previously marked spots to
compensate leveling.
Lower the base and validate leveling and the stability of
the base on the oor. If needed, use additional shims.
2.4
Check me!
10
STEPInstalling the base (cont'd)
2
Lift the base. Place cement or wood shims under all legs
to support the shower base oor. Lower the shower base
and validate leveling and stability of the base on the
oor. If needed, use additional wood shims or cement.
We recommend that a plumber completes the drain
pipe connection.
Distinct / Zone Square
2.5
Check me!
If needed use wood shims between the studs and the
fastening ange to maintain the position of the base.
2.6
Check me!
13
11
STEPInstalling the base (cont'd)
2
With a 1/8" drill bit, drill holes in the base ange then
secure the base to all the wall studs with #8 x 1¾"
at-head screws (not included). Pre-drill the flange
only and not the studs.
HAND TIGHTEN ONLY!
THE BOTTOM OF ALL HOLES IN THE FLANGE
MUST BE AT LEAST 8MM (3/8") ABOVE THE BASE
THRESHOLD! HOLES MUST BE FILLED WITH
SILICONE BEFORE SCREWING
CUT THE EXCESS PART OF SHIMS
Distinct / Zone Square
2.7
Check me!
Ø 1/8"
13
3/8" (8 mm)
Distinct 48 drain cover installation
Insert the drain cover (13a) as shown.
2.8
Check me!
Tiling ange
13a
12
STEPInstalling Ulok system
www.maax.com
10060303 – ULOK Skin pack for Utile - 1 junction
3
1
2
4
1
2
BACK WALL
MUR ARRIÈRE
MURO POSTERIOR
INSIDE VIEW
VUE INTÉRIEURE
VISTA INTERIOR
SIDE WALL
MUR DE CÔTÉ
MURO LATERAL
3
4
INSIDE VIEW
VUE INTÉRIEURE
VISTA INTERIOR
by/par
MAAX
* Extra parts are included in this pack in case of loss or damage
* Des pièces supplémentaires sont incluses en cas de perte ou bris
* Piezas extras están incluidas en este empaque en caso de perdida o daño
3
on the walls
Back wall
14
The Ulok system parts are in the
side wall boxes. (1 pack per box)
Install three X fasteners (1) on the side of the back wall
(14) that will be assembled with the side wall, in the pre
drilled holes using the screws provided (2).
There is a positioning pin on X
Quick tip
fastener so they can only be
installed one way.
3.1
Check me!
2
1
Positioning
pin
This side
down
14
14
3.2
Side wall
Check me!
Fasten 3 retraction pins per side wall in the pre drilled
holes with the screws provided (4) to the left-hand or right-
hand fastening ange of the side walls (15) depending on
which side the wall will be installed on.
15
Quick tip
The side wall is interchangeable.
For wall to the left, install the pins
on the right side, for wall to the right
install the pins on the left side.
Fastening ange
4
3
This side down
13
STEPTemporary installation of the back
4
wall
4.1
Pull back the protective lm on the walls (14-15) at least
3" away from all edges. Keep the remaining protective
lm on the walls and base.
Check me!
14
Position and level the back wall (14) by sitting it on the
threshold at the back of the base.
Plumbing the back wall is
critical for alignment of the
side wall
Installing the walls temporarily will
Quick tip
With a 1/8" bit, drill holes in the back wall fastening
flange (14) at the top aligned with each stud. Only pre-drill the flange not the studs. Then, secure the back
wall (14) with one #8 x 1¾" screw (not included) in one
of the pre-drilled holes.
ensure proper wall alignment before
permanent installation.
Make sure the wall is plumb and
centered on the base.
4.2
Check me!
Cut view
Back wall
Base threshold
4.3
Check me!
IMPORTANT: HAND TIGHTEN ONLY. TEMPORARY
INSTALLATION.
Push the bottom of the back wall
Quick tip
with your foot when fastening in
place.
min.3/16"
max.3/8"
Stud
14
X fastener
STEPTemporary installation of the side wall
5
Back
wall
Top view
Measure the distance between the front face of the back
wall (14) and the center of the faucet. Then measure the
distance from the top of the base threshold to the center
of the faucet.
Using those two measurements mark the position of the
faucet hole on the remaining side wall. Measure from the
side and bottom of the side wall.
Repeat this process for all required faucet holes.
Measure twice, drill once !
Record measures below.
5.1
Check me!
5.2
Check me!
Base
threshold
Front cut
view
Faucet
center
Drill a hole from front for the faucets at the previously
marked positions. Pre-drill the hole with the ⅛'' drill bit.
The hole saw size is determined by the faucet type; refer
to the faucet installation manual for hole saw size.
Hole saws can be rented at your
Quick tip
local hardware store or any tool
rental location.
For safe hole saw usage always
pre-drill a hole and wear safety
glasses when drilling.
5.3
Check me!
15
STEPTemporary installation of the
5
side walls (Cont'd)
3
Install the side wall (15). Lift the wall approximately 3"
above the threshold of the base, push it completely
against the back wall then lower the side wall into
position.
It is critical that all 3 retraction pins
engage with the X fasteners. There
should be no gap between the walls.
Place a level vertically
Quick tip
Quick tip
on the side wall. If the
wall is not straight,
make sure that the
retraction pins are
properly inserted in
the X fasteners.
The side wall should now line up
with the front of the base. If it does
not, remove the walls and shim
the back ange of base.
Side wall
Base
5.4
Check me!
Side wall
1
Back wall
15
With a 1/8" bit, drill holes in the side wall fastening flange
(15) at the top aligned with each stud. Only pre-drill the flange not the studs. Then, secure the side wall
(15) with one #8 x 1¾" screw (not included) in one of the
pre-drilled holes.
IMPORTANT: HAND TIGHTEN ONLY. TEMPORARY
INSTALLATION.
5.5
Check me!
16
STEPFinal installation of back wall
6
Remove all walls from the structure.
Clean the shower base and apply a bead of silicone on
the threshold at 3/8" from the back fastening flange. Run
the bead of silicone the entire length of the base and 1''
on the side wall will be installed on as well.
Lift and place back wall (14) directly over the silicone without sliding. Verify that the back wall (14) is plumb, shim
if needed. Then, secure the back wall to the wall studs at
top with #8 x 1¾" screws (not included) in the previously
drilled holes.
IMPORTANT: HAND TIGHTEN ONLY. DO NOT
OVER-TIGHTEN THE SCREWS.
6.1
Check me!
6.2
Check me!
⅜"
1"
⅜"
13
6.3
Check me!
It is critical for the side wall
installation for there to be at least
⅛'' and no more than ⅜" between
the stud and the X fastener.
Hold the bottom of the back wall
Quick tip
Apply a bead of silicone on both sides of base (13) threshold at 3/8" from the base side fastening flanges.
Apply silicone on both side of the back wall (14) just
before the wall side radius. The silicone applied on the base and vertically on the back wall must overlap.
with your foot when fastening in
place.
min.3/16"
max.3/8"
Stud
6.4
Check me!
X fastener
14
Back
wall
17
Base
⅜"
5
STEPFinal installation of side wall
7
3
Install the side wall (15). Lift the wall approximately
3 inches above the threshold of the base, push it
completely against the back wall then slide the side
wall into position.
WIPE OFF EXCESS SILICONE
BEFORE CONTINUING,
VALIDATE THAT ALL
THE WALLS ARE LEVEL,
PLUMB AND SQUARE
7.1
Check me!
7.2
Check me!
Side wall
1
Back wall
Secure the wall to the wall studs with #8 x 1¾ "
screws (not included) in the previously drilled holes.
Also, secure the wall by the fastening anges on the
side of the wall. Use the pre-dilled holes.
If needed, use shims to keep wall plumb, square
and leveled. (Cut shim excess)
IMPORTANT: HAND TIGHTEN ONLY. DO NOT
OVER-TIGHTEN THE SCREWS.
Quick tip
THE SIDE WALL SHOULD LINE UP WITH
THE BASE
7.3
Check me!
Side wall
Base
18
Loading...
+ 42 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.