ETC® Setup Guide
The battery pack option (UBPO) kit provides battery
power to the architectural control processor for up to 90
minutes during power outages when installed in an
ERn2 or DRd enclosure, or up to 40 minutes when
installed in an ERn4 enclosure with two Paradigm
Architectural Control Processors. The self-contained
battery pack installs on the bottom of the enclosure.
connects to DRd
or ERn right I/O
connects to ERn4
(2nd processor)
right I/O only
Battery cable lead
(connection required
prior to installation)
Unison Battery Pack Option Kit Installation
Note:
A single DRd enclosure supports the use of either the Unison ride thru option
(URTO) kit or the Unison battery pack option (UBPO) kit, but not both in the same
enclosure.
Install the Battery Pack Option Kit
The battery pack option kit is provided with a battery pack and a wiring harness with a four pin
connector. The battery pack also includes a battery cable lead which must be connected to the battery
prior to installation.
The wiring harness splits into two twisted pairs of cable with a two pin connector on each end. The
shorter of the two twisted pairs connects to the right I/O board of either a host DRd or ERn enclosure.
The longer of the two twisted pairs is used specifically for installation in an ERn4 top position right I/O
board. Cable tie this twisted pair back and out of the way when it is not required.
Corporate Headquarters
London, UK
Rome, IT
Holzkirchen, DE
Hong Kong Rm 1801, 18/F, Tower 1 Phase 1, Enterprise Square, 9 Sheung Yuet Road, Kowloon Bay, Kowloon, Hong Kong Tel +852 2799 1220 Fax +852 2799 9325
Service:
Web:
7183M2250
Unit 26-28, Victoria Industrial Estate, Victoria Road, London W3 6UU, UK Tel +44 (0)20 8896 1000 Fax +44 (0)20 8896 2000
Via Pieve Torina, 48, 00156 Rome, Italy Tel +39 (06) 32 111 683 Fax +44 (0) 20 8752 8486
(Americas) service@etcconnect.com
www.etcconnect.com
Rev C Released 2011-06 ETC intends this document to be provided in its entirety.
3031 Pleasant View Road, P.O. Box 620979, Middleton, Wisconsin 53562-0979 USA Tel +608 831 4116 Fax +608 836 1736
Ohmstrasse 3, 83607 Holzkirchen, Germany Tel +49 (80 24) 47 00-0 Fax +49 (80 24) 47 00-3 00
Copyright © 2011 ETC. All Rights Reserved. Product information and specifications subject to change.
(UK) service@etceurope.com (DE) techserv-hoki@etcconnect.com
(Asia) service@etcasia.com
Unison Battery Pack Option Kit Setup Guide Page 1 of 4 Electronic Theatre Controls, Inc.

ETC Setup Guide
DRd rack before UBPO cable and connector installation
DRd rack after UBPO cable and connector installation
Connect Battery Cable
The battery cable is left disconnected when shipped from the factory and should be connected prior to
installation.
Step 1: Temporarily remove the six screws securing the cover to the battery pack.
Step 2: Locate the loose red battery cable lead and attach it to the spade receptacle on the
battery.
Unison Battery Pack Option Kit
Note:
Step 3: Replace the cover and secure it with the six screws previously removed.
You might find it easier to lift the battery up slightly from the container to fit the
spade onto the receptacle.
Install Battery Pack
Step 1: Install the wiring harness into the enclosure (the connector is keyed to ensure proper
orientation). Harness installation into the enclosure is similar for both a host DRd and a
host ERn enclosure.
a: Insert the connector end through the opening in the bottom of the enclosure. The
connector is designed to snap into place without additional hardware, therefore slight
force may be required to ensure the connector installs properly.
Step 2: Connect to the right I/O board.
Unison Battery Pack Option Kit Setup Guide Page 2 of 4 Electronic Theatre Controls, Inc.

ETC Setup Guide
DRd right I/O ERn right I/O
Ride Thru / Batt
Ride Thru/Batt
a: Connect the two pin connector from the shorter twisted pair to the two pin receptacle
labeled “Ride Thru/Batt” on the right I/O board of the host product. In an ERn4 connect
to the bottom right I/O board.
b: The second (longer) twisted pair is required only for an ERn4 enclosure and should
be tied back when not required. For an ERn4, connect the two pin connector from the
longer twisted pair to the two pin receptacle labeled “Ride Thru/Batt” on the top right
I/O board.
Unison Battery Pack Option Kit
Ride Thru/Batt
to Signal Distro
Source
OFF
DUAL RACKS
DMXADMXB
End
24V In
- + - + - + - + - +
Aux Power
B A B A B A B A B A B A
LON
LON
DMX A
DMX Pass -Thru
DMX B
DMXA
DMXB
RPS IN
Ride-Thru/ Batt
CDI
LON
Unison Battery Pack Option Kit Setup Guide Page 3 of 4 Electronic Theatre Controls, Inc.

ETC Setup Guide
see note after step 4a instructions
Step 4a:
Step 4b:
Step 3: Secure the wiring harness and twisted pairs to the host enclosure using the supplied
cable tie. A loose or poorly routed wiring harness could interfere with option module (ERnNET or ERn-RPS) or option board (DRd-FLO or DRd-DALI) installation.
Step 4: Install the battery pack on to the bottom of the enclosure.
Unison Battery Pack Option Kit
a: Insert the tabs from the battery pack into the enclosure slots.
Note:
Unison Battery Pack Option Kit Setup Guide Page 4 of 4 Electronic Theatre Controls, Inc.
As the battery is mated to the rack, the connector on the battery pack and the
connector receptacle installed in step 1 also mate.
b: Secure the battery pack to the enclosure using the captured screw provided.