MAAX UTILE Installation Instructions Manual

GUIDE D’INSTALLATION
GUÍA DE INSTALACIÓN
CORNER SHOWER INSTALLATION (2 WALLS)
INSTALLATION DOUCHE EN COIN (2 MURS)
INSTALACIÓN DE DUCHA EN ESQUINA (2 MUROS)
HARDWARE INCLUDED
IN BOXES
QUINCAILLERIE INCLUSE
DANS LES BOÎTES
View Installation Video - Scan QR code with a mobile device
Voir Vidéo d'installation - Balayer QR code avec un dispositif mobile
Read all instructions carefully before proceeding.
SAVE THIS GUIDE FOR FUTURE REFERENCE.
ACCESORIOS INCLUIDOS
EN LAS CAJAS
OPEN ALL BOXES
BEFORE YOU START
OUVREZ TOUTES LES
BOÎTES AVANT DE
COMMENCER
ABRIR TODAS LAS CAJAS
ANTES DE EMPEZAR
A two person installation is required.
Une installation par deux
personnes est requise.
Se recomienda realizar la
instalación entre dos personas
Lire toutes les instructions attentivement avant de commencer l’installation.
CONSERVER POUR UN USAGE ULTÉRIEUR.
Leer detenidamente todas las instrucciones antes de comenzar la instalación
CONSERVAR ESTE MANUAL COMO REFERENCIA.
IMPORTANTRecord the serial numbers IMPORTANTNoter les numéros de série IMPORTANTERegistre el número de serie
Serial numbers Numéros de série Números de serie
For installation steps in ENGLISH go to page 6
Table of contents: Page
Tools and supplies.......................................................................................................................................... 3
Parts and components.................................................................................................................................... 4
1. Building the structure.................................................................................................................................. 6
2. Installing the base....................................................................................................................................... 7
2. Installing the base (Olympia)...................................................................................................................... 8
2. Installing the base (B3)............................................................................................................................... 9
2. Installing the base (Distinct / Zone square)................................................................................................ 10
3. Installing Ulok system on the walls............................................................................................................. 13
4. Temporary installation of back wall............................................................................................................. 14
5. Temporary installation of side wall.............................................................................................................. 15
6. Final installation of back wall...................................................................................................................... 17
7. Final installation of side wall....................................................................................................................... 18
8. Marking and drilling the glass shelf holes................................................................................................... 19
9. Silicone........................................................................................................................................................19
10. Glass shelf installation...............................................................................................................................20
11. Wall nish.................................................................................................................................................. 21
12. Maintenance tips....................................................................................................................................... 22
13. Warranty.................................................................................................................................................... 60
Pour les étapes d'installation en FRANÇAIS aller à la page 23
Table de matières: Page
Outils et materiaux.......................................................................................................................................... 3
Pièces et composantes...................................................................................................................................4
1. Construction de la structure........................................................................................................................ 23
2. Installation de la base................................................................................................................................. 24
2. Installation de la base (Olympia)................................................................................................................ 25
2. Installation de la base (B3)......................................................................................................................... 26
2. Installation de la base (Distinct / Zone square)........................................................................................... 27
3. Installation du système Ulok sur les murs.................................................................................................. 30
4. Installation temporaire du mur arrière......................................................................................................... 31
5. Installation temporaire du mur de côté....................................................................................................... 32
6. Installation nale du mur arrière................................................................................................................. 34
7. Installation nale du mur de côté................................................................................................................ 35
8. Marquage et perçage des trous pour la tablette......................................................................................... 36
9. Silicone........................................................................................................................................................36
10. Installation de la tablette............................................................................................................................37
11. Finition du mur........................................................................................................................................... 38
12. Conseils d'entretien.................................................................................................................................. 39
13. Garantie.................................................................................................................................................... 60
Para las etapas en ESPAÑOL ir a la pagina 40
Tabla de contenido: Página
Herramientas y materiales.............................................................................................................................. 3
Piezas y componentes....................................................................................................................................4
1. Construcción de la estructura..................................................................................................................... 40
2. Instalación de la base................................................................................................................................. 41
2. Instalación de la base (Olympia)................................................................................................................ 42
2. Instalación de la base (B3)......................................................................................................................... 43
2. Instalación de la base (Distinct / Zone square)........................................................................................... 44
3. Instalación del sistema Ulok sobre los muros............................................................................................ 47
4. Instalación temporal del muro posterior..................................................................................................... 48
5. Instalación temporal de los muros laterales............................................................................................... 49
6. Instalación nal del muro posterior............................................................................................................. 51
7. Instalación nal de los muros laterales....................................................................................................... 52
8. Marcado y perforación de agujeros para la repisa..................................................................................... 53
9. Silicona........................................................................................................................................................53
10. Instalación de la repisa..............................................................................................................................54
11. Acabado del muro..................................................................................................................................... 55
12. Consejos de mantenimiento..................................................................................................................... 56
13. Garantía.................................................................................................................................................... 60
24" level min.
Niveau de 24po. min.
Nivel de 24" min.
TOOLS
REQUIRED
Pencil
Crayon
Lápiz
OUTILS
REQUIS
HERRAMIENTAS
NECESARIAS
1/8" drill bits
Mèches de 1/8
Electric drill
Perçeuse électrique
Taladro eléctrico
Utility knife
Couteau à lame
rétractable
Cuchillo multiuso
18" square min.
Équerre de 18po. min.
Escuadra de 18" min.
Hole saw
Scie-cloche
Sierra de
perforación
SUPPLIES
SOLD SEPARATELY
Clear silicone sealant
Silicone claire
Sellador de silicona
transparente
Safety equipment
Équipement de sécurité
Equipamiento de
seguridad
MATÉRIAUX
VENDUS SÉPARÉMENT
50
Box of #8x1¾"flathead screws
Boîte de vis #8x1¾"
à tête plate
Caja de tornillos #8x1¾"
de cabeza plana
Screwdriver
Tournevis
Destornillador
MATERIALES
VENDIDOS POR SEPARADO
Wood shims
Cales en bois
Cuñas de madera
Measuring tape
Ruban à mesurer
Cinta métrica
Self levening cement
Ciment auto-nivelant
Cemento
autonivelante
Cement
Ciment
Cemento
Shower drain
Drain de douche
Desagüe de ducha
* Drain required for the Distinct shower base
*
* Drain requis pour la base de douche Distinct
* Desagüe requerido para la base de ducha Distinct
3
www.maax.com
10060303 – ULOK Skin pack for Utile - 1 junction
3
1
2
4
1
2
BACK WALL MUR ARRIÈRE
MURO POSTERIOR
INSIDE VIEW VUE INTÉRIEURE VISTA INTERIOR
SIDE WALL MUR DE CÔTÉ MURO LATERAL
3
4
INSIDE VIEW VUE INTÉRIEURE VISTA INTERIOR
by/par
MAAX
* Extra parts are included in this pack in case of loss or damage * Des pièces supplémentaires sont incluses en cas de perte ou bris * Piezas extras están incluidas en este empaque en caso de perdida o daño
PARTS PIÈCES PIEZAS
Inside the sidewall box À l'intérieur de la boîte du mur de côté En el interior de la caja del muro lateral
Inside the backwall box À l'intérieur de la boîte du mur arrière En el interior de la caja del muro posterior
PARTS INCLUDED IN PARTS PACK | PIÈCES COMPRISES DANS L'EMBALLAGE DES PIÈCES
| PIEZAS INCLUIDAS EN PAQUETE DE PIEZAS
1
2
43
# Part Nom de la pièce Pieza Qty/Qté Code
1 X fastener Fixation en forme de X Sujetador en forma de X 4
2
#8 x 1¼’’ Screw
(for X fastener)
Vis #8 x 1¼’’ (Pour
xation en X)
Tornillos #8 x 1¼’’
(Para sujetador en X)
4
3 Retraction pin Cheville d'ancrage Pasador de retracción 4
#8 x ⅜ Screw (for
4
retraction pin)
Vis #8 x ⅜ (pour
cheville d'ancrage)
Tornillos #8 x ⅜ (para
pasador de retracción)
4
PARTS INCLUDED IN SHELF PACK | PIÈCES COMPRISES DANS LA BOÎTE DE LA TABLETTE
| PIEZAS INCLUIDAS EN LA CAJA DE LA REPISA
10060303
5
6
109
7
11
8
12
# Part Nom de la pièce Pieza Qty/Qté Code
5 Glass shelf Tablette en verre Repisa 1 6 Bracket Support Soporte de repisa 2 7 #10 x 2’’ screws Vis #10 x 2’’ Tornillos #10 x 1½’’ (repisa) 2 8 Plastic washer Rondelle en plastique Arandela en plástico para repisa 2 9 Support cap Capuchon Tapa de la jación de repisa 2
10060011
10 #10 x ½ screws Vis #10 x ½ Tornillos #10 x ½ (para repisa) 2 11 Allen key Clé Allen Llave allen 1 12 Template Gabarit Plantilla de perforación 1
COMPONENTS COMPOSANTES COMPONENTES
# Part Nom de la pièce Pieza Qt Code
13 Base Base Base 1 *
13a
Drain cover (with
Distinct base only) 14 Back wall Mur arrière Muro posterior 1 * 15 Side wall Mur de côté Muro lateral 1 *
Drain (included with Zone square
16
and B3Square base only)
Couvercle du drain lineaire (inclus
avec la base Distinct seulement)
Drain (inclus avec la base Zone
square et B3Square seulement)
4
Cubierta del desagüe (incluido
con la base Distinct únicamente)
Desagüe (incluido con la base Zone
square y B3Square únicamente )
1 10037090
1 10028619
OVERVIEW VUE D'ENSEMBLE
9
VISTA GENERAL
14
6
7
8
3
10
5
INSIDE VIEW VUE INTÉRIEURE VISTA INTERIOR
4
14
15
2
1
INSIDE VIEW VUE INTÉRIEURE
13
VISTA INTERIOR
13
5
6" 6"
For a worry free installation follow
A
B
C
D
6"
A
B
C
D
6"
A
B
C
D
all instructions and check them off as you go.
STEP Building the structure
1
Before starting make sure to have all parts and components refer to page 4.
Build a structure based on the dimensions in the chart below.
Top view of structure
1.1
Check me!
C
IF STRUCTURE IS ALREADY BUILD CHECK THAT IT RESPECTS THE DIMENSIONS BELOW
COMPATIBLE BASES No. A B C D
Olympia square 4832 106011
Olympia square 6032 106012
B3 Square 4832 420001-5XX
B3 Round 4832 410001-5XX
B3 Square 4836 420003-5XX
B3 Round 4836 410003-5XX B3 Square 6032 420005-5XX B3 Round 6032 410005-5XX B3 Square 6036 420006-5XX B3 Round 6036 410006-5XX
Distinct 4832 106350 48" - 48 1/4" 32" 4 1/2" 24" Zone Square 4832 106351 48" - 48 1/4" 32" 16" 24" Zone Square 6032 106352 - 106353 60" - 60 1/4" 32" 16" 11 3/4"
Between
48"- 48 1/4"
Between
60"- 60 1/4"
Between
48"- 48 1/4"
Between
60"- 60 1/4"
33 1/2"
33 1/2" 16"
37 1/2" 18"
33 1/2" 16"
37 1/2" 18"
16" 24"
16" 8 1/2"
8 1/2"
24"
B
6"
D
A
View of 48" shower
Respect front and inside corner studs position, others may vary.
1.2
Verify the walls are square, plumb and the ooring is
Check me!
perfectly level.
Leveling the oor is critical for a properly aligned
installation. Auto leveling cement can be used to level
oor. Be careful not to block the drain hole position.
Cut out an approximate 6" x 6" opening around the drain center outlined by measurements C and D. See image to the right and the chart above. We recommend that a plumber completes the drain pipe connection.
1.3
Check me!
6
D
C
STEP Installing the base
2
B3 / Olympia / Zone Square / Distinct
Drain assembly (included with Zone square and B3Square, required for the Distinct base)
Remove the clear plastic lm from around the drain hole and threshold before applying silicone. Keep the lm on the base oor as protection untilinstallation is complete.
Apply silicone around the edge of the drain hole in the base (surface between the top part of the drain and the base). Assemble as shown.
HAND TIGHTEN ONLY !
VERIFY THE MAAX LOGO ON THE DRAIN COVER IS FACING THE RIGHT WAY
REMOVE SILICONE EXCESS!
2.1
Check me!
Top view
Drain position varies according to base model
Rubber
Cardboard
Threshold
Install the base (13) pushing it completely against the studs.
2.2
Check me!
7
Top view
Flush
Flush
Studs
13
STEP Installing the base (cont'd)
2
Verify that the base is completely level on all sides. Conrm
that the drain pipe is centered in the drain head.
We recommend a plumber to complete the drain pipe connection.
Olympia
Leveling the base is critical for wall alignment
COMPATIBLE BASES No.
Olympia square 4832 106011
Olympia square 6032 106012
2.3
Check me!
13
If needed use wooden shims between the studs and
the fastening ange to maintain the position of the
base.
FOR OLYMPIA BASES DO NOT USE SHIMS UNDER THE BASE TO LEVEL! DOING SO WILL VOID THE MAAX WARRANTY!
With a 1/8" bit, drill holes in the fastening ange then
secure the base to all the wall studs with #8 x 1¾ " screws (not included). Only pre-drill the flange not
the studs.
HAND TIGHTEN ONLY !
THE BOTTOM OF ALL HOLES IN THE FLANGE HAVE TO BE AT LEAST 8MM (3/8") ABOVE THE BASE THRESHOLD! HOLES MUST BE FILLED WITH SILICONE BEFORE SCREWING
CUT THE EXCESS PART OF SHIMS
2.4
Check me!
13
2.5
Check me!
13
3/8" (8 mm)
Ø 1/8"
8
Shims and cement Cales et ciment Cuñas y cemento
STEP Installing the base (cont'd)
2
Lift the base. Place cement or wood shims under all legs to
support the shower base oor. Lower the shower base and validate leveling and stability of the base on the oor. If needed,
use additional wood shims or cement.
We recommend that a plumber completes the drain pipe connection.
B3
COMPATIBLE BASES No.
B3 Square 4832 420001-5XX
B3 Round 4832 410001-5XX
B3 Square 4836 420003-5XX
B3 Round 4836 410003-5XX
B3 Square 6032 410005-5XX
B3 Round 6032 410005-5XX
B3 Square 6036 410006-5XX
B3 Round 6036 410006-5XX
2.3
Check me!
13
Leveling the base is critical for wall alignment
If needed use wooden shims between the studs and
the fastening ange to maintain the position of the
base.
FOR B3 BASES YOU MAY USE SHIMS UNDER THE BASE TO LEVEL (UNDER THE BASE LEGS IDEALLY)
Shims and
cement under
to level B3
bases
2.4
Check me!
13
With a 1/8" bit, drill holes in the fastening ange then
secure the base to all the wall studs with #8 x 1¾ " screws (not included). Only pre-drill the flange not
the studs.
HAND TIGHTEN ONLY !
THE BOTTOM OF ALL HOLES IN THE FLANGE HAVE TO BE AT LEAST 8MM (3/8") ABOVE THE BASE THRESHOLD! HOLES MUST BE FILLED WITH SILICONE BEFORE SCREWING
CUT THE EXCESS PART OF SHIMS
2.5
Check me!
13
3/8" (8 mm)
Ø 1/8"
9
STEP Installing the base (cont'd)
2
Distinct / Zone Square
COMPATIBLE BASES No.
Distinct 4832 106350 Zone square 4832 106351 Zone square 6032 106352 - 106353
Verify the base leveling. Mark the studs and the oor
where shims will be required to perfectly level the base.
If the base is completely leveled go to step 2.5
Leveling the base is critical for wall alignment
2.3
Check me!
13
Lift the base. Insert wood shims on the oor around the
outline of the base on the previously marked spots to compensate leveling. Lower the base and validate leveling and the stability of
the base on the oor. If needed, use additional shims.
2.4
Check me!
10
STEP Installing the base (cont'd)
2
Lift the base. Place cement or wood shims under all legs
to support the shower base oor. Lower the shower base
and validate leveling and stability of the base on the
oor. If needed, use additional wood shims or cement.
We recommend that a plumber completes the drain pipe connection.
Distinct / Zone Square
2.5
Check me!
If needed use wood shims between the studs and the
fastening ange to maintain the position of the base.
2.6
Check me!
13
11
STEP Installing the base (cont'd)
2
With a 1/8" drill bit, drill holes in the base ange then
secure the base to all the wall studs with #8 x 1¾"
at-head screws (not included). Pre-drill the flange only and not the studs.
HAND TIGHTEN ONLY! THE BOTTOM OF ALL HOLES IN THE FLANGE
MUST BE AT LEAST 8MM (3/8") ABOVE THE BASE THRESHOLD! HOLES MUST BE FILLED WITH SILICONE BEFORE SCREWING
CUT THE EXCESS PART OF SHIMS
Distinct / Zone Square
2.7
Check me!
Ø 1/8"
13
3/8" (8 mm)
Distinct 48 drain cover installation
Insert the drain cover (13a) as shown.
2.8
Check me!
Tiling ange
13a
12
STEP Installing Ulok system
www.maax.com
10060303 – ULOK Skin pack for Utile - 1 junction
3
1
2
4
1
2
BACK WALL
MUR ARRIÈRE
MURO POSTERIOR
INSIDE VIEW VUE INTÉRIEURE VISTA INTERIOR
SIDE WALL MUR DE CÔTÉ MURO LATERAL
3
4
INSIDE VIEW VUE INTÉRIEURE VISTA INTERIOR
by/par
MAAX
* Extra parts are included in this pack in case of loss or damage * Des pièces supplémentaires sont incluses en cas de perte ou bris * Piezas extras están incluidas en este empaque en caso de perdida o daño
3
on the walls
Back wall
14
The Ulok system parts are in the
side wall boxes. (1 pack per box)
Install three X fasteners (1) on the side of the back wall (14) that will be assembled with the side wall, in the pre drilled holes using the screws provided (2).
There is a positioning pin on X
Quick tip
fastener so they can only be installed one way.
3.1
Check me!
2
1
Positioning
pin
This side
down
14
14
3.2
Side wall
Check me! Fasten 3 retraction pins per side wall in the pre drilled holes with the screws provided (4) to the left-hand or right-
hand fastening ange of the side walls (15) depending on
which side the wall will be installed on.
15
Quick tip
The side wall is interchangeable. For wall to the left, install the pins on the right side, for wall to the right install the pins on the left side.
Fastening ange
4
3
This side down
13
STEP Temporary installation of the back
4
wall
4.1
Pull back the protective lm on the walls (14-15) at least
3" away from all edges. Keep the remaining protective
lm on the walls and base.
Check me!
14
Position and level the back wall (14) by sitting it on the threshold at the back of the base.
Plumbing the back wall is critical for alignment of the side wall
Installing the walls temporarily will
Quick tip
With a 1/8" bit, drill holes in the back wall fastening flange (14) at the top aligned with each stud. Only pre- drill the flange not the studs. Then, secure the back wall (14) with one #8 x 1¾" screw (not included) in one of the pre-drilled holes.
ensure proper wall alignment before permanent installation. Make sure the wall is plumb and centered on the base.
4.2
Check me!
Cut view
Back wall
Base threshold
4.3
Check me!
IMPORTANT: HAND TIGHTEN ONLY. TEMPORARY INSTALLATION.
Push the bottom of the back wall
Quick tip
with your foot when fastening in
place.
min.3/16"
max.3/8"
Stud
14
X fastener
STEP Temporary installation of the side wall
5
Back
wall
Top view
Measure the distance between the front face of the back wall (14) and the center of the faucet. Then measure the distance from the top of the base threshold to the center of the faucet.
Using those two measurements mark the position of the faucet hole on the remaining side wall. Measure from the side and bottom of the side wall.
Repeat this process for all required faucet holes.
Measure twice, drill once !
Record measures below.
5.1
Check me!
5.2
Check me!
Base
threshold
Front cut
view
Faucet
center
Drill a hole from front for the faucets at the previously
marked positions. Pre-drill the hole with the ⅛'' drill bit.
The hole saw size is determined by the faucet type; refer to the faucet installation manual for hole saw size.
Hole saws can be rented at your
Quick tip
local hardware store or any tool
rental location.
For safe hole saw usage always pre-drill a hole and wear safety glasses when drilling.
5.3
Check me!
15
STEP Temporary installation of the
5
side walls (Cont'd)
3
Install the side wall (15). Lift the wall approximately 3" above the threshold of the base, push it completely against the back wall then lower the side wall into position.
It is critical that all 3 retraction pins engage with the X fasteners. There should be no gap between the walls.
Place a level vertically
Quick tip
Quick tip
on the side wall. If the wall is not straight, make sure that the retraction pins are properly inserted in
the X fasteners.
The side wall should now line up with the front of the base. If it does
not, remove the walls and shim
the back ange of base.
Side wall
Base
5.4
Check me!
Side wall
1
Back wall
15
With a 1/8" bit, drill holes in the side wall fastening flange (15) at the top aligned with each stud. Only pre-drill the flange not the studs. Then, secure the side wall (15) with one #8 x 1¾" screw (not included) in one of the pre-drilled holes.
IMPORTANT: HAND TIGHTEN ONLY. TEMPORARY INSTALLATION.
5.5
Check me!
16
STEP Final installation of back wall
6
Remove all walls from the structure.
Clean the shower base and apply a bead of silicone on the threshold at 3/8" from the back fastening flange. Run the bead of silicone the entire length of the base and 1'' on the side wall will be installed on as well.
Lift and place back wall (14) directly over the silicone wi­thout sliding. Verify that the back wall (14) is plumb, shim if needed. Then, secure the back wall to the wall studs at top with #8 x 1¾" screws (not included) in the previously drilled holes.
IMPORTANT: HAND TIGHTEN ONLY. DO NOT OVER-TIGHTEN THE SCREWS.
6.1
Check me!
6.2
Check me!
⅜"
1"
⅜"
13
6.3
Check me!
It is critical for the side wall
installation for there to be at least
⅛'' and no more than ⅜" between
the stud and the X fastener.
Hold the bottom of the back wall
Quick tip
Apply a bead of silicone on both sides of base (13) thres­hold at 3/8" from the base side fastening flanges. Apply silicone on both side of the back wall (14) just before the wall side radius. The silicone applied on the base and vertically on the back wall must overlap.
with your foot when fastening in place.
min.3/16"
max.3/8"
Stud
6.4
Check me!
X fastener
14
Back
wall
17
Base
⅜"
5
STEP Final installation of side wall
7
3
Install the side wall (15). Lift the wall approximately 3 inches above the threshold of the base, push it completely against the back wall then slide the side wall into position.
WIPE OFF EXCESS SILICONE
BEFORE CONTINUING, VALIDATE THAT ALL THE WALLS ARE LEVEL,
PLUMB AND SQUARE
7.1
Check me!
7.2
Check me!
Side wall
1
Back wall
Secure the wall to the wall studs with #8 x 1¾ " screws (not included) in the previously drilled holes.
Also, secure the wall by the fastening anges on the
side of the wall. Use the pre-dilled holes.
If needed, use shims to keep wall plumb, square and leveled. (Cut shim excess)
IMPORTANT: HAND TIGHTEN ONLY. DO NOT OVER-TIGHTEN THE SCREWS.
Quick tip
THE SIDE WALL SHOULD LINE UP WITH
THE BASE
7.3
Check me!
Side wall
Base
18
Loading...
+ 42 hidden pages