General information
3
1 General information
Support for cleaning and maintenance
This document helps support you with the cleaning and maintenance of the boiler. The required steps are listed in detail here.
Take note of the date of the cleaning or maintenance and any faults that may have occurred. This facilitates troubleshooting for the expert (system operator, heating technician...).
For services (such as commissioning, mainte-
nance, fault fixing provided by ETA customer service), the service reports are provided in digital form. For clarity , you should staple th ese reports to this document or enclose them.
Commissioning data
Enter the boiler number (printed on the type plate), the date of commissioning as well as the heating technician who commissioned the system.
Copyright
All contents of this document are property of ETA Heiztechnik GmbH and are protected by copyright. Any reproduction, transfer to third parties or use for other purposes is prohibited without written permission from the owner.
Subject to technical changes
We reserve the right to make technical modifications without notice. Printing and typesetting errors or changes of any kind made in the interim are not cause for claims. Individual configurations depicted or described here are only available optionally. In the event of contradictions between individual documents regarding delivery scope, the information in our current price list applies.
Explanation of symbols
Instructions and information
Layout of safety instructions
SIGNAL WORD!
Type and source of danger
Possible effects
Measures for avoiding the danger
Types of safety instruction
CAUTION!
On non-compliance with this safety instruction, there is a risk of material damage.
WARNING!
On non-compliance with this safety instruction, there is a risk of physical injury.
DANGER!
On non-compliance with this safety instruction, there is a risk of major physical injury.
Commissioning data
Boiler number: ________________________________________ Commissioned on: _________________________________________ Commissioned by (company): _________________________________________
_________________________________________
_________________________________________
4 www.eta.co.at
Maintenance notes Cleaning and maintenance
2 Cleaning and maintenance
2.1 Maintenance notes
Performing regular cleaning and maintenance
To ensure satisfactory functioning, cleaning and maintenance must be performed at regular intervals. Carry out this work within the intervals stated here.
All tasks where the maintenance table reads
"Customer" or "Customer or expert" in the column "T o b e carried out by" can be carr ied out by any trained adult. Instructions can be provided by the heating technician or our customer service. Steps that are marked with "Expert" only can only be carried out by the heating tech nician or our customer service.
Operation only by trained personnel
The product may be operated by trained adults only. Training may be provided by the heating technician or our customer service. Please read the associated doc­umentation carefully in order to avoid errors during operation and maintenance.
Persons who lack experience and knowledge as well as children may not operate, clean, or maintain the product.
Explanation of pictograms
Switch the boiler on/off with the mains switch.
Perform a visual check of the components.
Clean the components, for example, with a soft cloth.
Remove deposits with a vacuum or an ash vacuum.
Remove deposits with the poker.
Remove deposits with the cleaning brush.
Replace the wear parts (e.g. seals) on the components.
Lubricate the components. The lubricant to use is listed in the respective step.
Install the components with some force (for example the retaining tube or the Lambda probe).
Handle the components carefully, since they break very easily.
Clean panels
If necessary, clean the panels of the boiler and the ETAtouch screen with a moist cloth.
Under no circumstances use aggressive solvents, chemicals or scouring agent s. They can
lead to stress cracks and damage.
Checking the boiler counters
The counters can be seen in the boiler's text menu. Counter [Full load hours since maint.] is used for the service intervals. If it has reached one of the listed intervals, maintenance is required. This counter is in:
Counters
Full load hours since maint.
Cleaning and maintenance Maintenance notes
5
6 www.eta.co.at
Maintenance openings in the boiler Cleaning and maintenance
2.2 Maintenance openings in the
boiler
Maintenance openings and components
The illustrations show a boiler with a size of 2 (63
- 90 kW) with its fuel discharge on the left side. The fuel discharge depicted here is the standard con­figuration.
1 Combustion chamber door 2 Secondary air actuator (mirrored for fuel discharg e
installed on the right) 3 Actuator for tilting grate 4 Maintenance cover for optional flue gas recircula-
tion 5 Primary air actuator (mirrored for fuel discharge
installed on the right) 6 Firebed switch (mirrored for fuel discharge
installed on the right) 7 Safety switch for rotary valve maintenance cover
8 Plug screw for lubricating the stoker drive chain 9 Turnbuckle for the stoker drive chain 10 Drop chute safety switch 11 Drop chute maintenance cover
Cleaning and maintenance Maintenance openings in the boiler
7
1 Shut-off plug for optional flue gas recirculation 2 Maintenance cover for optional flue gas recircula-
tion 3 Flue gas temperature sensor 4 Heat exchanger cleaner 5 Ignition 6 Stoker drive chain 7 Maintenance cover for optional flue gas recircula-
tion 8 Plug screw for lubricating the de-ashing system's
drive chain 9 Draught fan
8 www.eta.co.at
Maintenance table Cleaning and maintenance
2.3 Maintenance table
Tasks
Regular
ly
Every
2500 h
or
1 year
Every
5000 h
or
3years
to be
performed by
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals
X X X Customer
Check the pressure of the heating system X X X Customer Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path
X X
Customer or
specialist
Chimney
Clean the flue tube
Flush the chimney's condensate drain
X X
Customer or
specialist
Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining
X X
Customer or
specialist
Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover
X X
Customer or
specialist
Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
X X
Customer or
specialist
Clean the draught fan X Specialist Clean the temperature sensor X Specialist Check air valve for primary and secondary air X Specialist Check the ash box position switch X Specialist Check de-ashing system X Specialist Clean ignition X Specialist Check boiler doors X Specialist Check stoker
Check stoker drive chain
Check gap of the rotary valve position sensor
X Specialist
Check drop chute safety switch X Specialist Check end position of the rotary valve X Specialist Calibrate the lambda probe X Specialist
Cleaning and maintenance Maintenance table
9
Reset the maintenance counter X Specialist Perform heating test X Specialist
Tasks
Regular
ly
Every
2500 h
or
1 year
Every
5000 h
or
3years
to be
performed by
10 www.eta.co.at
Regularly Cleaning and maintenance
2.4 Regularly
2.4.1 Preparation
Stop heating
End the boiler's heating mode with the On/Off switch
in the boiler overview window. The boiler performs an ember burnout and then changes to [Switched off] mode. Press the [De-ash] button to make the boiler perform a final de-ashing.
2.4.2 Empty the ash box
Remove excess ash from secondary combustion chamber
Open the combustion chamber door and use the poker to scrape the excess ash into the combustion chamber.
The ash in the secondary combustion chamber may not be steeper than 45°.
To remove this ash, initiate boiler de-ashing by pressing the [De-ash] button.
Empty the ash box, inspect the seals
By knocking on the vertical wall of the ash box,
you can also check the ash level without opening the box. A full ash box makes a short, dull thump. When empty it makes a hollower sound like a drum.
Open both lateral fasteners by pressing their safety catches in the direction of the arrow. Remove the ash box from the boiler.
Fig. 2-1: Fastener
Remove the lid by opening the fastener s and empty the ash box.
Fig. 2-2: Check ash
If there are large pieces of slag in the ash, the
combustion chamber and the tilting grate must be checked and the de-ashing interval reduced, if necessary.
Cleaning and maintenance Regularly
11
Inspect the seal on the ash box lid to ensure it is in good order, and replace it if necessary.
Fig. 2-3: Seal
Inspect the integrity of the ash box seals on the boiler, replace them if necessary.
Fig. 2-4: Seal
Attaching the ash box to the boiler
Reattach the cover of the ash box and secure with the fasteners. Push the ash box over the connection on the boiler and attach it to the boiler with the fasteners.
2.4.3 Check pressure of the heating system
Check heating system water pressure
In buildings with up to three storeys, the optimum water pressure in a cold heating s ystem is betwee n 1 and 2 bar. For a warm heating system, the optimum water pressure is between 1.5 and 2.5 bar.
Fig. 2-5: Pressure gauge
If the water pressure is too low, fill the cold
heating system to approx. 2 bar. Do not fill to a higher pressure, as water expands with increasing temperature and the water pressure al so rises when the boiler is in heating mode. The safety valve triggers at approx. 2.8 bar.
If the water pressure drops several times a year,
contact a heating professional. When refilling water in the heating system, the same water as used during initial filling should be used whenever possible (e.g. prepared water).
2.4.4 Establish operational readiness
Switching on the boiler
Switch the boiler back on with the On/Off switch.
12 www.eta.co.at
2500 h / annually Cleaning and maintenance
2.5 2500 h / annually
2.5.1 Preparation
Stop heating
End the boiler's heating mode with the On/Off switch
in the boiler overview window. The boiler performs an ember burnout and then changes to [Switched off] mode. Press the [De-ash] button to make the boiler perform a final de-ashing.
Switch off boiler via mains switch
WARNING!
Switch off the electricity to the boiler via the mains
switch. This prevents injuries caused by switching the boiler on inadvertently.
WARNING!
Burns caused by hot parts
Risk of burning on parts located behind the boiler housing, even after shutting the boiler down.
Allow the boiler to cool down sufficiently
before starting any activities.
2.5.2 Check safety devices
Checking the safety valves
Perform a visual check of all safety valves of the heating system. The outlets of the safety valves may not drip.
Fig. 2-6: Safety valve
If the safety valve drips, open it with a quarter turn of the red cap and rinse it out (danger of scalding). If the safety valve still cannot be sealed effectively after being rinsed several times, it must be cleaned or replaced by an installer (heating technician).
A manual check of the safety valve is carried out
with a 1/4 turn of the red cap. This rinses the safety valve. However it is very likely that the seal will be damaged in the process and thus the outlet will drip. That is why you should only perform this check on weekdays and never on weekends in cold winter , as no heating technician may be available if the seal is defective.
Check function of safety devices in fuel path
Check the safety devices in the fuel path, such as the temperature-monitoring system, the manually operated extinguishing system or the automatic extin­guishing system.
Also check malfunction indicators and alarms, for example if messages from the boiler room are displayed elsewhere.
Cleaning and maintenance 2500 h / annually
13
Checking the thermal relief valve
Visually examine the thermal relief valve. The outlet should not drip.
Fig. 2-7: Thermally actuated drain valve
If the relief valve is dripping, rinse it by pressing the red button (risk of scalding). If the relief valve still cannot be closed tightly after being rinsed several times, it must be cleaned by an installer (heating technician) o r replaced.
A manual check of the relief valve is carried out
by pressing the red button. This rins es the relief valve. However it is very likely that the seal will be damaged in the process and thus the outlet will drip. That is why you should only perform this check on weekdays and never on weekends in cold winter , as no heating technician may be available if the seal is defective.
2.5.3 Chimney
Clean the flue tube
Sweep the flue tube from the flue outlet to the chimney and remove flue ash from the chimney using a vacuum cleaner.
Fig. 2-8: Flue tube
Sweep the ash into the chimney, not into the boiler. Otherwise, ash will collect in the
fan housing and can block the draught fan.
Rinse the chimney's condensate drain
Check the chimney's condensate drain to make sure it is free, as ash can block the outlet. To check, rinse the outlet with some water.
Fig. 2-9: Condensate drain
14 www.eta.co.at
2500 h / annually Cleaning and maintenance
2.5.4 Cleaning the combustion chamber
Clean inside of the secondary combustion chamber
Open the combustion chamber door an d scrape all of the ash from the secondary combustion chamber into the primary combustion chamber with the poker.
Fig. 2-10: Secondary combustion chamber
Remove the combustion chamber cover in the secondary combustion chamber.
Fig. 2-11: Combustion chamber cover
Remove the cover on the front
Remove the screws for securing the cover. Push the cover on the front up slightly, detach and remove it.
Fig. 2-12: Cover
Clean tilting grate
Press the button on the tilting grate's actuator and tilt the grate with the supplied tool.
Fig. 2-13: Actuator
Use the poker to clean the tilting grate and the openings in it; let the ash fall down.
Fig. 2-14: Tilting grate
Cleaning and maintenance 2500 h / annually
15
Do not hit the tilting grate with the poker.
Clean secondary air openings
Clean secondary air openings (above the tilting grate).
Fig. 2-15: Secondary air openings
Clean the ignition tube
Check the ignition tube for combustion residues and clean it by vacuuming.
Fig. 2-16: Ignition tube
Check firebed button and firebed switch
Check the mobility of the firebed button in the combustion chamber by repeated lifting.
Fig. 2-17: Firebed button
The firebed switch on the front of the boiler must be actuated when lifting.
Fig. 2-18: Firebed switch
Check refractory lining
Check the refractory lining of the primary and secondary combustion chambers for damage and cracks.
16 www.eta.co.at
2500 h / annually Cleaning and maintenance
Replace the combustion chamber cover
Reinsert the combustion chamber cover , ensur ing that it is properly centred.
Fig. 2-19: Combustion chamber cover
The convex surface of the combust ion chamber cover must point to the top of the boiler.
Mount cover on the front
Mount the cover on the front of the boiler . Also re-install the screws for securing the cover.
Fig. 2-20: Cover
2.5.5 Cleaning the heat exchanger
Remove heat exchanger cover
Open the maintenance cover in the top of the boiler casing and remove the insulating cover.
Fig. 2-21: Insulating cover
Loosen the knurled nuts on the heat exchanger cover by turning it anti-clockwise and rotate the ball knobs by 180°.
Fig. 2-22: Knurled nuts and ball knobs
Remove the heat exchanger cover.
Fig. 2-23: Heat exchanger cover
Cleaning and maintenance 2500 h / annually
17
Clean heat exchanger and downdraft channel
Remove the internal cover between the secondary combustion chamber and the heat exch an g er.
Fig. 2-24: Internal cover
Brush out the downdraft channel and rem ove the flue ash from the heat exchanger, for example with an ash vacuum.
Fig. 2-25: Heat exchanger and downdraft channel
After cleaning, replace the internal cover. Ensure that it is firmly seated.
Clean lambda probe
Vacuum out the head of the lambda probe using a vacuum cleaner. Do not dismantle the lambda probe.
Fig. 2-26: Head of the lambda probe
Check heat exchanger tubes
Check the heat exchanger tubes and the turbulators for tar deposits.
Fig. 2-27: Heat exchanger tubes
18 www.eta.co.at
2500 h / annually Cleaning and maintenance
Tar deposits can have several causes, for example:
leak air through the heat exchanger cover, the combustion chamber door or the lambda probe.
an incorrectly calibrated lambda probe
overly moist wood chips
insufficient boiler runtime (start-stop operation)
Check heat exchanger cleaner
Remove the cover for the heat exchanger cleaner drive.
Fig. 2-28: Cover
Manually operate the lever and check its ease of movement. Lubricate the spring, guide and bearing with a heat-resistant lubricant.
Fig. 2-29: Lever
Check the gap between the sensor and the spring a rm. It must be 2 mm.
Fig. 2-30: Position sensor
Finally, re-attach the cover to the boiler.
Check seal on heat exchanger cover
Inspect the integrity of the seal on the heat exchanger cover and replace if necessary.
Fig. 2-31: Heat exchanger cover
Cleaning and maintenance 2500 h / annually
19
CAUTION!
Avoid operation with damaged seals
Never operate the boiler with damaged seals. Otherwise, leak air is sucked in, disturbing the combustion process and causing increased wear.
Always replace seals as soon as they are
damaged.
Close heat exchanger cover
Position the heat exchanger cover carefully.
Fig. 2-32: Heat exchanger cover
Turn both ball knobs through 180° to secure the heat exchanger cover. Then tighten the two knurled nuts evenly and cross-wise by turning them clockwise.
Fig. 2-33: Knurled nuts and ball knobs
Put the insulating cover back on.
Fig. 2-34: Insulating cover
20 www.eta.co.at
2500 h / annually Cleaning and maintenance
2.5.6 Clean flue gas recirculator (optional)
Remove the maintenance cover for flue gas recir­culation
Remove the two maintenance covers for the flue gas recirculation from the back side of the boiler.
Fig. 2-35: Maintenance cover
Also remove the shut-off plug (if present).
Fig. 2-36: Shut-off plug
Also remove the two maintenance covers from the front side of the boiler.
Fig. 2-37: Maintenance cover
Clean flue gas recirculation piping
Brush out the pipes of the flue gas recirculation with the brush and remove the ash with a vacuum cleaner.
Fig. 2-38: Pipes
Fig. 2-39: Pipes
Cleaning and maintenance 2500 h / annually
21
Also brush out and clean out the pipes on the front side of the boiler.
Fig. 2-40: Pipes
Inspecting seals on maintenan ce co ve rs
Check all seals for the maintenance cover of the flue gas recirculation to ensure they are in good condition, replace if necessary.
Fig. 2-41: Seal
CAUTION!
Avoid operation with damaged seals
Never operate the boiler with damaged seals. Otherwise, leak air is sucked in, disturbing the combustion process and causing increased wear.
Always replace seals as soon as they are
damaged.
Re-install maintenance cover.
Replace the shut-off plug (if this was already installed).
Fig. 2-42: Shut-off plug
Re-install all maintenance covers for flue gas recircu­lation.
Fig. 2-43: Maintenance cover
22 www.eta.co.at
2500 h / annually Cleaning and maintenance
Fig. 2-44: Maintenance cover
2.5.7 Establish operational readiness
Switch the boiler on via the mains switch and start de-ashing.
Establish the boiler's power supply at the mains switch. Press the [De-ash] button to de-ash the boiler. Switch the boiler back on with the On/Off switch.
Cleaning and maintenance 5000 h / 3 years
23
2.6 5000 h / 3 years
2.6.1 Preparation
Before this maintenance, perform all steps for the preceding maintenance intervals
Before this maintenance, all steps for the preceding maintenance intervals must be
performed.
WARNING!
The following activities may only be performed by qualified specialist personnel.
If you carry out these activities without the correspond­ing specialist training, and above all without the required experience, safe operation is no longer guaranteed. The resulting defects and consequential damage are excluded from the guarantee and warranty.
Equally an incorrect performance of these activities can lead to serious injuries.
Stop heating
End the boiler's heating mode with the On/Off switch
in the boiler overview window. The boiler performs an ember burnout and then changes to [Switched off] mode. Press the [De-ash] button to make the boiler perform a final de-ashing.
Switch off boiler via mains switch
WARNING!
Switch off the electricity to the boiler via the mains
switch. This prevents injuries caused by switching the boiler on inadvertently.
WARNING!
Burns caused by hot parts
Risk of burning on parts located behind the boiler housing, even after shutting the boiler down.
Allow the boiler to cool down sufficiently
before starting any activities.
2.6.2 Clean draught fan
Clean the draught fan
Unplug the power supply and remove the draught fan from the boiler by removing the wing screws.
Fig. 2-45: Draught fan
Remove the ash from the fan housing on the boiler.
Fig. 2-46: Clean the fan housing
Carefully clean the impeller of the draught fan with a soft brush (not a wire brush) or with compresse d air , so that the impeller does not move out of balance. Replace the seal on the draught fan.
Fig. 2-47: Clean impeller; replace seal
24 www.eta.co.at
5000 h / 3 years Cleaning and maintenance
Lubricate the screws with heat-resistant lubricant and reattach the draught fan to the fan housing. T ighten the screws evenly. The plug connection must point to the right when viewed from behind the boiler.
2.6.3 Clean temperature sensor
Clean the flue gas temperature sensor
To clean, loosen the screw and pull out the flue gas temperature sensor. Clean the sensor with a soft cloth and then re-install it. When fixing the temperature sensor in place, only tighten the screw hand-tight so as not to damage the sensor.
Fig. 2-48: Flue gas temperature sensor
Cleaning and maintenance 5000 h / 3 years
25
2.6.4 Check air valve
Remove the cover on the front
Remove the screws for securing the cover. Push the cover on the front up slightly, detach and remove it.
Fig. 2-49: Cover
Check air valve
Manually operate both air valve ac tuators and check their movement.
Fig. 2-50: Air valve actuators
For manual operation, push the release button (red button) and manually turn the actuator through 90° with the set screw.
Fig. 2-51: Manual operation of actuator
1 Set screw 2 Release button
If there is resistance in the movement of the air valves, lubricate only with dry lubricant (e.g.
PTFE spray).
Mount cover on the front
Mount the cover on the front of the boiler . Also re-install the screws for securing the cover.
Fig. 2-52: Cover
26 www.eta.co.at
5000 h / 3 years Cleaning and maintenance
2.6.5 Check ash box position switch
Check the ash box position switch
Inspect the function of the ash box position switch. It must be actuated when the ash box is fitted.
Fig. 2-53: Position switch for ash box
2.6.6 Check de-ashing
Lubricating the de-ashing drive chain
On the rear of the boiler, remove the plug screw from the cover next to the de-ashing drive.
Fig. 2-54: Plug screw
Through this opening, lubricate the de-ashing drive chain with chain spray. The easiest way to do this is to start de-ashing. This sets the chain in motion so it can be completely lubricated.
Check de-ashing system
Start de-ashing in order to check de-ashing of the boiler. The movement of the turbulators in the heat exchanger must be audible, the tilting grate must tip and then close again, and the ash screws must operate without malfunction.
Cleaning and maintenance 5000 h / 3 years
27
2.6.7 Clean ignition
Clean ignition fan and photocell
Remove the ignition fan from the boiler.
Fig. 2-55: Removing the ignition fan
Detach the ignition tube by loosening the 4 screws and remove the ignition rod. Clean the photocell with a soft cloth. Then reattach the ignition tube.
Fig. 2-56: Photocell
Also clean the opening in the boiler for the ignition tube.
Fig. 2-57: Ignition tube
Re-install the ignition fan and attach it to the boiler with the chain.
28 www.eta.co.at
5000 h / 3 years Cleaning and maintenance
2.6.8 Check boiler doors
Check airtightness of combustion chamber door
Open and then close the combustion chamber door. When closing, make sure that it closes tightly and with force. The sealing edges of the door frame must leave a clear indentation in the sealing cord of the combustion chamber door.
Leaks can be detected by variations in the
colouration of the sealing cord. If leaks are found, it is usually sufficient to adjust the hinges and the closing roller mount. If the hinges cannot be adjusted any further, the sealing cord must be replaced.
Fig. 2-58: Seal
Also check if the sealing cord is already "hard". To
check, press on the sealing cord with your finger nail. If it can no longer be pressed, it is "hard" already and must be replaced.
Adjustment requires the removal of the combustion chamber door. To do so, open the combustion chamber door, lift it slightly, remove it and carefully place it next to the boiler.
1 Closing roller mount 2 Hinge
Loosen the flange nuts (top and bottom) on the hinge and the closing roller mount and evenly make the gap to the boiler a bit smaller.
Fig. 2-59: Flange nut
Push the hinge and the closing roller mount onto the boiler and tighten the flange nuts.
Fig. 2-60: Reduce gap
Attach the door and check whether it closes fully . If no t, repeat the process.
Always adjust the hinges and the closing roller mount so that the seal is evenly
compressed.
Cleaning and maintenance 5000 h / 3 years
29
2.6.9 Check stoker
Check stoker drive chain
Remove the drive chain cover by loosening the acorn nuts.
Fig. 2-61: Cover
Check the tension of the stoker drive chain. The chain may sag by 1 - 2 cm without effort.
Fig. 2-62: Stoker drive chain
If it sags more, the chain must be tensioned with the turnbuckle.
Fig. 2-63: Turnbuckle
Lubricate the drive chain with chain spray.
Fig. 2-64: Lubricate drive chain
30 www.eta.co.at
5000 h / 3 years Cleaning and maintenance
Check gap of the rotary valve position sensor
Check the gap between the screw in the gear and the sensor. The gap should be about 1 - 2 mm.
Fig. 2-65: Gap between sensor and screw
Mount the drive chain cover
Remount the drive chain cover.
Fig. 2-66: Cover
2.6.10 Inspect safety switch on the drop chute
Check the contact switch on the drop chute
Check the contact switch on the drop chute. To do so, raise the drop chute cover.
Fig. 2-67: Contact switch on the drop chute
Check drop chute safety switch
Check the safety switch on the drop chute. To do so, raise the drop chute cover.
Fig. 2-68: Drop chute safety switch
Cleaning and maintenance 5000 h / 3 years
31
2.6.11 Check end position of the rotary valve
WARNING!
Injuries caused by moving parts
Possible danger of crushing by stoker drive chain.
The boiler must be switched off. This prevents
injuries caused by switching the boiler on inadver­tently.
WARNING!
Injuries caused by moving parts
Possible danger of crushing by conveyor s crew.
Opening the drop chute cover results in a risk of
crushing by the accessible conveyor screw. Therefore, perform only a visual check. Never reach into the conveyor screw.
Check end position of the rotary valve
The end position of the rotary valve is checked when filling using the [Rotary valve stop test] function. The function is found in the boiler text menu under:
When this function is activated, the rotaryvalve rotates until it is detected by the rotary valve position sensor and then it stops.
Next perform a visual check of the rotary valve end position. To do so, remove the locking nut and the spring and raise the drop chute cover.
Fig. 2-69: Visual check
The rotary valve is positioned correctly if the
opening in the rotary valve is completely visible from above (through the open drop chute cover). The rotary valve can then fully receive the discharge screw fuel.
Fig. 2-70: Correct and incorrect position of the rotary valve
If the opening is not completely visible, the end position must be adapted with the [Stoker delay] parameter. This parameter specifies the delay time for the rotary valve after it has been detected by the position sensor.
After setting the delay time, repeat the process to
check the setting. To do so, restart the [Rotary valve stop test] function and then perform a visual check.
Conveying system
Stoker unit
RotValveInPos
Rotary valve stop test
32 www.eta.co.at
5000 h / 3 years Cleaning and maintenance
Check the setting for the [RotValveStop] function
If the discharge screw and the stoker screw are in operation simultaneously, use the [Service] authorisa­tion in the boiler text menu to check the setting for the [RotValveStop] function. The factory setting is [Yes]. The function can be seen under:
It can be deliberately set to [No] if the used fuel requires it.
If the discharge screw and the stoker screw are in operation simultaneously and the function is set to [Y es], either the sensor is faulty or the gap betwee n the screw in the gear and the sensor is too large and must be adjusted. The gap should be about 1 - 2 mm.
2.6.12 Calibrate lambda probe
Calibrating the lambda probe
The boiler's built-in lambda probe checks the
residual oxygen content of the flue gas and uses it to control the combustion. To ensure reliability, the control system autonomously perf orms an automatic calibration after every 500 hours of operation.
If you wish to perform an additional lambda probe cal­ibration, the control system features the [Addl. calibra­tion] function. This function can be selected with the [Service] access level and can be found under:
Switch on this function and the additional calibration will now start. If the boiler is heating, it is automatically stopped first. De-ashing begins, then the boiler is purged with fresh air. After this, the residual oxygen content is measured and the lambda probe is automat­ically calibrated. Altogether, these steps last approxi­mately 1.5 to 2 hours. When the calibration is complete, the boiler goes back into operation and starts heating, if necessary.
After another 100 hours of operation, the control
system automatically performs another calibra­tion.
Conveying system
Stoker unit
RotValveStop
Inputs
Residual O2
Addl. calibration
Cleaning and maintenance 5000 h / 3 years
33
2.6.13 Establish operational readiness
Reset maintenance counter
When maintenance is complete, reset the counter. With the [Service] access level, it will be visible in the boiler text menu under:
Perform heating test
To perform the heating test, put the boiler into emissions measurement mode. To do this, carry out the following steps. In the boiler overview window, press the [Measurement] button in order to enter the emissions measurement settings window.
Fig. 2-71: Settings window for emissions measurement
Press the [Start now] button so the boiler will start immediately. The control system ensures that sufficient heat is channelled to the buffer, the heating circuits and the hot water tank.
After around 10 minutes of heating, the residual oxygen value should reach 6% to 9%. The current residual oxygen content is displayed in the boiler's text menu under:
If the value does not drop below 12% residual
oxygen, the boiler is receiving leak air. The reason (leaky combustion chamber door, heat exchanger cover, etc.) must be identified and corrected.
If possible, perform a flue gas measurement
during the heating test.
After the heating test, switch the boiler back to normal mode. T o do this, press the [Deactivate measurement]
button in the settings window.
Counters
Full load hours since maint.
Reset counter?
Boiler
Residual O2
34 www.eta.co.at
Cleaning (customer) Records
3 Records
3.1 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
Records Cleaning (customer)
35
3.2 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
36 www.eta.co.at
Maintenance (expert) Records
3.3 Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers Clean the draught fan
Clean the temperature sensor Check air valve for primary and secondary air Check the ash box position switch Check de-ashing system Clean ignition Check boiler doors
Check stoker
Check stoker drive chain
Check gap of the rotary valve position sensor Check drop chute safety switch
Check end position of the rotary valve
Records Maintenance (expert)
37
Comments:
Calibrate the lambda probe Reset the maintenance counter Perform heating test
Tasks Notes
performed on: _________________________
performed by: _________________________
38 www.eta.co.at
Cleaning (customer) Records
3.4 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
Records Cleaning (customer)
39
3.5 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
40 www.eta.co.at
Maintenance (expert) Records
3.6 Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers Clean the draught fan
Clean the temperature sensor Check air valve for primary and secondary air Check the ash box position switch Check de-ashing system Clean ignition Check boiler doors
Check stoker
Check stoker drive chain
Check gap of the rotary valve position sensor Check drop chute safety switch
Check end position of the rotary valve
Records Maintenance (expert)
41
Comments:
Calibrate the lambda probe Reset the maintenance counter Perform heating test
Tasks Notes
performed on: _________________________
performed by: _________________________
42 www.eta.co.at
Cleaning (customer) Records
3.7 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
Records Cleaning (customer)
43
3.8 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
44 www.eta.co.at
Maintenance (expert) Records
3.9 Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers Clean the draught fan
Clean the temperature sensor Check air valve for primary and secondary air Check the ash box position switch Check de-ashing system Clean ignition Check boiler doors
Check stoker
Check stoker drive chain
Check gap of the rotary valve position sensor Check drop chute safety switch
Check end position of the rotary valve
Records Maintenance (expert)
45
Comments:
Calibrate the lambda probe Reset the maintenance counter Perform heating test
Tasks Notes
performed on: _________________________
performed by: _________________________
46 www.eta.co.at
Cleaning (customer) Records
3.10 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
Records Cleaning (customer)
47
3.11 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
48 www.eta.co.at
Maintenance (expert) Records
3.12 Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers Clean the draught fan
Clean the temperature sensor Check air valve for primary and secondary air Check the ash box position switch Check de-ashing system Clean ignition Check boiler doors
Check stoker
Check stoker drive chain
Check gap of the rotary valve position sensor Check drop chute safety switch
Check end position of the rotary valve
Records Maintenance (expert)
49
Comments:
Calibrate the lambda probe Reset the maintenance counter Perform heating test
Tasks Notes
performed on: _________________________
performed by: _________________________
50 www.eta.co.at
Cleaning (customer) Records
3.13 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
Records Cleaning (customer)
51
3.14 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
52 www.eta.co.at
Maintenance (expert) Records
3.15 Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers Clean the draught fan
Clean the temperature sensor Check air valve for primary and secondary air Check the ash box position switch Check de-ashing system Clean ignition Check boiler doors
Check stoker
Check stoker drive chain
Check gap of the rotary valve position sensor Check drop chute safety switch
Check end position of the rotary valve
Records Maintenance (expert)
53
Comments:
Calibrate the lambda probe Reset the maintenance counter Perform heating test
Tasks Notes
performed on: _________________________
performed by: _________________________
54 www.eta.co.at
Cleaning (customer) Records
3.16 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
Records Cleaning (customer)
55
3.17 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
56 www.eta.co.at
Maintenance (expert) Records
3.18 Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers Clean the draught fan
Clean the temperature sensor Check air valve for primary and secondary air Check the ash box position switch Check de-ashing system Clean ignition Check boiler doors
Check stoker
Check stoker drive chain
Check gap of the rotary valve position sensor Check drop chute safety switch
Check end position of the rotary valve
Records Maintenance (expert)
57
Comments:
Calibrate the lambda probe Reset the maintenance counter Perform heating test
Tasks Notes
performed on: _________________________
performed by: _________________________
58 www.eta.co.at
Cleaning (customer) Records
3.19 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
Records Cleaning (customer)
59
3.20 Cleaning (customer)
Cleaning is to be carried out once a year or after 2500 hours.
Comments:
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers
performed on: _________________________
performed by: _________________________
60 www.eta.co.at
Maintenance (expert) Records
3.21 Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks Notes
Empty the ash box
Remove excess ash from secondary combustion chamber
Empty the ash box
Check the seals Check the pressure of the heating system _________ bar Check safety devices
Visual check of the safety valves
Visual check of the thermal relief valve
Check operational readiness of the safety devices in the fuel path Chimney
Clean the flue tube
Flush the chimney's condensate drain Clean combustion chamber
Clean inside of the secondary combustion chamber
Clean tilting grate
Clean secondary air openings
Clean the ignition tube
Check firebed button and firebed switch
Check refractory lining Clean heat exchanger
Clean heat exchanger and downdraft channel
Clean lambda probe
Check heat exchanger tubes
Check heat exchanger cleaner
Check seal on heat exchanger cover Clean flue gas recirculator (optional)
Clean flue gas recirculation piping
Inspecting seals on maintenance covers Clean the draught fan
Clean the temperature sensor Check air valve for primary and secondary air Check the ash box position switch Check de-ashing system Clean ignition Check boiler doors
Check stoker
Check stoker drive chain
Check gap of the rotary valve position sensor Check drop chute safety switch
Check end position of the rotary valve
Records Maintenance (expert)
61
Comments:
Calibrate the lambda probe Reset the maintenance counter Perform heating test
Tasks Notes
performed on: _________________________
performed by: _________________________