B150 Series Commercial Brewer
Direct Plumb Kit
Welcome Keurig Authorized Dealer!
This manual provides:
• Installation of the Direct Plumb Kit (DPK) that allows you to connect your
customer’s B150 brewer to municipal or independently pumped water supply.
• Maintenance Mode diagnostics that will provide you with system information and
tools so that you can fully diagnose any problems at the customer’s site.
• Instructions on how to descale the brewer in the event of problems associated
with hard water.
P/N 60-201142-000 Rev A 10/09
B150 Direct Plumb Unit Installation Instructions
The B150 brewer is designed to be easily transformed from the as-purchased, Pour Over
configuration to a plumbed unit. Reconfiguration is designed to be easily and quickly
accomplished by a technician using only a #2 Phillips screw driver.
It is advised that prior to beginning installation that all water be drained from the system
using the drain tubes located at rear of brewer (see Page 8 for Draining Instructions). The
brewer MUST also be disconnected from AC power supply during DPK installation.
1. Disconnect the brewer from AC power and drain the brewer’s Hot Water Tank as
detailed in instructions shown on Page 8.
2. Remove the Cold Water Tank (CWT) that came with brewer. FIGURE 1
3. You will now need to remove two covers to properly connect the DPK to the
B150 Brewer. Turning the drained brewer on its left side, locate and remove the
2 screws located below that Cold Water Tank. For easy identification, the screws
are located within indented surfaces on the Base Plate. FIGURE 2
FIGURE 1 FIGURE 2
4. Remove and reserve the screws. The Connection Access Plate can now be
removed. FIGURES 3 & 4
FIGURE 3 FIGURE 4
2
5. On the side of the brewer locate the Connector Cover. Remove and reserve the
screw. Remove the Connector Cover and expose DPK Interface Connector.
FIGURES 5 & 6
FIGURE 5 FIGURE 6
6. Make the electrical connection between the DPK CWT and the brewer body. The
Connector Cover has an alternate position that allows for cable exit and
reattachment to the Brewer Body. FIGURES 7 & 8
FIGURE 7 FIGURE 8
7. Install DPK and secure to Brewer Base using the 2 screws that were previously
used for the Connection Access Plate. FIGURE 9
FIGURE 9
8. The B150 Direct Plumbed Unit is now ready to be connected to AC Power and
filtered water supply in accordance with local Building Code rules and
regulations.
3