Introduction________________________________________________________________ A-1
Construction _______________________________________________________________ A-1
Shipping __________________________________________________________________ A-1
Installation warnings_________________________________________________________ A-3
Distances to respect__________________________________________________________ A-4
Installation ________________________________________________________________ A-6
Operation of the oven _______________________________________________________ A-10
Instructions to remove the conveyor and clean the oven FC18G ______________________ A-12
Instructions to remove the conveyor and clean the oven FC2G _______________________ A-20
Instruction to reverse direction of the conveyor ___________________________________ A-24
Maintenance of the burner ___________________________________________________ A-26
Instruction to remove the belt on the conveyor ___________________________________ A-28
Troubleshooting ___________________________________________________________ A-34
Cooking time and temperature recommendation __________________________________ A-36
Top diffuser FC18G __________________________________________________________B-1
Bottom diffuser FC18G _______________________________________________________B-2
Bottom diffuser FC2G ________________________________________________________B-3
Top diffuser FC2G ___________________________________________________________B-4
COMPONENT PARTS __________________________________________________________C-1
FC18G – Front view __________________________________________________________C-1
FC18G – Side view___________________________________________________________C-3
FC2G – Front view ___________________________________________________________C-5
FC2G – Top view ____________________________________________________________C-7
CONTROL PANELS ___________________________________________________________ D-1
Introduction ________________________________________________________________A-2
Construction ________________________________________________________________A-2
Expédition __________________________________________________________________A-2
Distances à respecter _________________________________________________________A-4
Avertissement lors de l'installation_______________________________________________A-5
Installation _________________________________________________________________A-8
Opération du four ___________________________________________________________A-11
Instructions pour enlever le convoyeur et nettoyer le four FC18G _____________________A-16
Instructions pour enlever le convoyeur et nettoyer le four FC2G ______________________A-22
Instruction pour inverser le convoyeur___________________________________________A-25
Entretien du brûleur _________________________________________________________A-27
Instruction pour enlever la courroie du convoyeur _________________________________A-31
Dépannage ________________________________________________________________A-35
Température et temps de cuisson recommandé ____________________________________A-36
AJUSTEMENT DES DIFFUSEURS D’AIR ___________________________________________B-1
Diffuseur du haut FC18G ______________________________________________________B-1
Diffuseur du bas FC18G_______________________________________________________B-2
Diffuseur du bas FC2G________________________________________________________B-3
Diffuseur du haut FC2G _______________________________________________________B-4
FC18G – Vue de face _________________________________________________________C-1
FC18G – Vue de côté _________________________________________________________C-3
FC2G – Vue de face __________________________________________________________C-5
FC2G – Vue de dessus ________________________________________________________C-7
PANNEAUX DE CONTRÔLE ____________________________________________________ D-1
AJUSTEMENT DU BRÛLEUR_____________________________________________________E-1
FC18 Gaz naturel ____________________________________________________________E-1
FC18 Gaz propane ___________________________________________________________E-2
FC2 Gaz naturel _____________________________________________________________E-3
FC2 Gaz propane ____________________________________________________________E-4
AVERTISSEMENT
Dans le cas où une odeur de gaz serait détectée, fermer la valve d'admission de gaz principale du
four et contacter la compagnie locale de gaz ou un technicien spécialisé.
A-1
SECTION A:
DESCRIPTION
INTRODUCTION
The manufacturer suggests to read this manual carefully.
This Jet Air oven is manufactured with first quality material by experienced technicians. Proper
installation and maintenance will guarantee a reliable service for years to come.
A nameplate fixed to the front or right side of the oven specifies the model number, type of
combustible, BTU rating, operating pressures, serial number, voltage and amperage.
Drawings and replacement parts numbers are included in this manual. The electrical diagram is affixed
in the control panel at the back of the oven.
ATTENTION
DOYON is not responsible for damages to the property or the equipment caused
by personnel who is not certified by known organisations. The customer is
responsible for finding qualified technicians in gas, electricity and plumbing for
the installation of the oven.
CONSTRUCTION
You just bought the most advanced gas fired oven in the world, "DOYON" technology at its best. This
gas fired oven is manufactured using the highest quality components and material.
The oven gives a perfect uniform baking with its unique Jet Air convection system. The DOYON oven
is designed with parts that are easy to find.
SHIPPING
For your safety, this equipment has been verified by qualified technicians and carefully crated before
shipment. The freight company assumes full responsibility concerning the delivery in good condition of
the equipment in accepting to transport it.
IMPORTANT
RECEPTION OF THE MERCHANDISE
Take care to verify that the received equipment is not damaged before signing the delivery receipt. If a
damage or a lost part is noticed, write it clearly on the receipt. If it is noticed after the carrier has left,
contact immediately the freight company in order that they do their inspection.
We do not assume the responsibility for damages or losses that may occur during transportation.
A-2
DESCRIPTION
INTRODUCTION
Le fabricant suggère de lire attentivement ce manuel et de suivre avec soin les instructions fournies.
Votre four à convection au gaz est fabriqué avec des matériaux de première qualité par des
techniciens d'expérience. Une utilisation normale et un entretien adéquat de l'équipement vous
assureront plusieurs années de bon service.
Une plaque signalétique, située sur le coin avant droit ou le côté droit du four, mentionne le numéro
de modèle, le type de combustible, BTU, le numéro de série, la tension, l'ampérage et les pressions
d'opérations.
Les dessins et les numéros de pièces de rechange sont inclus dans ce manuel. Le plan électrique est
affiché dans la boîte de contrôle à l'arrière du four.
ATTENTION
Équipement Doyon Inc. ne peut être tenu responsable pour les dommages causés à
la propriété ou à l'équipement par du personnel non certifié par des organismes
accrédités. Le client a la responsabilité de retenir les services d'un technicien
spécialisé gaz ou en électricité et d'un plombier qualifié pour l'installation du four.
CONSTRUCTION
Vous avez maintenant en votre possession le four au gaz le plus performant présentement disponible sur
le marché, un four utilisant la technologie "DOYON" à son meilleur. Ce four au gaz est fabriqué avec
des matériaux de première qualité.
Avec son système unique de convection «Jet Air», ce four vous permettra d'obtenir une cuisson
uniforme. Le four Doyon est fabriqué avec des matériaux et pièces composantes facilement disponibles
sur le marché.
EXPÉDITION
Pour votre protection, cet équipement a été vérifié et emballé avec précaution par des techniciens
qualifiés avant son expédition. La compagnie de transport assume la pleine responsabilité
concernant la livraison de cet équipement en bon état en acceptant de le transporter.
IMPORTANT
RÉCEPTION DE LA MARCHANDISE
Avant de signer le reçu de livraison, prenez soin de vérifier dès la réception si l'équipement n'est pas
endommagé. Si un dommage ou une perte est détecté, écrivez-le clairement sur le reçu de livraison
ou votre bon de transport et faites signer le livreur. Si le dommage est remarqué après le départ du
transporteur, contactez immédiatement la compagnie de transport afin de leur permettre de
constater les dommages causés.
Nous ne pouvons assumer la responsabilité pour les dommages ou les pertes qui pourraient survenir
pendant le transport.
A-3
INSTALLATION WARNINGS
The DOYON gas fired ovens are designed to be used with the gas specified on the descriptive
nameplate. Refer to National Fuel Gas Code, ANSI-Z223.1 and CAN/CGA.B149. Refer to last
edition year for XX. Copies of these are available at:
American Gas Association, 1515 Wilson Boulevard, Arlington, Virginia, 22209.
Canadian Gas Association, 55 rue Scarsdale, Don Mills, Ontario, Canada, M3B 2R3.
POWER FAILURE WARNING
WHEN YOU HAVE A POWER FAILURE, SHUT OFF THE OVEN POWER SWITCH TO
PROTECT THE ELECTRONIC COMPONENTS WHEN THE POWER COMES BACK.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS
AND LIQUIDS IN THE VICINITY OF THIS OR ANY APPLIANCE.
INSTALLATION AND SERVICE
WARNING
IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR
MAINTENANCE CAN CAUSE PROPERTY DAMAGE, INJURY OR DEATH.
READ THE INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT.
Installation and service must be done by specialised technicians. Contact a certified gas technician,
electrician and plumber for set up.
The oven must be connected to the utility and electrically grounded in conformity to the effective
local regulations. If these are not established, the oven must be connected according to the Canadian
Electrical Code (CSA-C22.1-XX) or National Electrical Code (NFPA 70-XX). Refer to last edition
year for XX. Installation must also allow proper access for service (24 inches each side and back).
The ovens must be installed with proper ventilation like:
• Under a vent hood
• Or an exhaust pipe connected directly to the oven chimney flue using the draft hood provided
with the oven.
A type B gas vent approved for use with gas appliances must be utilised.
Make sure that provision for adequate air supply is provided for the operation of the oven.
CAUTION
Make sure that the adjustments mentioned in the "Installation" section are correctly done
prior to firing the oven or converting to a new gas.
A-4
DISTANCES TO RESPECT
A)Back and sides of the oven:4 pouces.
B)Top of the oven:a clearance of 12 inches to the ceiling must exist to permit adequate
venting of the exhaust pipe and hot parts and to give proper access to a
technician. The draft hood must have a clearance of 2 inches minimum
all around.
C)Floor:on it's legs 4 inches minimum.
D)Sides of the oven:No clearance required from the end of the conveyor. Do not install other
than easily removable equipment for service and maintenance.
DISTANCES À RESPECTER
A)Arrière et coté du four :4 pouces.
B)Dessus du four :Il est obligatoire d'avoir au moins 12 pouces entre le dessus du four et le
plafond de manière à permettre une ventilation adéquate du tuyau
d’évacuation et des parties chauffantes tout en permettant l’accès à un
technicien.
C)Plancher :Une distance de 4 pouces minimum.
D)Les côtés du four :Pas d’espacement requis aux deux extrémités du convoyeur. Installer
uniquement des équipements légers et faciles à déplacer pour être en
mesure d’effectuer l’entretien de l'appareil..
A-5
AVERTISSEMENT LORS DE L'INSTALLATION
Les unités au gaz "DOYON" sont fabriquées pour être utilisées uniquement avec le type de gaz
spécifié sur la plaque d'identification. Se référer au Code National de Gaz, ANSI-Z223.1 et
CAN/CGA.B149. Référez-vous à l’année de la dernière édition pour XX. Des copies de ces normes
sont disponibles auprès de :
American Gas Association, 1515 Wilson Boulevard, Arlington, Virginia, 22209.
Association Canadienne du Gaz, 55 rue Scarsdale, Don Mills, Ontario, Canada, M3B 2R3.
PANNE ÉLECTRIQUE
LORS D'UNE PANNE ÉLECTRIQUE, FERMER L'INTERRUPTEUR DU FOUR POUR
PROTÉGER LES COMPOSANTES ÉLECTRONIQUES.
POUR VOTRE SÉCURITÉ
NE PAS EMMAGASINER OU UTILISER D'ESSENCE OU AUTRES VAPEURS
ET LIQUIDES INFLAMMABLES À PROXIMITÉ DE CET ÉQUIPEMENT
OU DE TOUT AUTRE APPAREIL.
INSTALLATION ET SERVICE
AVERTISSEMENT
UNE INSTALLATION, UN AJUSTEMENT, UNE ALTÉRATION, UN SERVICE OU UN
ENTRETIEN NON CONFORME AUX NORMES PEUT CAUSER DES DOMMAGES À LA
PROPRIÉTÉ, DES BLESSURES OU LA MORT. LIRE ATTENTIVEMENT LES DIRECTIVES
D'INSTALLATION, D'OPÉRATION ET D'ENTRETIEN AVANT DE FAIRE
L'INSTALLATION OU L'ENTRETIEN DE L'ÉQUIPEMENT.
L'installation et le service doivent être faits par un technicien spécialisé. Contactez un technicien
spécialisé en gaz, en électricité et un plombier certifié pour l'installation.
Cet appareil doit être branché et mis à la terre (grounded) conformément aux règlements effectifs de
votre localité. Si aucune réglementation n'est établie, le four doit être branché conformément au Code
Canadien de l’électricité CSA 22.1-XX ou au Code National de l'Électricité NFPA 70-XX. Référez-vous
à l’année de la dernière édition pour XX. L’installation doit aussi permettre un accès suffisant poureffectuer le service sur l’équipement (24 pouces sur toutes les faces).
Le four doit être installé sous une ventilation adéquate :
• Soit sous une hotte de ventillation
• Ou un tuyau d’échappement d'échappement doit être branché au-dessus du coupe tirage fourni avec
l'appareil
Le tuyau d'échappement de type B approuvé pour les appareils au gaz doit être utilisé.
Assurez-vous d'avoir un approvisionnement d'air suffisant afin d'assurer une ventilation adéquate pour
le bon fonctionnement du four.
AVERTISSEMENT
Assurez-vous que les ajustements mentionnés dans la section "Installation" ont été faits
correctement avant d'allumer le four ou de le convertir à un autre type de gaz.
A-6
INSTALLATION
IN GENERAL
Take off the packaging material with care. Take off all the material used for packing and accessories.
Install the draft hood on the chimney of the oven.
Each unit is set up to be used with the type of gas and electrical supply specified on the nameplate
fixed on the oven.
The installation must be conform with National fuel gas code ANSI Z223.1-XX and CAN/CGAB149-XX, Gas installation Code and local Codes where applicable. Refer to last edition year for
XX.
The oven's combustion system consists of a very safe gas burner certified in accordance to the
American Gas Association Standard in USA and with the Canadian Gas Association in Canada.
To the certified gas technician
The burner installed on DOYON gas fired ovens is set up and adjusted at the plant for a first
class operation. It is nevertheless necessary to verify on site the pressure at the burner input.
The following table indicates the pressures that must be set up to remain conform to the AGA
standards or CGA.
The burner used is adjusted for use with the gas indicated on the nameplate. It is nevertheless
possible to convert the burner to another gas by doing the modifications indicated in the
CONVERSION PROCEDURE provided with the oven. These modifications must be done carefully
and completely under the company's instruction to remain conform to A.G.A. or C.G.A standards.
Refer to Doyon Equipment to get the right CONVERSION KIT.
A-7
The installation must be made with a connector that meets with the standard for connectors movable gas
appliances ANSI Z21.69-XX and a Quick-disconnect device that complies with the standard for Quickdisconnect devices for use with gas fuel ANSI Z21.41-XX and addenda Z21.41a-XX and Z21.41b-XX. Refer
to last edition year for XX. It must also be installed with restraining device (chain comes with the oven) to
guard against transmission of strain to the gas supply and connectors. The pipe fittings compound must be
certified for gas.
The customer must install a manual shut off valve at the end of the gas supply pipe near the burner
which is approved by the American Gas Association Standard in Canada with the Canadian Gas
Association.
Clean the air contained in the gas supply pipe at the installation to insure a successful firing on the first
try. The gas pipe sealing compound tightness must be verified using a solution of water and soap prior
to firing the unit.
ATTENTION
Make sure not to obstruct the overpressure opening on the gas regulator.
NOTE: If there’s any modification done to the system or change of the type of gas used, make
sure that the regulator pressure of the burner is adjusted as recommended in this manual.
To the electrician.
Electrical supply installation must be in accordance with the electrical rating on the nameplate.
Check if the rotation of the motor is in accordance with the arrow on top of each unit.
If NOT
If the power supply is 3 phases and the unit is not connected in the right phase sequence, the fan
motor will turn the wrong way. This will affect the baking quality. Turn the power “OFF” and
change the phase sequence.
WARNING
The electrician must make sure that the supply cable does not come in contact with the oven top which
becomes hot.
A-8
INSTALLATION
EN GÉNÉRAL
Ouvrir avec soin l'emballage de votre équipement. Enlever tous les matériaux utilisés pour
l'envelopper ainsi que les accessoires. Installer le coupe tirage sur la cheminée du four.
Chaque unité est fabriquée pour être utilisée avec le type de gaz et la source électrique spécifiés sur
la plaque signalétique de l’appareil.
L'installation doit être conforme avec le Code National de Gaz, ANSI-Z223.1-XX et CAN/CGAB149-XX, le code d'installation au gaz et les codes locaux si applicables. Référez-vous à l’année de
la dernière édition pour XX.
Le système de combustion du four est conçu à partir d'un brûleur certifié en conformité avec les
normes de l'Association Américaine des Standards de Gaz et l'Association Canadienne de Gaz.
Au technicien spécialisé pour le gaz
Le brûleur installé sur les fours au gaz DOYON est monté et ajusté à l'usine par le fabricant
pour un fonctionnement optimal. Il est néanmoins nécessaire de vérifier sur place la pression à
l'entrée du brûleur. La table suivante indique la pression qui doit être ajustée pour se conformer
aux standards de AGA ou de CGA.
Le brûleur utilisé est ajusté pour être installé seulement avec le type de gaz spécifié sur la plaque
d'identification. Il est néanmoins possible de convertir le brûleur à un autre type de gaz en suivant
les modifications mentionnées dans la PROCÉDURE DE CONVERSION fournis avec le four. Pour
demeurer conforme aux standards de AGA et CGA, ces modifications doivent être faites au complet
et avec précaution en suivant les instructions du manufacturier. Se référer à Équipement Doyon
pour obtenir le nécessaire de conversion adéquat.
A-9
L'installation doit être faite avec un connecteur conforme aux standards des unités de gaz amovibles
ANSI-Z21.69-XX et un appareil "Quick-Disconnect" conforme aux standards pour les appareils
"Quick-Disconnect" pour utilisation avec du gaz ANSIZ1.41-XX et addenda Z21.41a-XX et Z21-41bXX. Référez-vous à l’année de la dernière édition pour XX. De plus, des équipements de retenues
(chaîne comprise avec le four) doivent être installés pour empêcher le tuyau d'alimentation et les
connecteurs de subir des tensions lorsque le four est déplacé. Le composé de joint à tuyau utilisé
pour relier les appareils au gaz doit être certifié résistant à l'action du gaz.
Le client doit installer une valve manuelle à la sortie de l’alimentation au gaz près du brûleur, laquelle
doit être approuvée par l’Association Américaine des Standards de Gaz aux États-Unis et par
l’Association Canadienne de Gaz au Canada.
Pour vous assurer d’un allumage lors de votre premier essai, vider le tuyau d’alimentation au gaz de
l’air qu’il contient lors de l’installation. Les joints des tuyaux devraient être vérifiés avec une solution
d’eau et de savon pour détecter les fuites avant de faire fonctionner l’unité.
ATTENTION
Ne pas obstruer le limiteur de fuite du régulateur de pression.
NOTE : Dans le cas d’une modification du système ou d’un changement de type de gaz, s’assurer
d’ajuster la pression du régulateur du brûleur telle que recommandée dans ce manuel.
À l’électricien
L’installation de l’alimentation électrique des fours doit être conforme avec la source électrique
spécifiée sur la plaque d’identification.
Vérifier si le moteur tourne dans le sens indiqué par la flèche.
Si ce n’est pas le cas ;
Si c’est un moteur 3 phases et que l’ordre de phase n’est pas correct, le moteur tourne du
mauvais sens. Ceci affectera la qualité de cuisson. Il faut couper l’alimentation et inverser deux
phases pour rétablir la situation.
AVERTISSEMENT
L’électricien doit s’assurer que le câble d’alimentation ne touche pas le dessus du four à cause du
degré élevé de chaleur dégagé par celui-ci.
A-10
OPERATION OF THE OVEN
1. Turn the switch to the " ON " position.
2. Adjust the thermostat at the desired setting (see THERMOSTAT INSTRUCTIONS below).
N.B. The thermostat display must be "ON" (If not, press the breaker on the front).
3. Adjust baking time according to your product. Use the up and down arrows on the speed control to
set your baking time.
(see suggestions in the tables)
4. Heat the unit until you reach the baking temperature.
When the desired temperature is reached, the red light ON goes out on the thermostat.
5. Place your products on the conveyor.
We recommend to use perforated pan or pizza screen.
6. To stop the oven, just turn the selector switch to "OFF" position. If the control compartment is too
hot, the cooling fan will run until the temperature drops.
THERMOSTAT INSTRUCTIONS
To obtain a very good thermal stability, we use a digital temperature controller with thermocouple.
The Omron E5CS thermostat controls the heat of every element at the SP (set point).
The temperature of the oven is always shown on the display of the thermostat and an arrow indicates
if the temperature is over or below the SP. When the green light is lit, it indicates that the
temperature is at the SP ± 1 %.
To adjust the SP (set point) value, you just have to press the key on the left and use the up and down
keys to set the temperature. Press the left key to return to run mode.
A-11
OPÉRATION DU FOUR
1. Démarrer le four (tourner le sélecteur à la position "MARCHE").
2. Ajuster le thermostat à la température désirée (voirFONCTIONNEMENT DU THERMOSTAT).
N.B.L'affichage digital doit être allumé. Si ce n'est pas le cas, vérifier le disjoncteur situé
sur le panneau avant.
3. Ajuster le temps de cuisson selon le produit. Utiliser les flèches sur le contrôleur de vitesse du
moteur. (voir les suggestions dans les tables)
4. Laisser chauffer jusqu'à ce que la température de cuisson soit stable, une lumière verte située
sur le thermostat s'allumera pour l'indiquer. (Si l'afficheur du thermostat est allumé et que le
four ne produit pas de chaleur, il y a un problème, contacter une compagnie de service.)
5. Placer les produits sur le convoyeur. Nous recommandons d’utiliser des pans perforées ou un
grillage à pizza.
6. Mettre le sélecteur à la position ‘Arrêt’ lorsque vous avez terminé l’utilisation.
Note : le ventilateur de refroidissement peut continuer de fonctionner si la température du
compartiment de contrôle est trop élevée. Il cessera de fonctionner lorsque la température sera
inférieure à la valeur désignée par le thermodisque.
FONCTIONNEMENT DU THERMOSTAT
Afin d'obtenir une très bonne stabilité thermique, nous utilisons un contrôleur de température digital
associé à un thermocouple. Le thermostat Omron E5CS maintient la température au point de
réglage SP (set point).
En tout temps, le contrôleur de température affiche la température du four et une flèche indique si
elle est supérieure ou inférieure au point de réglage SP (set point). Une lumière verte indique que la
température est à ± 1% de la valeur SP.
Pour régler la température, il suffit de presser sur le bouton de gauche pour sélectionner la variable
(SP) et d'utiliser les flèches pour régler la valeur. Il faut ensuite revenir au mode de fonctionnement
normal en appuyant à nouveau sur le bouton de gauche.
A-12
INSTRUCTIONS TO REMOVE THE CONVEYOR AND CLEAN
THE OVEN FC18G
12
ACB
1. Turn the power off ( A ).
♦ Remove the extended shelf ( B ).
♦ Remove the right tray ( C ).
3. Right tray ( C ).
♦ To remove the tray :
♦ Push ( 1 ) to the left (5mm), then lift
(10mm), then pull to the right ( 3cm )
♦ Pull the tray in the same direction as
indicated in ( 2 ) above.
D
2. Extended shelf ( B ).4. Left tray ( D ).
A-13
D
1
5. Left tray ( D ).
♦ To remove the tray :
♦ Push ( 1 ) to the right (5mm), then
lift (10mm), then pull to the left.
E
7. Remove gearbox cover ( E ).
♦ Lift ( 2cm ).
♦ Pull away from oven.
E
6. Remove gearbox cover ( E ).8. Remove rubber strap.
♦ Lift gearbox to remove the chain.
9. Lift conveyor ( 2cm ) and pull it out.10. Remove conveyor completely.
INTERIOR SECTION
11. Open the door.13.Top heat diffuser.
A-14
12. Remove the heat diffusers.14. Interior without top heat diffuser.
15. Remove bottom heat diffuser.16. Interior without top and bottom
heat diffuser.
A-15
FILTERS
F
G
17. The filters ( F,G ) must be cleaned
regularly, to maintain a good
ventilation.
18. The filters may be cleaned with
water and dishwashing liquid or
replaced by a new filter.
A-16
INSTRUCTIONS POUR ENLEVER LE CONVOYEUR ET NETTOYER
LE FOUR FC18G
12
ACB
1. Mettre l’interrupteur principal à
la position arrêt ( A ).
♦ Enlever le plateau d’extension du
convoyeur ( B ).
♦ Enlever le tiroir droit ( C ). Voir
étape # 3.
3. Tiroir droit ( C ).
♦ Pour enlever le tiroir:
♦ Pousser ( 1 ) vers la gauche
(5mm), lever (10mm) et tirer vers
la droite ( 3cm ).
♦ Tirer le tiroir dans la même
direction qu’indique le numéro (2)
ci-haut.
D
2. Extension du convoyeur ( B ).4. Tiroir de gauche ( D ).
A-17
D
1
5. Tiroir de gauche ( D ).
♦ Pour enlever le tiroir :
♦ Pousser ( 1 ) vers la droite (5mm),
lever (10mm), ensuite tirer vers la
gauche.
E
7. Pour enlever le couvert du moteur
réducteur ( E ).
♦ Lever ( 2cm ) et le retirer.
E
6. Enlever le couvert du moteur
réducteur ( E ).
9. Lever le convoyeur de ( 2cm ) et le
tirer.
8. Détacher la courroie de
caoutchouc.
♦ Lever le moteur pour enlever la
chaîne.
10. Retirer le convoyeur
complètement.
SECTION INTÉRIEURE
11. Ouvrir la porte avant du four.13. Diffuseur du haut.
A-18
12. Enlever les diffuseurs de chaleur.14. Intérieur sans le diffuseur du
haut.
15. Enlever le diffuseur du bas.16. Intérieur avec les deux diffuseurs
enlevés.
A-19
FILTRES
F
G
17. Les filtres ( F, G ) doivent être
nettoyés régulièrement afin d’avoir
une bonne ventilation.
18. Nettoyer les filtres avec de l’eau
savonneuse ou les remplacer.
INSTRUCTIONS TO REMOVE THE CONVEYOR AND CLEAN
THE OVEN FC2G
NOTE:In order to remove the conveyor, it is necessary to be two people.
1-Place the oven main switch [A] to the position "OFF" (see drawing next pages).
2-Make sure that the oven has cooled down completely.
3-Disconnect the yellow plug of the conveyor motor [B] (unscrew the plug).
A
B
4- Remove the two crumb trays located under the conveyor [C].
C
A-20
5-Take out the screws which hold the two finishing plates on each side of the conveyor [D] and remove
the finishing plate. [E]
6
D
E
6-To take out the conveyor, it takes two people, one at each end. The person who is at the
opposite side of the gear motor of the conveyor raises it 1 inch (2 cm) and pushes it
towards the front. When the end of the conveyor is inside the oven, it is preferable that
the same two people place themselves on each side of the conveyor and continue to pull
with precaution to take out the conveyor completely.
7-To re-install the conveyor, repeat the instructions above in reverse.
REVERSE THE CONVEYOR
It is possible to reverse the conveyor. When you are ready to re-install, just enter it at the opposite
side of the oven.
6
A-21
INTERIOR:
1-Remove the conveyor (see PAGE A11).
2-Open the door.3-Remove the 3 bottom deflector panels.
4-Remove thermocouple and slide out top air deflector panel using the handles.
5-Remove inside back plate for complete cleaning.
6-Clean the interior of the oven, the 3 bottom deflector panels and the conveyor with oven cleaner.
7-Clean the 4 air filters located on the front of the oven with water and soap.
Clean those in aluminum at each end of run and replace the red filters when dirty.
EXTERIOR:
Use stainless steel cleaner
A-22
INSTRUCTIONS POUR ENLEVER LE CONVOYEUR ET NETTOYER
LE FOUR FC2G
NOTE:Il est nécessaire d'être 2 personnes pour enlever le convoyeur.
1- Placer l'interrupteur principal [A] en position "ARRÊT".
2- S'assurer que le four est COMPLÈTEMENT REFROIDI.
3Débrancher le câble d'alimentation du convoyeur [B](dévisser la prise).
A
4 Enlever les deux plateaux situés sous le convoyeur [C].
C
5Dévisser les écrous qui retiennent les moulures de finition [D] de chaque coté et à l’extrémité
du convoyeur [E] et les enlever.
E
B
6
D
6Pour sortir le convoyeur, 1 personne doit se tenir à chaque extrémité. La personne située à
l'extrémité opposée au moteur d'entraînement soulève son extrémité d’environ 1" et la pousse
vers l'avant (l'autre tire) jusqu’à ce que le bout du convoyeur soit placé à l’intérieur du four.
Après, les 2 mêmes personnes s'installent de chaque coté du convoyeur et continuent de tirer
avec précaution pour sortir le convoyeur complètement.
7 Pour réinstaller le convoyeur, refaire toutes les mêmes opérations en sens inverse.
INVERSER LA DIRECTION DU CONVOYEUR
Pour inverser la direction du convoyeur, suivre les instructions précédentes. Lors de la réinstallation
du convoyeur, il faut l’insérer de l’autre côté du four.
6
A-23
INTÉRIEUR :
1-Enlever le convoyeur (page précédente).
2-Ouvrir la porte. 3-Sortir les 3 panneaux déflecteurs du bas.
4-Enlever la sonde de température et sortir le panneau diffuseur du haut à l’aide des poignées.
5-Enlever le panneau arrière intérieur (4 vis) pour un nettoyage complet.
6-Nettoyer l’intérieur du four, les 3 panneaux déflecteurs et le convoyeur avec un nettoyeur pour four.
7-Nettoyer les filtres à air situés à l’avant du four avec de l’eau et du savon. Nettoyer les deux en
aluminium à la fin de chaque production et remplacer les rouges lorsqu’ils sont sales.
EXTÉRIEUR
Utiliser un nettoyeur à acier inoxydable.
A-24
C
D
INSTRUCTION TO REVERSE DIRECTION OF THE CONVEYOR
FC2
To reverse the direction of the conveyor on FC2 oven, follow the instructions at page A-20.
FC18
When you reverse the conveyor direction, you have to install the extension shelf on the other side of the
conveyor (see picture A). Unscrew the pizza stopper [1] and screw to the other side of the extension
[2].
A
To reverse the direction of the conveyor, open the back panel of the oven. (picture B) Disconnect the
red and black wire of the conveyor motor on the gray terminal block and invert the two wire. (pictureC) The conveyor should run in the other direction.
To reverse on some models with the optional directional switch, change the position of the switch
(picture D and E) located beside the conveyor motor from position I to II.
1
2
B
WARNING: Shut off the main power switch of the oven before reversing the conveyor.
E
A-25
INSTRUCTION POUR INVERSER LE CONVOYEUR
FC2
Pour inverser la direction du convoyeur, suivre les instructions à la page A-22.
FC18
Pour inverser la direction du convoyeur, vous devez installer l’extension de l’autre côté du convoyeur
(voir figure A). Dévisser la plaque d’arrêt de pizza [1] et vissez-la de l’autre côté de l’extension [2].
A
Pour inverser la direction du convoyeur, ouvrir le panneau arrière du four (fig. B). Déconnecter les fils
rouge et noir du moteur du convoyeur sur le bloc terminal gris et inverser les deux fils. (fig. C) Le
convoyeur devrait fonctionner dans l’autre direction.
Pour inverser sur certains modèles avec interrupteur directionnel optionnel, changer la position de
l’interrupteur (fig. D et E) situé sous le moteur du convoyeur de I à II.
1
2
C
B
IMPORTANT : Toujours fermé l’interrupteur principale du four avant de changer la direction du
convoyeur.
D
E
MAINTENANCE OF THE BURNER
! Once a year, you should ask a certified technician to make a tune up.
Make sure everything works properly, verify and clean especially:
1. The gas mixer.
2. The spark rod and porcelain insulators.
3. The flame detection rod.
4. Verify the burner input pressure.
5. Verify every adjustments.
6. Clean every moving pieces.
FC2G
A-26
2
FC18G
3
1
4
1
3
4
2
A-27
ENTRETIEN DU BRÛLEUR
! Vous devriez faire faire l’entretien de votre système de brûleur par un technicien qualifié
une fois par année. Le technicien doit s’assurer que tout fonctionne bien, vérifier et
nettoyer spécialement :
1. L’entrée d’air du mélangeur.
2. L’électrode d’allumage et la porcelaine isolante.
3. L’électrode de détection de flamme.
4. Vérifier la pression d’entrée de gaz.
5. Vérifier tous les ajustements.
6. Nettoyer toutes les pièces mobiles
FC2G
2
FC18G
3
1
4
1
3
4
2
INSTRUCTION TO REMOVE THE BELT ON THE CONVEYOR
BEFORE YOU BEGIN SPLICING
DISCONNECT THE POWER TO THE CONVEYOR
FOR FULL STRAND SPLICING
1. Begin splicing in the center.
! Make sure the strand matches the belt to be spliced.
! INSERT the strand ends into the center space of the opposite edge (see space 3 on diagram).
! Pull the ends of the strand through until the center space “locks” in place.
! It is critical to straighten each splice before moving onto the next step.
! USE OUR WIRE STRAIGHTENING TOOL.
2. Upon completion of splice.
A-28
! Check drive sprocket alignment.
! Adjust tension.
A - BEND WIRE IN CENTER.
A-29
B – INSERT THE STRAND ENDS INTO CENTERSPACE.
C – BEND WIRE AND INSERT TRYING NOT TO BEND Z-BEND.
D – CONTINUE TO BEND AND PULL THROUGH.
E – PULL STAND UNTIL IT LOCKS.
F – CONNECT SPLICE END LOOP TO SLICE CLIPS BELT END LOOPS.
G – HOOK END LOOP. REPEAT PROCESS ON OPPOSITE SIDE
A-30
CONNECTING DOUBLE LOOP EDGES (DLE)
AB
CD
A-31
É
É
R
D
E
L
U
CONVO
U
INSTRUCTION POUR ENLEVER LA COURROIE DU CONVOYEUR
AVANT DE COMMENCER À RACCORDER
DÉBRANCHEZ LE CONVOYEUR
POUR LE MEILLEUR RENDEMENT POSSIBLE
3. Commencez à raccorder par le centre.
! Assurez-vous que la maille d’union est compatible à la courroie originale.
! INSÉREZ les extrémités de la maille d’union dans les espacements B & D (voir le diagramme).
! Tirer sur les extrémités de la maille d’union jusqu’à ce que le centre soit en place.
! Il est important que chacune des mailles soient bien en place et droite avant d’avancer à l’étape
suivante.
4. Après l’accomplissement du raccord.
! Vérifier l’alignement des roues dentés.
! Ajustez la tension.
CÔT
ÉLOIGNÉ
CÔT
APPRO
A – PLIER LA BROCHE AU CENTRE
IRECTION D
A CHAINE D
YE
B – INSÉREZ LE BOUT DE LA MAILLE D’UNION AU CENTRE DE LA MAILLE
É
É
É
É
R
É
SUIVANTE.
CÔT
LOINGN
A-32
CÔT
APPROCH
C – NE PAS TROP PLIER LA BROCHE POUR ÉVITER D’ENDOMMAGER LA
BROCHE EN PERMANENCE.
D – CONTINUEZ À PLIER ET PASSEZ À TRAVERS.
E – TIREZ JUSQU’À CE QUE LA MAILLE SOIT EN PLACE.
A-33
D
E
F – CONNECTEZ LE BOUT DE LA MAILLE AU CROCHET DE L’EXTRÉMITÉ.
G – ACCROCHEZ LES CROCHETS ENSEMBLE, RÉPÉTEZ L’OPÉRATION
POUR LE CÔTÉ OPPOSÉ.
COMMENT JOINDRE LES EXTRÉMITÉS
CÔTÉ ÉLOIGNÉ
IRECTION D
LA CHAÎNE DU
CONVOYEUR
CÔTÉ RAPPROCHÉ
AB
CD
TROUBLESHOOTING
BEFORE CALLING FOR SERVICE
ANSWERS TO MOST FREQUENT QUESTIONS
QuestionsSolutions
The oven is "ON", but does not function.
The fan runs but the oven does not heat.
The red light on the front control panel is
on and the alarm ring.
The oven heat too much or does not
produce enough heat.
The conveyor chain is not tight enough.
The conveyor does not turn.
A-34
! Check the main breaker (the one on the building
panel) and also the breaker located at the front of
the oven (5 amps).
! On FC18 oven, check if the emergency stop
switch located at the front of the oven is pulled
out.
! Check if the thermostat is adjusted high enough
to fire the oven.
! Check the main gas valve.
! To start it over, press the red button on the front
control panel for 2 seconds. The burner will start
up (you can hear it). You can repeat this
operation three times. If it does not start up again,
contact our company or a certified gas technician.
! Measure the temperature with an oven
thermometer and compare it with the temperature
indicated on the thermostat.
! To tighten:Take off the protector at the end of the
speed control located on the sides of the
conveyor. With a 7/16" key, lightly unscrew the
2 screws having an adjustment on each side;
! Tighten the belt of the conveyor and the screws;
! Put back the protectors.
! Check the 0.75 amps breaker on the front for
FC2 or on the side for FC18 of the oven.
! If the breaker is "tripped", check if the conveyor
is free from any obstructions before resetting the
breaker.
! Check the conveyor main shaft if the security
clutch is not slipping.
A-35
DÉPANNAGE
AVANT D'APPELER LE DÉPARTEMENT DE SERVICE
SOLUTION AUX PROBLÈMES LES PLUS FRÉQUENTS
ProblèmesSolutions
Si l'interrupteur est à la position "MARCHE" et
que rien ne fonctionne.
Le ventilateur tourne mais le four ne
chauffe pas et l’alarme sonne (le brûleur
n’allume pas).
Le four chauffe trop ou pas assez.
Le ventilateur tourne et le four chauffe
mais la chaîne du convoyeur ne tourne pas.
La chaîne du convoyeur n'est pas assez
tendue.
! FC2 : Vérifier le disjoncteur principal du
bâtiment et le disjoncteur 5 ampères à l'avant du
four.
! FC18 : Vérifier le bouton d’urgence rouge si il est
bien sorti.
! S’assurer que le thermostat est en demande (ajusté
plus haut que la température du four).
! S’assurer que la valve à gaz est ouverte.
1. Si le brûleur ne s’allume pas tout de suite, l’alarme
sonnera. Appuyer sur le bouton rouge sur le
panneau de contrôle avant pour réinitialiser
l’allumage. Répéter cette opération trois fois. Si le
brûleur ne s’allume toujours pas, contacter un
technicien en gaz..
! Vérifier la température du four à l'aide d'un
thermomètre adéquat et comparer avec la
température ajustée sur le four.
! Faire un nettoyage complet des diffuseurs de
chaleur.
! Vérifier le disjoncteur 0.75 ampères à l'avant du
four mais s’assurer que rien ne bloque le
convoyeur avant de ré-enclencher le disjoncteur.
! Vérifier si l’embrayage de sécurité sur l’arbre
central du convoyeur ne glisse pas.
! Pour la tendre: Enlever les protecteurs sur les
côtés du convoyeur du bout du réducteur de
vitesse.
! Dévisser légèrement les boulons qui ont un
ajustement (2 de chaque coté) à l'aide d'une clef
de 7/16po.
IMPORTANT: Vous devez ajuster vos temps de cuisson en fonction de vos recettes. Nous
vous recommandons de faire des tests de cuisson et de noter et conserver les résultats
pour utilisation ultérieure.
B-1
B-1
SECTION B:
HEAT DIFFUSER ADJUSTMENT
AJUSTEMENT DES DIFFUSEURS D’AIR
TOP DIFFUSER FC18G
DIFFUSEUR DU HAUT FC18G
B-2
B-2
BOTTOM DIFFUSER FC18G
DIFFUSEUR DU BAS FC18G
B-3
B-3
BOTTOM DIFFUSER FC2G
DIFFUSEUR DU BAS FC2G
B-4
B-4
TOP DIFFUSER FC2G
DIFFUSEUR DU HAUT FC2G
C-1
C-1
SECTION C:
COMPONENT PARTS
PIÈCES COMPOSANTE
FC18G – FRONT VIEW
FC18G – VUE DE FACE
ItemPart NumberDescriptionQuantity
1PFC18STDFC18 DOOR1
2QUF100FILTER1
3ELM960MOTOR CONTROL FOR FC (DART)1
4ELB0965A BREAKER1
5ELB09915A BREAKER1
6ELP407EMERGENCY STOP RED BUTTON 40mm TURNS TO
RELEASE
7ELI408MOUNTING BASE ONLY1
8ELI409CONTACT BLOCK NC1
9ELI5560/1 PLATE2
10ELI419''EMERGENCY STOP'' PLATE1
11ELL411RED PUSHBUTTON ILLUMINATES LED1
12ELL410RED LED BASE 24V WITH 1NC1
13ELI402BLACK SELECTOR 2 POS.1
14ELI413BASE WITH 2NO1
15ELT515ELECTRONIC THERMOSTAT1
ItemNum. PièceDescriptionQuantité
1PFC18STDASS. SOUDER PORTE FC181
2QUF100FILTRE1
3ELM960CONTRÔLE MOTEUR POUR FC (DART)1
4ELB096DISJONCTEUR 5A1
5ELB099DISJONCTEUR 15A1
6ELP407ARRÊT D'URGENCE 40mm TOURNE POUR RELÂCHER
ROUGE
7ELI408BASE SANS CONTACT1
8ELI409BLOC CONTACT NC1
9ELI556PLAQUED'IDENTIFICATION 0/12
10ELI419PLAQUE ''EMERGENCY STOP''1
11ELL411BOUTON POUSSOIR ROUGE ILLUMINE LED1
12ELL410BASE LED 24V ROUGE AVEC 1NC1
13ELI402SÉLECTEUR 2 POS. NOIR1
14ELI413BASE AVEC 2NO1
15ELT515THERMOSTAT ÉLECTRONIQUE1
1
1
C-2
C-3
C-3
FC18G – SIDE VIEW
FC18G – VUE DE CÔTÉ
ItemPart #Description
15009300
9
2ELM940GEAR BOX MOTOR ELM940X
3ELM961PULSE GENERATOR DART
4ELB0890.75A BREAKER
5ELI638DPDT BLACK SWITCH 20A
6GAC230HONEYWELL CARBURATOR
7GAC235SOLENOID GAS VALVE 24V
8GAD190IGNITION ELECTRODE
9GAM200ATMOSPHERIC MIXER
10GAD200DETECTION ELECTRODE
11GAB500 ELECTRONIC CONTROL BOX
21ELT680THERMOSTAT 700°F
22ELM735SOLID STATE TIMER ICM
23ELB073
A
24ELB073TERMINAL BLOCK 30A
25ELB073
B
26ELM760COOLING FAN 120V
27ELM72911 PIN RELAY BASE (FOR
28ELM720MULTI-FONCTION TIMER 11
29ELO125OVERLOAD BASE RELAY
30ELO100OVERLOAD 7 TO 10A
-ELO098OVERLOAD 2.5 TO 4A
31ELC912TELE. CONTACTOR (COIL
SPROCKET CLUTCH
ASSEMBLY
(WITHOUT ELM961)
PU-2E
(NATURAL, EXCEPT TLO)
50/60HZ
FOR GAS OVEN (S87D)
100VA
120-240 250VA 50Hz
230V 60Hz/50Hz A.O. SMITH
ELECTRIC ATTACH
INSULATING BARRIER
TIMER)
PIN 100-240VAC
TELE.
120V) 25A 2HP
Description
ASSEMBLAGE D'EMBRAYAGE
COMPLET
MOTEUR RÉDUCTEUR DE
VITESSE ELM940X (SANS
ELM961)
GÉNÉRATEUR DE PULSATION
DART PU-2E
DISJONCTEUR 0.75A
INTERRUPTEUR DPDT NOIR 20A
CARBURATEUR HONEYWELL
(NATUREL, SAUF TLO)
VALVE À GAZ SOLENOÏDE 24V
50/60HZ
ÉLECTRODE D'ALLUMAGE
MÉLANGEUR ATMOSPHÉRIQUE
ÉLECTRODE DE DÉTECTION
BOÎTE DE CONTRÔLE ÉLEC.
FOUR AU GAZ (S87D)
THERMODISQUE 110°F
TRANSFO. 120/24V 20VA
TRANSFO. 120/240 À 12/24, 100VA
TRANSFORMATEUR 120-240 >
120-240 250VA 50Hz OUVERT
MOTEUR .75HP 1PH 115/208-
230V 60Hz/50Hz A.O. SMITH
INTERRUPTEUR À PRESSION
SONNERIE 24V
PLAQUE DE THERMOSTAT
BOUTON DE THERMOSTAT
700°F
THERMOSTAT 700°F
MINUTERIE ICM
ATTACHE ÉLECTRIQUE
BLOC TERMINAL 30A
BARRIÈRE ISOLANTE
VENTILATEUR DE
REFROIDISSEMENT 120V
BASE DE RELAIS 11 PINS (POUR
MINUTERIE)
MINUTERIE MULTI-FONCTION
11 PIN 100-240VAC
BASE RELAIS DE SURCHARGE
TÉLÉ.
RELAI DE SURCHARGE 7 À 10A
RELAI DE SURCHARGE 2.5 À 4A
CONTACTEUR TÉLÉ. (BOB. 120V)
25A 2HP
C-4
Quant
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
C-5
C-5
FC2G – FRONT VIEW
FC2G – VUE DE FACE
ItemPart NumberDescriptionQuantity
1ELM961PULSE GENERATOR, DART1
2ELM940CONVEYOR MOTOR GEARBOX1
3ELM760COOLING FAN 120VOLTS3
4ELB089.75 AMP BREAKER1
5ELB0965A BREAKER1
6ELM960CONVEYOR CONTROL MOTOR DART1
7ELT515ELECTRONIC THERMOSTAT1
8ELI402BLACK SELECTOR 2 POS.1
ANDELI406BASE WITH 1NO2
ANDELI556ON - OFF PLATE1
9ELL410RED LED BASE 24V WITH 1NC1
ANDELL411RED PUSH BUTTON ILLUMINATES LED1
ETELI406BASE AVEC 1NO2
ETELI556PLAQUE MARCHE - ARRÊT1
9ELL410BASE LED 24V ROUGE AVEC 1NC1
ETELL411BOUTON POUSSOIR ROUGE ILLUMINÉ LED)1
10QUF100FILTRE2
1150093010PIGNON A EMBRAYAGE DE SÉCURITÉ1
C-6
C-7
C-7
FC2G – TOP VIEW
FC2G – VUE DE DESSUS
ItemPart NumberDescriptionQuantity
1ELM800MLMOTOR 1 PH. 3/4 HP. 6 1/4 INCHES SHAFT.1
2GAB500ELECTRONIC CONTROL ( HONEYWELL S87D )1
ORGAB505ELECTRONIC CONTROL ( FENWAL )1
3GAP300PRESSURE SWITCH DWYER1
4GAC230HONEYWELL GAS VALVE #VR8205A28001
ANDGAC241NNATURAL GAS PRESSURE REGULATOR1
ORGAC241PPROPANE GAS PRESSURE REGULATOR1
4AGAC235SOLENOID VALVE 24VAC1
5GAM200ATMOSPHERIC MIXER1
6GAD200FLAME DETECTION ROD1
7QUC910CONVEYOR CHAIN 36" WIDE1
8P120SFCGPAN 120V 1PH (SEE 120V SIMP. FC-2-G)1
OR(PAN 220V 1Ph (SEE 220V SIMP. FC-2-G))
9GAD190IGNITION ROD1
ItemNuméro PièceDescriptionQuantité
1ELM961GENERATEUR DE PULSATION DART1
2ELM940MOTEUR/REDUCTEUR DE VITESSE CONVOYEUR1
3ELM760VENTILATEUR DE REFROIDISSEMENT 120 VOLTS3
4ELB089DISJONCTEUR .75 AMPÈRE1
5ELB096DISJONCTEUR 5 Amps.1
6ELM960CONTROLE MOTEUR CONVOYEUR DART1
7ELT515THERMOSTAT ÉLÉCTRONIQUE1
8ELI402SÉLECTEUR 2 POS. NOIR1
ETELI406BASE AVEC 1NO2
ETELI556PLAQUE MARCHE - ARRÊT1
9ELL410BASE LED 24V ROUGE AVEC 1NC1
ETELL411BOUTON POUSSOIR ROUGE ILLUMINÉ LED)1
10QUF100FILTRE2
1150093010PIGNON A EMBRAYAGE DE SÉCURITÉ1
C-8
D-1
D-1
SECTION D:
CONTROL PANELS
PANNEAUX DE CONTRÔLE
FC2G 1PH 120V 60HZ
FC2G 1PH 120V 60HZ
D-2
D-2
FC2G 1PH 220V 60HZ
FC2G 1PH 220V 60HZ
E-1
SECTION E:
BURNER ADJUSTEMENTS
AJUSTEMENT DU BRÛLEUR
FC18 NATURAL GAZ
FC18 GAZ NATUREL
E-2
FC18 PROPANE GAZ
FC18 GAZ PROPANE
E-3
FC2 NATURAL GAZ
FC2 GAZ NATUREL
E-4
FC2 PROPANE GAZ
FC2 GAZ PROPANE
LIMITED WARRANTY
(Continental United States Of America And Canada Only)
Doyon Equipment Inc. guarantees to the original purchaser only that its product are
free of defects in material and workmanship, under normal use.
This warranty does not cover any light bulbs, thermostat calibration or defects due to
or resulting from handling, abuse, misuse, nor shall it extend to any unit from which
the serial number has been removed or altered, or modifications made by
unauthorised service personnel or damage by flood, fire or other acts of God. Nor will
this warranty apply as regards to the immersion element damaged by hard water.
The extent of the manufacturer’s obligation under this warranty shall be limited to the
replacement or repair of defective parts within the warranty period. The decision of
the acceptance of the warranty will be made by Doyon Equipment service
department, which decision will be final.
The purchaser is responsible for having the equipment properly installed, operated
under normal conditions with proper supervision and to perform periodic preventive
maintenance.
If any parts are proven defective during the period of one year from date of purchase,
Doyon Equipment Inc. hereby guarantees to replace, without charge, F.O.B. Linière,
Quebec, Canada, such part or parts.
Doyon Equipment Inc will pay the reasonable labour charges in connection with the
replacement parts occurring within one year from purchase date. Travel over 50
miles, holiday or overtime charges are not covered. After one year from purchase
date, all labour and transportation charges in connection with replacement parts will
be the purchaser’s responsibility.
Doyon Equipment Inc. does hereby exclude and shall not be liable to purchaser for
any consequential or incidental damages including, but not limited to, damages to
property, damages for loss of use, loss of time, loss of profits or income, resulting
from any breach or warranty.
In no case, shall this warranty apply outside Canada and continental United States
unless the purchaser has a written agreement from Doyon Equipment Inc.
GARANTIE LIMITÉE
(Pour le Canada et les États continentaux des États-Unis)
Équipement Doyon Inc. garantit ses produits à l'acheteur original, contre tout défaut
de matériaux ou de fabrication, en autant qu'ils aient été utilisés de façon normale.
Cette garantie ne s'applique cependant pas sur les ampoules, les calibrations de
température, tout défaut dû ou résultant d'une mauvaise manipulation, d'un emploi
abusif ou d'un mauvais usage. La garantie ne s'applique pas non plus sur tout
équipement dont le numéro de série aurait été enlevé ou altéré, tout produit modifié
par du personnel de service non autorisé, endommagé par une inondation, un feu ou
tout autre acte de Dieu, ni sur les éléments immergés endommagés par l'eau dure.
L'étendue des obligations du manufacturier, selon cette garantie, est le remplacement
ou la réparation des pièces défectueuses durant la période de garantie. L'acceptation
de la garantie sera faite par le département de service d'Équipement Doyon Inc.
Cette décision sera définitive.
L'acheteur est responsable de faire installer son équipement adéquatement, de
l'opérer sous des conditions normales d'utilisation avec une bonne supervision, ainsi
que d'effectuer un entretien préventif périodique.
Dans le cas où les pièces s'avéreraient défectueuses durant une période d'un an à
partir de la date d'achat, Équipement Doyon Inc. s'engage à les remplacer, sans
frais, F.O.B. Linière, Québec, Canada.
Équipement Doyon Inc. couvrira les frais raisonnables de main-d'œuvre reliés au
remplacement des pièces, pour une période d'un an à partir de la date d'achat.
Toutefois, les frais encourus pour les déplacements au-delà de 50 milles, le temps
supplémentaire et les jours de congé ne sont pas couverts. Au-delà d'un an après la
date d'achat, tous frais de transport et de main-d'œuvre pour le remplacement des
pièces sont la responsabilité de l'acheteur.
Équipement Doyon Inc. ne se tient pas responsable envers l'acheteur pour toutes
conséquences ou dommages incluant, mais non limités à, dommages à la propriété,
dommages pour perte d'usage, perte de temps, perte de profits ou de revenus,
provenant de tout bris de garantie.
En aucun cas, cette garantie ne s'applique à l'extérieur du continent des États-Unis
d'Amérique ou du Canada, à moins que l'acheteur n'ait une entente écrite avec
Équipement Doyon Inc.
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.