Lencore Jordna Hub User Manual

JORDNA HUB INSTALLATION INSTRUCTIONS
The following guide will provide you basic installation instructions for the Jordna Hub
The Jordna Hub is used when installing a Lencore® Spectra® i.Net Sound Masking System and there is no music or paging required on the installation.
The Jordna hub is used for:
– Wire management
– Wire breakout
– System expansion and connectivity
The below diagram demonstrates standard connectivity of the i.Lon, Jordna Hub and the Operating Platform (OP).
1. Using plenum rated 16 gauge, 2 conductor wire, connect pins 1 and 2 on the Jordna Hub to pins 17 and 18 on the i.Lon device.
2. Next, using plenum rated CAT5 RJ45 cable, plug the cable into any of the 4 Data Outputs available at the top of the Jordna Hub.
3. Connect the cable from the Data Output in step 3 to the rst Operating Platform (OP) in the system.
For additional Technical Support call: 516-682-9292
The information contained herein is proprietary to Lencore Acoustics Corp. and copyright protected. No part of this document can be copied, used, or distributed without prior authorization from Lencore. Copyright 2012. Lencore, Spectra, Spectra i.Net, are trademarks of Lencore Acoustics Corp.
www.lencore.com
Loading...