The range of BS2000/OSD servers has been extended by the addition of the S120 series.
The spectrum of user facilities of the new models lies betweeen that of the S115 and the
S135. They are powerful systems for scientific and commercial applications.
The S120 Business Server (or cluster) has a modular structure and can easily be upgraded
on site.
The main memory can be expanded by up to 2 Gbytes.
The input/output system consists of 1 I/O processor. Up to 64 channels can therefore be
configured for connecting peripheral devices with type-2, type-S or type-F channel interfaces. LAN networking is possible via the 3970-SKP servive/console processor, a connection to the TRANSDATA network world via front-end processors.
The service processor (SVP) and the external 3970-SKP service/console processor
support commonoperation, monitoring, diagnosisandmaintenance of the computer as well
as TELESERVICE.
Like all computers in the 7.500 system family and the S1xx server series, the S120
Business Server uses the BS2000 operating system in either dialog, online teleprocessing
(OLTP) or batch mode. This offers the portability and compatibility of BS2000 programs.
1.1Objectives and target group
This manual provides you with all the information you require to operate the S120 Business
Server via the service/console processor, and is thus intended for operators and system
managers.
Knowledge of BS2000 system operation and management as well as basic knowledge of
SINIX are required.
Further manuals with information on the operation of BS2000, SINIX and TELESERVICE
are listed under “Related publications” at the back of this manual.
U41182-J-Z126-1-741
Summary of contentsIntroduction
1.2Summary of contents
This operating manual covers the hardware operating functions of the S120 Business
Server with the 3970-SKP service/console processor.
The chapters “Overview”, “Controls and indicators” and “Standard processing in SVP
mode” provide information on hardware and the operating concept. You should read these
chapters first.
The chapter entitled “Troubleshooting” provides valuable assistance in recognizing and
solving problems.
Document references in the text are given in abbreviated form between quotation marks.
The full title to which the specified number refers is listed under that number at the back of
the manual in the related publications section, accompanied by a brief description.
A keyword index at the end of the manual helps you to find the relevant information quickly.
1.3Notational conventions
Some text passages are marked using the following symbols:
Information that is particularly important for the function of the product.
i
Important instructions, e.g. warnings.
!
V7
ÊThe input symbol indicates actions which must be carried out (e.g. keyboard input).
Ë This character represents a blank in keyboard input.
[ ... ]References to relevant literature or optional parameters in commands are given in
This typewriter font is used for names, commands and messages (e.g. the
/DETË*CHA(xx) command).
2U41182-J-Z126-1-74
Reference to the “SINIX-2000 V7.5/V8.0” [1] manual.
square brackets.
2Important instructions
This chapter lists selected notes from the manufacturer and information on RFI
suppression.
You should pay particular attention to the safety instructions in section 2.3.
2.1Manufacturer instructions
This product complies with the EC guideline 89/336/EEC "Electronic Compatibility". The product bears the EC certificate.
2.2RFI suppr ession
WARNING:Thisis a class A equipment. This equipment may cause interference to
!
radio and television reception in a residential installation. If it does cause interference, the user may be requested to take appropriate corrective measures at his
or her own cost.
The devices generate and emit high-frequency energy.
If the devices are installed and used other than as instructed in the manual, failures in the
devices or other electric systems may occur. If failures of this type occur it is the task of the
user to carry out measurements and implement measures to solve the problem. Only the
cables supplied with the system or recommended by Fujitsu Siemens Computers may be
used.
All other devices which are connected to the present product must be radio interference
suppressed in accordance with BMPT Order No. 1046/84 and Order No. 243/91 or EU
Directive 89/336/EEC. Products which satisfy this requirements are provided with an appropriate certificate by the manufacturer and bear the CE mark or the interference suppression
symbol.
U41182-J-Z126-1-743
Safety instructionsImportant instructions
2.3Safety instructions
This device fulfills the prevailing safety requirements for information technology equipment,
including electrical office machines.
In emergencies (e.g. damaged housing, operating elements or network cables,
intrusion of liquid or foreignobjects), switch off the device immediately (UNIT
EMERGENCY POWER OFF) and contact our service department.
UNIT
EMERGENCY
I
o
POWER
OFF
S120 Business Server
Figure 1: UNIT EMERGENCY POWER OFF switch on the S120
The systems may only be installed by authorized trained personnel.
The cables must be laid in such a way that there is no danger of anyone tripping over
them and they cannot be damaged.
Data transmission lines must not be connected or disconnected during electrical
storms.
Ensure that no foreign bodies (e.g. necklaces, paperclips etc.) or liquids find their way
into the device (danger of electric shock, short circuit).
4U41182-J-Z126-1-74
Important instructionsSafety instructions
Repairs to the device may only be carried out by authorized and trained personnel. All
areas which are secured by locks or can only be opened using tools are maintenance
areas and may only be accessed by trained personnel.
Unauthorized opening of the maintenance area and improper repairs can be dangerous
for the user (electric shock, danger of fire).
U41182-J-Z126-1-745
Eine Dokuschablone von Frank Flachenecker
3Overview
This chapter provides information on the configuration levels and the configuration of the
S120 Business Server series and the concept of system operation.
S120 Business Server
Figure 2: S120 Business Server with additional cabinet
The S120 Business Server consists of a cabinet plus an additional cabinet for channel
expansions.
U41182-J-Z126-1-747
Configuration levels of the S120 Business ServerOverview
3.1Configuration levels of the S120 Business Server
The S120 Business Server series consists of four models. Upgrading of the individual
models can easily be carried out on site, so that system downtime is not extended due to
hardware installation.
The S120 models can have multiple channel groups. Thus a reconfiguration is possible for
these models if there is a partial failure.
The service/console processor (3970-SKP) with the SINIX operating system.
Operation of the S120 system is handled via a local PC, the 3970-SKP service/console
processor. S120 and 3970-SKP communicate with one another in three ways:
–serial line (V.24)
–type-S I/O channel
–internal LAN connection
The following components can be operated via the local 3970-SKP screen and remote
secondary consoles:
–the SINIX system of the 3970-SKP
–the SVP of the S120
–the BS2000 running on the S120
–consoles for up to 7 VM2000 guest systems
–BS2000 applications via 9750 emulation
Automatic Operator (ATOP).
The ATOPis a device which is connected to the 3970-SKP via a serial line. It makes the
following functions possible:
–automatic switching on and off of the S120
–automatic operation of the BS2000 system
The customer can program the ATOP to specify which operating functions should
be executed for which conditions.
Examples:
–automatic shutdown of the system in the case of fan failure.
–automatic command entry in reaction to certain BS2000 console messages.
It is possible to connect a radio-controlled clock or Global Time Server (GTS).
On/off facility makes it possible to switch the S120 on and off from the 3970-SKP.
10U41182-J-Z126-1-74
OverviewConcept of system operation
3.2.2Software
The following software components play an important role in S120 operation:
Window interface
The SINIX operating system is run on the 3970-SKP. One component of SINIX is the
window interface based on the X Window system (see the ”SINIX-2000 V7.5/V8.0” [1]
manual).
V7
The following system components use the window system:
–BS2000 (e.g. CONS0 or EM9750 window, see page 33)
–SVP (e.g. SVPST0 window, see page 33)
–SINIX (e.g. SINIX or EVENT window, see page 33)
The system provides preconfigured windows for operation which are opened automatically when the 3970-SKP is started up.
V7
Console distribution program KVP (German acronym)
The operation of BS2000 from the 3970-SKP is controlled by the Console Distribution
Program.KVP carries out the following tasks:
–authorization controls
–distribution of the BS2000 tasks to several consoles
–short- and long-term logging of the console traffic
A brief introduction to the window system can be found in the chapter entitled
"Brief introduction to the window system" in the "SINIX-2000 V7.5/V8.0" [1]
manual. Further information can be found in the "SINIX/windows User
Environment V3.0" [2] manual.
The number of windows for operating BS2000 and SINIX, the order of the
windows on the screen, their size and some other properties can be changed
using the relevant configuration functions. Information on this can be found in
the chapter entitled "Configuring the system", in the sections "X screens" and
"Virtual screens", in the "SINIX-2000 V7.5/V8.0" manual.
KVP requires parameters that are stored in the KVP parameter file of the built-in disk of
the 3970-SKP. The KVP parameters are created in SINIX when the system is installed
and can be changed with the help of the SINIX configuration.
V7
U41182-J-Z126-1-7411
Information on configuringtheKVP can be foundinthechapter entitled“Configuring the system”, in the section “KVP”, in the “SINIX-2000 V7.5/V8.0” manual.
Concept of system operationOverview
3.2.3Authorization control
The access to operation of the BS2000, SVP and SINIX system components is protected.
The passwords will be defined during the installation of the systems and can be changed
afterwards.
Access to the SVP operation
After you have filled out and sent off the welcome screen in the window for SVP
operation, the system requests you to enter the password.
Access to the BS2000 console
If you try to make an entry in a BS2000 control window after the SINIX system has been
started up for the first time, you will be requested to enter a password.
For further information, see chapter 7, ”Operating the BS2000 console”, on page 89.
Access to VM2000 consoles
Direct operation of VM2000 guest systems is possible via the SKP-X.
When you try to make an entry in a VM2000 console window for the first time after pow-
ering up the SINIX system, you will be requested to enter the password.
The configuration of VM2000 consoles requires release by means of key diskettes.
Access to BS2000 system administration
If you want to work as a system administrator in BS2000, you must use a type EM9750
window, fill in the welcome screen, and log in by entering a BS2000 user ID (usually
tsos) and - if agreed - a BS2000 password for BS2000.
Access to SINIX system administration
If you want to carry out system administration tasks under SINIX you must log into a
SINIX window by entering a SINIX user ID (i.e. admin, root or sysadm) and password.
Access to the EVENT window
Certain functions can be executed using the EVENT window.
The first time you try to make an entry in this window after the system has been started
up, you will be requested to enter the password for the SINIX user ID
event.
12U41182-J-Z126-1-74
4Controls and indicators
The following controls and indicators are provided for the S120 Business Server:
control panel on the Business Server cabinet, see page 14
EMERGENCY STOP switch, see page 18
The S120 is operated using the operator terminals on the service/console processor.
U41182-J-Z126-1-7413
Control panel on the S120 Business Server cabinetControls and indicators
4.1Control panel on the S120 Business Server cabinet
The control panel is connected with the service processor (SVP) in the S120 Business
Server. The physical structure of the control panel is illustrated in the following diagram:
UNIT
EMERGENCY
POWER ON
STAND- BY
I
o
POWER
OFF
POWER
COMPLETE
Figure 5: Control panel on t he cabinet of the S120 Business Server
SYSTEM
CHECK
The functions of the indicators and control elements on the control panel are described
below.
4.1.1Function of the indicators
STATUS
The STATUS indicator is an LCD display and can show alphanumeric characters. The
codes change when the Business Server and the IMPL are switched on. No P codes
should be displayed if POWER ON or IMPL has been run without errors (see next
page). If this is not the case, this indicates a malfunction and you should contact the
service department.
CANCEL/
ALARM STOP
IMPLBACK LIGHT
14U41182-J-Z126-1-74
Controls and indicatorsControl panel on the S120 Business Server cabinet
Information is displayed on the LCD display in the following format:
STATUS
CC C CCCC
FFFFFFFFFFFFFFFF
CMCET
Pnnn
Line 1
Line 2
DOWN
PALM
STOP
Displays in line 1
WAIT
RUN
LOAD
FFFFFFFFFFFFFFFF
Figure 6: LC display in the control panel of the S120
Meanings:
LineDisplay fieldDisplayMeaning
Line 1Maintenance
mode
Test modenoneNormal mode
Cluster statusPnnnP000: S120 switched off
noneUser mode
CEMaintenance mode
CMHot system maintenance mode
TTest mode = maintenance mode
DOWNDisplay for system fault
PALMPower supply error or fan error
RUNCPU in RUN status
WAITCPU in WAIT status
STOPCPU in STOP status
LOADIPL is being executed
Displays in line 2
(together with the CE display)
P001toP599: Pcodesduring theswitchingon
and initialization phase as well as when
switchingoff:
U41182-J-Z126-1-7415
Control panel on the S120 Business Server cabinetControls and indicators
Line 2Flag codenoneNormal state
FFFFFFFFFFFFFFFFMessage or error code:
this display is for the purposes of the serv ice
department.
POWER COMPLETE
This green light illuminates after the system power controller has terminated the
switching on sequence without errors. The light is extinguished when the STAND-BY
key is pressed in the S120 control panel.
SYSTEM
This green light illuminates when the processing unit is active.
CHECK
This yellow light illuminates when the service processor has decoded a machine error
or an error in the power supply of the Business Server. A buzzer sounds at the same
time.
Potentiometer for volume
This is used to set the volume of the buzzer.
Potentiometer for contrast
This is used to set the contrast of the LCD display.
4.1.2Button functions
LCD BACK LIGHT
The LCD display STATUS (background) is illuminated for five minutes when you press
this button. The lights go out immediately when you press this button again.
POWER ON
When this button is pressed, the power supplies of the entire system are switched on
sequentially. The order is predetermined. It begins with the Business Server system
components and ends with the peripheral devicesconnected to the PCI (PowerControl
Interface). Then an IMPL (Initial Micro Program Load) is carried out. The system is
ready for operation when the display of P codes on the LCD display is extinguished.
If POWER ON IPL is configured, the operating system is subsequently loaded (see
LOAD PRESET1-Frame on page 71).
STAND-BY
This is the button for switching off the power supply forthe entire system. The sequence
begins with the peripheral devices connected to the PCI and ends with the Business
Server system components. The button is protected by a flap so that the system cannot
be switched off unintentionally.
16U41182-J-Z126-1-74
Controls and indicatorsControl panel on the S120 Business Server cabinet
CANCEL / ALARM STOP
When this button is pressed, start of the IMPL for the security query is aborted or, in the
eventofanerror,theb uzzer in the control panel is stopped and the CHECK light is extinguished. If another malfunction occurs after the light is extinguished, e.g. a machine
error or a malfunction in the power supply, the buzzer and the CHECK light are reactivated.
IMPL
When this button is pressed twice, the IMPL is executed and confirmed. The S120 is
initialized and the firmware is loaded in the individual components (CPU, channel
processor). Furthermore, the IORSF selected in the IORSF Control Frameis activated.
After the IMPL is terminated, the P codes in the LCD display are extinguished. Afterwards an IPL (Initial Program Load) of the BS2000 can be executed on the SKP.
This button loads another configuration or activates another IORSF.
A protective cover prevents the button being pressed inadvertently.
The system will crash if an IMPL is executed during operation.
!
If this instruction is not heeded, BS2000 will be terminated abruptly!
After you press the IMPL button for the first time the question
displayedontheLCDdisplay.
–Ifno IMPL is to be executed, the CANCEL / ALARM STOP button can be
pressed or the IMPL request terminates itself after 10 seconds.
–If the IMPL is to be started, the IMPL button must be pressed a second time.
ARE YOU SURE? is
U41182-J-Z126-1-7417
EMERGENCY STOP switchControls and indicators
4.2EMERGENCY STOP switch
The Business Server cabinet has an EMERGENCY STOP switch (UNIT EMERGENCY
POWER OFF).
If you wish to cut power to the entire system, the EMERGENCY STOP switch must be
pressed.
UNIT
EMERGENCY
I
o
POWER
OFF
S120 Business Server
Figure 7: EMERGENCY STOP switch on the S120 Business Server cabinet
Theswitchshouldonlybeusedinemergencies.
!
The switch can only be reset by the service department. The system can only be
switched back on after the switches has been reset.
Use the EMERGENCY STOP switch as follows:
ÊOpen the transparent switch cover.
ÊPress the red switch downwards to the O position.
18U41182-J-Z126-1-74
5Switchingthe S120 Business Server on and off
This chapter describes the various technical options for switching the S120 Business
Server on and off, depending on the hardware.
5.1Switching the S120 o n and off using the control panel
Console
SKP
COM1
Remote operator terminal
Figure 8: Switching the S120 on and off using the control panel
I/O channel
internal LAN
V.24
on/off facility
LAN
S120
SVP
Switching on
To switch on the entire system via the control panel, the SKP must be switched on using the
on/off button (see also the operating instructions for the SKP [2]). The S120 must be
switched on by pressing the POWER ON on its control panel.
U41182-J-Z126-1-7419
Switching the S120 on and off using the control panelSwitching on and off
When both systems are ready, i.e. all windows on the 3970-SKP have been opened and the
LCD display on the S120 no longer shows any P codes, you can log in on the SVP (see
page 33ff) and start the BS2000 system via PROGRAM LOAD FRAME: DETAIL-1 (see
page 52).
If a POWER ON IPL is configured, the system is loaded automatically (see page 71
AUXILIARY FRAME: LOAD PRESET1).
Switching off
After BS2000 has been shut down, the S120 can be switched off by pressing the
STAND-BY button on the S120 control panel (see page 16) or by selecting the menu item
POWER STAND-BY in AUXILIARY FRAME: POWER STAND-BY/IMPL (see page 70).
The SKP is switched off as follows:
There are three options for terminating the SINIX system of the SKP:
1. You call the basic menu of your window administration program by clicking on the gray
window background using the right mouse button. This menu contains the item “Exit
system”. Selecting this item allows you to initiate the termination of the system. As a
result of this selection, “<computer name>: shut down” is output. Then carry out the
following actions:
ÊActivate the root password field using the left mouse button and enter the password
for the user ID root.
ÊSelect the Init status by
Êpositioning the cursor over the “Shut down” button,
Êpressing the left-hand mouse button,
Êholding the mouse button down, positioning the cursor on the desired entry of
the opened menu (“Shut down” or “Restart”) and
Êreleasing the mouse button.
ÊCarry out the desired function by clicking the “Start” button.
2. You can also terminate the SINIX system by
Êlogging in as the system administrator,
Êentering the shell command shutdown (for shutting down the system) or
Êthe shutdown -i6 command (for shutting down and restarting the system).
20U41182-J-Z126-1-74
Switching on and offSwitching the S120 on and off using the control panel
3. You can also terminate the SINIX system using the on/off button on the SKP.
WhenyouswitchofftheSKP,takenoteofthefollowing:
If the SKP is switched off , it sends the command /shutdown or a self-defined /run
xxxx command (default value) to any running BS2000 system before it switches
!
itself off after a certain wait time has expired.
V7
You can define the shutdown command and the length of the wait period using the
sysadm forms.
Information on operation of the FMLI interfaces can be found in the “SINIX-2000
V7.5/V8.0” manual [1].
ÊSelect or open a SINIX screen
ÊLogin: root or sysadm
ÊEnter password
ÊFor login with root: enter sysadm
The SINIX system administration window is displayed.
Figure 9: SINIX system administration window
ÊSelect the menu item “sinix_2000” on the UNIX System V, Administration menu.
ÊSelect the menu item “up_down” on the SINIX-2000 system administration menu.
U41182-J-Z126-1-7421
Switching the S120 on and off from the SKPSwitching on and off
You willfindadetailed descriptionofhow to configuretime-controlledstartup/shutdown
in the section “up_down” of the “SINIX-2000 V7.5/V8.0” manual.
5.2Switching the S120 o n and off from the SKP
Console
SKP
COM1
Remote operator terminal
Figure 10: Switching the S120 on and off from the SKP
I/O channel
internalLAN
V.24
on/off facility
LAN
S120
SVP
The on/off facility can be used to switch the S120 on and off from the SKP. The on/off facility
is linked to the SKP via the COM1 V.24 interface.
You access the “Switching on / off the host” form via the sysadm menu:
Information on operation of the FMLI interfaces can be found in the “SINIX-2000
V7
V7.5/V8.0” manual [1].
ÊSelect or open a SINIX screen
ÊLogin: root or sysadm
ÊEnter password
ÊFor login with root: enter sysadm
The SINIX system administration window is displayed.
ÊSelect the menu item “sinix_2000” on UNIX System V, Administration menu.
22U41182-J-Z126-1-74
Switching on and offSwitching the S120 on and off from the SKP
ÊSelect the menu item “host” on System Administration SINIX-2000 menu.
ÊSelect the menu item “host” on Host Configuration and Powercontrol menu.
The “Switching on / off the host” form is displayed:
Figure 11: Form „Switching on / off the host“
By entering YES for one of the two questions at the bottom of the form followed by the
P2
CHOICES)key, you can specify whether the S120 can be switched on or off immedi-
(
ately. On no account should both questions be answered with YES.
ÊPress the(SAVE)keyafterfillingouttheform.
U41182-J-Z126-1-7423
P3
Switching the S120 on and off from the SKPSwitching on and off
The “Confirmation of immediate switching of the host“ form is displayed:
Figure 12: Form „Confirmation of immediate switching of the host“
ÊEnter YES by hitting the(CHOICES)key.
The switching operating is performed after you press the(
P2
P3
SAVE)key.
24U41182-J-Z126-1-74
Switching on and offAutomatic switching on/off of the S120 via the SKP
5.3Automatic switching on/off of the S120 via the SKP
Console
SKP
COM1
Figure 13: Automatic switching on/off of the S120 via the SKP
I/O channel
internal LAN
V.24
on/off facility
Remote operator terminal
S120
SVP
LAN
The on/off facility can be used to switch the S120 on and off from the SKP. The on/off facility
is linked to the SKP via the V.24 interface COM1.
You access the “Switching on / off the host” form via the sysadm menu:
Information on operation of the FMLI interfaces can be found in the “SINIX-2000
V7
V7.5/V8.0” manual [1].
ÊSelect or open a SINIX screen
ÊLogin: root or sysadm
ÊEnter password
ÊFor login with root: enter sysadm
The SINIX system administration window is displayed.
ÊSelect the menu item “sinix_2000” on the UNIX System V, Administration menu.
ÊSelect the menu item “host” on the System Administration SINIX-2000 menu.
ÊSelect the menu item “host” on Host Configuration and Powercontrol menu.
U41182-J-Z126-1-7425
Automatic switching on/off of the S120 via the SKPSwitching on and off
The “Switching on / off the host” form is displayed:
Figure 14: Form „Switching on / off the host“
By using the(CHOICES) to enter YES for the two questions at the top of the window,
P2
you can specify
–whether the S120 should be switched on automatically if the 3970-SKP is switched
on or SINIX is started on the 3970-SKP, and
–whether the S120 should be automatically switched off if the SINIX system is shut
down or the 3970-SKP is switched off.
P3
ÊPress the(
SAVE)keyafterfillingouttheform.
However, it is only switched off automatically if the SINIX system is shut down using
shutdown. If it is shut down and restarted using shutdown -i6, no switching action is
carried out.
Configuring the automatic deactivation may have unforeseen consequences, since
switching off the 3970-SKP without thinking about it properly (e.g. for maintenance
!
work) also causes the S120 to be switched off.
Werecommend shutting down the systemmanually at the required times,switching
off the S120 via the AU4 frame (see page 70) or using the sysadm form described
above (bottom query), and then switching off the 3970-SKP.
26U41182-J-Z126-1-74
Switching on and offTime-driven switching on and off of the SKP and S120
If an ATOP is connected (see page 28), the sequence of actions for switching off
must be programmed accordingly.
5.4Time-driven switching on and off of the SKP and S120
The on/off facility can be used to switch the S120 on and off from the SKP.
In addition, the S120 must be configured to switch on and off automatically as part of the
starting and shutting down procedure for the SKP (see page 25).
The SKP switches during startup the S120 on. After the IMPL, the BS2000 system is
started by the POWER ON IPL function of the SVP.
When the SKP and S120 are switched off, the shutdown command is sent to the BS2000
system. You must ensure that the system has completed all its task. BS2000 can terminate
during the wait period before the S120 is switched off. Once this wait period has expired,
the S120 is switched off, the SINIX system is shut down, and the SKP is switched off.
Definition of the time at which the SKP and the S120 are to be switched on/off, a
shutdown command, and the length of the wait time before the SKP and S120 are
switched off can be specified using the sysadm forms.
ÊSelect or open a SINIX screen
ÊLogin: root or sysadm
ÊEnter password
ÊFor login with root: enter sysadm
The SINIX system administration window is displayed.
ÊSelect the menu item “sinix_2000” on the UNIX System V, Administration menu.
ÊSelect the menu item “up_down” on the SINIX-2000 system administration menu.
You willfindadetailed descriptionofhow to configuretime-controlledstartup/shutdown
in the section “up_down” of the “SINIX-2000 V7.5/V8.0” manual.
Please see the note on page 26.
!
U41182-J-Z126-1-7427
Switching the SKP and S120 on and off using ATOP 3925Switching on and off
5.5Switching the SKP and S120 on and off using ATOP 3925
Console
SKP
ATOP
COM1
Remote operator terminal
Figure 15: Switching the SK P and S120 on and off using ATOP 3925
I/O channel
internal LAN
V.24
on/off facility
LAN
S120
SVP
Together with the 3925 Multi-ATOP, the SKP supports the possibility of switching the S120
on automatically using the on/off facility.
In addition, the S120 must be configured to switch on and off automatically as part of the
starting and shutting down procedure for the SKP (see page 25).
The ATOP switches the SKP on via its remote switching interface. The SKP switches during
startup the S120 on. After the IMPL, the BS2000 system is started using the POWER ON
IPL function of the SVP or using the ATOP menu.
The BS2000 system can be operated both via the ATOP and manually by the operator.
To switch off the system, BS2000 must first of all be exited (ATOP/operator). The S120 is
switched off by the ATOP. Therefore the ATOP sends the command
/usr/apc/bin/onoff -off to the SINIX of the SKP. Afterwards the ATOP can terminate
the SINIX system by sending the command shutdown and can switch off the SKP.
You will find information on operating and programming the ATOP in the ATOP operating
instructions enclosed.
28U41182-J-Z126-1-74
Switching on and offSwitching the S120 on and off from a remote system
5.6Switching the S120 on and off from a remote system
DCU
8323
or
Console
DCU
8323
Figure 16: Switching the S120 on and off from a remote system
Modem
Telephone network
Modem
ATOP
Remote operator terminal
SKP
COM1
I/O channel
internal LAN
V.24
on/off facility
LAN
S120
SVP
Switching on and off can be carried out from a remote system using a modem/DCU. In
addition, automatic switching on/off of the S120 must be configured as part of the starting
and shutting down procedure for the SKP (see page 25). The SKP switches during startup
the S120 on. After the IMPL, the BS2000 system is started using the POWER ON IPL
function of the SVP.
Information on operating the DCU can be found in the data sheet “8323 Data Communication Unit” [5].
U41182-J-Z126-1-7429
Eine Dokuschablone von Frank Flachenecker
Loading...
+ 79 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.