Power Hinge
™
Installation
AB
Post
Metal Bar
Metal Bar
Metal Bar
Post
Power
Hinge™
Power
Hinge™
Weld Hinge to Post
Post
Gate in Open Position
See Reverse Side
for Important
Precautions
Weld all four sides
of each hinge
Finished installation gate closed
Clamp the outside of the hinges to the post using a metal bar
between the clamp and hinge as shown. Use the metal bar to
ensure both hinges are equally aligned, level and positioned.
When the hinges are properly positioned, weld them to the post
making sure you weld all four sides of each hinge. Once you
have a strong weld remove the clamps and metal bar used for
alignment.
Weld Hinge to Gate
Clamp the inside of the hinges to the gate using the metal
alignment bar as shown. The gate must be in the open position
for the clamps to fit. Make sure the gate and post is even and
that the hinges are level and aligned. Weld inside hinge halves to
gate making sure you weld all four sides of each hinge. Remove
clamps and metal rod and gate is ready for use.
®
™
© 2004 The Chamberlain Group, Inc.
All Rights Reserved
Important Precautions!
AA
BB
Post
Post
CD
Proper Alignment
It is very important, for smooth and proper operation of the
gate, that the hinge shafts are in line and level.
Improper Alignment
Improper installation of the hinges will result in poor gate
operation and shearing of the shafts.
845 Larch Avenue
Elmhurst, Illinois 60125-1196
For technical support: 1-800-528-2806
www.chamberlain.com
01-50690
®
™