Groen D20 Operator’s Manual

c
n
g
s
r
R
U
e
R
g
L
m
h
e
c
f
N
P
h
a
h
o
o
u
C
D
d
A
b
e
d
r
w
t
d
a
h
S
K
o
n
r
h
a
a
l
h
o
p
l
e
d
y
d
h
g
t
e
e
o
e
e
n
I
STRU
D and
ower-Ai
TION
L Tilting
(#51) C
HEET
ettle
ver Kit
Introdu
The D a Groen M attachin mechani and inst of orienti cover.
1.0
1.1 hardwar
1.2
tion:
d DL Tiltin
odel D or D
the hinge
m, a “U” s uctions for f ng the cove
iser Brack
npack the
.
emove the
Kettle Pow
Kettle. T echanism
aped riser, ield installat r on top of t
t Installati
over and c
our hole pl
ssem
er-Aid Cov
e kits inclu
nd a bent and a hard ion. The ins
e kettle an
n
mponents
g caps in t
ly and Mou
Kits are s
e a spun st
od handle,
are kit with ructions be
securing t
nd locate th
e left trunni
ting
ipped com
inless stee
spring-ass items need ow will gui
e assembl
e U-shaped
n plate.
lete for fiel disk cover
isted power
d for attac
e you throu
bracket to
riser brack
installation
with studs f
aid hinge ing the cov
h the proc
he pedesta
t and mou
on a
r
r
ss
l
ting
146551 R
Page 1
v. B
1.3
A
A
e
e
e
n
t
d
a
w
d
n
e
o
e
1.4 lock was nuts to a
lign the rise
lign the hol
hers and nu
20 ft/lb torq
r to the hol
s in the ris ts to secure ue with a 3/
s in the tru
r bracket to the bracke 8” open en
nion plate
the cover a
to the cove
or socket
s shown.
s shown an r, gasket a
rench.
install the
d backing p
mounting b late. Tight
lts,
n the
146551 R
Page 2
v. B
Loading...
+ 4 hidden pages