Glow-worm ENERGY 25c, ENERGY 30c, ENERGY 35c, Energy 15s, Energy 12s Installation And Maintenance Instructions Manual

...
Installation and main­tenance instructions
ENERGY
25c 30c 35c
GB, IE
Contents
Contents
1 Safety .................................................................... 4
1.1 Action-related warnings ......................................... 4
1.2 Risk caused by inadequate qualifications.............. 4
1.3 Intended use .......................................................... 4
1.4 General safety information .................................... 4
1.5 Regulations (directives, laws, standards).............. 6
2 Notes on the documentation .............................. 7
2.1 Observing other applicable documents ................. 7
2.2 Storing documents................................................. 7
2.3 Validity of the instructions...................................... 7
2.4 Benchmark............................................................. 7
3 Product description............................................. 7
3.1 Compartment Ventilation ....................................... 7
3.2 Information on the identification plate.................... 7
3.3 Functional elements: Combination unit ................. 8
3.4 CE label ................................................................. 8
4 Set-up.................................................................... 8
4.1 Transporting the unit .............................................. 8
4.2 Unpacking the product........................................... 8
4.3 Checking the scope of delivery.............................. 8
4.4 Dimensions............................................................ 9
4.5 Minimum clearances.............................................. 9
4.6 Using the mounting template................................. 9
4.7 Wall-mounting the product..................................... 9
4.8 Removing/installing the front casing.................... 10
4.9 Removing/installing the side section ................... 10
5 Installation.......................................................... 11
5.1 Checking the gas meter....................................... 11
5.2 Gas and water connections ................................. 11
5.3 Connecting the drain pipework for the
expansion relief valve .......................................... 12
5.4 Connecting the condensate discharge pipe ........ 12
5.5 Electrical installation ............................................ 13
6 Operation............................................................ 15
6.1 Using diagnostics codes ...................................... 15
6.2 Displaying the status codes................................. 15
6.3 Using check programmes .................................... 16
7 Start-up ............................................................... 16
7.1 Carrying out the initial start-up............................. 16
7.2 Checking the type of gas ..................................... 16
7.3 Checking the factory setting ................................ 16
7.4 Checking and treating the heating water/filling
and supplementary water .................................... 16
7.5 Avoiding danger arising from insufficient water
pressure............................................................... 17
7.6 Switching on the product ..................................... 18
7.7 Filling and purging the heating installation .......... 18
7.8 Filling the condensate siphon .............................. 18
7.9 Filling the hot water circuit ................................... 18
7.10 Checking and adjusting the gas settings ............. 18
7.11 Checking leak-tightness ...................................... 20
8 Adapting the unit to the heating
installation.......................................................... 21
8.1 Burner anti-cycling time ....................................... 21
8.2 Setting the pump output....................................... 21
8.3 Setting the bypass valve...................................... 22
8.4 Setting the hot water temperature ....................... 22
9 Handing the product over to the end user ...... 22
10 Inspection and maintenance ............................ 22
10.1 Using original seals.............................................. 22
10.2 Observing inspection and maintenance
intervals ............................................................... 22
10.3 Procuring spare parts .......................................... 23
10.4 Checking the COcontent ................................... 23
10.5 Setting the COcontent ....................................... 23
10.6 Removing the gas-air mixture unit ....................... 24
10.7 Cleaning the heat exchanger............................... 24
10.8 Checking the burner ............................................ 25
10.9 Checking the ignition electrode ........................... 25
10.10 Cleaning the condensate siphon ......................... 25
10.11 Cleaning the filter in the cold water inlet .............. 25
10.12 Cleaning the heating filter.................................... 25
10.13 Installing the gas-air mixture unit ......................... 26
10.14 Draining the product ............................................ 26
10.15 Checking the admission pressure of the
expansion vessel ................................................. 26
10.16 Completing inspection and maintenance work .... 26
10.17 Checking the product for leak-tightness .............. 26
11 Troubleshooting ................................................ 26
11.1 Rectifying faults ................................................... 26
11.2 Calling up the fault memory ................................. 26
11.3 Deleting the fault memory.................................... 26
11.4 Resetting parameters to factory settings ............. 26
11.5 Preparing the repair work .................................... 26
11.6 Replacing defective components......................... 26
11.7 Checking the product for leak-tightness .............. 29
12 Decommissioning the product ......................... 29
13 Customer service............................................... 29
Appendix ............................................................................30
A Check programmes – Overview ....................... 30
B Overview of diagnostics codes........................ 30
C Status codes – Overview .................................. 34
D Overview of fault codes .................................... 35
E Wiring diagram: Combi boiler .......................... 37
F Wiring diagram: Combi boiler (35 kW) ............ 38
G Inspection and maintenance work –
Overview............................................................. 39
H Position of the opening in the air/flue pipe ..... 40
H.1 Positioning of the opening of a fan-supported
flue gas pipe ........................................................ 40
H.2 Horizontal terminal positioning ............................ 41
I Commissioning Checklist................................. 42
Contents
0020177746_03 ENERGY Installation and maintenance instructions 3
J Pipe lengths for the air/flue pipe ...................... 46
J.1 Length of the C13 type air/flue pipe..................... 46
J.2 Length of the C33 type air/flue pipe..................... 46
J.3 Length of the C43 type air/flue pipe..................... 46
K Technical data.................................................... 46
Index ...................................................................................49
1 Safety
1 Safety
1.1 Action-related warnings
Classification of action-related warnings
The action-related warnings are classified in accordance with the severity of the possible danger using the following warning signs and signal words:
Warning symbols and signal words
Danger!
Imminent danger to life or risk of severe personal injury
Danger!
Risk of death from electric shock
Warning.
Risk of minor personal injury
Caution.
Risk of material or environmental damage
1.2 Risk caused by inadequate qualifications
Set-upDismantlingInstallationStart-upInspection and maintenanceRepairDecommissioning
Observe all instructions that are included
with the product.
Proceed in accordance with current tech-
nology.
Observe all applicable directives, stand-
ards, laws and other regulations.
1.3 Intended use
There is a risk of injury or death to the user or others, or of damage to the product and other property in the event of improper use or use for which it is not intended.
The product is intended as a heat generator for closed heating installations and for hot water generation.
Depending on the unit type, the products referred to in these instructions must only be installed and operated in conjunction with the
air/flue pipe accessories listed in the other applicable documents.
Intended use includes the following:
– observance of accompanying operating,
installation and servicing instructions for the product and any other system compon­ents
– installing and fitting the product in accord-
ance with the product and system approval
– compliance with all inspection and main-
tenance conditions listed in the instruc­tions.
Intended use also covers installation in ac­cordance with the IP code.
Any other use that is not specified in these in­structions, or use beyond that specified in this document shall be considered improper use. Any direct use in industrial or commercial processes is also deemed to be improper.
Caution.
Improper use of any kind is prohibited.
1.4 General safety information
1.4.1 Risk of death from escaping gas
What to do if you smell gas in the building:
Avoid rooms that smell of gas.If possible, open doors and windows fully
and ensure adequate ventilation.
Do not use naked flames (e.g. lighters,
matches).
Do not smoke.Do not use any electrical switches, mains
plugs, doorbells, telephones or other com­munication systems in the building.
If it is safe to do so, close the emergency
control valve or the main isolator.
If possible, close the gas isolator cock on
the product.
Warn other occupants in the building by
yelling or banging on doors or walls.
Leave the building immediately and ensure
that others do not enter the building.
Notify the gas supply company or the Na-
tional Grid +44 (0) 800 111999 by tele­phone once you are outside of the build­ing.
Safety 1
0020177746_03 ENERGY Installation and maintenance instructions 5
1.4.2 Risk of death from escaping flue gas
If you operate the product with an empty con­densate trap / siphon, then flue gas may es­cape into the room air.
In order to operate the product, ensure that
the condensate trap / siphon is always full.
1.4.3 Risk of death due to blocked or leaking flue gas routes
Installation errors, damage, tampering, unau­thorised installation sites or similar can cause flue gas to escape and result in a risk of pois­oning.
What to do if you smell flue gas in the prop­erty:
Open all accessible doors and windows
fully to provide ventilation.
Switch off the product.Check the flue gas routes in the product
and the flue gas diversions.
1.4.4 Risk of death due to explosive and flammable materials
Do not use the product in storage rooms
that contain explosive or flammable sub­stances (such as petrol, paper or paint).
1.4.5 Risk of death from electric shock
There is a risk of death from electric shock if you touch live components.
Before commencing work on the product:
Unplug the mains plug.Or disconnect the product from the power
supply by switching off all power supplies (electrical partition with a contact gap of at least 3 mm, e.g. fuse or circuit breaker).
Secure against being switched back on
again.
Wait for at least 3 minutes until the capa-
citors have discharged.
Check that there is no voltage.
1.4.6 Risk of death due to lack of safety devices
The schematic drawings included in this doc­ument do not show all safety devices re­quired for correct installation.
Install the necessary safety devices in the
system.
Observe the applicable national and inter-
national laws, standards and guidelines.
1.4.7 Risk of poisoning and burns caused by escaping hot flue gases
Only operate the product if the air/flue pipe
has been completely installed.
With the exception of short periods for
testing purposes, only operate the product when the front casing is installed and closed.
1.4.8 Risk of being burned or scalded by hot components
Only carry out work on these components
once they have cooled down.
1.4.9 Risk of injury due to the heavy weight of the product
Make sure that the product is transported
by at least two people.
1.4.10 Risk of corrosion damage due to
unsuitable combustion and room air
Sprays, solvents, chlorinated cleaning agents, paint, adhesives, ammonia com­pounds, dust or similar substances may lead to corrosion on the product and in the flue system.
Ensure that the supply of combustion air is
always free of fluorine, chlorine, sulphur, dust, etc.
Ensure that no chemical substances are
stored at the installation site.
If you are installing the product in
hairdressing salons, painter's or joiner's workshops, cleaning businesses or similar locations, choose a separate installation room in which the room air is technically free of chemical substances.
1.4.11 Risk of material damage caused by
frost
Do not install the product in rooms prone
to frost.
1 Safety
1.4.12 Risk of material damage caused by using an unsuitable tool
Use the correct tool to tighten or loosen
threaded connections.
1.5 Regulations (directives, laws,
standards)
Observe the national regulations, stand-
ards, guidelines and laws.
Notes on the documentation 2
0020177746_03 ENERGY Installation and maintenance instructions 7
2 Notes on the documentation
2.1 Observing other applicable documents
You must observe all the operating and installation in-
structions included with the system components.
2.2 Storing documents
Pass these instructions and all other applicable docu-
ments on to the system operator.
2.3 Validity of the instructions
These instructions apply only to:
Product article number
Article number Gas Council
Number
ENERGY 25c -A (H­GB)
0010015652 47-019-24
ENERGY 30c -A (H­GB)
0010015653 47-019-25
ENERGY 35c -A (H­GB)
0010015654 47-019-26
2.4 Benchmark
Glow-worm is a licensed member of the Benchmark Scheme.
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by a competent person approved at the time by the Health and Safety Executive and that it meets the requirements of the appropriate Building Regu­lations. The Benchmark Checklist can be used to demon­strate compliance with Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commission­ing and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme.
Benchmark is managed and promoted by the Heating and Hotwater Industry Council.
For more information visit www.centralheating.co.uk
3 Product description
3.1 Compartment Ventilation
The boilers are very high efficiency appliances.
As a consequence the heat loss from the appliance casing during operation is very low.
Compartment ventilation is not required as the products are only certified, and can only be fitted with a concentric flue system.
3.2 Information on the identification plate
The identification plate is mounted on the underside of the product in the factory.
The identification plate keeps record of the country in which the product is to be installed.
Information on the identification plate
Meaning
Barcode with serial number
Serial number For quality control purposes; 3rd and 4th
digits = year of production
For quality control purposes; 5th and 6th digits = week of production
For identification purposes; 7th to 16th digits = product article number
For quality control purposes; 17th to 20th digits = place of manufacture
ENERGY ..c Product description
2H, G20 – 2.0 kPa (20 mbar)
Factory setting for type of gas and gas connection pressure
Cat. Approved gas category
Condensing techno­logy
Efficiency class of the boiler in accord­ance with EC Directive 92/42/EEC
Type: Xx3(x) Permissible flue gas connections
PMS Maximum water pressure in heating
mode
PMW Maximum water pressure in hot water
handling mode
V/Hz Electric connection
W Max. electrical power consumption
IP Level of protection
Heating mode
Hot water generation
Pn Nominal heat output range in heating
mode
Pnc Nominal heat output range in heating
mode (condensing technology)
P Nominal heat output range in hot water
handling mode
Qn Nominal heating load range in heating
mode
Qnw Nominal heating load range in hot water
handling mode
T
max.
Max. flow temperature
NOx NOx class for the product
Code (DSN) Specific product code
4 Set-up
Information on the identification plate
Meaning
Read the instructions.
GC no. Gas council number
3.3 Functional elements: Combination unit
15
12
11
10
8
9
7
5
6
4
3
2
1
18
17
20 19
14
16
13
1 Electronics box
2 Heating circuit expan-
sion relief valve
3 Plate heat exchanger
4 Condensate siphon
5 Flue gas pipe
6 Pressure sensor
7 Flue gas analysis point
(for rear flue gas con­nection)
8 Ignition transformer
9 Gas valve
10 Air intake pipe
11 Fan
12 Supply air measuring
stub pipe (for upper flue gas connection)
13 Flue gas analysis point
(for upper flue gas connection)
14 Primary heat exchanger
15 Heating expansion
vessel
16 Purge hose
17 Volume flow sensor
18 Heating pump
19 Bypass
20 3-way valve
3.4 CE label
The CE label shows that the products comply with the basic requirements of the applicable directives as stated on the identification plate.
The declaration of conformity can be viewed at the manufac­turer's site.
4 Set-up
4.1 Transporting the unit
Important: With regard to the regulations of 1992 concern-
ing the manual handling of loads, the unit exceeds the weight that can be lifted by a single person.
4.1.1 General
Hold the load as close as possible to your body. Avoid
rotational movements. Instead, reposition your feet.
If the unit is being lifted by two persons, ensure your
movements are coordinated during lifting.
Avoid bending your upper body – do not lean forwards or
to the side.
Wear suitable non-slip protective gloves in order to pro-
tect your hands against sharp edges. Ensure that you are carrying the load securely.
If required, get somebody to assist you in this.
4.1.2 Unloading the box from the delivery van
It is recommended that two people lift the unit together.Lift the box using the straps provided.Use safe lifting techniques – keep your back straight and
bend your legs at the knee.
Hold the load as close as possible to your body.If the unit is being lifted by two persons, ensure your
movements are coordinated during lifting.
If required, get somebody to assist you in this.
4.2 Unpacking the product
1. Remove the product from its box.
2. Remove the protective film from all of the product's components.
4.3 Checking the scope of delivery
Check that the scope of delivery is complete and intact.
Number Designation
1 Heat generator
1 Unit mounting bracket
1
Flexible condensate discharge pipe
6 3/4" seals
4 1/2" seals
1 Service valve
1 Gas stopcock
1 Filling device
Set-up 4
0020177746_03 ENERGY Installation and maintenance instructions 9
Number Designation
2 Connection pipe (heating flow and return)
1 Cold water connection pipe
1 Domestic hot water connection pipe
1 Gas pipe
1 Expansion relief valve discharge pipe
1 Mounting template
1 Enclosed documentation
4.4 Dimensions
96
121
34
123
185
390
123
58 58
170
702
150
280
1 2 3 4 5
7
6
1 Heating flow
2 Hot water connection
3 Gas connection
4 Cold water connection
5 Heating return
6 Connection on the back
of the air/flue pipe
7 Connection on the top
of the air/flue pipe
4.5 Minimum clearances
CC
A
B
D
Minimum clearance
A 150 mm (top air/flue gas connection)
20 mm (air/flue gas connection on the rear)
B 150 mm
C 5 mm
(70 mm if the side panels ought to be removed)
D 600 mm
It is not necessary to maintain a clearance between the product and components made of combustible materials that go beyond the minimum clearances.
4.6 Using the mounting template
Use the mounting template to ascertain the locations at
which you need to drill holes.
4.7 Wall-mounting the product
Note
If you are using the rear air/flue gas connection, install the air/flue pipe before you wall-mount the product.
1. Check whether the wall has sufficient load-bearing ca­pacity to bear the operational weight of the product.
2. Check if the supplied fixing material may be used for the wall.
4 Set-up
Conditions: The load-bearing capacity of the wall is sufficient, The fixing material may be used for the wall
Wall-mount the product as described.
Conditions: The load-bearing capacity of the wall is not sufficient
Ensure that wall-mounting apparatus on-site has a suf-
ficient load-bearing capacity. Use individual stands or primary walling, for example.
Do not wall-mount the product if you cannot provide
wall-mounting apparatus with a sufficient load-bearing capacity.
Conditions: The fixing material may not be used for the wall
Wall-mount the product as described using the permitted
fixing material provided on-site.
4.8 Removing/installing the front casing
4.8.1 Removing the front casing
B
C
A
1
1
1. Undo the two screws (1).
2. Gently press the front casing backwards in the centre so that the latching lug is released.
3. Pull the front casing forwards at the bottom edge.
4. Lift the front casing upwards from the bracket.
4.8.2 Installing the front casing
Refit the components in the reverse order.
4.9 Removing/installing the side section
4.9.1 Removing the side section
Caution. Risk of material damage caused by mech-
anical deformation.
Removing both side sections may cause mechanical distortion in the product, which may cause damage to the piping, for ex­ample, and potentially result in leaks.
Always remove only one side section –
never both side sections at the same time.
Note
If there is sufficient lateral clearance (at least 70 mm), you can remove the side section to fa­cilitate maintenance or repair work.
2x
1
A
B
C
D
1. Tilt the electronics box forward.
2. Hold on to the side section so that it cannot fall and unscrew both screws (1), one from the top and one from the bottom.
3. Tilt the side section to the outside and move it down­wards and out.
4.9.2 Installing the side section
Refit the components in the reverse order.
Installation 5
0020177746_03 ENERGY Installation and maintenance instructions 11
5 Installation
Danger! Risk of scalding and/or damage due to
incorrect installation leading to escaping water.
Mechanical stresses in the connection pipes may lead to leaks.
Ensure that there is no mechanical stress
when installing the connection pipes.
Caution. Risk of material damage caused by
residues in the pipelines.
Welding remnants, sealing residues, dirt or other residues in the pipelines may damage the product.
Flush the heating installation thoroughly
before installing the product.
5.1 Checking the gas meter
Make sure that the existing gas meter is capable of
passing the rate of gas supply required.
5.2 Gas and water connections
Caution. Risk of damage caused by incorrect gas
connection installation.
Excess test pressure or operating pressure may cause damage to the gas valve.
Check the leak-tightness of the gas valve
using a maximum pressure of 11 kPa (110 mbar).
Caution. Risk of material damage caused by corro-
sion
Due to non-diffusion-tight plastic pipes in the heating installation, air gets into the heating water. Air in the heating water causes corro­sion in the heat generator circuit and in the product.
If you use non-diffusion-tight plastic pipes
in the heating installation, ensure that no air gets into the heat generator circuit.
Caution. Risk of material damage due to heat trans-
fer during soldering.
Only solder connectors if the connectors
are not yet screwed to the service valves.
Note
Apply heat insulation to the water pipes to the boiler outlet and to the installation.
Preliminary work
1. Check that the system volume and the volumetric capa­city of the expansion vessel are compatible.
If the volume of the expansion vessel is insufficient
for the installation.
Install an additional expansion vessel in the
heating return, as close to the product as pos­sible.
Install a non-return valve at the product's outlet
(heating flow).
2. Ensure that the installation has the following compon­ents:
A cold water stopcock for the unitA gas stopcock for the unitA filling and draining device in the heating installa-
tion
1
2
3
4
5
1 Heating flow connec-
tion, G3/4
2 Hot water connection,
G3/4
3 Gas connection, G1/2
4 Connection for the cold
water supply line, G3/4
5 Heating return connec-
tion, G3/4
1. Connect the water and gas connections in accordance with the applicable standards.
2. Purge the gas pipe before start-up.
3. Check whether the connections (Page 20) are leak­tight.
5 Installation
5.3 Connecting the drain pipework for the expansion relief valve
1
Ensure that the pipeline is visible.The pipe must have a continuous fall and be routed to a
position so that any discharge of water, possibly boiling, or steam cannot create any danger to persons, damage to property or external electrical components and wiring.
The piping must be installed in such a way that you
can see when water drips out.
5.4 Connecting the condensate discharge pipe
1
2
Follow the instructions listed here and observe the legal
and local regulations on condensate discharge.
Use PVC or any other material that is suitable for drain-
ing the non-neutralised condensate.
If you cannot guarantee that the materials from which the
drain pipework is made are suitable, install a system for neutralising the condensate.
Note
The condensate drain pipework must have a continuous fall (45 mm per metre) and should whenever possible terminate at a suitable drain point within the heated envelope of the building that will remain frost free under long periods of low external temperatures.
Connect the condensate traps (1). Use the supplied drain
hose (2) for this.
Connect a condensate discharge pipe (21.5 mm, not
included in the scope of delivery) to the drain hose (2).
During installation remove all burrs from inside of cut pipe
work and avoid excessive adhesive which may trap small pockets of water close to the pipe wall which can freeze and build into a larger ice plug.
For any installation the condensate must be free flowing
and not be possible for air back-pressure to prevent wa­ter flow.
As with other pipe work insulate the condensate dis-
charge pipe to minimise any risk of freezing and beware when crossing cavities that the fall is maintained and the pipe sleeved.
You can find further information in specification "BS 6798" for installing and maintaining gas-fired boilers with a nominal heat input below 70 kW.
5.4.1 Condensate drainage systems
5.4.1.1 Internal soil and vent pipe
Ø19mm
min
5.4.1.2 External soil and vent pipe
L = 3m max
Ø19mm
min
Ø30mm
5.4.1.3 External termination into a gulley or hopper
L = 3m max
Ø19mm
min
Ø30mm
Installation 5
0020177746_03 ENERGY Installation and maintenance instructions 13
5.4.1.4 Internal termination into combined sink waste
Ø30mm
Ø19mm
min
5.4.1.5 Internal termination downstream of sink waste
Ø30mm
Ø19mm
min
5.4.1.6 External termination into soakaway
400mm min
300mm
min
25mm
min
500mm min
Ø100mm
L = 3m max
Ø19mm
min
Ø30mm
5.4.1.7 External termination into rain water down pipe
Ø19mm
min
Ø30mm
5.5 Electrical installation
Danger! Risk of death from electric shock!
The power supply terminals L and N remain live even if the product is switched off:
Switch off the power supply.Secure the power supply against being
switched on again.
Only qualified electricians may carry out the electrical install­ation.
5.5.1 Opening the electronics box
B
B
A
Follow the instructions in the specified sequence.
5 Installation
5.5.2 Closing the electronics box
Follow the instructions in the reverse order.
5.5.3 Cable route
1
2
1 24-V eBUS cable route 2 230-V eBUS cable route
5.5.4 Carrying out the wiring
30 mm max.
1. Shorten the connection cables to the appropriate lengths to prevent them from causing damage inside the electronics box.
2. Screw the plug to the connection cable.
3. Plug the plug into the slot provided on the PCB.
5.5.5 Establishing the power supply
1
1. Observe all valid regulations.
2. Make sure that the rated voltage of the mains is 230 V.
3. Provide one common electricity supply for the boiler and for the corresponding controller:
Power supply: Single-phase, 230 V, 50 HzFuse protection: 3 A
4. Open the electronics box. (Page 13)
5. Observe the routing of the power supply cable (1) in the electronics box in order to guarantee that there is no strain.
≤ 30 mm
NL
X1 230V~
RT
6. Carry out the wiring. (Page 14)
7. Close the electronics box. (Page 14)
8. Screw the supplied plug to a three-core power supply cable that complies with the relevant standards.
9. Connect the plug for the power supply cable.
10. Make sure that access to the power supply is always
freely available and is not covered or blocked by an obstruction.
Operation 6
0020177746_03 ENERGY Installation and maintenance instructions 15
5.5.6 Connecting controllers to the electronic system
X2
X22
X41
+
24V=
RT BUS
Burner
off
X106
BUS24 V
BUSRTB.off
B ur ner
off
R T
24V
=
-
+
B U S
1
4
32
1 Safety thermostat for
floor-standing heating
2 24 V controller
3 eBUS controller or radio
receiver unit
4 Outside temperature
sensor, wired
1. Open the electronics box. (Page 13)
2. Carry out the wiring. (Page 14)
3. Connect the individual components depending on the
type of installation.
Conditions: If installing a multi-circuit controller.
Change the pump operating mode (d.18) from Eco (in-
termittent pump operating mode) to Comfort (continuous pump operating mode).
Conditions: If you are connecting a controller (230 V).
≤ 30 mm
NL
X1 230V~
RT
Connect the controller to the main plug.Remove the bridge from the plug 24V=RT.
4. Close the electronics box.
6 Operation
6.1 Using diagnostics codes
You can use the parameters marked as adjustable in the table of diagnostics codes to adapt the product to the system and customer requirements.
Overview of diagnostics codes (Page 30)
6.1.1 Activating diagnostics codes
1.
Press and hold the button for 7 seconds.
is shown in the display.
2.
Press the or button to set the value.
The access code (96) is reserved for the competent
person.
The access code (35) is reserved for the customer
service.
3.
Press the button to confirm.
is shown in the display.
6.1.2 Setting a diagnostics code
1.
Press the or button to select the diagnostics code.
2.
Press the button to confirm.
The value and/or status of the diagnostics code is
shown in the display.
3.
Press the or button to set the value.
4. If you allow the value to flash for three seconds, the setting is automatically confirmed.
is shown in the display for 1 second.
Note
You can manually confirm the setting at any time by pressing and holding the button for less than 3 seconds.
5. Proceed accordingly for all parameters that need to be changed.
6.
Press and hold the button for 3 seconds to finish configuring the diagnostics codes.
The display switches to the basic display.
6.2 Displaying the status codes
The status codes display the product's current operating status.
Status codes – Overview (Page 34)
6.2.1 Activating the status codes display
1.
Hold the button down for more than 7 seconds.
S.XX is shown on the display, followed by the heat-
ing flow temperature, the internal system pressure and the cylinder temperature (depending on the ver­sion).
2.
Press the button to exit this menu.
7 Start-up
The display switches to the basic display.
6.3 Using check programmes
By activating various check programmes, you can trigger various special functions on the product.
Check programmes – Overview (Page 30)
6.3.1 Calling up the check programmes
1.
Hold the button down for more than 5 seconds.
All symbols are shown in the display.
is shown in the display.
2.
Press and hold the button for five seconds.
is shown in the display.
3.
Press the or button to select the check programme.
4.
Press the button to confirm.
on is shown in the display and the programme
starts.
5.
Press the and buttons at the same time whilst running a check programme.
The heating water temperature and the filling pres-
sure for the heating installation are shown altern­ately in the display.
6.
Press the button to return to the check programme.
The display shows the check programme.
7.
Press the button to finish the check programme.
OFF is shown in the display.
8.
Press and hold the button for 3 seconds to finish the check programmes.
End is shown in the display.The display switches to the basic display.
Note
If you do not press any button for 15 minutes, the current programme is automatically can­celled and the basic display is shown.
6.3.2 Displaying the pressure and temperature of the heating during a check programme
1.
Press the buttons simultaneously.
Display the filling pressure in the heating installation.Display the heating flow temperature.
2.
Press the button to display the check programme currently running.
7 Start-up
7.1 Carrying out the initial start-up
Initial start-up must be carried out by a customer service technician or an authorised competent person using the first­commissioning-checklist. The first-commissioning-checklist in the appendix (Page 42) of the installation instructions must be filled out and stored carefully along with the unit's documentation.
Carry out the initial start-up using the first-commission-
ing-checklist in the appendix.
Fill out and sign the first-commissioning-checklist.
7.2 Checking the type of gas
Make sure that the product is set up correctly by checking the type of gas. This ensures optimum combustion quality.
Check the type of gas as part of routine product mainten-
ance work when replacing components or carrying out work on the gas route.
7.3 Checking the factory setting
The product's combustion has been factory tested and is preset for operation with the gas group indicated on the iden­tification plate.
The product is only authorised to be operated with natural gas.
Check the information about the type of gas indicated on
the identification plate and compare this with the type of gas available at the installation location.
Conditions: The product design is not compatible with the local gas group
Do not start up the product.
Conditions: The product design is compatible with the local gas group
Proceed as described below.
7.4 Checking and treating the heating water/filling and supplementary water
Caution. Risk of material damage due to poor-qual-
ity heating water
Ensure that the heating water is of suffi-
cient quality.
Before filling or topping up the installation, check the
quality of the heating water.
Checking the quality of the heating water
Remove a little water from the heating circuit.Check the appearance of the heating water.If you ascertain that it contains sedimentary materials,
you must desludge the installation.
Use a magnetic rod to check whether it contains mag-
netite (iron oxide).
If you ascertain that it contains magnetite, clean the in-
stallation and apply suitable corrosion-protection meas­ures, or fit a magnetic filter.
Check the pH value of the removed water at 25 °C.
Loading...
+ 36 hidden pages