Lift-master Q411 User Manual

Part # Q411
CSW / SL Surge Protection Module for Non-OmniControl Commercial Gate Operators
Please read this entire manual before installation
Chamberlain Professional Products strongly recommends the installation of this Surge Protection Module to protect the gate operator from harmful surges caused by lightning strike phenomenon.
It is important to recognize that the surge protection module may not prevent damage to the gate operator in the event of a direct lightning strike.
The success of the surge protection will be based in the proper installation of the Surge Protection Module and the proper grounding of both the surge protector module and the gate operator itself.
This Surge Protection Module will provide protection for the following input commands.
Name of Lines Protected
External Safety Loop “Command” input External Exit Loop “Command” input Fire Department or Key switch “Open” command Strike Open or Push Button to open command Radio receiver “Command” input Ground reference and +24 VDC supply
DO NOT
CSW / SL SURGE SUPPRESSOR
P/N Q411 – P
P/N Q411 – P
USE WITH:
• OMNICONTROL BOARD OR
• OMNICONTROL BOARD OR
• ROBO CONTROL BOARD
• ROBO CONTROL BOARD
®
EXIT
EXIT
SAFTEY
ATENT PENDING
ATENT PENDING
SAFTEY
LOOP
LOOP
LOOP
LOOP
K
K
IR
IR
F
F
Y
Y
E
E
Number of Lines Protected
1 1 1 1 1 2
++
––
STRIKE OPEN
STRIKE OPEN
T
T
P
P
E
E
D
D
E
E
PUSH BUTTON
PUSH BUTTON
H
H
C
C
IT
IT
W
W
S
S
RADIO
RADIO
RECEIVER
RECEIVER
2
2
S
S
S
S
A
A
L
L
C
C
LY
LY
P
P
P
P
U
U
S
S
Earth Ground Rod Installation
Proper grounding gives an electrical charge, such as from an electrical static discharge or a near lightning strike, a path from which to dissipate its energy safely into the earth.
Without this path, the intense energy generated by lightning could be directed towards the gate operator. Although nothing can absorb the tremendous power of a direct lightning strike, proper grounding can protect the gate operator in most cases.
Before digging more than 18" deep, contact local underground utility locating companies.
Avoid damaging gas, power, or other underground utility lines.
The earth ground rod must be located within 3 feet from the gate operator. Use the proper type earth ground rod for your area.
The ground wire must be a single, whole piece of wire. Never splice two wires for the ground wire. If you should cut the ground wire too short, break it, or destroy its integrity, replace it with a single wire length.
Chamberlain Professional Products, Inc. is not responsible for improper installation or failure to comply with all necessary local building codes.
12 gauge wire
8 ft
®
765432189
+
10
Exit LoopSafety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
765432189
+
10
Exit LoopSafety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
765432189
+
10
Exit LoopSafety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
765432189
+
10
Exit LoopSafety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
765432189
+
10
Exit LoopSafety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
CSW / SL Surge Protection Module
Step-by-Step instructions
STEP 2
Remove J1 plug.
STEP 1
STEP 5
Use a nut driver and remove the 2 hex nuts holding the terminal block connector (10 terminals) on the electrical box.
STEP 6
Remove the terminal block connector from the electrical box.
STEP 3
Remove the wire nuts from the black and white wires (16 AGW) coming from the plug .
STEP 4
Remove all the accessory wires attached to the terminal block. Make sure to mark all the wires you are removing to reconnect them later.
OffOff
OffOff
OnOn
OnOn
OnOn
OffOff
OffOff
OffOff
OnOn
OffOff
OffOff
Gate Operator
M
ain
Room
Eug. Rm Oper. Rm
Eug. Dept. M
anu. 1 Rm
Main Dept. Manu. 2 Rm
Air (1)
Conditioner
Air (2)
Conditioner
C
onfere
nce
R
oom
1
Conference
Rm
2, 3
Refer.
Bus 1, 2, 3
Conference
Room 2
C
o
m
p
.
S
erve
2
C
o
m
p.
S
e
rve
1
Turn the gate operator off by turning off the building/facility breaker for the 120 Vac supply to the gate operator.
®
C
S
W
/ S
L
S
U
R
G
E
Loading...
+ 2 hidden pages