Daikin AZQS100B8V1B, AZQS125B8V1B, AZQS140B8V1B, AZQS100B7Y1B, AZQS125B7Y1B Installer reference guide

...
Installer reference guide
Split system air conditioners
AZQS100B8V1B AZQS125B8V1B AZQS140B8V1B
AZQS100B7Y1B AZQS125B7Y1B AZQS140B7Y1B
Installer reference guide
Split system air conditioners
English
1 Table of contents

Table of contents

1 General safety precautions 2

1.1 About the documentation .......................................................... 2
1.1.1 Meaning of warnings and symbols.............................. 3
1.2 For the installer.......................................................................... 3
1.2.1 General ....................................................................... 3
1.2.2 Installation site ............................................................ 3
1.2.3 Refrigerant .................................................................. 4
1.2.4 Brine............................................................................ 4
1.2.5 Water .......................................................................... 4
1.2.6 Electrical ..................................................................... 5
2 About the documentation 5
2.1 About this document.................................................................. 5
2.2 Installer reference guide at a glance ......................................... 6
3 About the box 6
3.1 Overview: About the box ........................................................... 6
3.2 Outdoor unit............................................................................... 6
3.2.1 To unpack the outdoor unit ......................................... 6
3.2.2 To handle the outdoor unit.......................................... 6
3.2.3 To remove the accessories from the outdoor unit....... 6
4 About the units and options 7
4.1 Overview: About the units and options...................................... 7
4.2 Identification .............................................................................. 7
4.2.1 Identification label: Outdoor unit ................................. 7
4.3 Combining units and options ..................................................... 7
4.3.1 Possible options for the outdoor unit........................... 7
5 Preparation 7
5.1 Overview: Preparation............................................................... 7
5.2 Preparing the installation site .................................................... 7
5.2.1 Installation site requirements of the outdoor unit ........ 7
5.2.2 Additional installation site requirements of the
outdoor unit in cold climates ....................................... 8
5.3 Preparing refrigerant piping....................................................... 8
5.3.1 Refrigerant piping requirements.................................. 8
5.3.2 Refrigerant piping insulation ....................................... 9
5.4 Preparing electrical wiring ......................................................... 9
5.4.1 About preparing electrical wiring................................. 9
6 Installation 9
6.1 Overview: Installation ................................................................ 9
6.2 Opening the units ...................................................................... 9
6.2.1 About opening the units .............................................. 9
6.2.2 To open the outdoor unit............................................. 9
6.3 Mounting the outdoor unit.......................................................... 10
6.3.1 About mounting the outdoor unit................................. 10
6.3.2 Precautions when mounting the outdoor unit.............. 10
6.3.3 To provide the installation structure............................ 10
6.3.4 To install the outdoor unit............................................ 10
6.3.5 To provide drainage.................................................... 10
6.3.6 To prevent the outdoor unit from falling over .............. 11
6.4 Connecting the refrigerant piping .............................................. 11
6.4.1 About connecting the refrigerant piping ...................... 11
6.4.2 Precautions when connecting the refrigerant piping... 11
6.4.3 Guidelines when connecting the refrigerant piping..... 12
6.4.4 Pipe bending guidelines.............................................. 12
6.4.5 To flare the pipe end................................................... 12
6.4.6 To braze the pipe end................................................. 12
6.4.7 Using the stop valve and service port......................... 13
6.4.8 To connect the refrigerant piping to the outdoor unit .. 13
6.4.9 To determine if oil traps are required.......................... 14
6.5 Checking the refrigerant piping ................................................. 14
6.5.1 About checking the refrigerant piping ......................... 14
6.5.2 Precautions when checking the refrigerant piping ...... 15
6.5.3 Checking refrigerant piping: Setup............................... 15
6.5.4 To check for leaks........................................................ 15
6.5.5 To perform vacuum drying ........................................... 15
6.6 Charging refrigerant ................................................................... 15
6.6.1 About charging refrigerant ........................................... 15
6.6.2 Precautions when charging refrigerant ........................ 16
6.6.3 To determine the additional refrigerant amount........... 16
6.6.4 To determine the complete recharge amount.............. 17
6.6.5 Charging refrigerant: Setup.......................................... 17
6.6.6 To charge additional refrigerant ................................... 17
6.6.7 To fix the fluorinated greenhouse gases label ............. 17
6.7 Connecting the electrical wiring.................................................. 17
6.7.1 About connecting the electrical wiring.......................... 17
6.7.2 About electrical compliance ......................................... 17
6.7.3 Precautions when connecting the electrical wiring ...... 18
6.7.4 Guidelines when connecting the electrical wiring ........ 18
6.7.5 Specifications of standard wiring components............. 18
6.7.6 To connect the electrical wiring on the outdoor unit..... 18
6.8 Finishing the outdoor unit installation ......................................... 20
6.8.1 To finish the outdoor unit installation ........................... 20
6.8.2 To close the outdoor unit ............................................. 20
6.8.3 To check the insulation resistance of the compressor. 20
7 Commissioning 20
7.1 Overview: Commissioning.......................................................... 20
7.2 Precautions when commissioning .............................................. 20
7.3 Checklist before commissioning................................................. 20
7.4 To perform a test run.................................................................. 21
7.5 Error codes when performing a test run ..................................... 21
8 Hand-over to the user 21
9 Maintenance and service 21
9.1 Overview: Maintenance and service .......................................... 22
9.2 Maintenance safety precautions................................................. 22
9.2.1 To prevent electrical hazards....................................... 22
9.3 Checklist for yearly maintenance of the outdoor unit ................. 22
10 Troubleshooting 22
10.1 Overview: Troubleshooting......................................................... 22
10.2 Precautions when troubleshooting ............................................. 22
11 Disposal 22
11.1 Overview: Disposal..................................................................... 22
11.2 About pump down ...................................................................... 22
11.3 To pump down............................................................................ 23
12 Technical data 24
12.1 Overview: Technical data ........................................................... 24
12.2 Service space: Outdoor unit ....................................................... 24
12.3 Piping diagram: Outdoor unit...................................................... 25
12.4 Wiring diagram: Outdoor unit ..................................................... 26
12.5 Information requirements for Eco Design ................................... 27
13 Glossary 27
1 General safety precautions

1.1 About the documentation

▪ The original documentation is written in English. All other
languages are translations.
▪ The precautions described in this document cover very important
topics, follow them carefully.
▪ The installation of the system, and all activities described in the
installation manual and in the installer reference guide MUST be performed by an authorised installer.
Installer reference guide
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04
1 General safety precautions

1.1.1 Meaning of warnings and symbols

DANGER
Indicates a situation that results in death or serious injury.
DANGER: RISK OF ELECTROCUTION
Indicates a situation that could result in electrocution.
DANGER: RISK OF BURNING
Indicates a situation that could result in burning because of extreme hot or cold temperatures.
DANGER: RISK OF EXPLOSION
Indicates a situation that could result in explosion.
WARNING
Indicates a situation that could result in death or serious injury.
WARNING: FLAMMABLE MATERIAL
CAUTION
Indicates a situation that could result in minor or moderate injury.
NOTICE
Indicates a situation that could result in equipment or property damage.
INFORMATION
Indicates useful tips or additional information.
Symbol Explanation
Before installation, read the installation and operation manual, and the wiring instruction sheet.
Before performing maintenance and service tasks, read the service manual.
For more information, see the installer and user reference guide.

1.2 For the installer

1.2.1 General

If you are NOT sure how to install or operate the unit, contact your dealer.
NOTICE
Improper installation or attachment of equipment or accessories could result in electric shock, short-circuit, leaks, fire or other damage to the equipment. Only use accessories, optional equipment and spare parts made or approved by Daikin.
WARNING
Make sure installation, testing and applied materials comply with applicable legislation (on top of the instructions described in the Daikin documentation).
CAUTION
Wear adequate personal protective equipment (protective gloves, safety glasses,…) when installing, maintaining or servicing the system.
WARNING
Tear apart and throw away plastic packaging bags so that nobody, especially children, can play with them. Possible risk: suffocation.
DANGER: RISK OF BURNING
▪ Do NOT touch the refrigerant piping, water piping or
internal parts during and immediately after operation. It could be too hot or too cold. Give it time to return to normal temperature. If you must touch it, wear protective gloves.
▪ Do NOT touch any accidental leaking refrigerant.
WARNING
Provide adequate measures to prevent that the unit can be used as a shelter by small animals. Small animals that make contact with electrical parts can cause malfunctions, smoke or fire.
CAUTION
Do NOT touch the air inlet or aluminium fins of the unit.
NOTICE
▪ Do NOT place any objects or equipment on top of the
unit.
▪ Do NOT sit, climb or stand on the unit.
NOTICE
Works executed on the outdoor unit are best done under dry weather conditions to avoid water ingress.
In accordance with the applicable legislation, it might be necessary to provide a logbook with the product containing at least: information on maintenance, repair work, results of tests, stand-by periods,…
Also, at least, following information MUST be provided at an accessible place at the product:
▪ Instructions for shutting down the system in case of an emergency
▪ Name and address of fire department, police and hospital
▪ Name, address and day and night telephone numbers for
obtaining service
In Europe, EN378 provides the necessary guidance for this logbook.

1.2.2 Installation site

▪ Provide sufficient space around the unit for servicing and air
circulation.
▪ Make sure the installation site withstands the weight and vibration
of the unit.
▪ Make sure the area is well ventilated. Do NOT block any
ventilation openings.
▪ Make sure the unit is level.
Do NOT install the unit in the following places:
▪ In potentially explosive atmospheres.
▪ In places where there is machinery that emits electromagnetic
waves. Electromagnetic waves may disturb the control system, and cause malfunction of the equipment.
▪ In places where there is a risk of fire due to the leakage of
flammable gases (example: thinner or gasoline), carbon fibre, ignitable dust.
▪ In places where corrosive gas (example: sulphurous acid gas) is
produced. Corrosion of copper pipes or soldered parts may cause the refrigerant to leak.
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
1 General safety precautions

1.2.3 Refrigerant

If applicable. See the installation manual or installer reference guide of your application for more information.
NOTICE
Make sure refrigerant piping installation complies with applicable legislation. In Europe, EN378 is the applicable standard.
NOTICE
Make sure the field piping and connections are NOT subjected to stress.
WARNING
During tests, NEVER pressurize the product with a pressure higher than the maximum allowable pressure (as indicated on the nameplate of the unit).
WARNING
Take sufficient precautions in case of refrigerant leakage. If refrigerant gas leaks, ventilate the area immediately. Possible risks:
▪ Excessive refrigerant concentrations in a closed room
can lead to oxygen deficiency.
▪ Toxic gas may be produced if refrigerant gas comes
into contact with fire.
DANGER: RISK OF EXPLOSION
Pump down – Refrigerant leakage. If you want to pump
down the system, and there is a leak in the refrigerant circuit:
▪ Do NOT use the unit's automatic pump down function,
with which you can collect all refrigerant from the system into the outdoor unit. Possible consequence: Self-combustion and explosion of the compressor because of air going into the operating compressor.
▪ Use a separate recovery system so that the unit's
compressor does NOT have to operate.
WARNING
ALWAYS recover the refrigerant. Do NOT release them directly into the environment. Use a vacuum pump to evacuate the installation.
NOTICE
After all the piping has been connected, make sure there is no gas leak. Use nitrogen to perform a gas leak detection.
NOTICE
▪ To avoid compressor breakdown, do NOT charge more
than the specified amount of refrigerant.
▪ When the refrigerant system is to be opened,
refrigerant MUST be treated according to the applicable legislation.
WARNING
Make sure there is no oxygen in the system. Refrigerant may only be charged after performing the leak test and the vacuum drying.
▪ In case recharge is required, see the nameplate of the unit. It
states the type of refrigerant and necessary amount.
▪ The unit is factory charged with refrigerant and depending on pipe
sizes and pipe lengths some systems require additional charging of refrigerant.
▪ Only use tools exclusively for the refrigerant type used in the
system, this to ensure pressure resistance and prevent foreign materials from entering into the system.
▪ Charge the liquid refrigerant as follows:
If Then
A siphon tube is present
(i.e., the cylinder is marked with "Liquid filling siphon attached")
A siphon tube is NOT present Charge with the cylinder upside
▪ Open refrigerant cylinders slowly.
▪ Charge the refrigerant in liquid form. Adding it in gas form may
prevent normal operation.
CAUTION
When the refrigerant charging procedure is done or when pausing, close the valve of the refrigerant tank immediately. If the valve is NOT closed immediately, remaining pressure might charge additional refrigerant. Possible consequence: Incorrect refrigerant amount.
Charge with the cylinder upright.
down.

1.2.4 Brine

If applicable. See the installation manual or installer reference guide of your application for more information.
WARNING
The selection of the brine MUST be in accordance with the applicable legislation.
WARNING
Take sufficient precautions in case of brine leakage. If brine leaks, ventilate the area immediately and contact your local dealer.
WARNING
The ambient temperature inside the unit can get much higher than that of the room, e.g. 70°C. In case of a brine leak, hot parts inside the unit can create a hazardous situation.
WARNING
The use and installation of the application MUST comply with the safety and environmental precautions specified in the applicable legislation.

1.2.5 Water

If applicable. See the installation manual or installer reference guide of your application for more information.
NOTICE
Make sure water quality complies with EU directive 98/83EC.
Installer reference guide
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04

2 About the documentation

1.2.6 Electrical

DANGER: RISK OF ELECTROCUTION
▪ Turn OFF all power supply before removing the
switch box cover, connecting electrical wiring or touching electrical parts.
▪ Disconnect the power supply for more than 1minute,
and measure the voltage at the terminals of main circuit capacitors or electrical components before servicing. The voltage MUST be less than 50 V DC before you can touch electrical components. For the location of the terminals, see the wiring diagram.
▪ Do NOT touch electrical components with wet hands.
▪ Do NOT leave the unit unattended when the service
cover is removed.
WARNING
If NOT factory installed, a main switch or other means for disconnection, having a contact separation in all poles providing full disconnection under overvoltage category III condition, MUST be installed in the fixed wiring.
WARNING
▪ ONLY use copper wires.
▪ Make sure the field wiring complies with the applicable
legislation.
▪ All field wiring MUST be performed in accordance with
the wiring diagram supplied with the product.
▪ NEVER squeeze bundled cables and make sure they
do NOT come in contact with the piping and sharp edges. Make sure no external pressure is applied to the terminal connections.
▪ Make sure to install earth wiring. Do NOT earth the unit
to a utility pipe, surge absorber, or telephone earth. Incomplete earth may cause electrical shock.
▪ Make sure to use a dedicated power circuit. NEVER
use a power supply shared by another appliance.
▪ Make sure to install the required fuses or circuit
breakers.
▪ Make sure to install an earth leakage protector. Failure
to do so may cause electric shock or fire.
▪ When installing the earth leakage protector, make sure
it is compatible with the inverter (resistant to high frequency electric noise) to avoid unnecessary opening of the earth leakage protector.
CAUTION
When connecting the power supply, the earth connection must be made before the current-carrying connections are established. When disconnecting the power supply, the current-carrying connections must be separated before the earth connection is. The length of the conductors between the power supply stress relief and the terminal block itself must be as such that the current-carrying wires are tautened before the earth wire is in case the power supply is pulled loose from the stress relief.
NOTICE
Precautions when laying power wiring:
▪ Do NOT connect wiring of different thicknesses to the
power terminal block (slack in the power wiring may cause abnormal heat).
▪ When connecting wiring which is the same thickness,
do as shown in the figure above.
▪ For wiring, use the designated power wire and connect
firmly, then secure to prevent outside pressure being exerted on the terminal board.
▪ Use an appropriate screwdriver for tightening the
terminal screws. A screwdriver with a small head will damage the head and make proper tightening impossible.
▪ Over-tightening the terminal screws may break them.
Install power cables at least 1 metre away from televisions or radios to prevent interference. Depending on the radio waves, a distance of 1metre may not be sufficient.
WARNING
▪ After finishing the electrical work, confirm that each
electrical component and terminal inside the electrical components box is connected securely.
▪ Make sure all covers are closed before starting up the
unit.
NOTICE
Only applicable if the power supply is three‑phase, and the compressor has an ON/OFF starting method.
If there exists the possibility of reversed phase after a momentary black out and the power goes on and off while the product is operating, attach a reversed phase protection circuit locally. Running the product in reversed phase can break the compressor and other parts.
2 About the documentation

2.1 About this document

Target audience
Authorised installers
INFORMATION
This appliance is intended to be used by expert or trained users in shops, in light industry and on farms, or for commercial use by lay persons.
Documentation set
This document is part of a documentation set. The complete set consists of:
General safety precautions:
▪ Safety instructions that you MUST read before installing
▪ Format: Paper (in the box of the outdoor unit)
Outdoor unit installation manual:
▪ Installation instructions
▪ Format: Paper (in the box of the outdoor unit)
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide

3 About the box

21
ENERG
IJAY
IAIE
ENERG
IJAY
IAIE
2
3
1
a
b c
d
e
Installer reference guide:
▪ Preparation of the installation, reference data,…
▪ Format: Digital files on http://www.daikineurope.com/support-
and-manuals/product-information/
Latest revisions of the supplied documentation may be available on the regional Daikin website or via your dealer.
The original documentation is written in English. All other languages are translations.
Technical engineering data
▪ A subset of the latest technical data is available on the regional
Daikin website (publicly accessible).
▪ The full set of latest technical data is available on the Daikin
Business Portal (authentication required).

2.2 Installer reference guide at a glance

Chapter Description
General safety precautions
About the documentation What documentation exists for the
About the box How to unpack the units and remove
About the units and options
Preparation What to do and know before going
Installation What to do and know to install the
Commissioning What to do and know to commission the
Hand‑over to the user What to give and explain to the user
Maintenance and service How to maintain and service the units
Troubleshooting What to do in case of problems
Disposal How to dispose of the system
Technical data Specifications of the system
Glossary Definition of terms
Safety instructions that you must read before installing
installer
their accessories
▪ How to identify the units
▪ Possible combinations of units and
options
on‑site
system
system after it is installed

3.2 Outdoor unit

3.2.1 To unpack the outdoor unit

3.2.2 To handle the outdoor unit

CAUTION
To avoid injury, do NOT touch the air inlet or aluminium fins of the unit.
Carry the unit slowly as shown:
3 About the box

3.1 Overview: About the box

This chapter describes what you have to do after the box with the outdoor unit is delivered on-site.
It contains information about:
▪ Unpacking and handling the unit
▪ Removing the accessories from the unit
Keep the following in mind:
▪ At delivery, the unit MUST be checked for damage. Any damage
MUST be reported immediately to the claims agent of the carrier.
▪ Bring the packed unit as close as possible to its final installation
position to prevent damage during transport.
▪ Prepare the path along which you want to bring the unit inside in
advance.
Installer reference guide

3.2.3 To remove the accessories from the outdoor unit

AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04

4 About the units and options

a General safety precautions b Outdoor unit installation manual c Cable tie d Fluorinated greenhouse gases label e Energy label
4 About the units and options

4.1 Overview: About the units and options

This chapter contains information about:
▪ Identifying the outdoor unit
▪ Combining the outdoor unit with options

4.2 Identification

NOTICE
When installing or servicing several units at the same time, make sure NOT to switch the service panels between different models.

4.2.1 Identification label: Outdoor unit

Location

4.3 Combining units and options

4.3.1 Possible options for the outdoor unit

Demand adaptor kit
Can be used for the following:
▪ Low noise: To lower the operation sound of the outdoor unit.
▪ I-demand function: To limit the power consumption from the
system (example: budget control, limit power consumption during peak moments…).
Model Demand adaptor kit
AZQS_Y1 KRP58M51
AZQS_V1 SB.KRP58M51
For installation instructions, see the installation manual of the demand adaptor kit.
▪ Preparing the refrigerant piping
▪ Preparing the electrical wiring

5.2 Preparing the installation site

Do NOT install the unit in places often used as work place. In case of construction works (e.g. grinding works) where a lot of dust is created, the unit MUST be covered.
Choose an installation location with sufficient space for carrying the unit in and out of the site.

5.2.1 Installation site requirements of the outdoor unit

INFORMATION
Also read the following requirements:
▪ General installation site requirements. See the
"General safety precautions" chapter.
▪ Service space requirements. See the "Technical data"
chapter.
▪ Refrigerant piping requirements (length, height
difference). See further in this "Preparation" chapter.
▪ Select a place where rain can be avoided as much as possible.
▪ Take care that in the event of a water leak, water cannot cause
any damage to the installation space and surroundings.
▪ Choose a location where the hot/cold air discharged from the unit
or the operation noise, will NOT disturb anyone.
▪ Heat exchanger fins are sharp and injury is possible. Choose an
installation location where there is no risk for injury (especially in areas where children play).
Do NOT install the unit in the following places:
▪ Sound sensitive areas (e.g. near a bedroom), so that the
operation noise will cause no trouble. Note: If the sound is measured under actual installation conditions, the measured value might be higher than the sound pressure level mentioned in Sound spectrum in the data book due to environmental noise and sound reflections.
INFORMATION
The sound pressure level is less than 70dBA.
▪ In places where a mineral oil mist, spray or vapour may be
present in the atmosphere. Plastic parts may deteriorate and fall off or cause water leakage.
It is NOT recommended to install the unit in the following places because it may shorten the life of the unit:
▪ Where the voltage fluctuates a lot
▪ In vehicles or vessels
▪ Where acidic or alkaline vapour is present
Seaside installation. Make sure the outdoor unit is NOT directly exposed to sea winds. This is to prevent corrosion caused by high levels of salt in the air, which might shorten the life of the unit.

5 Preparation

5.1 Overview: Preparation

This chapter describes what you have to do and know before going on-site.
It contains information about:
▪ Preparing the installation site
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
5 Preparation
b
c
a
a
b
c
d
c
d
a
b
c
b
a
b
c
c
d
t
Ø
Install the outdoor unit away from direct sea winds.
Example: Behind the building.
If the outdoor unit is exposed to direct sea winds, install a windbreaker.
▪ Height of windbreaker≥1.5×height of outdoor unit
▪ Mind the service space requirements when installing the
windbreaker.
b Prevailing wind direction c Air outlet
The outdoor unit is designed for outdoor installation only, and for ambient temperatures ranging:
Model Cooling Heating
AZQS –5~46°C –15~15.5°C

5.2.2 Additional installation site requirements of the outdoor unit in cold climates

Protect the outdoor unit against direct snowfall and take care that the outdoor unit is NEVER snowed up.
a Sea wind b Building c Outdoor unit d Windbreaker
Strong winds (≥18 km/h) blowing against the outdoor unit’s air outlet causes short circuit (suction of discharge air). This may result in:
▪ deterioration of the operational capacity;
▪ frequent frost acceleration in heating operation;
▪ disruption of operation due to decrease of low pressure or
increase of high pressure;
▪ a broken fan (if a strong wind blows continuously on the fan, it
may start rotating very fast, until it breaks).
It is recommended to install a baffle plate when the air outlet is exposed to wind.
It is recommended to install the outdoor unit with the air inlet facing the wall and NOT directly exposed to the wind.

5.3 Preparing refrigerant piping

5.3.1 Refrigerant piping requirements

▪ Foreign materials inside pipes (including oils for fabrication) must
be ≤30mg/10m.
a Snow cover or shed b Pedestal (minimum height=150mm) c Prevailing wind direction d Air outlet
INFORMATION
Also read the precautions and requirements in the "General safety precautions" chapter.
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant. Use phosphoric acid deoxidised seamless copper for refrigerant.
Refrigerant piping material
Piping material: Phosphoric acid deoxidised seamless copper.
Flare connections: Only use annealed material.
Piping temper grade and thickness:
Outer diameter
(Ø)
6.4mm (1/4")
9.5mm (3/8")
12.7mm (1/2")
15.9mm (5/8") Annealed (O) ≥1.0mm
19.1mm (3/4") Half hard (1/2H)
Installer reference guide
a Baffle plate
Temper grade Thickness (t)
Annealed (O) ≥0.8mm
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
(a)
4P385529-1C – 2019.04

6 Installation

H1
L1
(a) Depending on the applicable legislation and the unit's
maximum working pressure (see "PS High" on the unit name plate), larger piping thickness might be required.
Refrigerant piping diameter
Use the same diameters as the connections on the outdoor units:
L1 liquid piping Ø9.5mm
L1 gas piping Ø15.9mm
Refrigerant piping length and height difference
The piping length and height difference must comply with the following requirements:
Total one‑way piping length:
5m≤L1≤50m (70m)
Height difference between the highest indoor unit and the outdoor unit:
H1≤30m
(a) Parenthesised figure represents the equivalent length. (b) For details about the combination of your outdoor and
indoor unit, see the engineering databook.
(a)(b)

5.3.2 Refrigerant piping insulation

▪ Use polyethylene foam as insulation material:
▪ with a heat transfer rate between 0.041 and 0.052W/mK (0.035
and 0.045kcal/mh°C)
▪ with a heat resistance of at least 120°C
▪ Insulation thickness
Ambient
temperature
≤30°C 75% to 80% RH 15mm
>30°C ≥80% RH 20mm
Humidity Minimum thickness

5.4 Preparing electrical wiring

5.4.1 About preparing electrical wiring

WARNING
▪ All wiring MUST be performed by an authorised
electrician and MUST comply with the applicable legislation.
▪ Make electrical connections to the fixed wiring.
▪ All components procured on-site and all electrical
construction MUST comply with the applicable legislation.
WARNING
ALWAYS use multicore cable for power supply cables.
6 Installation

6.1 Overview: Installation

This chapter describes what you have to do and know on-site to install the system.
Typical workflow
Installation typically consists of the following stages:
▪ Mounting the outdoor unit.
▪ Mounting the indoor units.
▪ Connecting the refrigerant piping.
▪ Checking the refrigerant piping.
▪ Charging refrigerant.
▪ Connecting the electrical wiring.
▪ Finishing the outdoor installation.
▪ Finishing the indoor installation.
INFORMATION
For installation of the indoor unit (mounting the indoor unit, connecting the refrigerant piping to the indoor unit, connecting the electrical wiring to the indoor unit …), see the installation manual of the indoor unit.
INFORMATION
Also read the precautions and requirements in the "General safety precautions" chapter.
INFORMATION
Also read "6.7.5 Specifications of standard wiring
components"on page18.
WARNING
▪ If the power supply has a missing or wrong N-phase,
equipment might break down.
▪ Establish proper earthing. Do NOT earth the unit to a
utility pipe, surge absorber, or telephone earth. Incomplete earthing may cause electrical shock.
▪ Install the required fuses or circuit breakers.
▪ Secure the electrical wiring with cable ties so that the
cables do NOT come in contact with sharp edges or piping, particularly on the high-pressure side.
▪ Do NOT use taped wires, stranded conductor wires,
extension cords, or connections from a star system. They can cause overheating, electrical shock or fire.
▪ Do NOT install a phase advancing capacitor, because
this unit is equipped with an inverter. A phase advancing capacitor will reduce performance and may cause accidents.

6.2 Opening the units

6.2.1 About opening the units

At certain times, you have to open the unit. Example:
▪ When connecting the refrigerant piping
▪ When connecting the electrical wiring
▪ When maintaining or servicing the unit
DANGER: RISK OF ELECTROCUTION
Do NOT leave the unit unattended when the service cover is removed.

6.2.2 To open the outdoor unit

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
6 Installation
3
45°~90°
(4)
2
1
(mm)
>150
620
350
(345-355)
4× M12
a
20
a
4× M12

6.3 Mounting the outdoor unit

6.3.1 About mounting the outdoor unit

Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1 Providing the installation structure.
2 Installing the outdoor unit.
3 Providing drainage.
4 Preventing the unit from falling over.
5 Protecting the unit against snow and wind by installing a snow
cover and baffle plates. See "Preparing installation site" in
"5Preparation"on page7.

6.3.2 Precautions when mounting the outdoor unit

INFORMATION
Also read the precautions and requirements in the following chapters:
▪ General safety precautions
▪ Preparation

6.3.3 To provide the installation structure

Check the strength and level of the installation ground so that the unit will not cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the foundation drawing.
Prepare 4 sets of anchor bolts, nuts and washers (field supply) as follows:
a Make sure not to cover the drain holes of the bottom plate
of the unit.
INFORMATION
The recommended height of the upper protruding part of the bolts is 20mm.
NOTICE
Fix the outdoor unit to the foundation bolts using nuts with resin washers (a). If the coating on the fastening area is stripped off, the metal can rust easily.

6.3.4 To install the outdoor unit

Installer reference guide
10

6.3.5 To provide drainage

▪ Make sure that condensation water can be evacuated properly.
▪ Install the unit on a base to make sure that there is proper
drainage in order to avoid ice accumulation.
▪ Prepare a water drainage channel around the foundation to drain
waste water away from the unit.
▪ Avoid drain water flowing over the footpath, so that it does NOT
become slippery in case of ambient freezing temperatures.
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04
6 Installation
≥150 mm
A
B
B
C D E
160 160620
262
416
595
285
279
260
161
(345~355)
a
▪ If you install the unit on a frame, install a waterproof plate within
150 mm of the bottom side of the unit in order to prevent water from getting into the unit and to avoid drain water dripping (see the following figure).
INFORMATION
If necessary, you can use a drain plug kit (field supply) to prevent drain water from dripping.
NOTICE
If drain holes of the outdoor unit are covered by a mounting base or by floor surface, raise the unit to provide a free space of more than 150mm under the outdoor unit.
Drain holes (dimensions in mm)
1 Prepare 2 cables as indicated in the following illustration (field
supply).
2 Place the 2 cables over the outdoor unit.
3 Insert a rubber sheet between the cables and the outdoor unit
to prevent the cables from scratching the paint (field supply).
4 Attach the ends of the cables and tighten them.

6.4 Connecting the refrigerant piping

6.4.1 About connecting the refrigerant piping

Before connecting the refrigerant piping
Make sure the outdoor and indoor unit are mounted.
Typical workflow
Connecting the refrigerant piping involves:
▪ Connecting the refrigerant piping to the outdoor unit
▪ Connecting the refrigerant piping to the indoor unit
▪ Installing oil traps
▪ Insulating the refrigerant piping
▪ Keeping in mind the guidelines for:
▪ Pipe bending
▪ Flaring pipe ends
▪ Brazing
▪ Using the stop valves
A Discharge side B Distance between anchor points C Bottom frame D Drain holes E Knockout hole for snow
Snow
In regions with snowfall, snow might build up and freeze between the heat exchanger and the external plate. This might decrease the operating efficiency. To prevent this:
1 Remove the knockout hole (a) by tapping on the attachment
points with a flat head screwdriver and a hammer.
2 Remove the burrs, and paint the edges and areas around the
edges using repair paint to prevent rusting.

6.3.6 To prevent the outdoor unit from falling over

In case the unit is installed in places where strong wind can tilt the unit, take following measure:
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04

6.4.2 Precautions when connecting the refrigerant piping

INFORMATION
Also read the precautions and requirements in the following chapters:
▪ General safety precautions
▪ Preparation
DANGER: RISK OF BURNING
CAUTION
▪ Do NOT use mineral oil on flared part.
▪ NEVER install a drier to this R410A unit to guarantee
its lifetime. The drying material may dissolve and damage the system.
Installer reference guide
11
6 Installation
a
b
c
d
R=
0.4~0.8
±2
45°
90°
±2
A
a b
A
a b
c
NOTICE
Take the following precautions on refrigerant piping into account:
▪ Avoid anything but the designated refrigerant to get
mixed into the refrigerant cycle (e.g. air).
▪ Only use R410A when adding refrigerant.
▪ Only use installation tools (e.g. manifold gauge set) that
are exclusively used for R410A installations to withstand the pressure and to prevent foreign materials (e.g. mineral oils and moisture) from mixing into the system.
▪ Install the piping so that the flare is NOT subjected to
mechanical stress
▪ Protect the piping as described in the following table to
prevent dirt, liquid or dust from entering the piping.
▪ Use caution when passing copper tubes through walls
(see figure below).
Unit Installation period Protection method
Outdoor unit >1month Pinch the pipe
<1month Pinch or tape the pipe
Indoor unit Regardless of the
period
Piping size
(mm)
Tightening
torque (N•m)
Flare
dimensions (A)
Flare shape
(mm)
(mm)
Ø6.4 15~17 8.7~9.1
Ø9.5 33~39 12.8~13.2
Ø12.7 50~60 16.2~16.6
Ø15.9 63~75 19.3~19.7
Ø19.1 90~110 23.6~24.0

6.4.4 Pipe bending guidelines

Use a pipe bender for bending. All pipe bends should be as gentle as possible (bending radius should be 30~40mm or larger).

6.4.5 To flare the pipe end

CAUTION
▪ Incomplete flaring may cause refrigerant gas leakage.
▪ Do NOT re-use flares. Use new flares to prevent
refrigerant gas leakage.
▪ Use flare nuts that are included with the unit. Using
different flare nuts may cause refrigerant gas leakage.
1 Cut the pipe end with a pipe cutter.
2 Remove burrs with the cut surface facing down so that the
chips do NOT enter the pipe.
INFORMATION
Do NOT open the refrigerant stop valve before checking the refrigerant piping. When you need to charge additional refrigerant it is recommended to open the refrigerant stop valve after charging.

6.4.3 Guidelines when connecting the refrigerant piping

Take the following guidelines into account when connecting pipes:
▪ Coat the flare inner surface with ether oil or ester oil when
connecting a flare nut. Tighten 3 or 4 turns by hand, before tightening firmly.
▪ ALWAYS use 2 wrenches together when loosening a flare nut.
▪ ALWAYS use a spanner and torque wrench together to tighten the
flare nut when connecting the piping. This to prevent nut cracking and leaks.
a Cut exactly at right angles. b Remove burrs.
3 Remove the flare nut from the stop valve and put the flare nut
on the pipe.
4 Flare the pipe. Set exactly at the position as shown in the
following figure.
Flare tool for
R410A (clutch
type)
Conventional flare tool
Clutch type
(Ridgid-type)
Wing nut type
(Imperial-type)
A 0~0.5mm 1.0~1.5mm 1.5~2.0mm
5 Check that the flaring is properly made.
a Flare’s inner surface MUST be flawless. b The pipe end MUST be evenly flared in a perfect circle. c Make sure the flare nut is fitted.
Installer reference guide
12
a Torque wrench b Spanner c Piping union d Flare nut

6.4.6 To braze the pipe end

▪ When brazing, blow through with nitrogen to prevent creation of
large quantities of oxidised film on the inside of the piping. This film adversely affects valves and compressors in the refrigerating system and prevents proper operation.
▪ Set the nitrogen pressure to 20kPa (0.2bar) (just enough so it
can be felt on the skin) with a pressure-reducing valve.
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04
a b c d e
f
f
a Refrigerant piping
c
d
a
b
a
b
c
a
b d
a
b
c
d
b Part to be brazed c Taping d Manual valve e Pressure-reducing valve
f Nitrogen
▪ Do NOT use anti-oxidants when brazing pipe joints.
Residue can clog pipes and break equipment.
▪ Do NOT use flux when brazing copper-to-copper refrigerant
piping. Use phosphor copper brazing filler alloy (BCuP), which does not require flux. Flux has an extremely harmful influence on refrigerant piping systems. For instance, if chlorine based flux is used, it will cause pipe corrosion or, in particular, if the flux contains fluorine, it will deteriorate the refrigerant oil.
▪ Always protect the surrounding surfaces (e.g. insulation foam)
from heat when brazing.

6.4.7 Using the stop valve and service port

To handle the stop valve
Take the following guidelines into account:
▪ The stop valves are factory closed.
▪ The following figure shows the stop valve parts required when
handling the valve.
6 Installation
To open/close the stop valve
1 Remove the stop valve cover.
2 Insert a hexagon wrench (liquid side: 4 mm, gas side: 6 mm)
into the valve stem and turn the valve stem:
Counterclockwise to open. Clockwise to close.
3 When the stop valve CANNOT be turned any further, stop
turning.
4 Install the stop valve cover.
Result: The valve is now open/closed.
To handle the stem cap
▪ The stem cap is sealed where indicated with the arrow. Do NOT
damage it.
▪ After handling the stop valve, tighten the stem cap, and check for
refrigerant leaks.
Item Tightening torque (N∙m)
Stem cap, liquid side 13.5~16.5
Stem cap, gas side 22.5~27.5
a Service port and service port cap b Valve stem c Field piping connection d Stem cap
▪ Keep both stop valves open during operation.
▪ Do NOT apply excessive force to the valve stem. Doing so may
break the valve body.
▪ ALWAYS make sure to secure the stop valve with a spanner, then
loosen or tighten the flare nut with a torque wrench. Do NOT place the spanner on the stem cap, as this could cause a refrigerant leak.
a Spanner b Torque wrench
▪ When it is expected that the operating pressure will be low (e.g.
when cooling will be performed while the outside air temperature is low), sufficiently seal the flare nut in the stop valve on the gas line with silicon sealant to prevent freezing.
To handle the service cap
▪ ALWAYS use a charge hose equipped with a valve depressor pin,
since the service port is a Schrader type valve.
▪ After handling the service port, tighten the service port cap, and
check for refrigerant leaks.
Item Tightening torque (N∙m)
Service port cap 11.5~13.9

6.4.8 To connect the refrigerant piping to the outdoor unit

1 Do the following:
▪ Remove the service cover (a) with screw (b). ▪ Remove the piping intake plate (c) with screw (d).
2 Choose a piping route (a, b, c or d).
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Silicon sealant; make sure there is no gap.
Installer reference guide
13
6 Installation
b b bb
a
a
a
b
d
e
f
b
a
c
a
a
b
10 m
INFORMATION
▪ Remove the knockout hole (a) in the bottom plate or
cover plate by tapping on the attachment points with a flat head screwdriver and a hammer.
▪ Optionally, cut out the slits (b) with a metal saw.
NOTICE
Precautions when making knockout holes:
▪ Avoid damaging the casing and underlying piping.
▪ After making the knockout holes, we recommend to
remove the burrs and paint the edges and areas around the edges using repair paint to prevent rusting.
▪ When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent damage.
3 Do the following:
▪ Connect the liquid pipe (a) to the liquid stop valve. ▪ Connect the gas pipe (b) to the gas stop valve.
WARNING
Provide adequate measures to prevent that the unit can be used as a shelter by small animals. Small animals that make contact with electrical parts can cause malfunctions, smoke or fire.
NOTICE
Make sure to open the stop valves after installing the refrigerant piping and performing vacuum drying. Running the system with the stop valves closed may break the compressor.

6.4.9 To determine if oil traps are required

If oil flows back into the outdoor unit's compressor, this might cause liquid compression or deterioration of oil return. Oil traps in the rising gas piping can prevent this.
If Then
The indoor unit is installed higher than the outdoor unit
Install an oil trap every 10m (height difference).
4 Do the following:
▪ Insulate the liquid piping (a) and the gas piping (b). ▪ Wind heat insulation around the curves, and then cover it
with vinyl tape (c).
▪ Make sure the field piping does not touch any compressor
components (d).
▪ Seal the insulation ends (sealant etc.) (e).
The outdoor unit is installed higher than the indoor unit
a Rising gas piping with oil trap
b Liquid piping
Oil traps are NOT required.

6.5 Checking the refrigerant piping

6.5.1 About checking the refrigerant piping

The outdoor unit's internal refrigerant piping has been factory tested for leaks. You only have to check the outdoor unit's external refrigerant piping.
Before checking the refrigerant piping
5 If the outdoor unit is installed above the indoor unit, cover the
stop valves (f, see above) with sealing material to prevent condensed water on the stop valves from moving to the indoor unit.
NOTICE
Any exposed piping might cause condensation.
6 Reattach the service cover and the piping intake plate.
7 Seal all gaps (example: a) to prevent snow and small animals
from entering the system.
Make sure the refrigerant piping is connected between the outdoor unit and the indoor unit.
Typical workflow
Checking the refrigerant piping typically consists of the following stages:
1 Checking for leaks in the refrigerant piping.
2 Performing vacuum drying to remove all moisture, air or
nitrogen from the refrigerant piping.
Installer reference guide
14
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04
6 Installation
a
c
f
b d e
R410A
If there is a possibility of moisture being present in the refrigerant piping (for example, water may have entered the piping), first carry out the vacuum drying procedure below until all moisture has been removed.

6.5.2 Precautions when checking the refrigerant piping

INFORMATION
Also read the precautions and requirements in the following chapters:
▪ General safety precautions
▪ Preparation
NOTICE
Use a 2-stage vacuum pump with a non-return valve that can evacuate to a gauge pressure of −⁠100.7 kPa (−⁠1.007 bar)(5 Torr absolute). Make sure the pump oil does not flow oppositely into the system while the pump is not working.
NOTICE
Use this vacuum pump for R410A exclusively. Using the same pump for other refrigerants may damage the pump and the unit.
NOTICE
▪ Connect the vacuum pump to both the service port of
the gas stop valve and the service port of the liquid stop valve to increase efficiency.
▪ Make sure that the gas stop valve and liquid stop valve
are firmly closed before performing the leak test or vacuum drying.

6.5.3 Checking refrigerant piping: Setup

2 Check for leaks by applying the bubble test solution to all
connections.
3 Discharge all nitrogen gas.

6.5.5 To perform vacuum drying

NOTICE
▪ Connect the vacuum pump to both the service port of
the gas stop valve and the service port of the liquid stop valve to increase efficiency.
▪ Make sure that the gas stop valve and liquid stop valve
are firmly closed before performing the leak test or vacuum drying.
1 Vacuum the system until the pressure on the manifold indicates
−0.1MPa (−1bar).
2 Leave as is for 4-5minutes and check the pressure:
If the pressure… Then…
Does not change There is no moisture in the
system. This procedure is finished.
Increases There is moisture in the
system. Go to the next step.
3 Vacuum the system for at least 2 hours to a manifold pressure
of −0.1MPa (−1bar).
4 After turning the pump OFF, check the pressure for at least
1hour.
5 If you do NOT reach the target vacuum or CANNOT maintain
the vacuum for 1hour, do the following:
▪ Check for leaks again. ▪ Perform vacuum drying again.
NOTICE
Make sure to open the stop valves after installing the refrigerant piping and performing vacuum drying. Running the system with the stop valves closed may break the compressor.
INFORMATION
After opening the stop valve, it is possible that the pressure in the refrigerant piping does NOT increase. This might be caused by e.g. the closed state of the expansion valve in
a Pressure gauge b Nitrogen c Refrigerant d Weighing machine e Vacuum pump
f Stop valve

6.5.4 To check for leaks

NOTICE
Do NOT exceed the unit's maximum working pressure (see "PS High" on the unit name plate).
NOTICE
Make sure to use a recommended bubble test solution from your wholesaler. Do not use soap water, which may cause cracking of flare nuts (soap water may contain salt, which absorbs moisture that will freeze when the piping gets cold), and/or lead to corrosion of flared joints (soap water may contain ammonia which causes a corrosive effect between the brass flare nut and the copper flare).
1 Charge the system with nitrogen gas up to a gauge pressure of
at least 200 kPa (2 bar). It is recommended to pressurize to 3000kPa (30bar) in order to detect small leaks.
the outdoor unit circuit, but does NOT present any problem for correct operation of the unit.

6.6 Charging refrigerant

6.6.1 About charging refrigerant

The outdoor unit is factory charged with refrigerant, but in some cases the following might be necessary:
What When
Charging additional refrigerant When the total liquid piping
length is more than specified (see later).
Completely recharging refrigerant Example:
▪ When relocating the system.
▪ After a leak.
Charging additional refrigerant
Before charging additional refrigerant, make sure the outdoor unit's external refrigerant piping is checked (leak test, vacuum drying).
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
15
6 Installation
a
b
c
a
b c
a
b
c
a
b c
L1 (m)
INFORMATION
Depending on the units and/or the installation conditions, it might be necessary to connect electrical wiring before you can charge refrigerant.
Typical workflow – Charging additional refrigerant typically consists of the following stages:
1 Determining if and how much you have to charge additionally.
2 If necessary, charging additional refrigerant.
3 Filling in the fluorinated greenhouse gases label, and fixing it to
the inside of the outdoor unit.
Completely recharging refrigerant
Before completely recharging refrigerant, make sure the following is done:
1 All refrigerant is recovered from the system.
2 The outdoor unit's external refrigerant piping is checked (leak
test, vacuum drying).
3 Vacuum drying on the outdoor unit's internal refrigerant piping is
performed.
NOTICE
Before completely recharging, perform vacuum drying on the outdoor unit's internal refrigerant piping as well. To do so, use the internal service port of the outdoor unit (between the heat exchanger and the 4‑way valve). Do NOT use the service ports of the stop valves, because vacuum drying cannot be performed properly from these ports.
WARNING
Some sections of the refrigerant circuit may be isolated from other sections caused by components with specific functions (e.g. valves). The refrigerant circuit therefore features additional service ports for vacuuming, pressure relief or pressurizing the circuit.
In case it is required to perform brazing on the unit, ensure that there is no pressure remaining inside the unit. Internal pressures need to be released with ALL the service ports indicated on the figures below opened. The location is depending on model type.
AZQS140_V1
AZQS100+125_V1
AZQS140_Y1
a Internal service port b Stop valve with service port (liquid) c Stop valve with service port (gas)
Typical workflow – Completely recharging refrigerant typically consists of the following stages:
1 Determining how much refrigerant to charge.
2 Charging refrigerant.
3 Filling in the fluorinated greenhouse gases label, and fixing it to
the inside of the outdoor unit.
AZQS100+125_Y1

6.6.2 Precautions when charging refrigerant

INFORMATION
Also read the precautions and requirements in the following chapters:
▪ General safety precautions
▪ Preparation
Installer reference guide
16

6.6.3 To determine the additional refrigerant amount

To determine if adding additional refrigerant is necessary
If Then
L1≤30m (chargeless length) You do not have to add
additional refrigerant.
L1>30m You must add additional
refrigerant.
For future servicing, encircle the selected amount in the tables below.
INFORMATION
Piping length is the one-way length of liquid piping.
To determine the additional refrigerant amount (R in kg)
30~40m 40~50m
R: 0.5kg 1.0kg
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04
6 Installation
L1 (m)
b
Contains fluorinated greenhouse gases
2
1
1
1
2
2
kg
tCO2eq
GWP × kg
1000
=
=
+
kg
=
kg
=
GWP: XXX
RXXX
a
f
c
d
e
INFORMATION
For details about the combination of your outdoor and indoor unit, see the engineering databook.

6.6.4 To determine the complete recharge amount

Model
5~10 10~20 20~30 30~40 40~50
AZQS100+125 1.9 2.4 2.9 3.4 3.9
AZQS140 3.0 3.5 4.0 4.5 5.0
INFORMATION
For details about the combination of your outdoor and indoor unit, see the engineering databook.

6.6.5 Charging refrigerant: Setup

See "6.5.3Checking refrigerant piping: Setup"on page15.

6.6.6 To charge additional refrigerant

WARNING
▪ Only use R410A as refrigerant. Other substances may
cause explosions and accidents.
▪ R410A contains fluorinated greenhouse gases. Its
global warming potential (GWP) value is 2087.5. Do NOT vent these gases into the atmosphere.
▪ When charging refrigerant, always use protective
gloves and safety glasses.
CAUTION
To avoid compressor breakdown, do NOT charge more than the specified amount of refrigerant.
Prerequisite: Before charging refrigerant, make sure the refrigerant piping is connected and checked (leak test and vacuum drying).
1 Connect the refrigerant cylinder to both the service port of the
gas stop valve and the service port of the liquid stop valve.
2 Charge the additional refrigerant amount.
3 Open the stop valves.
If pump down is needed in case of dismantling or relocating the system, see To pump down for more details.

6.6.7 To fix the fluorinated greenhouse gases label

1 Fill in the label as follows:
a If a multilingual fluorinated greenhouse gases label is
delivered with the unit (see accessories), peel off the applicable language and stick it on top of a.
b Factory refrigerant charge: see unit name plate c Additional refrigerant amount charged d Total refrigerant charge e Quantity of fluorinated greenhouse gases of the total
refrigerant charge expressed as tonnes CO2 equivalent.
f GWP = Global warming potential
NOTICE
Applicable legislation on fluorinated greenhouse gases requires that the refrigerant charge of the unit is indicated both in weight and CO2 equivalent.
Formula to calculate the quantity in CO2 equivalent tonnes: GWP value of the refrigerant × total refrigerant
charge [in kg] / 1000
Use the GWP value mentioned on the refrigerant charge label. That GWP is based on the current legislation on fluorinated greenhouse gases. The GWP mentioned in the manual might be outdated.
2 Fix the label on the inside of the outdoor unit. There is a
dedicated place for it on the wiring diagram label.

6.7 Connecting the electrical wiring

6.7.1 About connecting the electrical wiring

Before connecting the electrical wiring
Make sure the refrigerant piping is connected and checked.
Typical workflow
Connecting the electrical wiring typically consists of the following stages:
1 Making sure the power supply system complies with the
electrical specifications of the units.
2 Connecting the electrical wiring to the outdoor unit.
3 Connecting the electrical wiring to the indoor units.
4 Connecting the main power supply.

6.7.2 About electrical compliance

AZQS_V1 + AZQS125_Y1
Equipment complying with EN/IEC 61000‑3‑12 (European/ International Technical Standard setting the limits for harmonic currents produced by equipment connected to public low-voltage systems with input current >16A and ≤75A per phase.).
AZQS140_Y1
Equipment complying with:
EN/IEC 61000‑3‑12 provided that the short-circuit power Ssc is
greater than or equal to the minimum Ssc value at the interface point between the user's supply and the public system.
▪ EN/IEC 61000‑3‑12 = European/International Technical
Standard setting the limits for harmonic currents produced by equipment connected to public low-voltage systems with input current >16A and ≤75A per phase.
▪ It is the responsibility of the installer or user of the equipment to
ensure, by consultation with the distribution network operator if necessary, that the equipment is connected only to a supply with a short-circuit power Ssc greater than or equal to the minimum Ssc value.
Model Minimum Ssc value
AZQS140_Y1 1170kVA
(a) This is the most stringent value. For specific product data,
see the databooks.
(a)
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
17
6 Installation
b a
c b
c
aa
A
AA´
c b ba c
a
B
B
a b

6.7.3 Precautions when connecting the electrical wiring

INFORMATION
Also read the precautions and requirements in the following chapters:
▪ General safety precautions
▪ Preparation
DANGER: RISK OF ELECTROCUTION
WARNING
ALWAYS use multicore cable for power supply cables.
CAUTION
For use of units in applications with temperature alarm settings it is recommended to foresee a delay of 10 minutes for signalling the alarm in case the alarm temperature is exceeded. The unit may stop for several minutes during normal operation for "defrosting the unit", or when in "thermostat stop" operation.

6.7.4 Guidelines when connecting the electrical wiring

Keep the following in mind:
▪ If stranded conductor wires are used, install a round crimp-style
terminal on the end of the wire. Place the round crimp-style terminal on the wire up to the covered part and fasten the terminal with the appropriate tool.
a Stranded conductor wire b Round crimp-style terminal
▪ Use the following methods for installing wires:
Wire type Installation method
Single-core wire
a Curled single-core wire
b Screw
c Flat washer
Stranded conductor wire with round crimp-style terminal
a Terminal
b Screw
c Flat washer
O Allowed
X NOT allowed
Tightening torques
Item Tightening torque (N•m)
M4 (X1M) 1.2~1.8
M4 (earth) 1.2~1.4
M5 (X1M) 2.0~3.0
M5 (earth) 2.4~2.9

6.7.5 Specifications of standard wiring components

Component AZQS_V1 AZQS_Y1
100 125 140 100 125 140
Power supply cable MCA
(a)
29.5A 31.5A 32.8A 15.2A 17.2A 21.8A
Voltage 230V 400V
Phase 1~ 3N~
Frequency 50Hz
Wire sizes Must comply with applicable legislation
Interconnection cables Minimum cable section of 2.5 mm² and applicable for 230 V
Recommended field fuse 32A 40A 16A 20A 25A
Earth leakage circuit breaker Must comply with applicable legislation
(a) MCA=Minimum circuit ampacity. Stated values are maximum values (see electrical data of combination with indoor units for exact values).

6.7.6 To connect the electrical wiring on the outdoor unit

NOTICE
▪ Follow the wiring diagram (delivered with the unit,
located at the inside of the service cover).
▪ Make sure the electrical wiring does NOT obstruct
proper reattachment of the service cover.
1 Remove the service cover. See "6.2.2 To open the outdoor
unit"on page9.
2 Strip insulation (20mm) from the wires.
3 Connect the interconnection cable and power supply as follows:
a Strip wire end to this point b Excessive strip length may cause electrical shock or
leakage.
Installer reference guide
18
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04
6 Installation
c
a
d
e
1~50 Hz
220-240 V
3N~50 Hz
380-415 V
V1 Y1
L1 L2 L3
L1 L2 L3
N
b
b
a
b
V1 Y1
cc
cc
dd ee
ff
a
b
a
b
a
b
2
3
1
a b c d e
A B
b
c
a
a Interconnection cable b Power supply cable c Earth leakage circuit breaker d Fuse e User interface
Routing through the frame
Connecting to the frame
Choose one of the 3 possibilities:
a Power supply cable
b Interconnection cable
When cables are routed from the unit, a protection sleeve for the conduits (PG insertions) can be inserted at the knockout hole.
When you do not use a wire conduit, protect the wires with vinyl tubes to prevent the edge of the knockout hole from cutting the wires.
a Switch box b Stop valve attachment plate c Earth d Cable tie e Interconnection cable
f Power supply cable
4 Fix the cables (power supply and interconnection cable) with a
cable tie to the stop valve attachment plate and route the wiring according to the illustration above.
5 Choose a knockout hole and remove the knockout hole by
tapping on the attachment points with a flat head screwdriver and a hammer.
6 Route the wiring through the frame and connect the wiring to
the frame at the knockout hole.
A Inside of the outdoor unit
B Outside of the outdoor unit
a Wire
b Bush
c Nut
d Frame
e Hose
NOTICE
Precautions when making knockout holes:
▪ Avoid damaging the casing and underlying piping.
▪ After making the knockout holes, we recommend to
remove the burrs and paint the edges and areas around the edges using repair paint to prevent rusting.
▪ When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent damage.
a Knockout hole b Burr c Sealant etc.
7 Reattach the service cover. See "6.8.2 To close the outdoor
unit"on page20.
8 Connect an earth leakage circuit breaker and fuse to the power
supply line.
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
19

7 Commissioning

f
b
a
e
d
c
1
3
2
4

6.8 Finishing the outdoor unit installation

6.8.1 To finish the outdoor unit installation

1 Insulate and fix the refrigerant piping and interconnection cable
as follows:
a Gas pipe
b Gas pipe insulation
c Interconnection cable
d Liquid pipe
e Liquid pipe insulation
f Finishing tape
2 Install the service cover.

6.8.2 To close the outdoor unit

NOTICE
When closing the outdoor unit cover, make sure that the tightening torque does NOT exceed 4.1N•m.
3 Measure the insulation resistance again.
7 Commissioning

7.1 Overview: Commissioning

This chapter describes what you have to do and know to commission the system after it is installed.
Typical workflow
Commissioning typically consists of the following stages:
1 Checking the "Checklist before commissioning".
2 Performing a test run for the system.

7.2 Precautions when commissioning

INFORMATION
During the first running period of the unit, the required power may be higher than stated on the nameplate of the unit. This phenomenon is caused by the compressor, that needs a continuous run time of 50 hours before reaching smooth operation and stable power consumption.
NOTICE
Before starting up the system, the unit MUST be energised for at least 6hours. The crankcase heater needs to heat up the compressor oil to avoid oil shortage and compressor breakdown during startup.
NOTICE
NEVER operate the unit without thermistors and/or pressure sensors/switches. Burning of the compressor might result.
NOTICE
Do NOT operate the unit until the refrigerant piping is complete (when operated this way, the compressor will break).
NOTICE
Cooling operation mode. Perform the test run in cooling
operation mode so that stop valves failing to open can be detected. Even if the user interface was set to heating operation mode, the unit will run in cooling operation mode

6.8.3 To check the insulation resistance of the compressor

NOTICE
If, after installation, refrigerant accumulates in the compressor, the insulation resistance over the poles can drop, but if it is at least 1 MΩ, then the unit will not break down.
▪ Use a 500V mega-tester when measuring insulation.
▪ Do not use a mega-tester for low-voltage circuits.
1 Measure the insulation resistance over the poles.
If Then
≥1MΩ Insulation resistance is OK. This procedure
is finished.
<1MΩ Insulation resistance is not OK. Go to the
2 Turn ON the power and leave it on for 6hours.
Result: The compressor will heat up and evaporate any
refrigerant in the compressor.
Installer reference guide
next step.
20
during 2‑3 minutes (although the user interface will display the heating icon), and then automatically switch to heating operation mode.
NOTICE
If you cannot operate the unit in test run, see "7.5Error
codes when performing a test run"on page21.
WARNING
If the panels on the indoor units are not installed yet, make sure to power OFF the system after finishing the test run. To do so, turn OFF operation via the user interface. Do NOT stop operation by turning OFF the circuit breakers.

7.3 Checklist before commissioning

After the installation of the unit, first check the following items. Once all below checks are fulfilled, the unit MUST be closed, ONLY then can the unit be powered up.
You read the complete installation instructions, as described in the installer reference guide.
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04

8 Hand-over to the user

The indoor units are properly mounted.
In case a wireless user interface is used: The indoor unit decoration panel with infrared receiver is installed.
The outdoor unit is properly mounted.
The following field wiring has been carried out according to this document and the applicable legislation:
▪ Between the local supply panel and the outdoor unit
▪ Between the outdoor unit and the indoor unit
There are NO missing phases or reversed phases.
The system is properly earthed and the earth terminals are tightened.
The fuses or locally installed protection devices are installed according to this document, and have NOT been bypassed.
The power supply voltage matches the voltage on the identification label of the unit.
There are NO loose connections or damaged electrical components in the switchbox.
The insulation resistance of the compressor is OK.
There are NO damaged components or squeezed pipes on the inside of the indoor and outdoor units.
There are NO refrigerant leaks.
Error code Possible cause
Nothing displayed
(the currently set temperature is not displayed)
E3, E4 or L8 ▪ The stop valves are closed.
E7 There is a missing phase in case of three-
L4 The air inlet or air outlet is blocked.
U0 The stop valves are closed.
U2 ▪ There is a voltage imbalance.
U4 or UF The inter-unit branch wiring is not correct.
UA The outdoor and indoor unit are
▪ The wiring is disconnected or there is a
wiring error (between power supply and outdoor unit, between outdoor unit and indoor units, between indoor unit and user interface).
▪ The fuse on the outdoor unit PCB has
blown out.
▪ The air inlet or air outlet is blocked.
phase power supply units.
Note: Operation will be impossible. Turn OFF the power, recheck the wiring, and switch two of the three electrical wires.
▪ There is a missing phase in case of
three-phase power supply units. Note: Operation will be impossible. Turn OFF the power, recheck the wiring, and switch two of the three electrical wires.
incompatible.
The correct pipe size is installed and the pipes are properly insulated.
The stop valves (gas and liquid) on the outdoor unit are fully open.

7.4 To perform a test run

NOTICE
Do not interrupt the test run.
INFORMATION
In case you have to redo the test run, see the service manual.
1 Perform introductory steps.
# Action
1 Open the liquid stop valve and gas stop valve by
removing the cap and turning counterclockwise with a hex wrench until it stops.
2 Close the service cover to prevent electric shocks.
3 Turn ON power for at least 6hours before starting
operation to protect the compressor.
4 On the user interface, set the unit to cooling operation
mode.
2 On the user interface, turn ON the unit.
Result: The test run starts automatically. During the test run,
the H2P test LED is ON. When the test run is done, the LED turns OFF.

7.5 Error codes when performing a test run

If the installation of the outdoor unit has NOT been done correctly, the following error codes may be displayed on the user interface:
NOTICE
▪ The reversed phase protection detector of this product
only functions when the product starts up. Consequently reversed phase detection is not performed during normal operation of the product.
▪ The reversed phase protection detector is designed to
stop the product in the event of an abnormality when the product is started up.
▪ Replace 2 of the 3 phases (L1, L2, and L3) during
reverse-phase protection abnormality.
8 Hand-over to the user
Once the test run is finished and the unit operates properly, please make sure the following is clear for the user:
▪ Make sure that the user has the printed documentation and ask
him/her to keep it for future reference. Inform the user that he can find the complete documentation at the URL mentioned earlier in this manual.
▪ Explain the user how to properly operate the system and what to
do in case of problems.
▪ Show the user what to do for the maintenance of the unit.

9 Maintenance and service

NOTICE
Maintenance MUST be done by an authorized installer or service agent.
We recommend performing maintenance at least once a year. However, applicable legislation might require shorter maintenance intervals.
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
21

10 Troubleshooting

NOTICE
Applicable legislation on fluorinated greenhouse gases requires that the refrigerant charge of the unit is indicated both in weight and CO2 equivalent.
Formula to calculate the quantity in CO2 equivalent tonnes: GWP value of the refrigerant × total refrigerant
charge [in kg] / 1000

9.1 Overview: Maintenance and service

This chapter contains information about:
▪ Maintenance safety precautions
▪ The yearly maintenance of the outdoor unit

9.2 Maintenance safety precautions

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
NOTICE:Risk of electrostatic discharge
Before performing any maintenance or service work, touch a metal part of the unit in order to eliminate static electricity and to protect the PCB.

10.2 Precautions when troubleshooting

WARNING
▪ When carrying out an inspection on the switch box of
the unit, ALWAYS make sure that the unit is disconnected from the mains. Turn off the respective circuit breaker.
▪ When a safety device was activated, stop the unit and
find out why the safety device was activated before resetting it. NEVER shunt safety devices or change their values to a value other than the factory default setting. If you are unable to find the cause of the problem, call your dealer.
DANGER: RISK OF ELECTROCUTION
WARNING
Prevent hazards due to inadvertent resetting of the thermal cut-out: power to this appliance MUST NOT be supplied through an external switching device, such as a timer, or connected to a circuit that is regularly turned ON and OFF by the utility.
DANGER: RISK OF BURNING

11 Disposal

9.2.1 To prevent electrical hazards

When performing service to inverter equipment:
1 Do NOT open the electrical component box cover for
10minutes after turning off the power supply.
2 Measure the voltage between terminals on the terminal block
for power supply with a tester and confirm that the power supply is shut off. In addition, measure points as shown in the figure, with a tester and confirm that the voltage of the capacitor in the main circuit is less than 50VDC.

9.3 Checklist for yearly maintenance of the outdoor unit

Check the following at least once a year:
▪ Heat exchanger
The heat exchanger of the outdoor unit can get blocked up due to dust, dirt, leaves, etc. It is recommended to clean the heat exchanger yearly. A blocked heat exchanger can lead to too low pressure or too high pressure leading to worse performance.
10 Troubleshooting

10.1 Overview: Troubleshooting

In case of problems:
▪ See "7.5Error codes when performing a test run"on page21.
▪ See the service manual.
Before troubleshooting
Carry out a thorough visual inspection of the unit and look for obvious defects such as loose connections or defective wiring.
NOTICE
Do NOT try to dismantle the system yourself: dismantling of the system, treatment of the refrigerant, oil and other parts MUST comply with applicable legislation. Units MUST be treated at a specialised treatment facility for reuse, recycling and recovery.

11.1 Overview: Disposal

Typical workflow
Disposing of the system typically consists of the following stages:
1 Pumping down the system.
2 Bringing the system to a specialized treatment facility.
INFORMATION
For more details, see the service manual.

11.2 About pump down

The unit is equipped with an automatic pump down function, with which you can collect all refrigerant from the system into the outdoor unit.
NOTICE
The outdoor unit is equipped with a low pressure switch or a low pressure sensor to protect the compressor by turning it OFF. NEVER short-circuit the low pressure switch during pump down operation.
Installer reference guide
22
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04

11.3 To pump down

DANGER: RISK OF EXPLOSION
Pump down – Refrigerant leakage. If you want to pump
down the system, and there is a leak in the refrigerant circuit:
▪ Do NOT use the unit's automatic pump down function,
with which you can collect all refrigerant from the system into the outdoor unit. Possible consequence: Self-combustion and explosion of the compressor because of air going into the operating compressor.
▪ Use a separate recovery system so that the unit's
compressor does NOT have to operate.
1 Turn ON the main power supply switch.
2 Make sure the liquid stop valve and the gas stop valve are
open.
3 Press the pump down button (BS4) for at least 8seconds. BS4
is located on the PCB in the outdoor unit (see wiring diagram).
Result: The compressor and outdoor unit fan start automatically, and the indoor unit fan might start automatically.
4 ±2 minutes after the compressor started, close the liquid stop
valve. If it is not closed properly during compressor operation,
the system cannot be pumped down.
5 Once the compressor stops (after 2~5 minutes), close the gas
stop valve.
Result: The pump down operation is finished. The user
interface may display " " and the indoor pump may continue operating. This is NOT a malfunction. Even if you press the ON button on the user interface, the unit will NOT start. To restart the unit, turn OFF the main power supply switch and turn it ON again.
6 Turn OFF the main power supply switch.
11 Disposal
NOTICE
Make sure to reopen both stop valves before restarting the unit.
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
23

12 Technical data

1
1+2
1
A~E
a b c d e e
B
e
D
HBHDH
U
(mm)
a
b
c
d
e
e
B
e
D
A
B
C
D
E
H
B
H
U
H
D
B ≥100
A, B, C ≥100 ≥100 ≥100
B, E ≥100 ≥1000 ≤500
A, B, C, E ≥150 ≥150 ≥150 ≥1000 ≤500
D ≥500
D, E
≥1000 ≤500
≥500
≥500
B, D ≥100
B, D, E HB<HDHB≤½H
U
≥250 ≥750 ≥1000 ≤500
½HU<HB≤H
U
≥250 ≥1000 ≥1000 ≤500
HB>H
U
HB>H
D
HB<H
D
HB>H
D
HD≤½H
U
≥100 ≥1000 ≥1000 ≤500
½HU<HD≤H
U
≥200 ≥1000 ≥1000 ≤500
HD>H
U
H
U
a
b
≥100
≥100
c
d
e
e
B
e
D
A
B
C
D
E
H
B
H
D
A, B, C ≥200 ≥300 ≥1000
A, B, C, E ≥200 ≥300 ≥1000 ≥1000 ≤500
D ≥1000
D, E ≥1000 ≥1000 ≤500
B, D HD>H
U
≥300 ≥1000
HD≤½H
U
≥250 ≥1500
½HU<HD≤H
U
≥300 ≥1500
B, D, E HB<HDHB≤½H
U
≥300 ≥1000 ≥1000 ≤500
½HU<HB≤H
U
≥300 ≥1250 ≥1000 ≤500
HB>H
U
HB>HDHD≤½H
U
≥250 ≥1500 ≥1000 ≤500
½HU<HD≤H
U
≥300 ≥1500 ≥1000 ≤500
HD>H
U
12 Technical data
A subset of the latest technical data is available on the regional Daikin website (publicly accessible). The full set of latest technical data is available on the Daikin Business Portal (authentication required).

12.1 Overview: Technical data

This chapter contains information about:
• Service space
• Piping diagram
• Wiring diagram
• Information requirements for Eco Design

12.2 Service space: Outdoor unit

Suction side In the illustrations below, the service space at the suction side is based on 35°CDB and cooling operation. Foresee
more space in the following cases:
▪ When the suction side temperature regularly exceeds this temperature.
▪ When the heat load of the outdoor units is expected to regularly exceed the maximum operating capacity.
Discharge side Take refrigerant piping work into account when positioning the units. If your layout does not match with any of the
layouts below, contact your dealer.
Single unit ( ) | Single row of units ( )
A,B,C,D Obstacles (walls/baffle plates)
a,b,c,d,e Minimum service space between the unit and obstacles A, B, C, D and E
Installer reference guide
HUHeight of the unit
HB,HDHeight of obstacles B and D
24
E Obstacle (roof)
eBMaximum distance between the unit and the edge of obstacle E, in the direction of obstacle B eDMaximum distance between the unit and the edge of obstacle E, in the direction of obstacle D
1 Seal the bottom of the installation frame to prevent discharged air from flowing back to the suction side through the bottom of the unit. 2 Maximum two units can be installed.
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04
Not allowed
b (mm)
HB≤½H
U
b≥250
½HU<HB≤H
U
b≥300
HB>H
U
HBH
U
≥1000
≥200
≥2000
≥100
≥3000
≥600
≥1500
b
≥100
≥100
≥100
≥100
≥100
≥100
H
B
H
U
A1
B1
A2
B2
A2
≥1000
A2
≥300
≥100
≥100
≥100
≥300
≥100
≥100
B2
≥100
≥1000
B2
R2T
R4T
R6T
R1T
e
d
i
j
h
g
f
a
c
c
b
e
Y1E
Y1S
M1F-M2F
M1C
S1PL
S1PH
R5T
R3T
Multiple rows of units ( )
Stacked units (max. 2 levels) ( )
12 Technical data
A1=>A2 (A1) If there is danger of drainage dripping and freezing between the upper and lower units…
(A2) Then install a roof between the upper and lower units. Install the upper unit high enough above the lower unit to prevent ice buildup at the upper unit's bottom plate.
B1=>B2 (B1) If there is no danger of drainage dripping and freezing between the upper and lower units…
(B2) Then it is not required to install a roof, but seal the gap between the upper and lower units to prevent discharged air from flowing back to the suction side through the bottom of the unit.

12.3 Piping diagram: Outdoor unit

a Field piping (liquid: Ø9.5 flare connection) b Field piping (gas: Ø15.9 flare connection) c Stop valve (with service port 5/16") d Accumulator e Filter
f Heat exchanger g Internal service port 5/16" h Switch box cooling (only for AZQS_V1)
i Compressor accumulator
j Check valve (only for AZQS100 and AZQS125)
M1C Motor (compressor)
M1F‑M2F Motor (upper and lower fan)
R1T Thermistor (air) R2T Thermistor (discharge) R3T Thermistor (suction) R4T Thermistor (heat exchanger) R5T Thermistor (heat exchanger middle) R6T Thermistor (liquid)
S1PH High pressure switch
S1PL Low pressure switch (only for AZQS_V1)
Y1E Electronic expansion valve Y1S Solenoid valve (4‑way valve)
Heating Cooling
Installer reference guide
25
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
12 Technical data

12.4 Wiring diagram: Outdoor unit

The wiring diagram is delivered with the unit, located at the inside of the service cover.
Notes for AZQS_V1:
1 Symbols (see legend).
2 Colours (see legend).
3 This wiring diagram applies only to the outdoor unit.
4 Refer to the wiring diagram sticker (on the back of the service
cover) for how to use the BS1~BS4 and DS1 switches.
5 When operating, do not short-circuit protective devices S1PH
and S1PL.
6 Refer to the service manual for instructions on how to set the
selector switches (DS1). The factory setting of all switches is OFF.
7 Refer to the combination table and the option manual for how
to connect the wiring to X6A, X28A and X77A.
Notes for AZQS_Y1:
1 This wiring diagram applies only to the outdoor unit.
2 Refer to the combination table and the option manual for how
to connect the wiring to X6A, X28A and X77A.
3 Refer to the wiring diagram sticker (on the back of the service
cover) for how to use the BS1~BS4 and DS1 switches.
4 When operating, do not short-circuit protective device S1PH.
5 Refer to the service manual for instructions on how to set the
selector switches (DS1). The factory setting of all switches is OFF.
6 Only for 71 class.
Legend for wiring diagrams:
A1P~A2P Printed circuit board
BS1~BS4 Push button switch
C1~C3 Capacitor
DS1 DIP switch
E1H Bottom plate heater (option)
F1U~F8U
(AZQS100_V1)
F1U~F8U
(AZQS125+140_V1)
F1U~F8U
(AZQS_Y1)
H1P~H7P Light-emitting diode (service monitor is
HAP Light-emitting diode (service monitor is
K1M, K11M Magnetic contactor
K1R
(AZQS_V1)
K1R
(AZQS_Y1)
K2R
(AZQS100_V1)
▪ F1U, F2U: Fuse
▪ F6U: Fuse (T 3.15A / 250V)
▪ F7U, F8U: Fuse (F 1.0A / 250V)
▪ F1U~F4U: Fuse
▪ F6U: Fuse (T 5.0A / 250V)
▪ F7U, F8U: Fuse (F 1.0A / 250V)
▪ F1U, F2U: Fuse (31.5A / 250V)
▪ F1U (A2P): Fuse (T 5.0A / 250V)
▪ F3U~F6U: Fuse (T 6.3A / 250V)
▪ F7U, F8U: Fuse (F 1.0A / 250V)
orange)
green)
Magnetic relay (Y1S)
▪ K1R (A1P): Magnetic relay (Y1S)
▪ K1R (A2P): Magnetic relay
Magnetic relay
K2R
(AZQS_Y1)
K10R, K13R~K15R Magnetic relay
K4R Magnetic relay E1H (option)
L1R~L3R Reactor
M1C Motor (compressor)
M1F Motor (upper fan)
M2F Motor (lower fan)
PS Switching power supply
Q1DI Earth leakage circuit breaker (field
R1~R6 Resistor
R1T Thermistor (air)
R2T Thermistor (discharge)
R3T Thermistor (suction)
R4T Thermistor (heat exchanger)
R5T Thermistor (heat exchanger middle)
R6T Thermistor (liquid)
R7T
(AZQS125+140_V1)
R7T, R8T
(AZQS100_V1)
R10T
(AZQS_Y1)
RC Signal receiver circuit
S1PH High pressure switch
S1PL Low pressure switch
TC Signal transmission circuit
V1D~V4D Diode
V1R IGBT power module
V2R, V3R Diode module
V1T~V3T Insulated gate bipolar transistor (IGBT)
X6A Connector (option)
X1M Terminal strip
Y1E Electronic expansion valve
Y1S Solenoid valve (4‑way valve)
Z1C~Z6C Noise filter (ferrite core)
Z1F~Z6F Noise filter
Symbols:
L Live
N Neutral
Field wiring
Terminal strip
Connector
Relay connector
Connection
Protective earth
Noiseless earth
Terminal
Option
Colours:
BLK Black
BLU Blue
▪ K2R (A1P): Magnetic relay (E1H
option)
▪ K2R (A2P): Magnetic relay
supply)
Thermistor (fin)
Thermistor (Positive Temperature Coefficient)
Thermistor (fin)
Installer reference guide
26
AZQS100~140B8V1B + AZQS100~140B7Y1B
Split system air conditioners
4P385529-1C – 2019.04

13 Glossary

BRN Brown
GRN Green
ORG Orange
RED Red
WHT White
YLW Yellow

12.5 Information requirements for Eco Design

Follow the steps below to consult the Energy Label – Lot 21 data of the unit and outdoor/indoor combinations.
1 Open the following webpage: https://energylabel.daikin.eu/
2 To continue, choose:
▪ "Continue to Europe" for the international website. ▪ "Other country" for a country related site.
Result: You are directed to the "Seasonal efficiency" webpage.
3 Under "Eco Design – Ener LOT21", click "Generate your data".
Result: You are directed to the "Seasonal efficiency (LOT21)"
webpage.
4 Follow the instructions on the webpage to select the correct
unit.
Result: When the selection is done, the LOT 21 datasheet can be viewed as a PDF or a HTML webpage.
INFORMATION
Other documents (e.g. manuals, ...) can also be consulted from the resulting webpage.
Accessories
Labels, manuals, information sheets and equipment that are delivered with the product and that need to be installed according to the instructions in the accompanying documentation.
Optional equipment
Equipment made or approved by Daikin that can be combined with the product according to the instructions in the accompanying documentation.
Field supply
Equipment NOT made by Daikin that can be combined with the product according to the instructions in the accompanying documentation.
13 Glossary
Dealer
Sales distributor for the product.
Authorised installer
Technical skilled person who is qualified to install the product.
User
Person who is owner of the product and/or operates the product.
Applicable legislation
All international, European, national and local directives, laws, regulations and/or codes that are relevant and applicable for a certain product or domain.
Service company
Qualified company which can perform or coordinate the required service to the product.
Installation manual
Instruction manual specified for a certain product or application, explaining how to install, configure and maintain it.
Operation manual
Instruction manual specified for a certain product or application, explaining how to operate it.
Maintenance instructions
Instruction manual specified for a certain product or application, which explains (if relevant) how to install, configure, operate and/or maintain the product or application.
AZQS100~140B8V1B + AZQS100~140B7Y1B Split system air conditioners 4P385529-1C – 2019.04
Installer reference guide
27
4P385529-1C 2019.04
Copyright 2014 Daikin
Loading...