DeDietrich GT 430 A, GT 330 A Operating Instructions Manual

GT 430 A
82294154
11-20-09
Oil-Gas Fired Hot Water boiler
English
11/20/09
Installation and operating instructions
Warning:
Before putting the boiler into operation read this manual carefully.
Warning:
The operating manual is part of the documentation that is
or the gas supplier.
delivered to the installation’s operator. Go through the information in this manual with the owner/operator and make sure that he or she is familiar with all the necessary operating instructions.
Notice:
This manual must be retained for future reference. Improper installation, adjustment, alteration, service or maintenance can cause injury, loss of life or property damage. For assistance or additional information consult a qualified installer, service agency
Guideline of Notices
82294154
11-20-09
"Installation of this equipment must be in accordance to National and local codes having jurisdiction"
[Canadian Installations] CSA B139 for Oil & CSA B149 for Gas [USA Installations] NFPA 31 for Oil & NFPA 54/ANSI Z223.1 for Gas.
The boiler must be connected to a venting system that will safely exhaust all flue gases in an effective manner.
The boiler is certified to use only these fuels listed below, do not burn garbage or paper, never leave combustible material near it. Do not burn gasoline, crankcase draining or any other fuel containing gasoline.
Natural Gas, Propane Gas & # 2 Fuel Oil
Safety Considerations
Warning:
indicates presence of hazards that can cause, if not avoided, severe personal injury, death or substantial property damage.
! Caution:
indicates presence of hazards t hat will or ca n cause, if not avoided, minor personal injury or property damage.
Notice:
Application comment for optimum use of equipment and adjustment as well as useful information.
Reference to an other instruction book.
Z
Observe the following symbols
DANGER
due to explosion of gas.
- Work only on gas components when you have a license to do so.
- Note t hat the a ssembly of gas and vent connections, the initial start-up, the electrical connections, the maintenance and service can only be perfor med by a licensed se rvice contra ctor or technician.
DANGER
due to electricity.
- Prior to doing any work on the heating system, disconnect all electrical power to the boiler at the emergency switch.
- It is NOT sufficient to shut off only the boiler control!
! CAUTION!
SYSTEM DAMAGE due to improper installation.
- Observe l ocal and state codes as well as common i ndustry practices during the install ation and operation of the heating appliance.
! CAUTION!
SYSTEM DAMAGE due to inadequate cleaning and maintenance.
- A boiler cleaning and maintenance should be performed annually. Verify complete system operation at the same time.
- Correct the prob lem immediately to prevent damage to the system!
! Caution:
Refer to User’s Manual regar ding the carcinogenic hazard of crystalline silica that may be found during installation, servicing and removal of this boiler.
Please observe the following safety instructions. Read this manual carefully. Correct in stallation and adjustment of the burner and the control
panel is a precondition for safe, efficient operation of the gas boiler. Read this manual and the specifications on the safety label carefully
before attempting to put the burner into operation.
Do not store or use gasoline or other flammable liquids in
the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
- Do not try to light any appliance.
- Do not touch any electric switch, do not use any phone in your building.
- Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
- If you cannot reach your gas supplier, call the Fire Department.
Installation and service must be performed by a qualified installer, service agency or the gas supplier.
Warning:
Improper installation, adjustment, and/or operation could cause carbon monoxide poisoning resulting in injury or death. This product must be installed and serviced by a professional service technician who is experienced and qualified in hot water boiler installation and gas combustion.
! Caution: Strict compliance with these instructions is a
precondition for the correct operation of the boiler.
! IMPORTANT
Service on this boiler should be undertaken only by trained and skilled personnel. Keep bo iler area cle ar and free from combustible materials, gasoline and other flammable vapors and liquids. Do not place any obstruction in the boiler room that will hinder the flow of combustion and ventilating air. Read these instructions carefully before proceeding with the installation of boiler. Post instructions near boiler for reference by owner and serviceman. Maintain instructions in legible condition.
2
Contents
82294154
11-20-09
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Regulations and guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
1 Boilers covered by this document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
2 Uncrating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
3 Packing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
4 Technical specifications of boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Main Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Boiler Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
1 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
2 Ventilation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27
1 Dimensional information required. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27
2 Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27
3 Filling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28
4 Ancillaries. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28
Combustion and ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30
1 Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30
2 Replacement procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
3 Dimensional information required for connection of the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Oil or gas connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32
1 Specific technical information supplied with the burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32
Electrical. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
1 Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
2 Wiring procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
3 Wiring boiler panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Start up procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
1 Shut-down procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
1 Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
2 Shut down procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Service and maintenance schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Isometric views and list of spare parts - GT 400 A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40
3
Regulations and guidelines
82294154
11-20-09
Only a qualified and licensed heating professional is to carry out the removal, installation, startup and maintenance of this boiler. The boiler must be installed according to all national and local codes having jurisdiction. The operation of the boiler must be verified and all safety controls checked. Any defect or abnormal operations must be corrected immediately. The entire system requires annual service and cleaning at least once a year.
The installation and operating instructions shown here are given as a guide for installation and operation and are not meant to replace any State or Local Codes that may apply to the individual installation. Good engineering practice should be used. Any deviation from laws or regulations or industry Code or these instructions will void the boiler warranty and any other responsibility or liability of the De Dietrich Thermiques S.A.
Installation codes
• THE BOILER SHALL BE ASSEMBLED AND INSTALLE D BY A QUALIFIED PROFESSIONAL ONLY. STRICT COMPLIANCE WITH THESE INSTALLATION AND OPER ATING INSTRUCTIONS IS A PRECONDITION FOR THE CORRECT AND GUARANTEE OF THE BOILER.
THE INSTALLATION MUST CONFORM TO THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION OR, IN THE ABSENCE OF SUCH REQUIREMENTS, TO THE CAN/ CGA B-149 FUEL GAS INSTALLATION CODES AND CSA B-139 OIL INSTALLATION CODES.
• WHERE REQUIRED BY THE AUTHORITY HAVING JURISDICTION, THE INSTALLATION MUST CONFORM T STANDARD FOR CONTROLS AND SAFETY DEVICES FOR AUTOMATICALLY FIRED BOILERS ANSI/ASME CSD-1.
The boilers of the GT430 A range are automatic independent hot­water boilers designed for con necting to a flue which require a separate fuel oil or gas burner.
1 Boilers covered by this document
O THE
• THE INSTALLATIO OF THE RELIEF VALVE SHALL BE CONSISTENT WITH CODE, SECTION IV CSA B51.
• THE BOILER MUST NOT BE INSTALLED ON CARPETING.
• IF AN EXTERNAL ELECTRICAL BO
ILER WHEN INSTALLED, MUST BE ELECTRICALLY BONDED TO GROUND IN ACCORD THE AUTHORITY HAVING JURISDICTION OR, IN THE ABSENCE O F SUCH REQUIREMENTS , WI TH THE CANADIAN ELEC
TRICAL CODE
LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN
SERVICING CONTROLS. WIRING CAN CAUSE IMPROPER OPERATION AFTER SERVICINGS. “VERIFY PROPER OPERATION AFTER SERVICE”.
ANSI/ASME BOILER PRESSURE VESSEL
SOURCE IS UTILIZED, THE
ANCE WITH
PART 1, CSA C22.1, ELECTRICAL CODE.
THE REQUIREMENTS OF
General
The GT 430 A boilers are pressurized hot water heating boilers, connected to a flue, fitted with an independent burner using domestic fuel oil or gas.
2 Uncrating
Upon arrival, check shipment to ensure all parts have been shipped. Inspect all items for delivery damage. Report all damage and shortages to the delivery carrier. Report any damage and shortages to the Distributor.
4
The boiler is equipped with standard control panel.
GT 430A Series - Cast Iron Sectional Boiler Technical
82294154
11-20-09
Specification Data Table
Model
Item
Firing Sequence Consult Burner Technical Data
[CSA] - Gas Input
[CSA] - # 2 Fuel Oil Input
[CSA] - Output [Gas-Oil]
NET I=B=R Water Rating
Cast Iron Sections
Flue-way baffles
Water Capacity
Water
Resistance
[T = °F]
18° F
27° F
36° F
Diameter
[equivalent]
Combustion
Chamber
Depth
Dimensions
Volume
Volume
Combustion chamber
and flue way volume
Volume
MAWP [Water]
Min. Safety Relief Capacity
Electrical Connection 120/1/60 < 10A
Max. Water Temp.
Safety Limit [MR]
Water Operating
S3NA Panel
Temperature Range
Chamber Resistance
Gas-Vent Category I-II-III-IV & Sidewall
Boiler Vent Connection
Weight [Dry]
Unit GT 430-8A GT 430-9A GT 430-10A GT 430-11A GT 430-12A GT 430-13A GT 430-14A
MBH 1,730 1,947 2,278 2,567 2,826 3,100 3,389
kW 507.2 570.5 667.7 752.3 828.3 908.6 993.2
US GPH 12.00 13.50 15.80 17.80 19.60 21.50 23.50
MBH 1,474 1,659 1,941 2,187 2,408 2,641 2,887
kW 432.1 486.1 568.9 640.9 705.8 774.2 846.2
MBH 1,282 1,442 1,688 1,902 2,094 2,297 2,511
# 8 9 1011121314
# 16161624202020
US Gal 96.70 108.06 119.42 130.78 142.14 153.50 164.86
Liter 366 409 452 495 538 581 624
Ft. H
Ft. H
Ft. H
O [mbar]
2
O [mbar]
2
O [mbar]
2
Inch
1.360 [40.656] 2.040 [60.984] 3.232 [96.595] 4.095 [122.390] 5.241 [156.667] 6.630 [198.181] 8.312 [248.467]
0.605 [18.069] 0.907 [27.104] 1.437 [42.947] 1.824 [54.527] 2.331 [69.681] 2.977 [88.990] 3.694 [110.430]
0.340 [10.164] 0.510 [15.246] 0.808 [24.147] 1.025 [30.647] 1.310 [39.167] 1.658 [49.545] 2.079 [62.155]
20.87
mm
Inch 46.57 52.87 59.17 65.47 71.77 78.07 84.37
mm 1,183 1,343 1,503 1,663 1,823 1,983 2,143
3
Ft
3
m
3
Ft
3
m
10.95 12.50 13.98 15.50 16.98 18.47 19.95
0.31 0.354 0.396 0.439 0.481 0.523 0.565
19.88 22.53 25.14 27.79 30.37 32.98 35.59
0.563 0.638 0.712 0.787 0.860
PSI
MBH 1,618 1,820 2,130 2,400 2,643 2,899 3,168
V/P/H
° F
° C
° F
° C
Adjustable 104 - 212 [factory preset stop at 185] Optional Hi-Temperature kit available
Adjustable 40 - 100 [factory preset stop at 85] Optional Hi-Temperature kit available
Fixed non adjustable 248
Fixed non adjustable 120
inch w.c. 0.44 0.60 0.80 1.00 1.00 1.00 1.00
mbar 1.1 1.5 2 2.5 2.5 2.5 2.5
#
Inch 10 10 10 12 12 12 12
lb 3,241 3,638 4,034 4,431 4,828 5,225 5,622
kg 1,470 1,650 1,830 2,010 2,190 2,370 2,550
530
0.934 1.008
90
Note:
• CSA - MBH Output based on Thermal Efficiency Test According to ANSI Z21.13a/CSA 4.9a-2005
• All Models Certified for 0 - 4,500 feet ASL installation altitude, consult factory for higher altitudes
• [NET] MBH Output Factor 1.15, Allowance for Piping and Pickup Losses
• Chamber Resistance Based on Neutral Chimney-Vent Pressure
• Conversion Btu/Hr to kW = 3,412 Btu/Hr per kW
• All Models are Design Certified & Eligible to Bear Approval Marking as Shown.
• All Models Certified to Fire; # 2 oil, Natural & Propane Gases. Consult factory for Available Burners.
• All Models Comply and Certified in Accordance to the latest Canadian & US standards
Due to ongoing and continuous product improvements, DDR Americas Inc. reserves all rights to amend and delete information provided on this product specification table.
GT 430 A
G50_0001
X
82294154
11-20-09
8229N071
Main Dimensions
1/8
29
6A
==
¿3
0 I
61
16
(3) (2)
A
¯
¿3
1/8
1/2
2
1/8
5
1/4
3
(1)
S
1/8
5
5
1/8
4
1/16
59
1/4
3/4
5
1/2
21
45
1/4
7
1/2
25
25
(4)(5)
2
2
1/8
1/8
7/8
1/4
20
45
6
5/8
25 40
3/8
==
(1) 3” 150# weld neck flange (2) 1/2” NPT tapping for temp sensing well, etc…
L
(4) 3/4” NPT tapping for low water cutoff probe type (5) 1/2” NPT tapping for combination pres/temp gauge
4
15/16
(3) 2” NPT tapping for safety relief valve
32
35
38
1/2
1/2
GT 430-13A
3/4"
90
1/16"
78
13/16"
11
Type of boiler GT 430-8A GT 430-9A
L
S
Ø A out.
46
59
1/4"
9/16
7/8
9
65
52
1/2"
7/8"
7/8
9
GT 430-10A
7/8
71
1/8
59
7/8
9
GT 430-11A
1/8"
78
1/2"
65
13/16"
11
GT 430-12A
1/2"
84
3/4"
71
13/16"
11
Dimension "X" Maximum Burner Length (inches)
Boiler Model Riello Weishaupt Power flame Fuel Master Gordon Piatt
GT430-8A
GT430-9A 32
13/16
22
GT430-10A
GT430-11A
GT430-12A
1/16
33
GT430-13A
GT430-14A
23
26
1/8
25
3/16
31
1/8
30
7/16
37
Notes:
-Dimension are for gas burners only
1/2
5
==
GT 430-14 A
97"
3/8"
84
13/16"
11
26
-Oil and combination oil/gas burner , refer to burner manufacturer specifications
8
Boiler Installation
82294154
11-20-09
Do not install boiler on combustible flooring, pad or carpet.
Dimension 'X' - consult burner information, an additional 24 inches in front of the burner is needed for servicing.
1Installation
The GT 400 A boiler has a sturdy underframe, it does not need any special base although a housekeeping pad is recommended to keep steel parts out of casual water. It s furnace is closed, so it is not necessary to place it on a fireproof floor, but the floor must be able to bear the weight.
59
1/16"
"
1/8
7
40
1/8
"
4
1/8
21 1/2"
"
S
Combustion air
per local codes
Dimension LDimension BDimension
GT 408 A
GT 409 A
GT 410 A
GT 411 A
GT 412 A
GT 413 A
GT 414 A 97"
59
65
71
78
84
90
1/4"
1/2"
7/8"
1/8"
1/2"
3/4"
"
B
40
3/8
"
L
X
"
3/8
20
C
3/8"
5
5/8"
1
1/8"
4
5/8"
1
1/8"
4
5/8"
1
1/8"
4
24"
71"
71"
71"
76"
76"
76"
Top view
Burner door open
20
25 1/8"
3/8
10 1/8"
5/8"
R = 17"
"
5/8
Additional
the space required when the burner door is open.
R = 30
9
2 Combustion Air Supply
82294154
11-20-09
Combustion air supply must be sized according to national and local codes CSA B149.1 & .2 CSA B139 ANSI Z223.1 & NFPA 31
Boilers operating in atmospheres t hat contain fluorides or chlorides such as beauty shops and automotive repair garage s whe re air conditioning services are performed or industrial applications that may have corrosive elements in the air must have a clean source of combustion and ventilation air. Boiler damage by contaminants will void the warranty and any other responsibility or liability of De Dietrich Thermique/FES Ltd.
To fit the sections, proceed in the following order :
- fit the rear section
- fit the special intermediate section
-fit all of the normal intermediate sections
- fit the front section
1
Note: Ensure boiler room is adequately ventilated and clear
and free from combustible materials, gasoline and other flammable vapours and liquids.
Assembly
.
2
8229 025AN
8229-0043
8229-0045
8229-0041 8229-0042
1: rear 2: front
Rear section
Boiler model
GT 430-8 A 1 1 5 1
GT 430-9
A 1 1 6
GT 430-10 A 1 1 7 1
GT 430-11 A 1 1 8 1
GT 430-12 A 1 1 9 1
GT 413 A1 1101
GT 414 A
n° 8229-0043
1 1111
Special intermediate
section
8229-0045
Normal intermediate
section
8229-0041
Front section
8229-0042
1
10
Step one
82294154
11-20-09
Step two
Front - Rear
GT 430-8A - GT 430-10A - GT 430-12A - GT 430-14A
GT 430-9A - GT 430-11A - GT 430-13A
- Fit the 2 rear attachment brackets (in the body accessories pack)
and attach them onto the framework using 2 bolts HM 12X25/25 + 4 washers L12 and 2 nuts HM 12.
Use the corresponding holes following the indication on
the frame.
- Put the lower insulation in place (fabric to the top) packs CS 51 to
CS 57. Adapt length if necessary or fold the lower insulation after
the casing has been completely assembled.
Mounting of framework and thermocord
L 12
HM 12
Locate the framework depending on the direction in which the burner door will be opened and the length of the burner.
Put the rear section in position on the framework and support it. Attach it at the brackets using 2 bolts HM 12x40/40 + 4 washers L 12 + 2 nuts HM 12.
Using a silicone gun, put silicone mastic points (1 cartridge supplied with the accessory pack CS 20) into the sealing groove of the section (approx. every 5 to 10 cm) then carefully put the thermocord in place in the sealing groove.
do not pull on the cord when it is being put in, to avoid
stretching to preserve its thickness. Avoid to locate the junction point at the bottom of the section.
HM 12
40x40
8"
2/5"
11
Step three
82294154
11-20-09
Handle the nipples with gloves, there might be sharp
edges.
Step four
Clean the bores and nipples with a solvent.
Coat them with the lubricant supplied with the sections.
- Drive in the 2 nipples gently.
12
Step five
82294154
11-20-09
Assembling the sections
A : thermocord
Special intermediate section before rear section.
Place the special intermed iate section, note fro nt back
relationship with the sealing groove against the thermocord.
For safety, insert an up per assembly rod ( body accessories
pack) into the holes in the 2 sections.
Gently and at the same time driv e in the 2 nipples of the rear
section using a hammer and a piece of wood.
13
Step six
82294154
11-20-09
- Put the special assembly tool in place. - Tighten progressively so the upper and lower connectio ns come
together equally at the same time.
Step seven
- Fit the remaining sections one by one in the order given,
proceeding as per steps 3-4-5-6.
- Leave the assembly tool in place.
14
Loading...
+ 25 hidden pages