Groen D20 Operator’s Manual

c
n
g
s
r
R
U
e
R
g
L
m
h
e
c
f
N
P
h
a
h
o
o
u
C
D
d
A
b
e
d
r
w
t
d
a
h
S
K
o
n
r
h
a
a
l
h
o
p
l
e
d
y
d
h
g
t
e
e
o
e
e
n
I
STRU
D and
ower-Ai
TION
L Tilting
(#51) C
HEET
ettle
ver Kit
Introdu
The D a Groen M attachin mechani and inst of orienti cover.
1.0
1.1 hardwar
1.2
tion:
d DL Tiltin
odel D or D
the hinge
m, a “U” s uctions for f ng the cove
iser Brack
npack the
.
emove the
Kettle Pow
Kettle. T echanism
aped riser, ield installat r on top of t
t Installati
over and c
our hole pl
ssem
er-Aid Cov
e kits inclu
nd a bent and a hard ion. The ins
e kettle an
n
mponents
g caps in t
ly and Mou
Kits are s
e a spun st
od handle,
are kit with ructions be
securing t
nd locate th
e left trunni
ting
ipped com
inless stee
spring-ass items need ow will gui
e assembl
e U-shaped
n plate.
lete for fiel disk cover
isted power
d for attac
e you throu
bracket to
riser brack
installation
with studs f
aid hinge ing the cov
h the proc
he pedesta
t and mou
on a
r
r
ss
l
ting
146551 R
Page 1
v. B
1.3
A
A
e
e
e
n
t
d
a
w
d
n
e
o
e
1.4 lock was nuts to a
lign the rise
lign the hol
hers and nu
20 ft/lb torq
r to the hol
s in the ris ts to secure ue with a 3/
s in the tru
r bracket to the bracke 8” open en
nion plate
the cover a
to the cove
or socket
s shown.
s shown an r, gasket a
rench.
install the
d backing p
mounting b late. Tight
lts,
n the
146551 R
Page 2
v. B
2.0
A
A
A
f
A
c
d
d
r
e
e
n
4
v
n
o
e
n
r
t
w
e
s
e
d
o
a
e
h
b
v
r
m
e
s
e
0
2.1 ssembl
enough
ctuator an
lign the stu e the fende or adjustm
Cover Ins
s on the co
washers a
nt.
tallation a
er actuato
d nuts to th
d Adjustm
to the hole e undersid
nt
in the top
of the actu
f the riser tor, but lea
racket.
e them loo
e
2.2 locking in/lb torq
ssemble th ompound a ue with a 1/
actuator t
d the dom ” open end
the three s
nuts suppli
or socket
uds on the
ed in the co
rench.
omed cov
ver kit. Tig
r and secu
ten the do
e using thr
e nuts to 2
ad
146551 R
Page 3
v. B
E
d
s
n
c
A
e
n
o
a
k
o
s
f
h
t
p
o
w
a
o
e
o
t
w
h
m
o
u
e
d
e
e
h
e
t
2.3 kettle. A four nut wrench.
nsure the k
just the mo
securing th
ttle is tilted unting brac e actuator t
to the full u et to align t
the riser t
right positi
he cover ov
a 10 ft/lb t
n and then
r the kettle
rque with a
lower the c
and then f
1/4” open
ver over th lly tighten t nd or sock
e
t
2.4 I locking
2.5 a 20 ft/lb
stall the ha
ompound t
ttach the h
torque and
dle spacer
the ends o
ndle over t then install
over the t
the two stu
e spacers
he red ball
o studs at
ds.
nd secure
on the hand
he front of t
ith two do
le end.
e cover an
e nuts. Tig
apply thre
hten the nu
ad
s to
146551 R
Page 4
v. B
2.6
A
T
n
e
s
e
u
d
h
s
e
two 3/4”
2.7
djust the te
open end w
he complet
sion in the
renches.
d Power-Ai
ctuator as
cover ass
embly by t
mbly shoul
rning the a
d look as s
justing nut
own below:
as shown.
Use
146551 R
Page 5
v. B
1055 Mendell Davis Drive, Jackson, MS 39272 • 888.994.7636 • 888.864.7636 • unifiedbrands.net
ADDITIONAL MANUFACTURING LOCATION: 525 SOUTH COLDWATER ROAD, WEIDMAN MI 48893
© 2009 Unified Brands. All Rights Reserved. Unified Brands is a wholly-owned subsidiary of Dover Corporation.
Page 6
146551 Rev. B
Loading...