D-Link NPP-C61BLK242 Hardware Quick Installation Manual

This document will guide you through the basic installation process for your new D-Link Unshielded Patch Panel.
Hardware Quick Installation Guide Unshielded Patch Panel
Quick Installation Guide
Building Networks for People
2
ENGLISH
About This Guide
This guide contains step-by-step instructions for setting up your D-Link Unshielded Patch Panel. Please note that the model you have purchased may appear slightly different from those shown in the illustrations.
Product Overview
Front Panel
Figure 1. Unshielded Patch Panel Front
Color Coding Information
T568A T568B
Pin 1 White/Green Pin 1 White/Orange
Pin 2 Green Pin 2 Orange
Pin 3 White/Orange Pin 3 White/Green
Pin 4 Blue Pin 4 Blue
Pin 5 White/Blue Pin 5 White/Blue
Pin 6 Orange Pin 6 Green
Pin 7 White/Brown Pin 7 White/Brown
Pin 8 Brown Pin 8 Brown
Table 1. Wire Color Code
A. To connect a cable to the Unshielded Patch
Panel, rst take the end of the cable wiring and strip approximately 30 mm off the cable jacket. (Figure 2)
B. Separate the wires into 4 pairs.
Installation
Figure 2.
C. Take off the support bar before punching
wires. (Figure 3)
D. Follow the IDC color code for T568A or
T568B wiring. (Table 1)
Use the impact tool to punch in and
connect the wires to the IDC. (Figure 4)
E. Lock the support bar onto the rear of the
panel. (Figure 5)
F. Use a twist tie to secure the cable tightly
onto the support bar. Repeat this process for each cable you wish to connect. (Figure 6)
Figure 3.
Figure 4.
Figure 5.
Figure 6.
Support bar
Cable tie
Cut outside
Ver. 1.00(WW) 2013/03/12 GAAHA1Y1100003
Loading...